Individuals Who Build Solutions Across Boundaries for Environmental Remediation and Nuclear Waste Disposal - 16204

This paper profiles individuals who shifted from developing solutions primarily from within one organization to across multiple organizations for decisions requiring input from multiple parties. These individuals are engineers and scientists who work as government employees or government contractors. This paper contains six areas of discussion: 1. Why individuals build solutions across organizational boundaries, 2. The results they achieve, 3. Supporting skills and personal characteristics, 4. Means to build solutions across boundaries, 5. How they enlist others to participate, and 6. The importance of a catalyst. This paper is based on three sources of information. The primary source are interviews with nine engineers and scientists with direct experience building solutions across organizational boundaries in the fields of environmental remediation or nuclear energy/waste management and disposal. The second source are selected research studies. The third source is the author's experience both as a government employee and a consultant. The author's hope is that this paper will strengthen people's desire and ability to engage multiple parties in decisions requiring their input. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Demonstration - San Onofre Nuclear Generating Station South Yard Facility - 16544

Following the decision to retire Units 2 and 3 at the San Onofre Nuclear Generating Station (SONGS), Southern California Edison (SCE) staffed a multi-discipline team to investigate decommissioning best practices. SCE also tasked this team with reducing the overall radiological footprint and radioactive material inventory in the near term. The SCE decommissioning activities investigation team targeted projects at the facility which could reduce the source term and risk, and investigate management approaches with decommissioning contractors. SCE, through this team, contracted EnergySolutions to provide a solution for processing and disposal of equipment and materials at a storage facility south of the plant. The South Yard Facility included offices, instrument repair facilities, a large machine shop, outage equipment storage, waste management facilities, and decontamination facilities. SCE contracted EnergySolutions to manage, supervise, plan, and provide labor for the disposition of the legacy waste stored at the South Yard to include the Radioactive Equipment/Materials Storage (REMS) Pad and South Yard Facility. Under the Contractor Work Authorization (CWA), SCE authorized EnergySolutions to consolidate, package, transport, and dispose of the Low Level Radioactive Waste (Class A) and Mixed Low Level Radioactive Waste from the aforementioned areas. The scope also included disposition of material that was expected to be free from radiological contamination, but required management as a hazardous waste. The legacy waste consisted of an inventory of containers designated as trash provided by SCE, as well as, all materials stored within the rooms of the SYF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Frozen Soil Barrier to Control Groundwater Inflow into Damaged Reactors at the Fukushima Daiichi Nuclear Power Station - 16613

Reactor buildings and support facilities at the Fukushima Daiichi Nuclear Power Station (F1 Site) were damaged by a March 2011 tsunami. In response, the Tokyo Electric Power Company (TEPCO) is implementing a number of countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of environmental protection. In general, the strategy represents an example of a 'defense in depth' concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area, reduce the amount of water entering damaged reactors, and reduce the resulting volume of contaminated water that requires treatment and storage. The frozen soil barrier was designed and installed by a team from TEPCO and Kajima Corporation. A group of scientists and engineers from US Department of Energy National Laboratories provided independent evaluation of the frozen barrier design and operational plans along with technical recommendations to the TEPCO team. The frozen soil barrier design extends to about 30 m depth; the bottom of the barrier is in a low permeability interval, and the total barrier length around the reactors is just over 1.5 km. The barrier required 1927 total boreholes: 1568 for freeze pipes plus 359 for temperature monitoring arrays. Drilling of all of the boreholes was completed November 9, 2015. Construction of the refrigeration plant is complete and all of the above ground piping/manifolds are in the final stages of construction. The DOE laboratory independent assessment of the frozen soil barrier concluded that the technical characteristics of a frozen barrier are relatively well suited to Fukushima-specific hydrogeologic conditions and the need for reducing the inflow of water into damaged reactors at the F1 Site. The scale of the Fukushima barrier is bounded by industry experience and the equipment and infrastructure proposed for the ground freezing is well understood. The on-site pilot test at Fukushima indicated predictable ground freezing and supported the full scale design parameters. These factors increase the confidence in the frozen soil barrier project underway at Fukushima. TEPCO is currently working with the Japanese Nuclear Regulatory Authority (NRA), providing operational plans/strategies for the frozen soil barrier and modeling results of the projected performance. Full scale frozen soil barrier operations are to begin after authorization from NRA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ATALANTE research facility-implementation of a rule of fractions for the management of reflecting materials in mass-limited units

ATALANTE, a research unit located in Marcoule, is one of the main Nuclear Facilities of the French CEA. As concerns criticality risk prevention, this facility is divided into work units mostly managed through a mass control mode. The authorized limit is 350 g of fissile material with {sup 239}Pu-H{sub 2}O as reference fissile medium. This mass limit was determined considering a reflection by 20 cm of water. Under these conditions, some neutronic reflectors which are more efficient than water can only be authorized in limited quantities. In ATALANTE the reflecting materials identified as requiring a specific form of management are lead, uranium ({sup 235}U/U{sub total} = 1%), graphite, heavy water and beryllium. Initially a maximum permissible mass was determined for each of these materials taken separately. However, this method requires that when different reflectors are present simultaneously, the sum of the masses of all these reflectors must be less than the limit specified for the most penalizing of them. This rule has proved to be too restrictive for the operators. A new rule has therefore been implemented: the rule of fractions. Criticality calculations were performed to demonstrate that this rule is acceptable. The geometric configurations studied involved a sphere of 350 g of {sup 239}Pu moderated by water and reflected by various masses of 2 to 6 reflectors (successions of concentric shells), followed by 20 cm of water. It was concluded that compliance with the new rule makes it possible to ensure criticality safety in the simultaneous presence of different reflectors. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A New Safeguards Technique for Spent Fuel Verification in Dry Storage by Using He-4 Detectors - 18262

It is demanded to find key issues and critical paths for verifying and monitoring a spent nuclear fuel cask or storage with a purpose of non-proliferation of nuclear weapon. However, unfortunately there are no reliable methods to verify the containment in a spent nuclear fuel cask or storage. Therefore, research and development (R and D) has been continuously required to develop new and alternative technologies for searching and verifying undeclared nuclear materials, activities, and facilities. Therefore, the present authors have developed a new safeguards technique of passively scanning a spent fuel cask or storage using pressurized He-4 scintillation neutron detectors. A new approach is to quickly verify content in a spent nuclear fuel cask or presence of all special nuclear materials in unknown packages by comparing experimental and computational results. For that, the present authors have developed a new algorithm and user-interface coupled ORIGEN-ARP and MCNP codes, and the prototype safeguards apparatus employing the array of He-4 fast neutron detectors has been designed, built, and tested. The feasibility test of this new apparatus has been performed with Cf-252 neutron sources and the laboratory scale model cask, minimized by a factor of ten compared to the actual dimension of a KN-21 cask. This technique has several advantages over current methods based on neutron and gamma detection; (1) incident neutron energy information is preserved, (2) disturbance of gamma-ray is excellently rejected (discriminated), and (3) much higher neutron counts and operational cost and space-effectiveness are expected since no moderator is required for fast neutrons. The final goal of this study will (1) conduct a prototype instrument and employ it to monitor a nuclear spent fuel cask or storage at a commercial nuclear power reactor facilities, (2) use spectral-specific measurement data to show proof of concept for measurable data successfully converted to quantifiable signatures, such as diversion/removal of fuel, and maintenance of fuel and cask integrity of fuel, and (3) develop a cask imaging capability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Case Study - Benefits and Lessons Learned from Implementation of a Modern Data Solution at Maywood - 18399

This paper focuses on data production and management practices dating back to 1999 that continue to evolve to support the project today. In 2000, the FUSRAP Maywood Project began using a software environmental data management system and laboratory information management system, developed by a single database administrator (DA) and authored in Microsoft Access{sup TM} (MS Access). The original databases included basic functionality including sample number assignment and label generation, tracking of LIMS gamma spec QC and assignment of basic qualifiers and basic database queries. The DA continued over the next fifteen years to refine the EDMS/LIMS by integrating project-specific data evaluation guidance document processes and Quality Assurance/Quality Control (QA/QC) charting and excursion warning tools. With the retirement of the original DA, the U.S. Army Corps of Engineers (USACE)-Cabrera Team procured and implemented a commercial-leaning solution using modern database tools and an established EDMS vendor. For the database transition process, the project team established and configured the new EDMS/LIMS with basic architecture and accessibility; evaluated existing workflows; established/revised LIMS and EDMS-related documentation (manuals and procedures); and conducted dry runs and validation testing. The overall team coordinated closely to facilitate a seamless transition from initial assessment and authoring, to data migration, and finally to resumption of normal ongoing operations. Key features of the new EDMS Subcontractor's software included lookup tables, an import wizard, data checking options and unique indexes. Since the database systems became operational, the technical staff gathered useful feedback from end users (e.g., lab staff, field engineers, task managers, and the third-party data validator) to refine the EDMS/LIMS operation. This feedback triggered improvements in the performance of onsite laboratory qualification forms, promoted consistency in sample ID numbers between the database sample planning screens and field chain-of-custodies, corrected bugs in the LIMS Duplicate Evaluation Report, eliminated data import issues such as blank, inconsistent or missing data from key fields. One of the advantages of the commercial database solution was that it allowed the project to cut cost over time due to the lower cost of database maintenance provided by the commercial database vendor versus the cost of an on-staff DA. Cost savings are estimated at $40,000 per year. There were also indirect cost savings resulting from implementation of the new database since it allowed better integration of the LIMS and EDMS. While there will always be challenges associated with long term records/data management for any old remediation site, the Maywood Team's approach to an upgraded EDMS/LIMS implementation serves as one element of the overall effort to enhance the integrity and reproducibility of critical data that supports the remediation program while at the same time, more effectively using available resources. These lessons-learned will enhance implementation of cost-effective solutions for similar environmental remediation sites. (authors)

97 MATHEMATICS AND COMPUTING↗

Experience by BAM in the Transport Package Safety Assessment of German Waste Containers - 18469

Transport and storage containers for low and mid-level radioactive waste are getting more and more of relevance due to the nuclear phase out decision in 2011. For higher activities Type B(U) approved waste containers will be needed for the shut down and dismantling phases of NPPs. It is expected that large quantities are required in the near future. German waste containers are generally approved for transport and interim storage and are also intended for the final disposal in the Konrad repository. BAM is involved in the authority licensing of transport package designs in Germany. In this context, BAM is responsible for the assessment of safe containment, mechanical, thermal and quality management issues. BAM also operates test facilities and performs drop as well as thermal tests during package licensing procedures. This paper summarizes our experience in the transport package design assessment of Type B(U) waste containers. A general overview of the approval process, the requirements and approaches BAM applies are described. Some examples are used to illustrate different aspects and technical issues we are addressing during the package assessment. In the first part of the paper the specific design aspects of German waste containers are described. Here, a general overview is given e.g. about closure systems, impact limiter designs, and the handling concepts. Furthermore, the wide range of radioactive content and their physical behavior including the impact on the packages assessment are described. The second part is focused on questions about the licensing and assessment process of German waste containers from the BAM authority point of view. The general approaches for the strategy of demonstration are outlined on the basis of the test conditions according to IAEA Regulations SSR-6. Furthermore, particular issues of the mechanical and thermal assessment with respect to the specific test conditions are discussed. For accident conditions of transport, aspects to be mentioned are e.g. the assessment of the lid bolts, the axial gap applied between content and lid, and the thermal behavior of the wood filled impact limiter after the fire test. However, issues of the assessment for routine and normal conditions of transport are addressed in this paper, too. The intention of this paper is introduce recent approval procedure experience in Germany, describing technical evaluation issues and so reduce rounds of questions during applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conditioning and Requalification of Legacy Waste Packages - 18648

In most German interim storage facilities, hundreds of waste packages are waiting for re-conditioning and qualification to comply with the waste acceptance criteria (WAC) for the Konrad repository. Especially the waste classification as well as some characteristics and the description of the material composition in its current state do not comply with the Konrad requirements since the conditioning of these waste packages took place up to 40 years ago. The German name for these waste packages is 'Altgebinde', hereafter referred to as 'legacy waste packages'. The present article will provide an overview of the measures for the qualification of these legacy waste packages to fulfill the Konrad requirements. The following measures, when necessary, are carried out for the qualification of legacy waste packages: - Collection and evaluation of all documents related to the primary conditioning process, e. g. the used equipment, documented waste and packaging properties, conditioning and radiology, if available (hereafter 'old documents'). - Preparation of a conceptual report and a process control quality plan based on existing data, with appropriate measures to qualify the waste packages. Assessment and approval of the process control quality plan by the competent authority. - Characterization of the waste and packaging properties by visual inspection or tomography, recording or updating of dose rate, contamination and mass, verification of product stability, for example by gas analysis of the interior atmosphere of the container. - Characterization of the nuclide inventory by gammas scans, sample taking to analyze nuclides which can not be measured by means of in-situ gamma spectrometry, and for material declaration. - Qualification or post-conditioning of the legacy waste packages if necessary, e. g. by drying the waste packages and packaging them in containers approved for disposal. - Compilation of all results of the above mentioned tests and steps to create a waste package documentation, including the calculations for the nuclide inventory and the description of the material composition of the waste packages. - Receiving approval by the competent authority after evaluation of the final documentation. The aim behind this structured approach is to prevent additional, unnecessary measures and treatment of the waste. Consequently, the additional characterization is preferably carried out on the basis of the available documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cataloguing Past Incidents in Transporting Spent Nuclear Fuel

Shipments of spent nuclear fuel (SNF) and high level radioactive waste (HLW) have a history of more than 50 years, during which tens of thousands of tons of material have been transported in tens of thousands of shipments worldwide. The vast majority of these have been completed without incident. This safety record has been made possible by establishing robust regulatory requirements for the casks used in transport, studying past shipments and incidents, and improving equipment and procedures to lessen the probability and impacts of future events. The authors recently collected a wide array of publicly available information on transportation incidents involving SNF and HLW worldwide. This presented a challenge, as no international or US databases currently exist which are dedicated to SNF and HLW transportation incidents. Thus, sources for this research included national database reports from nations that publish them; technical reports and archival journal papers focused on the solutions to particular transportation problems; and news reports of SNF and HLW transportation incidents, including transportation accidents and protests of shipments. Based on the survey of past transportation incidents, of which several representative descriptions are included in this paper, the authors conclude that (1) the casks in which SNF and HLW are shipped are able to contain their radioactive cargoes in severe accidents because of their robust construction and their being in compliance with regulatory requirements; and (2) most incidents in transporting SNF and HLW have been minor ones, primarily resulting from procedural compliance deficiencies. Furthermore, recent incidents suggest that public information and engagement challenges outweigh technical challenges in SNF and HLW transportation, since the most significant challenges surrounding shipments in recent years have been the results of public demonstrations and protests. This paper discusses some SNF and HLW transportation incidents, as well as the process used in cataloguing them. In general, there have been few transportation incidents worldwide in the history of transporting SNF and HLW. The transportation of SNF and HLW has an excellent safety record; by learning from past incidents, shippers of SNF and HLW can continue to make safe shipments while avoiding mistakes made in the past. Despite the safe and successful record of SNF and HLW transportation, information on its record is not easy to find. Few incidents are detailed as thoroughly as the truck accident that occurred in 1971. Several anti-nuclear organizations publish pamphlets that make reference to transportation accidents involving radioactive material and imply that transporting SNF and HLW is an intrinsically dangerous activity whose history is fraught with accidents. The absence of a clear, complete, official record on transportation incidents allows these claims to continue to be unanswered and uncorrected. For these reasons, it would be beneficial to develop a database detailing incidents involving SNF and HLW internationally. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of the B-25 Low Level Radioactive Waste Container in Taiwan - 1900x

Chinshan Nuclear Power Plant will be permanently stopped its operation in the middle of 2019 and will be the first nuclear power plant stepping into the decommissioning phase in Taiwan. According to Nuclear Reactor Facilities Regulation Act, a nuclear facility must be dismantled in 25 years after being permanently ceased operation. In its decommissioning plan, the B -25 low level radioactive waste container was one of the proposed containers used for this decommissioning task. However, the B-25 waste container was not used or developed in Taiwan before. To meet this need, Institute of Nuclear Energy Research developed a new type of B-25 waste container and will apply to the authority for its usage license. This article provided the information of the low level radioactive waste containers have been approved in Taiwan and described the design specifications of the developed B-25 waste container. Besides, the numerical evaluation and test results were also included in this article. Based on the evaluation and test results, the developed B-25 waste container satisfied the requirements of the storage container and industrial package type 2. It is believed that the usage license would be granted soon after applying it to the authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Rare Earth Element Fingerprints for Distinguishing Between Site-Related Wastes and Background - 19441

Actinides such as uranium, thorium and radium are known to be present in sites associated with various phases of the cold war weapons research, development and production. Remediation of these sites as well as others associated with chemical plants that may have generated radioactive actinide-containing wastes have been the focus of the Formerly Utilized Sites Remedial Action Program (FUSRAP) for the past 20 years. The goal is to remediate a site to established cleanup standards as efficiently and cost-effectively as possible. For radiologically-contaminated sites, one potential challenge is the presence of non-FUSRAP media such as naturally-occurring radioactive material (NORM) or technologically-enhanced naturally-occurring radioactive material (TENORM), from non-FUSRAP sources, at concentrations exceeding site cleanup standards. Such NORM and TENORM, and even byproduct radionuclides from other unrelated activities on or near the site, can be mistaken for project waste and thus incur significant additional excavation and waste transport and disposal costs. Past studies have provided examples of NORM and non-FUSRAP waste and described strategies to distinguish them from FUSRAP waste. This paper describes various sources of NORM, summarizes the types of project-related waste at some active FUSRAP sites, and identifies TENORM sites from which radionuclides could possibly migrate via various environmental pathways to nearby FUSRAP sites. The authors also examine two Case Studies that calculate distinctive elemental ratios and are examples of tools which may be used for distinguishing FUSRAP waste from other radionuclides present in natural or other man-made contributors to background. Case Study I examines two bodies of data and calculates distinctive elemental ratios between pairs of rare earth elements (REE) to see if significant differences may exist between such ratios in unregulated coal ash residue, common in fill in well-established towns and cities, and FUSRAP waste. The first group of data, consisting of eighteen sample results, was obtained from the FUSRAP Maywood Superfund Site's historical data while the second was obtained from a paper which provided extensive data (more than 100 samples) on the REE content in fly ash residues from three major coal-producing areas in the United States. This example illustrates statistically significant differences in five of six REE ratios and thus provides a potential tool for distinguishing FUSRAP waste from coal ash-based NORM. Case Study II examines differences in the mean REE:Actinide and REE:REE ratios in Welsbach-impacted sample results to distinguish project waste from background. While the purpose of this study was to distinguish project waste from background levels of the radionuclides of concern (ROC), it provides a good example of how one or more ratios could potentially be used to distinguish FUSRAP waste from NORM. Lastly, the authors recommend that future projects ensure robust characterization, that considers all potential radionuclide contributors from both FUSRAP activities as well as from other contributors to background for the region during the Planning Phase of the Data Life Cycle described within the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). It is expected that the incremental characterization sampling and analysis costs will be dwarfed by potential savings from efforts to better delineate and limit remediation to FUSRAP wastes rather than other potentially unregulated contributors to regional background. Other agencies or commercial entities with radiological environmental liabilities similar to FUSRAP would benefit from similar considerations of REEs and other radionuclides that could contribute to regional background. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Critical Design Elements for an On-Site Mercury Concentration and Holding Facility - 20175

Administrative changes and funding issues have delayed the Department of Energy (DOE) from establishing and commissioning a National Repository for mercury as required under the Mercury Export Ban Act (MEBA) of 2008. In the interim, a few hazardous waste Treatment, Storage, and Disposal Facilities (TSDFs) have been authorized to accept mercury classified as a hazardous waste as under Subtitle C of the Resource Conservation and Recovery Act (RCRA). Waste generators are charged (either by weight or by volume) for the waste they manifest to these TSDFs. In many cases, mercury and mercury compounds have chemically sorbed to (or physically lodged into) the interstitial spaces of a substrate material. This almost always causes the amount of waste generated to be unnecessarily large, due to the extra volume (or weight) of the accompanying, non-mercury materials. Depending on a multitude of factors, it could be financially beneficial for waste generators to take greater control of their mercury affairs by separating these substrate materials from the mercury and mercury compounds that have become associated with them. Building and operating an on-site mercury Concentration and Holding Facility (CHF) could help relieve a waste generator's overall cost burden. The purpose of such CHFs is not to treat or dispose of mercury, but to recover and concentrate mercury from bulky mercury-laden materials to the extent that the host substrate to which the mercury may have previously been sorbed could pass a Toxicity Characteristic Leaching Procedure (TCLP) test and either be disposed of at a conventional landfill, or be disposed of at a hazardous waste landfill, but absent additional restrictions specifically for mercury. A CHF represents a way for waste generators to save money by separating mercury from common host materials, concentrating it, and then safely storing it until transportation to an authorized TSDF takes place This paper focuses on the critical design elements waste generators should consider when designing and operating a mercury CHF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗