Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Concept Study: Exploration and Production in Environmentally Sensitive Arctic Areas

The Alaska North Slope offers one of the best prospects for increasing U.S. domestic oil and gas production. However, this region faces some of the greatest environmental and logistical challenges to oil and gas production in the world. A number of studies have shown that weather patterns in this region are warming, and the number of days the tundra surface is adequately frozen for tundra travel each year has declined. Operators are not allowed to explore in undeveloped areas until the tundra is sufficiently frozen and adequate snow cover is present. Spring breakup then forces rapid evacuation of the area prior to snowmelt. Using the best available methods, exploration in remote arctic areas can take up to three years to identify a commercial discovery, and then years to build the infrastructure to develop and produce. This makes new exploration costly. It also increases the costs of maintaining field infrastructure, pipeline inspections, and environmental restoration efforts. New technologies are needed, or oil and gas resources may never be developed outside limited exploration stepouts from existing infrastructure. Industry has identified certain low-impact technologies suitable for operations, and has made improvements to reduce the footprint and impact on the environment. Additional improvements are needed for exploration and economic field development and end-of-field restoration. One operator-Anadarko Petroleum Corporation-built a prototype platform for drilling wells in the Arctic that is elevated, modular, and mobile. The system was tested while drilling one of the first hydrate exploration wells in Alaska during 2003-2004. This technology was identified as a potentially enabling technology by the ongoing Joint Industry Program (JIP) Environmentally Friendly Drilling (EFD) program. The EFD is headed by Texas A&M University and the Houston Advanced Research Center (HARC), and is co-funded by the National Energy Technology Laboratory (NETL). The EFD participants believe that the platform concept could have far-reaching applications in the Arctic as a drilling and production platform, as originally intended, and as a possible staging area. The overall objective of this project was to document various potential applications, locations, and conceptual designs for the inland platform serving oil and gas operations on the Alaska North Slope. The University of Alaska Fairbanks assisted the HARC/TerraPlatforms team with the characterization of potential resource areas, geotechnical conditions associated with continuous permafrost terrain, and the potential end-user evaluation process. The team discussed the various potential applications with industry, governmental agencies, and environmental organizations. The benefits and concerns associated with industry's use of the technology were identified. In this discussion process, meetings were held with five operating companies (22 people), including asset team leaders, drilling managers, HSE managers, and production and completion managers. Three other operating companies and two service companies were contacted by phone to discuss the project. A questionnaire was distributed and responses were provided, which will be included in the report. Meetings were also held with State of Alaska Department of Natural Resources officials and U.S. Bureau of Land Management regulators. The companies met with included ConcoPhillips, Chevron, Pioneer Natural Resources, Fairweather E&P, BP America, and the Alaska Oil and Gas Association.

02 PETROLEUM↗

EnergyPlus Graphical User Interface

LBNL, Infosys Technologies and Digital Alchemy are developing a free, comprehensive graphical user interface (GUI) that will enable EnergyPlus to be used more easily and effectively by building designers and other professionals, facilitating its widespread adoption. User requirements have been defined through a series of practitioner workshops. A new schematic editor for HVAC systems will be combined with different building envelope geometry generation tools and IFC-based BIM import and export. LBNL and Digital Alchemy have generated a detailed function requirements specification, which is being implemented in software by Infosys, LBNL and and Digital Alchemy. LBNL and practitioner subcontractors will develop a comprehensive set of templates and libraries and will perform extensive testing of the GUI before it is released in Q3 2011. It is planned to use an Open Platfom approach, in which a comprehensive set of well documented Application Programming Interfaces (API's) would be provided to facilitate both the development of third party contributions to the official, standard GUI and the development of derivative works.

Source record↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Large Concrete Samples

Materials issues are a key concern for the existing nuclear reactor fleet as material degradation can lead to increased maintenance, increased downtime, and increased risk. Extending reactor life to 60 years and beyond will likely increase susceptibility and severity of known forms of degradation. Additionally, new mechanisms of materials degradation are also possible. The purpose of the U.S. Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of nuclear power plants beyond 60 years. The intent of this LWRS Concrete nondestructive evaluation (NDE) roadmap is to define Research & Development (R&D) actions to address gaps between available NDE concrete techniques and the technology needed to make quantitative measurements to determine the durability and performance of concrete structures on our current nuclear power plant (NPP) fleet. A multitude of concrete-based structures are typically part of a light water reactor (LWR) plant to provide foundation, support, shielding, and containment functions. Concrete has been used in the construction of NPPs because of three primary properties: its inexpensiveness, its structural strength, and its ability to shield radiation. Examples of concrete structures important to the safety of LWR plants include containment building, spent fuel pool, and cooling towers. This use has made its long-term performance crucial for the safe operation of commercial NPPs. With respect to the concrete structures, age-related degradation may affect engineering properties, structural resistance/capacity, failure mode, and location of failure initiation that in turn may affect the ability of a structure to withstand challenges in service. In order to ensure the safe operation of NPPs, it is essential that the effects of potential degradation of the plant structures, as well as systems and components, be assessed and managed during both the current operating license period as well as subsequent license renewal periods. In contrast to many mechanical and electrical components, replacement of many concrete structures is impractical. Therefore it is necessary that safety issues related to plant aging and continued service of the concrete structures are resolved through sound scientific and engineering understanding.

concrete↗

Decentralized and mobile biomass torrefaction to upgrade the biomass supply chain

As part of the Cyclotron Road program, Takachar seeks to investigate the scaling laws and behaviors of a small-scale biomass torrefaction reactor design and its technoeconomic feasibility in various potential applications. Traditionally, biomass is logistically expensive and complicated to utilize in various energy and chemical industries, because it is often loose, wet, bulky, and present in small pockets in dispersed regions. Biomass torrefaction is an approach whereby raw biomass is subject to moderate heat, releasing low-energy molecules. The resultant torrefied biomass becomes energy and volume dense, which reduces the relative transportation cost, and in many cases can even support a local value chain that would otherwise not be possible. However, conventional biomass torrefaction systems are often large-scale, centralized in design, rending them difficult to deploy in many biomass applications in rural/decentralized regions. By building upon prior research at Massachusetts Institute of Technology (MIT), the concept of small-scale, low-cost, and portable biomass torrefaction units was explored further. This investigation has led to the advancement and scale-up of the MIT technology which can be deployed to a much wider spectrum of the biomass market than the conventional technologies.

09 BIOMASS FUELS↗

Nuclear Forensics

Nuclear forensics is a key part of the nuclear security strategy for the United States and the international community. The NACS Division is central to the leadership role that LLNL has had in nuclear forensics over the past 25 years. Our current nuclear forensic program includes conducting R&D on provenance and attribution signatures, collaborating with international partners, training the next generation of nuclear forensic experts, developing test materials for verification and validation exercises, and providing expert advice to national and international policy makers. Key to our success in these areas has been the strong and continuing involvement in nuclear forensic casework obtained through law enforcement and intelligence channels as well as our outstanding analytical capabilities. NACS must continue to conduct forward-thinking R&D in nuclear forensics that supports operational programs and addresses intelligence gaps. To maintain leadership in nuclear forensics, we must attract, develop, and retain the best talent. The NNSA has a central leadership role in developing educational initiatives for nuclear forensics. In concert with the Glenn T. Seaborg Institute, the NACS Division will continue to participate in all nuclear forensic educational initiatives (undergraduate, graduate, postdoctoral) and incorporate LLNL’s D&I vision into its student and postdoc recruitment efforts. We will continue to build formal relationships with key academic partners and institutions with active and emerging nuclear forensic research interests. We will also strengthen relationships with NNSA DNN and SSAA funded university consortia (e.g. NSSC, ACE, CNEC, CVT, ETI, MTV), helping them conduct research of interest and relevance to nuclear forensics, while at the same time evaluating and recruiting promising talent from these programs.

07 ISOTOPE AND RADIATION SOURCES↗

Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of value to UCD are possible using this approach. First, optimal investment choices for buildings under the two alternative objectives can be derived. Second, a week-ahead building operations forecaster has been written that executes DER-CAM to find an optimal operating schedule for buildings given their expected building energy services requirements, electricity prices, and local weather. As part of its matching contribution, OSIsoft provided a full implementation of PI and a server to install it on at Berkeley Lab. Using the PItoPI protocol, this gives Berkeley Lab researchers direct access to UCD's PI data base. However, this arrangement is in itself inadequate for performing optimizations. Additional data not included in UCD's PI database would be needed and the campus was not able to provide this information. This report details the process, results, and lessons learned of this commercialization project.

25 ENERGY STORAGE↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

Materials Science of the Interstitial Doping Process

Particle accelerators are an increasingly important tool for frontier science. Growing initial and operating costs are a significant barrier for upgrades and for new machines. While everything matters, the major cost contributor is the SRF cavities and their ancillary facilities (e.g., cryoplant). Accordingly, the accelerator science community devotes much R&D effort to improving their energy efficiency (increased Q o ) and gradient (E acc ). While improved gradient is at the forefront for certain machines (ILC), improved quality factor has broader impact, benefitting all SRF applications. An important opportunity for accelerator science and technology to move forward arose in the course of building the LCLS-II, the second generation Linac Coherent Light Source at SLAC. At more or less the same time, researchers at Fermilab discovered that introducing a small amount of nitrogen to the niobium surface could improve the mid-range quality factor as much as three-fold. A firm resolution of how nitrogen confers its benefit attracts much current research interest. The key elements of the “nitrogen doping” process were vacuum bake at 800 °C, brief exposure to mTorr of nitrogen at several hundred degrees followed by electropolish (EP) to remove several microns from the surface to eliminate unwanted nitrides: While the process as a whole was novel, the comprising unit operations are familiar to the accelerator community. It was judged reasonable to adopt it as a cost-reduction technology for LCLS-II. Researchers carried out a program of varying process parameters and measuring performance in single-cell cavities, leading to a consensus stable protocol for the project. The transition to vendor fabrication and multiple niobium sources has presented unforeseen challenges of performance variation evidently not connected to anything that could be incorporated in a purchase specification. Moving beyond the high temperature N-doping process above, researchers reported a simplified process consisting entirely of tens of hours anneal in a N atmosphere at low temperatures (~120°C – 160°C) after 800 °C UHV bake. These processes typically yield a few-nm doped layer while the high temperature process yields at least a few to many micron doped layer. Even more recently, oxygen has been used to dope instead of nitrogen which leaves a few-µm O-alloyed layer upon vacuum annealing for 300 °C for ~3 hours. The investigation of these materials is just beginning, but the process simplification they may offer is surely attractive. The very low quantity of material that appears to be significant in the “infusion” process indicates the need for very careful control of gas species available for diffusion into the surface during low temperature treatment, both for process control and research to characterize the underlying dynamics. Oxygen alloying offers the further opportunity to utilize the decomposition of the surface native oxide as the dopant source. It is necessary to understand and (thus) manage this process. We have been supported by the Department of Energy Offices of High Energy Physics and Nuclear Physics to pursue this goal.

36 MATERIALS SCIENCE↗

An Innovative Technique for Evaluating the Integrity and Durability of Wind Turbine Blade Composites - Final Project Report

To build increasingly larger, lightweight, and robust wind turbine blades for improved power output and cost efficiency, durability of the blade, largely resulting from its structural composites selection and aerodynamic shape design, is of paramount concern. The safe/reliable operation of structural components depends critically on the selection of materials that are resistant to damage and failure in the expected service environment. An effective surveillance program is also necessary to monitor the degradation of the materials in the course of service. Composite materials having high specific strength/stiffness are desirable for the construction of wind turbines. However, most high-strength materials tend to exhibit low fracture toughness. That is why the fracture toughness of the composite materials under consideration for the manufacture of the next generation of wind turbines deserves special attention. In order to achieve the above we have proposed to develop an innovative technology, based on spiral notch torsion test (SNTT) methodology, to effectively investigate the material performance of turbine blade composites. SNTT approach was successfully demonstrated and extended to both epoxy and glass fiber composite materials for wind turbine blades during the performance period. In addition to typical Mode I failure mechanism, the mixed-mode failure mechanism induced by the wind turbine service environments and/or the material mismatch of the composite materials was also effectively investigated using SNTT approach. The SNTT results indicate that the proposed protocol not only provides significant advance in understanding the composite failure mechanism, but also can be readily utilized to assist the development of new turbine blade composites.

17 WIND ENERGY↗

Advanced Electric Systems and Aerodynamics for Efficiency Improvements in Heavy Duty Trucks

The Advanced Electric Systems and Aerodynamics for Efficiency Improvements in Heavy Duty Trucks program (DE-FC26-04NT42189), commonly referred to as the AES program, focused on areas that will primarily benefit fuel economy and improve heat rejection while driving over the road. The AES program objectives were to: (1) Analyze, design, build, and test a cooling system that provided a minimum of 10 percent greater heat rejection in the same frontal area with no increase in parasitic fan load. (2) Realize fuel savings with advanced power management and acceleration assist by utilizing an integrated starter/generator (ISG) and energy storage devices. (3) Quantify the effect of aerodynamic drag due to the frontal shape mandated by the area required for the cooling system. The program effort consisted of modeling and designing components for optimum fuel efficiency, completing fabrication of necessary components, integrating these components into the chassis test bed, completing controls programming, and performance testing the system both on a chassis dynamometer and on the road. Emission control measures for heavy-duty engines have resulted in increased engine heat loads, thus introducing added parasitic engine cooling loads. Truck electrification, in the form of thermal management, offers technological solutions to mitigate or even neutralize the effects of this trend. Thermal control offers opportunities to avoid increases in cooling system frontal area and forestall reduced fuel economy brought about by additional aerodynamic vehicle drag. This project explored such thermal concepts by installing a 2007 engine that is compliant with current regulations and bears additional heat rejection associated with meeting these regulations. This newer engine replaced the 2002 engine from a previous project that generated less heat rejection. Advanced power management, utilizing a continuously optimized and controlled power flow between electric components, can offer additional fuel economy benefits to the heavy-duty trucking industry. Control software for power management brings added value to the power distribution and energy storage architecture on board a truck with electric accessories and an ISG. The research team has built upon a previous truck electrification project, formally, 'Parasitic Energy Loss Reduction and Enabling Technologies for Class 7/8 Trucks', DE-FC04-2000AL6701, where the fundamental concept of electrically-driven accessories replacing belt/gear-driven accessories was demonstrated on a Kenworth T2000 truck chassis. The electrical accessories, shown in Figure 1, were controlled to provide 'flow on demand' variable-speed operation and reduced parasitic engine loads for increased fuel economy. These accessories also provided solutions for main engine idle reduction in long haul trucks. The components and systems of the current project have been integrated into the same Kenworth T2000 truck platform. Reducing parasitic engine loading by decoupling accessory loads from the engine and driving them electrically has been a central concept of this project. Belt or gear-driven engine accessories, such as water pump, air conditioning compressor, or air compressor, are necessarily tied to the engine speed dictated by the current vehicle operating conditions. These conventional accessory pumps are sized to provide adequate flow or pressure at low idle or peak torque speeds, resulting in excess flow or pressure at cruising or rated speeds. The excess flow is diverted through a pressure-minimizing device such as a relief valve thereby expending energy to drive unnecessary and inefficient pump operation. This inefficiency causes an increased parasitic load to the engine, which leads to a loss of usable output power and decreased fuel economy. Controlling variable-speed electric motors to provide only the required flow or pressure of a particular accessory system can yield significant increases in fuel economy for a commercial vehicle. Motor loads at relatively high power levels (1-5 kW, or higher) can be efficiently provided current from high-efficiency generators or batteries with system voltages in the range of 250 to 360 volts DC (VDC). In the previous project, the electric accessories could be powered from one of three sources: an AC voltage source ('shore power'), an on-board diesel generator (auxiliary power unit), or an ISG located in the flywheel housing and driven by the main engine. The electric accessories and power sources, including the ISG, have remained in place for the current upgrade of the research platform vehicle. In this project, more emphasis has been placed on determining the best way to use the ISG to power the vehicle and accessories, thereby yielding additional value from existing hardware.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Radiation Control on Uzbekistan Borders - Results and Perspectives

The measures and actions on prevention, detection and response to criminal or unauthorized acts involving radioactive materials in Uzbekistan are presented. In frames of program of radiation monitoring to prevent illicit trafficking of nuclear and radioactive materials main customs border checkpoints were equipped with commercial radiation portal monitors. Special radiation monitors elaborated and manufactured in INP AS RU are installed in INP(main gates, research reactor and laboratory building) to provide nuclear security of Institute facilities. The experience of Uzbekistan in establishing radiation monitoring systems on its borders, their operation and maintenance would be useful for realization of proposed plan of strengthening measures to prevent illicit trafficking in Republics of Central Asia region.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford nuclear reservation. Workers had to pass through metal detectors when they arrived at the plant and materials leaving the plant had to be scanned for security reasons. Whereas other high-security nuclear materials were shipped from the PFP to Savannah River, S.C. as part ofa Department of Energy (DOE) program to consolidate weapons-grade plutonium, it was determined that the SIF should remain onsite pending disposition to a national repository. Nevertheless, the SIF still requires a high level of security that the PFP complex has always provided. With the 60-year PFP mission of producing and storing plutonium concluded, the environmental cleanup plans for Hanford call for the demolition of the 63-building PFP complex. Consequently, if the SIF remained at PFP it not only would have interfered with the environmental cleanup plans, but would have required $100 million in facility upgrades to meet increased national security requirements imposed after the 9/11 terrorist attacks. A new smaller and more cost-effective area was needed to store this material, which led to the SIF Project. Once the SIF project was successfully completed and the SIF was safely removed from PFP, the existing Protected Area at PFP could be removed, and demolition could proceed more quickly without being encumbered by restrictive security requirements that an active Protected Area requires. The lightened PFP security level brought by safely removing and storing the SIF would also yield lowered costs for deactivation and demolition, as well as reduce overall life-cycle costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

China's Pathways to Achieving 40% ~ 45% Reduction in CO{sub 2} Emissions per Unit of GDP in 2020: Sectoral Outlook and Assessment of Savings Potential

Achieving China’s goal of reducing its carbon intensity (CO{sub 2} per unit of GDP) by 40% to 45% percent below 2005 levels by 2020 will require the strengthening and expansion of energy efficiency policies across the buildings, industries and transport sectors. This study uses a bottom-up, end-use model and two scenarios -- an enhanced energy efficiency (E3) scenario and an alternative maximum technically feasible energy efficiency improvement (Max Tech) scenario – to evaluate what policies and technical improvements are needed to achieve the 2020 carbon intensity reduction target. The findings from this study show that a determined approach by China can lead to the achievement of its 2020 goal. In particular, with full success in deepening its energy efficiency policies and programs but following the same general approach used during the 11th Five Year Plan, it is possible to achieve 49% reduction in CO{sub 2} emissions per unit of GDP (CO{sub 2} emissions intensity) in 2020 from 2005 levels (E3 case). Under the more optimistic but feasible assumptions of development and penetration of advanced energy efficiency technology (Max Tech case), China could achieve a 56% reduction in CO{sub 2} emissions intensity in 2020 relative to 2005 with cumulative reduction of energy use by 2700 Mtce and of CO{sub 2} emissions of 8107 Mt CO{sub 2} between 2010 and 2020. Energy savings and CO{sub 2} mitigation potential varies by sector but most of the energy savings potential is found in energy-intensive industry. At the same time, electricity savings and the associated emissions reduction are magnified by increasing renewable generation and improving coal generation efficiency, underscoring the dual importance of end-use efficiency improvements and power sector decarbonization.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of Exciton Delocalization and Exciton Coherence in Chromophores and Acoustic Nanostructures

Quantum materials have a rich potential for providing transformative energy technologies ranging from new energy efficient computation paradigms to lossless energy transport across the national grid. The field of quantum materials, however, is still in its infancy with many quantum materials systems requiring cyrogenic temperatures to be viable. Few viable, room-temperature quantum materials systems have been identified; therefore, identifying additional such systems is vitally important. This state of the science combined with the low number of potential systems that exhibit room-temperature quantum character make this field of research fertile ground for EPSCoR states (states eligible for funding under the Established Program to Stimulate Competitive Research program) such as Idaho to compete on a national level. As a result, this project proposed and accomplished two main goals in advancing two room-temperature quantum materials systems: (1) advance the science for demonstrating room temperature exciton delocalization in two excitonic systems and (2) build capacity and expertise in developing and understanding quantum materials at both Boise State University and Idaho National Laboratory. The work at Boise State focused mainly on the use of nucleic acid self-assembled chromophore molecule networks that offer a much easier and mature approach to construct aggregates of chromophores that can be tailored to specific two-dimensional and three-dimensional geometries and allow exciton manipulation towards achieving room-temperature quantum computation. A second complementary effort performed at Boise State and INL focused on confining excitons on quantum length scales using coherent surface acoustic phonons

36 MATERIALS SCIENCE↗

The added economic and environmental value of plug-in electric vehicles connected to commercial building microgrids

Connection of electric storage technologies to smartgrids or microgrids will have substantial implications for building energy systems. In addition to potentially supplying ancillary services directly to the traditional centralized grid (or macrogrid), local storage will enable demand response. As an economically attractive option, mobile storage devices such as plug-in electric vehicles (EVs) are in direct competition with conventional stationary sources and storage at the building. In general, it is assumed that they can improve the financial as well as environmental attractiveness of renewable and fossil based on-site generation (e.g. PV, fuel cells, or microturbines operating with or without combined heat and power). Also, mobile storage can directly contribute to tariff driven demand response in commercial buildings. In order to examine the impact of mobile storage on building energy costs and carbon dioxide (CO2) emissions, a microgrid/distributed-energy-resources (DER) adoption problem is formulated as a mixed-integer linear program with minimization of annual building energy costs applying CO2 taxes/CO2 pricing schemes. The problem is solved for a representative office building in the San Francisco Bay Area in 2020. By using employees' EVs for energy management, the office building can arbitrage its costs. But since the car battery lifetime is reduced, a business model that also reimburses car owners for the degradation will be required. In general, the link between a microgrid and an electric vehicle can create a win-win situation, wherein the microgrid can reduce utility costs by load shifting while the electric vehicle owner receives revenue that partially offsets his/her expensive mobile storage investment. For the California office building with EVs connected under a business model that distributes benefits, it is found that the economic impact is very limited relative to the costs of mobile storage for the site analyzed, i.e. cost reductions from electric vehicle connections are modest. Nonetheless, this example shows that some economic benefit is created because of avoided demand charges and on-peak energy. The strategy adopted by the office building is to avoid these high on-peak costs by using energy from the mobile storage in the business hours. CO2 emission reduction strategy results indicate that EVs' contribution at the selected office building are minor.

25 ENERGY STORAGE↗

Wyandotte Neighborhood Stabilization Program: Retrofit of Two Homes

The Wyandotte NSP2 project aims to build 20 new houses and retrofit 20 existing houses in Wyandotte, MI. Wyandotte is part of a Michigan State Housing Development Authority-led consortium that is funded by HUD under the NSP2 program. The City of Wyandotte has also been awarded DOE EE&CBG funds that are being used to develop a district ground source heat pump (GSHP) system to service the project. This report details the retrofit of two existing houses in the program, and examines the energy efficiency recommendations for the homes. The report will be of interest to anyone planning an affordable, high performance retrofit of an existing home in a cold climate zone. Information from this report will also be useful to retrofit or weatherization program staff as some of the proposed retrofit solutions will apply to a wide range of projects. Preliminary results from the first complete house suggest that the technology package employed (which includes spray foam insulation and insulating sheathing) does meet the specific whole house water, air, and thermal control requirements, as well as, the project’s affordability goals. Monitoring of the GSHP system has been recommended and analysis of this information is not yet available.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗