Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Public Communication of Technical Issues in Today's Changing Visual Language - 12436

Communication regarding the management of radioactive materials is a well-established challenge. Residents and consumers have suspected for years that companies and governments place short-term economic concerns ahead of health and safety. This skepticism is compounded with increased attention to safety issues at nuclear power plants everywhere after Fukushima. Nonetheless, today's environment presents unexpected opportunities to transform public fear into teachable moments that bring knowledge and facts to discussions on nuclear energy. In the weeks following Japan's crisis, the lack of reliable information on radiation levels saw citizens taking to the streets with dosimeters and Geiger counters in crowd-sourced radiation monitoring efforts. Efforts, based mainly online, represent a growing set of examples of how internet and cell-phone technology are being put to use in emergency situations. The maps, graphs and tables created to meet public interest also exemplify some of the psychological priorities of audiences and present learning tools that can improve future education efforts in non-emergency situations. Industry outreach efforts often consist of technical details and quantitative data that are difficult for lay audiences to interpret. The intense attention to nuclear energy issues since last March has produced a wide array of visual samples. Citizen monitors, news organizations, government agencies and others have displayed quantitative information in innovative ways. Their efforts offer new perspective on what charts, maps and info graphics do - or need to do - to illustrate requirements, record assessments and promote understanding of nuclear-waste issues. Surveying the best examples, nuclear communicators can improve their offerings of easy-to-use, evidence-based visuals to inform stakeholders. Familiar to most communications professionals in the nuclear industry, risk communication is a science-based approach with over three decades of research evidence informing the discipline. Risk communication principles address the fact that often perception is reality. Scientific evidence for decision making must be approached differently in situations where stakeholders have high levels of concern and low levels of trust. Visual communications must take this into account to be successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of the Environmental Management Site Specific Advisory Board under the Federal Advisory Committee Act, With Emphasis on the Northern New Mexico Citizens' Advisory Board - 12482

The Environmental Management Site Specific Advisory Board (EM SSAB) is comprised of eight Citizens' Advisory Boards, chartered under the Federal Advisory Committee Act (FACA) by the Assistant Secretary for Environmental Management for the U. S. Department of Energy (DOE). The purpose of the EM SSAB is to provide the DOE with recommendations regarding Environmental Management issues from legacy waste produced at major sites across the DOE Complex. The Northern New Mexico Citizens' Advisory Board (NNMCAB) is the site specific advisory board to the DOE on issues of environmental monitoring, remediation, waste management and long-term stewardship at Los Alamos National Laboratory (LANL). The other boards are located at: Hanford, Idaho, Nevada, Paducah, Portsmouth, Oak Ridge and Savannah River. Using broad citizen outreach and input, the SSAB provides an official mechanism for the citizenry at each of these sites to monitor current activities affecting the region and also to have input into the prioritization of future activities. 'The mission of the EM SSAB is to more directly involve stakeholders in EM Planning and decision-making processes for the nuclear weapons complex cleanup. DOE has various means of involving the public in its planning and decision-making processes; the EM SSAB is only one component of EM's public participation program, and is not intended to be an exclusive means of public participation. It is the policy of DOE and EM to conduct it programs in an open and responsive manner, thereby encouraging and providing the opportunity for public participation in its planning and decision-making processes. EM SSAB members are appointed to a two year term and may serve up to three terms. During this time, members are able to hear many presentation from subject matter experts, attend several site tours at their site and across the DOE complex and are able to express their concerns and give input to the prioritization of clean up at each site. It is an excellent education and it is hoped that these members will go out to their communities, friends and family and discuss these issues in an informed manner. Many times our citizens rely only on newspaper articles or the Internet, which are sometimes replete with fear and misinformation. The more stakeholders are able to be truly informed, the more accurate the discourse will be at each of the DOE sites. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned: Tribal Community Engagement, Remediation and Restoration of a Uranium Mine Tailings Site, Navajo Nation - 12484

In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right of way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U.S. Department of Energy Office of Legacy Management's Tribal Interactions - 12513

Effective government-to-government interactions with tribal nations and maintaining stakeholder relations with members of tribes are increasingly important to the U.S. Department of Energy (DOE) Office of Legacy Management (LM). As of October 2011, LM was responsible for long-term surveillance and maintenance of 87 sites and facilities in the continental U.S. and Puerto Rico, including some sites on tribal lands. The sites on tribal lands can affect natural resources that are managed or used by tribes, or the sites can potentially affect areas of cultural significance to tribal nations in Alaska, Arizona, Colorado, New Mexico, Utah, Washington, and Wyoming. Tribes are separate sovereign governments recognized in the U.S. Constitution and are significant stakeholders for LM sites. The tribes are individual nations with diverse histories, cultures, customs, religions, and laws. LM has regular communication with the affected tribes to inform members of issues, to allow the tribe to participate in decision making, to provide technical reviews, and to ensure tribal concerns are addressed. Four LM sites are in the Navajo Nation. Three of those sites contain uranium mill tailings disposal cells regulated under long-term surveillance and maintenance programs that require monitoring and annual inspections. The fourth site was remediated but still has a groundwater plume that LM is responsible for. DOE and LM have worked with the Navajo Nation for almost 30 years on technical issues and to ensure tribal concerns are addressed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Borehole Disposal Research in the United States - 17427

The U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) manages a research and development (R and D) program for the disposal of spent nuclear fuel and high-level radioactive waste in the United States. Deep boreholes are being evaluated for disposal of some smaller DOE-managed waste as an alternative to disposal in a mined geologic repository. The deep borehole disposal concept consists of drilling borehole(s) to a total depth of about 5,000 m (16,400 ft - or greater than three miles) into crystalline basement rock, placing waste packages in the lower emplacement zone portion of the borehole, and sealing and plugging the upper portion of the borehole. The required bottom-hole diameter of the borehole(s) depends on the waste package configuration for the reference concept, but ranges from 22 to 43 cm (8.5 to 17 inches). Additional research and development is desired in several important areas for further consideration of deep borehole disposal of radioactive waste. A Deep Borehole Field Test (DBFT) will be conducted by DOE to further assess the viability of deep borehole disposal as an alternative for the disposal of smaller DOE-managed waste forms. The DBFT will be used to evaluate three main areas: 1) evaluation of the capability for drilling and construction of deep, large-diameter boreholes; 2) downhole scientific analyses to assess hydrogeochemical conditions that control waste stability and containment; and 3) engineering activities to assess the viability and safety of waste package emplacement and retrieval in deep boreholes. The DBFT will include first drilling a characterization borehole, followed by an optional field test borehole, to a total depth of about 5,000 m (16,400 feet) into crystalline basement rock in a geologically stable continental location. The initial smaller diameter characterization borehole will be drilled and completed to facilitate downhole scientific testing and analysis. If site conditions are found to be suitable, DOE intends to drill a larger-diameter field test borehole to evaluate emplacement activities using surrogate waste packages. The surrogate waste packages will not contain any radioactive waste, nor will any radioactive waste be used in these tests. One of the advantages of deep borehole disposal is that it would give DOE the flexibility to consider options for disposal of smaller waste forms. Deep borehole disposal also potentially offers earlier disposal of some wastes than might be possible in a mined repository, and could reduce costs associated with projected treatments of some wastes. In order to accomplish the DBFT, DOE will require the support of multiple national laboratories, along with a site contractor to acquire a suitable test site and to manage the site and the required testing activities. DOE issued a competitive solicitation via a request for proposal (RFP) in July, 2015, which requested proposals to provide a test site and site management services. The contract was awarded in January, 2016, to a team led by Battelle Memorial Institute which included a proposed test site in Pierce County, North Dakota. After efforts to acquire both the initial test site in North Dakota and an alternative proposed site in Spink County, South Dakota were unsuccessful, activities were suspended. The experiences in Pierce County, ND and Spink County, SD highlighted the importance of public engagement and support for the DBFT, and that relevant levels of government and other public stakeholders should be involved from the beginning. Using the lessons learned in North and South Dakota, DOE issued a new RFP on August 22, 2016 which emphasized local, state, and tribal (if applicable) government engagement, as well as public and other stakeholder involvement ahead of proposal submittals and throughout the contract execution phases. The new RFP allowed for multiple initial awards and multiple phases of contract execution. In December, 2016, DOE announced the selection of four companies - AECOM, ENERCON, RE/SPEC, and TerranearPMC - to begin exploring the possibility of conducting a DBFT under the terms of the new RFP. Ultimately, only one site will be chosen for the field test. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainability Index for Comparison of Environmental Remediation Technologies - 17492

Site remediation is a multi-decade process that incorporations planning from a variety of parties including stakeholders, regulators, scientists and engineers, and community members. When Best Management Practices are integrated during remediation action at sites, there are significant improvements to a variety of metrics including economic, environmental, and societal factors. Green and sustainable remediation tools are Best Management Practices that are a valuable means to reduce or remove environmental footprints after remedial action at sites. Applying the analysis to future feasibility studies, EM takes the next steps towards being a leader in global sustainability. The sustainability index is a quantitative test in response to a recent study published by scientists at the Hanford Site detailing an exit strategy for pump and treat remediation technologies in an effort to move away from active remediation in favor of passive techniques. The sustainability index attempts to quantify the relative sustainability of active and passive remediation strategies by examining a variety of metrics and perspectives from those involved in the decision-making process. Analysis compared 10 metrics encompassing environmental, social, and economic aspects of sustainability for the two types of remediation techniques. Perspectives and values of the stakeholders, regulators, scientists and engineers, and community members involved the decision-making process were also incorporated in this tool. Data were evaluated from active and passive remediation technologies at two locations (Richland, Washington and Mound, Ohio). Data suggest passive remediation technologies performed better in terms of sustainability performance than active technologies. Switching from active remediation to passive remediation techniques has the following impacts: aids in the conservation of local ecosystems, reduces community impacts and improves the community perception of the cleanup, lowers the lifecycle cost of the project, and contributes positively to global sustainability by using less energy and raw materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Maywood Site - Remediation of a Residential Property at 61 Trudy Drive, Lodi, NJ - 17533

The Formerly Utilized Sites Remedial Action Program (FUSRAP) is the U.S. government program started in 1974 to identify, investigate and clean up or control sites that became contaminated as a result of the nation's early atomic programs. The FUSRAP Maywood (New Jersey) Superfund Site (FMSS) consists of 92 designated property parcels known as vicinity properties. 61 Trudy Drive in Lodi, New Jersey is one such vicinity property. Construction planning for a recently-completed remedial excavation at 61 Trudy Drive was predicated on a fundamental question: to remediate the property with the existing home remaining in place or to demolish the exiting home. Answering this question involved detailed engineering and cost analyses, programmatic considerations, and stakeholder input. 61 Trudy Drive was originally addressed under FUSRAP in 1985 by the U.S. Department of Energy (DOE). However, subsequent remediation on an adjacent property by the U.S. Army Corps of Engineers (USACE) in 1998 suggested that residual contamination remained at depth at 61 Trudy. The property owner at that time declined to allow FUSRAP access to the property. However, a property transfer in 2012 presented USACE with an opportunity to address this property. Characterization of the property began in 2013; remedial activities were completed in 2015. The 61 Trudy Drive remediation required an intensive stakeholder communications program tailored for several audiences, including the affected property owner, local government officials and the neighboring community This paper will present the FUSRAP history at 61 Trudy Drive, to provide context for recent FUSRAP actions there. It will then focus on the challenges and complexities of performing environmental remediation in a suburban residential setting, focusing on both construction and communications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring communication techniques across a wide spectrum of groups - 15105

Communication about radionuclide and nuclear waste is one factor in facilitating decisions regarding environmental issues and energy solutions. However, the decision process involves many people with a variety of perceptions that have been formed throughout many years. This paper describes various communication techniques across a spectrum of stakeholders from the general public, students, first responders, analysts, and decisions makers. Techniques include dose assessment tools, assessment training, preparing first responders to confront potential radiological/nuclear situations, web multimedia information, ongoing Department of Energy (DOE) education projects, public talks and presentations, and National Environmental Policy Act (NEPA) participation. Issues are identified concerning perception including units, background radiation, effects of environmental levels of radiation, potential approaches to energy literacy, and risk comparison. These various communication techniques across a spectrum of stakeholders are evaluated with feedback and use statistics concerning aspects of strategies, challenges, and common perceptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The evolution of the Nevada National Security site waste acceptance criteria - 15312

The Nevada National Security Site Waste Acceptance Criteria (DOE/NV--325) is an evolution of requirements spanning almost three decades of waste acceptance at the Nevada National Security Site (NNSS). The original waste acceptance criteria (WAC) document was written in 1978 (document NVO-185) and underwent multiple revisions as time passed and disposal experience was gained. This document came into being when the NNSS first started receiving significant quantities of low-level radioactive waste (LLW) from offsite U.S. Department of Energy (DOE) generators, such as the Mound and Rocky Flats Plants. The original WAC was far less prescriptive and rigorous than the current criteria since many of the current DOE order directives, Federal/State laws, and regulations did not exist. The current WAC reflects the results of numerous revisions in order to address the nuances of the varied waste streams and package configurations accepted for disposal at the NNSS. This includes waste streams that exhibit challenges not previously faced or covered by the WAC and therefore, from time to time, require new information and or changes to be made to the WAC. These wastes now represent a growing percentage of the remaining waste at cleanup sites across the DOE Complex. These waste streams present challenges, such as the technical basis for ensuring safe transportation to and disposal at the NNSS. The current WAC (Rev. 10 dated June 2013), is Available online at: http://www.nv.energy.gov/library/publications/Environmental/DOENV{sub 3}25.pdf). Other challenges for the NNSS include incorporating new and emerging technologies and addressing stakeholder concerns. Addressing these challenges sometimes results in changes to the NNSS WAC. Drivers for revising the NNSS WAC over the years have included operating experience improvements, the need to specify waste origin/ownership, and identifying preferred transportation routing. This paper will discuss various aspects of the NNSS WAC, and how it has evolved based upon DOE orders and requirements, acceptance of offsite mixed wastes, acceptance of non-radioactive classified wastes, stakeholder concerns and agreements, and the changing face of the remaining legacy waste at DOE sites across the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laying the groundwork for a large-scale spent nuclear fuel transportation system - 15408

The US Department of Energy Office of Nuclear Energy established the Nuclear Fuels Storage and Transportation Planning Project to lay the groundwork for implementing an interim storage facility, including associated transportation activities. Efforts include the development of a system for the large-scale transport of spent nuclear fuel that will be necessary in an integrated waste management system. Progress is being made on long lead time, destination-independent aspects of the transportation infrastructure. The large-scale transportation system for spent nuclear fuel is divided into three elements: institutional, operational, and hardware. The institutional element refers to the various forms of stakeholder interaction that must occur for this type of transportation system to be successful. It includes activities like development of a national transportation plan, work on policy development for Section 180(c) of the Nuclear Waste Policy Act, and identification of a preliminary suite of national transportation routes that reflect the interests of a broad cross section of stakeholders while meeting regulatory requirements. The operational element refers to the activities that must be undertaken to run a large-scale transportation system. This element is currently focused on development of a new SNF transportation routing analysis tool, study of the infrastructure near SNF storage sites that may be de-inventoried first, and development of tools for modeling transportation activities. The hardware element refers to the casks, railcars, and other items necessary to operate the system. This element currently focuses on development of railcars compliant with Association of American Railroads Standard S-2043, as well as studies related to the use of rail casks and their ancillary equipment. The Nuclear Fuels Storage and Transportation Planning Project is making significant progress in all three of these areas along the path forward to a fully operational transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of technetium contaminated demolition debris from the gaseous diffusion plants at the east Tennessee Technology Park - 15422

The demolition of the final section of the gaseous diffusion plant (GDP) facility formerly known as K-25 at the East Tennessee Technology Park was completed in December of 2013, with the final shipment of waste completed only six months later in June 2014. While most of the radioactive waste shipments would be considered 'routine' by today's standards (lower activity waste was disposed onsite at the Environmental Management Waste Management Facility [EMWMF] and at some offsite commercial disposal facilities with higher activity waste making its way across country to the Nevada National Security Site [NNSS] disposal facility) the final section of K-25, consisting of six cascade 'units', presented some unique technical and stakeholder challenges. Portions of this final section of K-25 were presumed to be heavily contaminated with Technetium-99 (Tc-99) based on sampling and analysis activities conducted during facility deactivation. Tc-99 is known to be highly mobile under a variety of environmental conditions, and is suspected to be potentially mobile in unmitigated landfill conditions, resulting in the need to implement additional engineered controls during facility demolition as well as throughout the management of the resultant waste. A variety of controls were implemented to ensure Tc-99 mobility was controlled and possible consequences mitigated, including isolation and offsite shipment of highest Tc-99 concentration components, as well as construction of a 'cell within a cell' at the EMWMF. This paper will examine the process utilized to develop the controls for management of Tc-99 contaminated waste and will describe those controls. Additionally, it will describe the stakeholder involvement and approval process as well as examining and documenting the efficacy of the controls that were implemented. Finally, this paper will discuss lessons learned from this first of a kind demolition effort and how this experience can be utilized to further refine the Tc-99 waste management approach for the remaining GDPs at ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Diversity and the citizens' advisory board: aligning disparate views for better results - 15469

The Northern New Mexico Citizens' Advisory Board (NNMCAB) is a group of -citizen experts,- i.e., experts on being citizens who take the time and focus their attention to grow more informed about nuclear science, nuclear waste remediation, and environmental monitoring issues. The Board digests complex information associated with these topics in light of the Los Alamos National Laboratory's (LANL) and Department of Energy's (DOE) activities in Northern New Mexico and discusses and conveys this information clearly to a diverse regional stakeholder population that includes a 400+ year old Hispanic culture, a 1,000+ year old Native American pueblo culture, a highly educated scientific and technical community of federal workers and their families, rural agricultural communities, creative/artistic communities, and political and peace activists. Our Board has either representation from each of these diverse New Mexican sectors or enjoys public comment from these sectors. Projects that involve such stakeholder-expert exchanges include remediation of an underground chromium plume, continued investigation and remediation associated with a radiation leak at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, the transport of Transuranic Waste off the Los Alamos 'Hill,- the ultimate disposition of -33 Shafts,- currently in place at Los Alamos National Laboratory, and the distilled voice of the citizen for continued and sufficient federal funding each year for responsible clean-up and monitoring of nuclear activities. Through the NNMCAB's communication venue of regular public meetings, mis-characterization is prevented, public input is incorporated into the official record, and recommendations to the DOE are promulgated. Scientific and technical experts join the bi-monthly NNMCAB meetings and monthly committee meetings to present and discuss current topics. The availability of these experts and their deeper reference materials is key to the interchange, as is the respectful and patient dialogue that exists between board members and the subject matter experts, both in the public forums and between meetings. Meetings are professionally organized and orchestrated to maximize the value of the experts' and board members' participation time. The professional format of the meetings ensures maximum learning and relationship-building which fosters effective channels for public dialogue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An approach to evaluating and monitoring ecological resources for sustainability on DOE remediation sites: Hanford as a case study - 15524

Protecting ecological and environmental resources is a worthy aspect of the Department of Energy's site missions, for each of its sites, during and after remediation. Ecological resources are important to a range of stakeholders, including regulatory agencies, resource agencies, natural resource trustees, Tribal governments, and the public, and may be an essential component of Native American cultural resources. Because the nature and value of ecological resources can change over time as a result of remediation, succession, and global climate change, it is imperative for DOE to have instituted an acceptable method of evaluating resources before initiation of active remediation, over the ensuing century when institutional and engineering controls are considered to be in effect. Having such a methodology in place also would be key to resource sustainability. Department of Energy sites generally have environmental programs, so instituting specific unified practices for evaluating resources should not be difficult to implement. Instituting these practices would assure the public that ecological resources, as well as human and cultural resources, are being protected now, and can be protected into the future. Key ecological species and/or unique habitats have been preserved at Department of Energy sites since the mid-20. century because of federal government stewardship. Such preservation is particularly true for the sites with larger land areas, including the Hanford Reservation, the Idaho National Laboratory and the Savannah River Site. Individual sites typically have extensive studies of site biodiversity, but site resources are not routinely examined within a regional or national context (Eco-region). The evaluation of the on-site resources with those resources in the appropriate Eco-region provides a context for 'valuing' on- site resources. On-site resources should also be evaluated in terms of federal and state legislation where species may have legal protection and require legal consideration during remediation if present or adjacent to the remediation site. A method is needed in this study for evaluating ecological resources prior to remediation and during remediation, and a paradigm is proposed that will ensure sustainability. Finally, in a period of climate change and instability, developing methods of evaluating ecological resources is essential to successful protection, enhancement, and sustainability. The ecological methodology is part of a Hanford site-wide Risk Review Project, conducted by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP). Our method adapts an existing methodology that includes using established levels for evaluating ecological resources by expanding the existing methodology to include field work for validating previous resource level designations, to assess the occurrence of invasive/exotic species, and to identify landscape scale features (patch size, connectivity). Evaluations should be conducted in the remediation unit itself, and in a buffer zone surrounding the remediation site. The methodology described has been applied to several remediation areas at Hanford, and issues that emerged during its application are discussed. The methodology can be applied at the major sites. Application of the Eco-region analysis will provide regulators and the public with an understanding of the value of the ecological resources in relation to the region, as well as an appreciation for the stewardship role the Department of Energy has played in protecting these resources since the beginning of the Cold War Era and can continue to do so sustainably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brownfields to Brightfields: A Sustainability Initiative at DOE'S East Tennessee Technology Park Cleanup - 16120

As DOE works toward completing their cleanup mission at the East Tennessee Technology Park (ETTP), the ultimate goal is to return property no longer needed for government use to the community for beneficial re-use. The vision for ETTP is to transform the former gaseous diffusion facility into a commercial industrial park, leveraging the site's infrastructure to attract businesses to the site. While hundreds of acres at ETTP have been transferred for re-use, areas within the former production footprint of the site have future use restricted due to the presence of residual contamination, underground structures and utilities and/or physical features that limit their reuse potential. Brownfield redevelopment with solar energy generation has proven to be an excellent option for beneficial reuse and sustainability thanks to the flexible nature of solar photovoltaic technology and design that can address the restrictions and limitations of the site. Developing a solar project on a cleanup site can be challenging due to a large number of stakeholders and regulatory compliance issues of the environmental legacy at DOE cleanup sites; however, the challenges can be offset by the available infrastructure and low cost property. The requirement for large amounts of land or surface area is a major constraint to the growth of photovoltaic solar systems. An average solar generating facility requires 2 or more hectares (5 acres) for each megawatt (MW) of power generated. Re-using land that is otherwise un-developable provides a cost effective site for renewable energy generation to innovative solar developers. At ETTP, DOE's Oak Ridge Office of Environmental Management and the community reuse organization (Community Reuse Organization of East Tennessee - CROET) supported a local small business (Restoration Services, Inc. - RSI) familiar with the site and environmental regulations to secure a power purchase agreement with the regional electric provider (Tennessee Valley Authority - TVA) for a 1 MW utility-scale photovoltaic solar facility. The solar facility, Powerhouse Six, was developed through a commercial partnership (RSI and Vis Solis, Inc.) that worked closely with the lead ETTP site cleanup contractor (URS-CH2M Oak Ridge LLC - UCOR) and the local government. The selected site at ETTP had limitations on subsurface disturbance to 10 feet below ground surface because of utility ducts and residual contamination. Near surface relics (facility foundation remnants) were also found to prohibit ground penetration. A photovoltaic solar design using a ballasted ground mount system was developed to conform to the restrictions. The ballasted system could follow existing land contours, eliminating the need for any extensive site preparation and avoiding the risk of ground penetration. The lead cleanup contractor's role in facilitating the completion of this project included making the necessary environmental assessment documentation available to obtain the construction notice to proceed from the regional electric provider. They accelerated the transfer of ETTP power lines and electric demand to the city electric department to accommodate connection to the electric grid and supplied the communication connection required for metering the electric power generation. DOE's support along with their cleanup contractor's re-industrialization program and power integration group provided regular communication with the project stakeholders for more than six months to facilitate the early transfer of the utility infrastructure. Powerhouse Six sustainability benefits: - Generates enough clean energy to power more than 100 homes or prevents pollution equivalent to removing 240 cars from the road annually (1,141 metric tons of carbon dioxide); - Provides Brownfield reuse/redevelopment at ETTP; - Eliminates the generation of wastes through excavation and saves money to cleanup other areas for re-use; - Supports regional electric provider's renewable energy initiative; - Offers community economic development/ jobs and property tax income to the City of Oak Ridge; - Demonstrates benefit of ETTP re-industrialization; - Provides long-term lease payments to the community reuse organization; - Supports DOE renewable energy goals; - Demonstrates collaboration between DOE and a public utility for renewable energy development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PHOENIX - Web-Based Application for Accessing Hanford Tank Monitoring Data - 16157

Data volume, complexity, and access issues pose severe challenges for analysts, regulators, and stakeholders interested in evaluating scientific data to support decision making at the Department of Energy's (DOE) Hanford Site. Pacific Northwest National Laboratory (PNNL) has developed a suite of web applications known collectively as PHOENIX (PNNL-Hanford Online Environmental Information exchange) to address data access, transparency, and integration challenges through intuitive query, visualization, and analysis tools that are accessible via desktop computer or mobile device by simply accessing the application web page (http://phoenix.pnnl.gov). Beginning in 2013, DOE's Office of River Protection (ORP) has worked with PNNL to develop a PHOENIX Tank Farm application to provide access to, and visualization of, in-tank monitoring data that had only been available to the public as text downloads for almost two decades. The Tank Farm application's user-friendly web-interface allows the public, stakeholders, regulators, and program managers to quickly and easily visualize in-tank and ex-tank data, facilitating data transparency and high-level decisions related to tank operations and management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SeeSnake: Radiological Characterisation of Complex Nuclear Spaces - 16162

Decommissioning of retired nuclear plant can be a difficult task for many reasons. A number of locations around the world have active cells awaiting decommissioning without a clear understanding of the internal structure and possible locations of radiological sources. Furthermore, many nuclear plant drawings and models do not reflect the 'as built' dimensions, and precise data required for safe and cost effective decommissioning is not readily available. This presents decommissioning teams with significant challenges when attempting to plan and execute their decommissioning programs. Due to the complex nature and constrained environments typical of legacy nuclear plant, it is often not possible to deploy traditional remote handling/inspection technologies. Even where possible, identifying the correct sensor, or suite of sensors, to characterize the environment is problematic. To address this common issue Create Technologies Ltd (Createc) and OC Robotics collaborated on SeeSnake, a project aimed at leveraging radiometric source mapping with 3D scanning and confined space remote handling. Createc's imaging and sensing systems have strong capabilities in the nuclear industry, led by their N-Visage products, as do OC Robotics' snake-arm robots as a remote deployment platform for confined and hazardous spaces. The snake-arm robot enables access through small penetrations with the ability to navigate internal structures and other obstacles without support from the environment; whilst multiple re-positioning of the N-Visage sensor, integrated with the snake-arm system, enables a thorough 3D map to be created. The SeeSnake project demonstrates the integrated systems ability to capture valuable radiation, visual and positional data enabling the characterization of a complex active environment. To mature the concept into an integrated, functional technology the SeeSnake partners overcame a number of challenges before demonstrating to key stakeholders in the UK nuclear industry. This paper describes these challenges and the solutions implemented, along with the results from early system trials and stakeholder demonstrations. It also addresses the next steps for the SeeSnake technology and identifies a number of applications which will may benefit from its exploitation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗