Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ventilation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humboldt Bay Power Plant Decommissioning Progress Update - 16358

Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility achieved several significant milestones in the summer and fall of 2015 when the RPV Segmentation Project completed, the Caisson Removal project began and the Unit 3 Refueling building (RFB) and Main Plant Ventilation system were released for Open Air Demolition (OAD). At the end of 2014 the Civil Works prime contractor Chicago Bridge and Iron (CB and I) was also awarded the contract to complete the RPV Segmentation. This work scope continued to use the First of a Kind (FOAK) segmentation equipment that was designed and fabricated for the HBPP Reactor Project. The preparation for RFB OAD was part of the original Civil Works contract scope. It was important that this work and the segmentation of the reactor shell be finished to allow a portion of the Refueling building to be demolished to continue the installation of the perimeter water cutoff wall and the caisson Support of Excavation (SOE) shoring system. The CB and I Civil Works contract endorsed the October 2012 HBPP Caisson Removal Feasibility Study approach to install a perimeter cutoff wall intended to stop movement of groundwater by installation of cement-bentonite (CB) backfill in a slurry wall trench excavated to a depth of 53 meters and tied into the Unit F clay layer. The CB and I on-site project manager and principal engineer from their home office re-evaluated the design approach outlined in their proposal and awarded contract. As CB and I further developed design plans, an option to complete the perimeter wall with Cutter Soil Mixing (CSM) technology was developed. CB and I described the CSM process as a modified trench cutter technique, to be used for both perimeter groundwater cutoff, and for caisson demolition SOE. CSM technology blends slurry while mixing soil on the down stroke, and injects cement into the blended soil cuttings on the upstroke to create a cemented 'cutoff wall'. CB and I proposed several variations for three key support elements: the perimeter cutoff wall; the dewatering well system; and the caisson SOE shoring system. The proposed alternatives brought many enhancements in the design and integration of the work to be executed. CB and I personnel were persistent in seeing their vision through that resulted in a significant benefit in worker safety and schedule enhancement (early finish by 5 months). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Activities of a Radiopharmaceuticals Production Facility - 18067

On May 2012, Best Medical Belgium S.A. (BMB), a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel: - Supports the definition of the clean-up and decommissioning strategies; - Drafts the Final Decommissioning Plan (FDP) and Safety Analysis Report (SAR) that will be submitted to FANC/AFCN (Belgian Federal Agency for Nuclear Control) in order to get the License for decommissioning; - Drafts the technical specifications of the public tendering process related to the D and D program; - Ensures the day to-day follow-up of the D and D activities on site. Four nuclear buildings are part of the D and D activities. One of them, building 14 (B14), represents the most challenging and extensive task with the clean-up of highly contaminated areas and its further decommissioning up to the final state. This building features two cyclotrons (CGR and IBA cyclotrons) successively used to produce radioisotopes, as well as hot cells and glove boxes used for their purification and the conditioning of the final pharmaceutical product. The present paper aims at presenting the most recent development steps of the clean-up phase regarding the adaptations of existing facilities and the upcoming activities in preparation of the decommissioning activities. To allow the sorting and the treatment of the radioactive material identified in the physical and radiological inventory, several workshops have been implemented within the B14 building in order to deal with radioactive materials arising from the clean-up and D and D activities. Following the conceptual design phase, Tractebel has actively monitored the on-site activities for the construction of those workshops such as: - The modification of the civil works; - The revamping of the ventilation system; - The installation of dedicated lifting equipment and workstations equipped with cutting devices; - The assembly of a docking station for filling the radioactive packages. The removal of the activated concrete surrounding the IBA cyclotron requires the erection of a containment structure and an extension structure. The containment structure, composed of light metallic beams, is located above the cyclotron and its irradiation zones. For operational security reasons and working efficiency, the cutting process of the concrete ceilings and walls will be performed from the top inside the containment structure by means of an eight tons overhead bridge crane. Concrete blocks resulting from the cutting process will then be lifted, without any loss of containment, towards the extension zone of the nuclear zone of the IBA cyclotron for further resizing, sorting and evacuation towards the identified waste routes. To prepare this task which will be performed during the decommissioning phase, Tractebel sets up the necessary technical specifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Industrial Steerable Needle for Inspecting Extremely Confined Spaces in Nuclear Facilities - 18316

We present a novel, compliant mechanism inspired by steerable needles for endoscopic surgery that provides the capability to navigate extremely confined spaces for the purpose of infrastructure inspection. Extremely confined spaces are commonly encountered during infrastructure inspection of nuclear facilities. These spaces can include pipes and ventilation ducts. Often these infrastructure features go uninspected simply because there is no viable way to access their interior. In addition, it is not uncommon for extremely confined spaces to be laid-out in a spider-web fashion that must be selectively navigated in order to execute an inspection. Recently, millimeter-scale imagers have become commercially available. These imagers are small enough to fit inside an extremely confined space, but there is currently no means to bring the imager to the portion of the structure that must be inspected. In this work this problem is addressed by taking inspiration from the field of steerable needles used in endoscopic surgery. Steerable needles are long flexible shafts that are capable of being directed through the human body using control forces applied external to the body. Unfortunately, steerable needles cannot be directly applied to the problem of navigating maze-like arrangements of extremely confined spaces. Traditional steerable needles must operate within a solid medium that can be penetrated in order to be steered so they are not directly applicable to navigating extremely confined spaces. However surgical steerable needles do suggest an approach to the problem. Steerable needles are typically made from super-elastic nitinol. This material has the property that it can experience high strain without yielding. Furthermore, superelastic nitinol is stiff enough that it is possible to push the tube down a long, maze-like arrangement of a confined space without buckling. The stiffness properties of nitinol combined with its high yield strain makes it an attractive material for navigating a tube through a maze-like arrangement of extremely confined spaces. The ability to selectively navigate extremely confined spaces opens up new possibilities to use emerging miniature imaging technology for infrastructure inspection. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Evaluation Criteria to Meet the WIPP Waste Acceptance Criteria - 18655

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for the disposal of Transuranic (TRU) waste and the only such disposal facility of its kind. TRU waste is radioactive mixed waste generated by the U. S. Department of Energy in support of National Defense. In 2014, the WIPP facility was shut down when two separate accidents occurred in the repository. The two accidents were a fire on a large underground haul truck that prompted evacuation and filled the mine with smoke and soot, and a radiation release that contaminated the exhaust ventilation and disposal areas of the mine. DOE performed two accident investigations in 2014 that resulted in many corrective actions. Some of the corrective actions resulted in significant changes in the WIPP Waste Acceptance Criteria (WAC) and are required to be applied to all TRU waste upon the resumption of shipments to WIPP. WIPP re-opened and began taking shipments again in 2017 and a large backlog of over 25,000 TRU waste containers that were certified prior to the new WAC have been undergoing re-evaluation since the re-opening. This paper will focus on the new WAC criteria that TRU waste must meet above-and-beyond previous WAC criteria and the implementation of new processes for approval. The primary area for these changes is in the area of waste characterization using Acceptable Knowledge (AK) and new detailed analyses required for chemical compatibility. The accident investigation revealed that the radiation release was due to a thermal runaway and bursting of the waste container due to inadvertent mixtures of nitrates and combustibles resulting in ignitable waste forms. In other words, the TRU waste container had incompatible contents that went undiscovered and created a hazard characteristic that was prohibited at WIPP. Through detailed chemical compatibility evaluations and new oversight, the DOE should be able to prevent a similar accident (see Figure 1). The new chemical compatibility evaluations and evaluations of oxidizing chemicals combined with combustibles are complex and detailed. Chemical compatibility is not a new requirement, but a much more detailed evaluation is a new requirement. And, obtaining historical information about the generation of the final waste form for legacy packaged waste can be very challenging. Specifically, determining possible amounts of chemicals in the waste can be extremely challenging. This paper does not explore in depth, the details of oxidizing chemicals. Other papers presented will discuss oxidizing chemicals. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Thermal Model for the Performance Analysis of Large Scale Spent Fuel Cooling Pond - 19173

This paper presents a thermal model for the performance analysis of a large scale cooling pond for the long term storage of spent nuclear fuel. The model has been developed using the knowledge gained from fundamental investigation using CFD and has been validated by comparing against reliable experimental and/or numerical data. It was then applied in the context of operation of a large scale pond to ascertain the sensitivity of various operational and environmental conditions. To develop the model, the water body along with the heating elements was considered as one zone and humid air inside the building as another zone, both of which are considered as well-mixed zones. Various input conditions namely, total heat load from the heat source, environmental temperature and relative humidity, ventilation rate, efficiency of the cooling tower, recirculation and make-up water flow rates have been programmed in the model. The statistical method AVONA has been used to assess the influence of the above variables. The results reveal that the efficiency of the cooling tower is the most influential parameter on the cooling performance of cooling pond within the considered values of heat load. It has also been found that the majority of the heat is taken by the recirculating water for very high heat load while the other modes of heat transfer are small but not insignificant. The model is capable of simulating the scenario of loss of cooling water and suggests that it can be used for managing a large pond efficiently as well as recovery from an accident situation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Operational and Safety Lessons Learned from the 2014 Fire and Radiological Events - 19389

The Waste Isolation Pilot Plant (WIPP) experienced two accident events in 2014 within 9 days of each other (salt haul truck fire and a radiological release). The repository was designed in the 1980's for high level waste and started operations in late 1990's for defense related transuranic (TRU) waste. Several long-standing technical issues from competing requirements between an underground facility (mine), nuclear safety, and environmental requirements lead to design, operations, and safety weaknesses that were not resolved prior to the two accident events. Other design issues and actions during early recovery efforts were identified as lessons learned for the Safety Significant Confinement Ventilation System (SSCVS) and Utility Shaft (US) capital asset projects and for future planning efforts. The infrastructure at WIPP was significantly degraded at the time of the events with key safety related items that had been out of service or not maintained for years. The emergency response to the two accident events was less than adequate and caused concerns with stakeholders. There are many operational and safety lessons learned from these two events and their corrective actions that will be valuable for all future planning of deep geological repositories (DGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Process Exhaust Tunnel Inspection Crawler Development - 20036

This paper covers development of a remote crawler used to inspect a subterranean radiochemical process ventilation tunnel located at the Savannah River Site near Aiken, SC. The purpose of the inspection was to ascertain the apparent structural condition of the tunnel with video footage. Manned entry is prohibited due to the hazardous environment requiring a fully-remote approach. The inspection system used high-definition cameras to archive over 1000 linear feet in the tunnel. While previous inspections had been undertaken, this crawler was developed to overcome obstacles that had put tunnel regions out of reach of prior inspection platforms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCR Operational Summary and Optimization for Tank 9 Processing - 20314

Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on ASME AG-1 and Revision of the DOE Nuclear Air Cleaning Handbook - 20536

The American Society of Mechanical Engineers AG-1 Code on Nuclear Air and Gas Treatment is updated every two years. This paper provides an overview of issues being discussed within AG-1 committee meetings and revisions that will be included in the next version of the code. Additional information is provided on issues being discussed ranging from media velocity limits, control of airflow using actual versus and standard cubic feet per minute. Navigation and identification of applicable high-efficiency particulate air (HEPA) filter code sections can be confusing for those unfamiliar with AG-1. A general reorganization of filtration code sections clarifies geometry, flow, and performance envelopes for nuclear grade HEPA filters. The initial step consists of establishment of Section FN covering qualification of conventional, ceramic, metal, and high strength fibrous glass media. Future filter sections are currently expected to be characterized by geometry and flow direction (axial vs. radial). The Department of Energy's (DOE) Nuclear Air Cleaning Handbook (NACH) is also undergoing revision. An update on the status of that effort, along with issues and changes being considered. The original charter of the AG-1 Code was specific to commercial nuclear power plants, and to safety-related air cleaning systems. This has evolved over the years to include normal non-safety ventilation systems and process gas systems. Corollary guidance for DOE facilities has been available in several editions of the Nuclear Air Cleaning Handbook, starting with ORNL-NSIC 65. The latest edition of the Handbook, 2003, is undergoing revision and modifications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The hydrogen behavior analysis in the water-ingress accident of the 250 MW pebble-bed modular high temperature gas-cooled reactor - 18639

The demonstration power plant of Chinese 250 MW high temperature gas-cooled reactor pebbled-bed module (HTR-PM) which is being under construction in the Shidao Bay of Shandong province has made breakthrough in all of the critical technologies, and is willing to operate in 2017. HTR-PM does not have the risk of large amount of hydrogen generation resulted from the zirconium water reaction due to its special design of graphite core structure and helium coolant of the primary circuit, however, considering that the HTR-PM has a small containment and does not design the deliberate ignitions which is the main hydrogen management measure in light water reactors, it is still necessary to study the hydrogen behavior in the water-ingress accident in which hydrogen will probably be generated. In this paper, the hydrogen generation amount and its distribution in the HTR-PM containment are analyzed with the TINTE code and GASFLOW code respectively in the water ingress accident caused by the steam generator heating tubes rupture. The calculation results indicate that there are total about 16.6 kg and 21 kg hydrogen produced due to graphite corrosion in the typical design basis water ingress accident and beyond design basis accident. The containment sub-pressure ventilation system makes sure the hydrogen concentration in the containment is less than 0.2% during the accident. There is no hydrogen explosion risk in the HTR-PM. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Smart Labs: Improving Lab Facilities to Meet Decarbonization Goals

Smart Labs enable safe and efficient world class science to occur in laboratories through high-performance methods. The Smart Labs Toolkit describes a systematic process to help laboratory owners and operators plan, assess, optimize, and manage laboratory facilities. This half-day workshop reviews the four phases of the Smart Labs Toolkit along with an interactive activity to complete a Laboratory Ventilation Risk Assessment. This session will also highlight the Lab Benchmarking Tool, which compares the energy use, emissions, and operational practices of lab buildings with similar facilities. Attendees will also discuss application as well as sharing tools and best practice guides.

assessment↗

TRANSIENT ACCIDENT ANALYSIS OF THE GLOVEBOX SYSTEM IN A LARGE PROCESS ROOM

Local transient hydrogen concentrations were evaluated inside a large process room when the hydrogen gas was released by three postulated accident scenarios associated with the process tank leakage and fire leading to a loss of gas confinement. The three cases considered in this work were fire in a room, loss of confinement from a process tank, and loss of confinement coupled with fire event. Based on these accident scenarios in a large and unventilated process room, the modeling calculations of the hydrogen migration were performed to estimate local transient concentrations of hydrogen due to the sudden leakage and release from a glovebox system associated with the process tank. The modeling domain represented the major features of the process room including the principal release or leakage source of gas storage system. The model was benchmarked against the literature results for key phenomena such as natural convection, turbulent behavior, gas mixing due to jet entrainment, and radiation cooling because these phenomena are closely related to the gas driving mechanisms within a large air space of the process room. The modeling results showed that at the corner of the process room, the gas concentrations migrated by the Case 2 and Case 3 scenarios reached the set-point value of high activity alarm in about 13 seconds, while the Case 1 scenario takes about 90 seconds to reach the concentration. The modeling results were used to estimate transient radioactive gas migrations in an enclosed process room installed with high activity alarm monitor when the postulated leakage scenarios are initiated without room ventilation.

08 HYDROGEN↗

TRENDS IN ESTIMATED MIXING DEPTH DAILY MAXIMUMS

Mixing depth is an important quantity in the determination of air pollution concentrations. Fireweather forecasts depend strongly on estimates of the mixing depth as a means of determining the altitude and dilution (ventilation rates) of smoke plumes. The Savannah River United States Forest Service (USFS) routinely conducts prescribed fires at the Savannah River Site (SRS), a heavily wooded Department of Energy (DOE) facility located in southwest South Carolina. For many years, the Savannah River National Laboratory (SRNL) has provided forecasts of weather conditions in support of the fire program, including an estimated mixing depth using potential temperature and turbulence change with height at a given location. This paper examines trends in the average estimated mixing depth daily maximum at the SRS over an extended period of time (4.75 years) derived from numerical atmospheric simulations using two versions of the Regional Atmospheric Modeling System (RAMS). This allows for differences to be seen between the model versions, as well as trends on a multi-year time frame. In addition, comparisons of predicted mixing depth for individual days in which special balloon soundings were released are also discussed.

54 ENVIRONMENTAL SCIENCES↗

Simulation of Energy Management Systems in EnergyPlus

An energy management system (EMS) is a dedicated computer that can be programmed to control all of a building's energy-related systems, including heating, cooling, ventilation, hot water, interior lighting, exterior lighting, on-site power generation, and mechanized systems for shading devices, window actuators, and double facade elements. Recently a new module for simulating an EMS was added to the EnergyPlus whole-building energy simulation program. An essential part of the EMS module is the EnergyPlus Runtime Language (ERL), which is a simple programming language that is used to specify the EMS control algorithms. The new EMS controls and the flexibility of ERL allow EnergyPlus to simulate many novel control strategies that are not possible with the previous generation of building energy simulation programs. This paper surveys the standard controls in EnergyPlus, presents the new EMS features, describes the implementation of the module, and explores some of the possible applications for the new EMS capabilities in EnergyPlus.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Metrics and Benchmarks for Energy Efficiency in Laboratories

A wide spectrum of laboratory owners, ranging from universities to federal agencies, have explicit goals for energy efficiency in their facilities. For example, the Energy Policy Act of 2005 (EPACT 2005) requires all new federal buildings to exceed ASHRAE 90.1-2004 [1] by at least 30%. A new laboratory is much more likely to meet energy efficiency goals if quantitative metrics and targets are specified in programming documents and tracked during the course of the delivery process. If not, any additional capital costs or design time associated with attaining higher efficiencies can be difficult to justify. This article describes key energy efficiency metrics and benchmarks for laboratories, which have been developed and applied to several laboratory buildings--both for design and operation. In addition to traditional whole building energy use metrics (e.g. BTU/ft{sup 2}.yr, kWh/m{sup 2}.yr), the article describes HVAC system metrics (e.g. ventilation W/cfm, W/L.s{sup -1}), which can be used to identify the presence or absence of energy features and opportunities during design and operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Rapid Data Assimilation in the Indoor Environment: theory and examples from real-time interpretation of indoor plumes of airborne chemicals

Releases of acutely toxic airborne contaminants in or near a building can lead to significant human exposures unless prompt response measures are identified and implemented. Commonly, possible responses include conflicting strategies, such as shutting the ventilation system off versus running it in a purge (100percent outside air) mode, or having occupants evacuate versus sheltering in place. The right choice depends in part on quickly identifying the source locations, the amounts released, and the likely future dispersion routes of the pollutants. This paper summarizes recent developments to provide such estimates in real time using an approach called Bayesian Monte Carlo updating. This approach rapidly interprets measurements of airborne pollutant concentrations from multiple sensors placed in the building and computes best estimates and uncertainties of the release conditions. The algorithm is fast, capable of continuously updating the estimates as measurements stream in from sensors. The approach is employed, as illustration, to conduct two specific investigations under different situations.

54 ENVIRONMENTAL SCIENCES↗

Tritium Room Air Monitor Operating Experience Review

Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗