Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Inducing Mineral Precipitation in Groundwater by Addition of Phosphate

Induced precipitation of phosphate minerals to scavenge trace metals and radionuclides from groundwater is a potential remediation approach for contaminated aquifers. Phosphate minerals can sequester trace elements by primary mineral formation, solid solution formation and/or adsorption, and they are poorly soluble under many environmental conditions, making them attractive for long-term sustainable remediation. The success of such engineered schemes will depend on the particular mineral phases generated, their rates of formation, and their long term stability. The purpose of this study was to examine the precipitation of calcium phosphate minerals under conditions representative of a natural groundwater. Because microorganisms are present in groundwater, and because some proposed schemes for induced phosphate mineral precipitation rely on the stimulation of native groundwater populations, we also tested the effect of bacterial cells (initial densities of 105 and 107 ml-1) within the precipitation medium. We also tested the effect of a trace mixture of propionic, isovaleric, formic and butyric acids (total concentration 0.035 mM). The experiments showed that the general progression of mineral precipitation was similar under all of the conditions, with initial formation of amorphous calcium carbonate, and transformation to poorly crystalline hydroxyapatite (HAP) by the end of the week-long experiments. The presence of the bacterial cells appeared to delay precipitation, although by the end of 7 days the overall extent of precipitation was similar for all of the treatments. The stoichiometry of the final precipitates as well as results of Rietveld refinement of x-ray diffraction data indicated that the treatments including organic acids and bacterial cells resulted in increased distortion of the HAP crystal lattice, with the higher concentration of cells resulting in the greatest distortion. Uptake of Sr into the phosphate minerals was decreased in the treatments with cells and organic acids, compared to the control. The results of the experiments enable a greater understanding of the challenges associated with phosphate-based remediation schemes for contaminated environments.

54 ENVIRONMENTAL SCIENCES↗

A Methodology to Evaluate Ecological Resources and Risk Using Two Case Studies at the Department of Energy’s Hanford Site

An assessment of the potential risks to ecological resources from remediation activities or other perturbations should involve a quantitative evaluation of resources on the remediation site and in the surrounding environment. We developed a risk methodology to rapidly evaluate potential impact on ecological resources for the U.S. Department of Energy’s Hanford Site in southcentral Washington State. We describe the application of the risk evaluation for two case studies to illustrate its applicability. The ecological assessment involves examining previous sources of information for the site, defining different resource levels from 0 to 5. We also developed a risk rating scale from nondiscernable to very high. Field assessment is the critical step to determine resource levels or to determine if current conditions are the same as previously evaluated. We provide a rapid assessment method for current ecological conditions that can be compared to previous site-specific data, or that can be used to assess resource value on other sites where ecological information is not generally available. The method is applicable to other Department of Energy’s sites, where its development may involve a range of state regulators, resource trustees, Tribes and other stakeholders. Achieving consistency across Department of Energy’s sites for valuation of ecological resources on remediation sites will assure Congress and the public that funds and personnel are being deployed appropriately.

54 ENVIRONMENTAL SCIENCES↗

Groundwater uranium stabilization by a metastable hydroxyapatite

In-situ remediation of groundwater uranium (U) contamination via the precipitation of uranyl phosphate (U-P) minerals is a promising, passive remedial approach for aquifers impacted by mobile hexavalent U (U(VI)). We demonstrate the efficacy of U stabilization in a contaminated aquifer using a metastable form of hydroxyapatite (mHAP) derived from fish bone. This material was reacted with depleted uranium (DU) contaminated groundwater both under ambient flow in-situ, and under pumped flow ex-situ. The U immobilized under both ambient and accelerated flow conditions was strongly bound in solid phases, with greater than 99% U removal from groundwater. Stable U uptake in excess of 50 g U/kg solid was achieved due to the precipitation of the crystalline U-P mineral chernikovite. Prior field trials yielded U immobilization by sorption alone, likely due to higher pH and alkalinity groundwater conditions, which increase the solubility of U-P phases via aqueous complexation. Our study is the first to demonstrate the feasibility of U immobilization by U-P precipitation from natural groundwater. Furthermore, these findings suggest that in groundwaters contaminated by U(VI) with circumneutral pH and low carbonate alkalinity, fish bone-derived hydroxyapatite is an effective material for in-situ U remediation that can be readily implemented, requiring no redox manipulation.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Recent advances in MoS{sub 2} nanostructured materials for energy and environmental applications – A review

Molybdenum disulfide (MoS{sub 2}), a layered transition metal dichalcogenide with an analogous structure to graphene, has attracted enormous attention worldwide owing to its use in a variety of applications such as energy storage, energy conversion, environmental remediation and sensors. MoS{sub 2} and graphene have almost similar functional properties such as high charge carrier transport, high wear resistance and good mechanical strength and friction. However, MoS{sub 2} is advantageous over graphene due to its low-cost, abundancy, tailorable morphologies and tuneable band gap with good visible light absorption properties. In this review, we have focussed mainly on recent advances in MoS{sub 2} nanostructured materials for the applications in the broad area of energy and environment. Special attention has been paid to their applications in dye-sensitized solar cells, supercapacitor, Li-ion battery, hydrogen evolution reaction, photocatalysis for the degradation of organic pollutants, chemical/bio sensors and gas sensors. Finally, the challenges to design MoS{sub 2} nanostructures suitable for energy and environmental applications are also highlighted. - Highlights: • Applications of MoS{sub 2} nanostructures towards energy, environmental remediation and sensors were summarized. • Recent advances in the development of MoS{sub 2} nanostructured materials were systematically investigated. • Wide range of energy applications including DSSCs, supercapacitors, Li-ion batteries and HER were reviewed. • Key challenges and optimization of structure for superior performance associated with MoS{sub 2} nanostructures were discussed. • Advances of environmental remediation based on MoS{sub 2} nanostructures were significantly highlighted.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dissolved organic matter reduces the effectiveness of sorbents for mercury removal

Mercury (Hg) contamination of soils and sediments impacts numerous environments worldwide and constitutes a challenging remediation problem. In this study, we evaluate the impact of dissolved organic matter (DOM) on the effectiveness of eight sorbent materials considered for Hg remediation in soils and sediments. The materials include both engineered and unmodified materials based on carbon, clays, mesoporous silica and a copper alloy. Initially, we investigated the kinetics of Hg(II) complexation with DOM for a series of Hg:DOM ratios. Steady-state Hg-DOM complexation occurred within 48 to 120 h, taking longer time at higher Hg:DOC (dissolved organic carbon) molar ratios. In subsequent equilibrium experiments, Hg(II) was equilibrated with DOM at a defined Hg:DOC molar ratio (2.4 · 10 –6 ) for 170 h and used in batch experiments to determine the effect of DOM on Hg partition coefficients and sorption isotherms by comparing Hg(II) and Hg-DOM. Hg sorption capacities of all sorbents were severely limited in the presence of DOM as a competing ligand. Thiol-SAMMS®, SediMite™ and pine biochar were most effective in reducing Hg concentrations. While pine biochar and lignin-derived carbon processed at high temperatures released negligible amounts of anions into solution, leaching of sulfate and chloride was observed for most engineered sorbent materials. Sulfate may stimulate microbial communities harboring sulfate reducing bacteria, which are considered one of the primary drivers of microbial mercury methylation in the environment. Here, the results highlight potential challenges arising from the application of sorbents for Hg remediation in the field.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The potential for aeration of MSW landfills to accelerate completion

Landfilling is a popular waste disposal method, but, as it is practised currently, it is fundamentally unsustainable. The low short-term financial costs belie the potential long-term environmental costs, and traditional landfill sites require long-term management in order to mitigate any possible environmental damage. Old landfill sites might require aftercare for decades or even centuries, and in some cases remediation may be necessary. Biological stabilisation of a landfill is the key issue; completion criteria provide a yardstick by which the success of any new technology may be measured. In order for a site to achieve completion it must pose no risk to human health or the environment, meaning that attenuation of any emissions from the site must occur within the local environment without causing harm. Remediation of old landfill sites by aerating the waste has been undertaken in Germany, the United States, Italy and The Netherlands, with considerable success. At a pilot scale, aeration has also been used in newly emplaced waste to accelerate stabilisation. This paper reviews the use of aerobic landfill worldwide, and assesses the ways in which the use of aerobic landfill techniques can decrease the risks associated with current landfill practices, making landfill a more sustainable waste disposal option. It focuses on assessing ways to utilise aeration to enhance stabilisation. The results demonstrated that aeration of old landfill sites may be an efficient and cost-effective method of remediation and allow the date of completion to be brought forward by decades. Similarly, aeration of newly emplaced waste can be effective in enhancing degradation, assisting with completion and reducing environmental risks. However, further research is required to establish what procedure for adding air to a landfill would be most suitable for the UK and to investigate new risks that may arise, such as the possible emission of non-methane organic compounds.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Data Mining Approach to Predict In Situ Detoxification Potential of Chlorinated Ethenes

Despite advances in physicochemical remediation technologies, in situ bioremediation treatment based on Dehalococcoides mccartyi (Dhc) reductive dechlorination activity remains a cornerstone approach to remedy sites impacted with chlorinated ethenes. Selecting the best remedial strategy is challenging due to uncertainties and complexity associated with biological and geochemical factors influencing Dhc activity. Guidelines based on measurable biogeochemical parameters have been proposed, but contemporary efforts fall short of meaningfully integrating the available information. Extensive groundwater monitoring data sets have been collected for decades, but have not been systematically analyzed and used for developing tools to guide decision-making. In the present study, geochemical and microbial data sets collected from 35 wells at five contaminated sites were used to demonstrate that a data mining prediction model using the classification and regression tree (CART) algorithm can provide improved predictive understanding of a site’s reductive dechlorination potential. The CART model successfully predicted the 3-month-ahead reductive dechlorination potential with 75.8% and 69.5% true positive rate (i.e., sensitivity) for the training set and the test set, respectively. The machine learning algorithm ranked parameters by relative importance for assessing in situ reductive dechlorination potential. The abundance of Dhc 16S rRNA genes, CH 4 , Fe 2+ , NO 3 – , NO 2 – , and SO 4 2– concentrations, total organic carbon (TOC) amounts, and oxidation–reduction potential (ORP) displayed significant correlations (p < 0.01) with dechlorination potential, with NO 3 – , NO 2 – , and Fe 2+ concentrations exhibiting precedence over other parameters. Contrary to prior efforts, the power of data mining approaches lies in the ability to discern synergetic effects between multiple parameters that affect reductive dechlorination activity. Overall, these findings demonstrate that data mining techniques (e.g., machine learning algorithms) effectively utilize groundwater monitoring data to derive predictive understanding of contaminant degradation, and thus have great potential for improving decision-making tools. Finally, a major need for realizing the predictive capabilities of data mining approaches is a curated, open-access, up-to-date and comprehensive collection of biogeochemical groundwater monitoring data.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Long-Term in Situ Reduction in Soil Lead Bioavailability Measured in a Mouse Model

In this study, effects of different treatments on the bioavailability of lead (Pb) in soil from a smelter emission contaminated site in Joplin, Missouri, were evaluated in a mouse model. Similar estimates of relative bioavailability for Pb in untreated or treated soil were obtained in mice and in the well-established juvenile swine model. In the mouse model, treatments that used phosphate (phosphoric acid or triple superphosphate) combined with iron oxide or biosolids compost significantly reduced soil Pb bioavailability. Notably, effects of these remediation procedures were persistent, given that up to 16 years had elapsed between soil treatment and sample collection. Remediation of soils was associated with changes in Pb species present in soil. Differences in Pb species in ingested soil and in feces from treated mice indicated that changes in Pb speciation occurred during transit through the gastrointestinal tract. Use of the mouse model facilitates evaluation of remediation procedures and allows monitoring of the performance of procedures under laboratory and field conditions.

54 ENVIRONMENTAL SCIENCES↗

Sequestration and Retention of Uranium (VI) in the Presence of Hydroxylapatite under Dynamic Geochemical Conditions

Numerous solid- and aqueous-phase, phosphate-based technologies for remediating heavy metals and radionuclides have the common premise of sequestration by hydroxylapatite. Complexation reactions and hydrolysis generally preclude actinides from incorporation into intracrystalline sites; rather, surface sorption and precipitation are significant mechanisms for the sequestration of actinides. The effect of pH, aqueous speciation, and the availability of reactive surface sites on minerals such as hydroxylapatite have a significant impact on the mechanism and degree of sequestration and retention of variably charged contaminants such as uranium. Yet, little attention has been given to the sequestration and retention of uranium by hydroxylapatite under dynamic geochemical conditions which may be encountered during remediation activities. We present the results of an investigation evaluating the removal of uranium by hydroxylapatite in systems near equilibrium with respect to hydroxylapatite, and the effect of dynamic aqueous geochemical conditions, such as those encountered during and subsequent to remediation activities, on the retention of uranium are considered. Results presented here support previous investigations demonstrating the efficiency of hydroxylapatite for sequestration of uranium and illustrate the importance of geochemical conditions, including changes to surface properties and aqueous speciation, on the sequestration and retention of uranium.

54 ENVIRONMENTAL SCIENCES↗

A Rapid Decision Support Tool for Estimating Impacts of a Vadose Zone Volatile Organic Compound Source on Groundwater and Soil Gas

Diminishing rates of subsurface volatile contaminant removal by soil vapor extraction (SVE) oftentimes warrants an in‐depth performance assessment to guide remedy decision‐making processes. Such a performance assessment must include quantitative approaches to better understand the impact of remaining vadose zone contamination on soil gas and groundwater concentrations. The spreadsheet‐based Soil Vapor Extraction Endstate Tool (SVEET) software functionality has recently been expanded to facilitate quantitative performance assessments. The updated version, referred to as SVEET2, includes expansion of the input parameter ranges for describing a site (site geometry, source characteristics, etc.), an expanded list of contaminants, and incorporation of elements of the Vapor Intrusion Estimation Tool for Unsaturated‐zone Sources software to provide soil gas concentration estimates for use in vapor intrusion evaluation. As part of the update, SVEET2 was used to estimate the impact of a tetrachloroethene (PCE) vadose zone source on groundwater concentrations, comparing SVEET2 results to field‐observed values at an undisclosed site where SVE was recently terminated. PCE concentrations from three separate monitoring wells were estimated by SVEET2 to be within the range of 6.0–6.7 μg/L, as compared to actual field concentrations that ranged from 3 to 11 μg/L PCE. These data demonstrate that SVEET2 can rapidly provide representative quantitative estimates of impacts from a vadose zone contaminant source at field sites. Finally, in the context of the SVE performance assessment, such quantitative estimates provide a basis to support remedial and/or regulatory decisions regarding the continued need for vadose zone volatile organic compound remediation or technical justification for SVE termination, which can significantly reduce the cost to complete for a site.

54 ENVIRONMENTAL SCIENCES↗

Removal of River-Stage Fluctuations from Well Response Using Multiple-Regression

Many contaminated unconfined aquifers are located in proximity to river systems. In groundwater studies, the physical presence of a river is commonly represented as a transient-head boundary that imposes hydrologic responses within the intersected unconfined aquifer. The periodic fluctuation of river-stage height at the boundary produces associated responses within the adjacent aquifer system, the magnitude of which is a function of the existing well, aquifer, boundary conditions, and river-stage fluctuation characteristics. The presence of well responses induced by the river stage can significantly limit characterization and monitoring of remedial activities within the stress-impacted area. This paper demonstrates the use of a time-domain, multiple-regression, convolution (superposition) method to develop well/aquifer river response function (RRF) relationships. Following RRF development, a multiple-regression deconvolution correction approach can be applied to remove river-stage effects from well water-level responses. Corrected well responses can then be analyzed to improve local aquifer characterization activities in support of optimizing remedial actions, assessing the area-of-influence of remediation activities, and determining mean groundwater flow and contaminant flux to the river system.

54 ENVIRONMENTAL SCIENCES↗

Norm - contaminated iodine production facilities decommissioning in Turkmenistan: experience and results

This report summarizes the data, including the cost parameters of the former iodine production facilities decommissioning project in Turkmenistan. Before the closure, these facilities were producing the iodine from the underground mineral water by the methods of charcoal adsorption. Balkanabat iodine and Khazar chemical plants' sites remediation, transportation and disposal campaigns main results could be seen. The rehabilitated area covers 47.5 thousand square meters. The remediation equipment main characteristics, technical solutions and rehabilitation operations performed are indicated also. The report shows the types of the waste shipping containers, the quantity and nature of the logistics operations. The project waste turnover is about 2 million ton-kilometers. The problems encountered during the remediation of the Khazar chemical plant site are discussed: undetected waste quantities that were discovered during the operational activities required the additional volume of the disposal facility. The additional repository wall superstructure was designed and erected to accommodate this additional waste. There are data on the volume and characteristics of the NORM waste disposed: 60.4 thousand cu.m. of NORM with total activity 1 439 x 10{sup 9} Bq (38.89 Ci) were disposed at all. This report summarizes the project implementation results, from 2009 to 15.02.2012 (the date of the repository closure and its placement under the controlled supervision), including monitoring results within a year after the repository closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rocky flats closure project - lessons learned in worker stakeholder engagement

The Rocky Flats Environmental Technology Site (EPA Superfund site near Denver, Colorado) produced plutonium components for nuclear weapons for the U.S. defense program. The facility shut down in 1989 and clean up began in 1992. To ensure safe remediation of inactive nuclear sites, site owners have begun to consult stakeholders more widely in recent years. The closure of Rocky Flats aimed to set the standard for stakeholder involvement in doing the work safely, complying with regulations/standards, in a cost-effective manner. We have studied, using ethnographic methods, the extent to which workers at Rocky Flats were involved in communication and decision making strategies. Our results point out that workers can have perceptions of the site remediation process that differ from management and even other workers and that a significant number of workers questioned the commitment by management to engage the worker as stakeholder. The most effective remediation efforts should involve careful consideration of the insights and observations of all workers, particularly those who face immediate and high-level health and safety risks. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2015 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site

The Gnome-Coach, New Mexico, Site was the location of a 3-kiloton-yield underground nuclear test in 1961 and a groundwater tracer test in 1963. The U.S. Geological Survey conducted the groundwater tracer test using four dissolved radionuclides--tritium, iodine-131, strontium-90, and cesium-137--as tracers. Site reclamation and remediation began after the underground testing, and was conducted in several phases at the site. The New Mexico Environment Department (NMED) issued a Conditional Certificate of Completion in September 2014, which documents that surface remediation activities have been successfully completed in accordance with the Voluntary Remediation Program. Subsurface activities have included annual sampling and monitoring of wells at and near the site since 1972. These annual monitoring activities were enhanced in 2008 to include monitoring hydraulic head and collecting samples from the onsite wells USGS-4, USGS-8, and LRL-7 using the low-flow sampling method. In 2010, the annual monitoring was focused to the monitoring wells within the site boundary. A site inspection and annual sampling were conducted on January 27-28, 2015. A second site visit was conducted on April 21, 2015, to install warning/notification signs to fulfill a requirement of the Conditional Certificate of Completion that was issued by the NMED for the surface.

54 ENVIRONMENTAL SCIENCES↗

Geochemical Characterization of Chromate Contamination in the 100 Area Vadose Zone at the Hanford Site

The major objectives of the proposed study were to: 1.) determine the leaching characteristics of hexavalent chromium [Cr(VI)] from contaminated sediments collected from 100 Area spill sites; 2.) elucidate possible Cr(VI) mineral and/or chemical associations that may be responsible for Cr(VI) retention in the Hanford Site 100 Areas through the use of i.) macroscopic leaching studies and ii.) microscale characterization of contaminated sediments; and 3.) provide information to construct a conceptual model of Cr(VI) geochemistry in the Hanford 100 Area vadose zone. In addressing these objectives, additional benefits accrued were: (1) a fuller understanding of Cr(VI) entrained in the vadose zone that will that can be utilized in modeling potential Cr(VI) source terms, and (2) accelerating the Columbia River 100 Area corridor cleanup by providing valuable information to develop remedial action based on a fundamental understanding of Cr(VI) vadose zone geochemistry. A series of macroscopic column experiments were conducted with contaminated and uncontaminated sediments to study Cr(VI) desorption patterns in aged and freshly contaminated sediments, evaluate the transport characteristics of dichromate liquid retrieved from old pipelines of the 100 Area; and estimate the effect of strongly reducing liquid on the reduction and transport of Cr(VI). Column experiments used the < 2 mm fraction of the sediment samples and simulated Hanford groundwater solution. Periodic stop-flow events were applied to evaluate the change in elemental concentration during time periods of no flow and greater fluid residence time. The results were fit using a two-site, one dimensional reactive transport model. Sediments were characterized for the spatial and mineralogical associations of the contamination using an array of microscale techniques such as XRD, SEM, EDS, XPS, XMP, and XANES. The following are important conclusions and implications. Results from column experiments indicated that most of contaminant Cr travels fast through the sediments and appears as Cr(VI) in the effluents. The significance of this for groundwater concentrations would, however, depend on the mass flux of recharge to the water table. adsorption of Cr(VI) to sediments from spiked Cr(VI) solution is low; calculated retardation coefficients are close to one. Calcium polysulfide solutions readily reduced Cr(VI) to Cr(III) in column experiments. However a significant amount of the Cr(VI) was mobilized ahead of the polysulfide solution front. This has significant implications for in-situ reductive remediation techniques. The experiments suggest that it would be difficult to design a remedial measure using infiltration of liquid phase reductants without increasing transport of Cr(VI) toward the water table. The microscopic characterization results are consistent with the column studies. Cr(VI) is found as ubiquitous coatings on sediment grain surfaces. Small, higher concentration, chromium sites are associated with secondary clay mineral inclusions, with occasional barium chromate minerals, and reduced to Cr(III) in association with iron oxides that are most likely magnetite primary minerals. Within the restricted access domains of sediment matrix, ferrous iron could also diffuse from in situ, high-surface-area minerals to cause the reductive immobilization of chromate. This process may be favored at microscale geochemical zones where ferrous iron could be supplied. Once nucleated, micrometer-scale precipitates are favored as growing locales for further accumulation, causing the formation of discrete zones of Cr(III).

54 ENVIRONMENTAL SCIENCES↗

SLUDGE TREATMENT PROJECT ALTERNATIVES ANALYSIS SUMMARY REPORT [VOLUME 1]

Highly radioactive sludge (containing up to 300,000 curies of actinides and fission products) resulting from the storage of degraded spent nuclear fuel is currently stored in temporary containers located in the 105-K West storage basin near the Columbia River. The background, history, and known characteristics of this sludge are discussed in Section 2 of this report. There are many compelling reasons to remove this sludge from the K-Basin. These reasons are discussed in detail in Section1, and they include the following: (1) Reduce the risk to the public (from a potential release of highly radioactive material as fine respirable particles by airborne or waterborn pathways); (2) Reduce the risk overall to the Hanford worker; and (3) Reduce the risk to the environment (the K-Basin is situated above a hazardous chemical contaminant plume and hinders remediation of the plume until the sludge is removed). The DOE-RL has stated that a key DOE objective is to remove the sludge from the K-West Basin and River Corridor as soon as possible, which will reduce risks to the environment, allow for remediation of contaminated areas underlying the basins, and support closure of the 100-KR-4 operable unit. The environmental and nuclear safety risks associated with this sludge have resulted in multiple legal and regulatory remedial action decisions, plans,and commitments that are summarized in Table ES-1 and discussed in more detail in Volume 2, Section 9.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

54 ENVIRONMENTAL SCIENCES↗

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

300 FF-5 Operable Unit↗