Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

On-Site Pilot Study - Removal of Uranium, Radium-226 and Arsenic from Impacted Leachate by Reverse Osmosis - 13155

Conestoga-Rovers and Associates (CRA-LTD) performed an on-site pilot study at the Welcome Waste Management Facility in Port Hope, Ontario, Canada, to evaluate the effectiveness of a unique leachate treatment process for the removal of radioactive contaminants from leachate impacted by low-level radioactive waste. Results from the study also provided the parameters needed for the design of the CRA-LTD full scale leachate treatment process design. The final effluent water quality discharged from the process to meet the local surface water discharge criteria. A statistical software package was utilized to obtain the analysis of variance (ANOVA) for the results from design of experiment applied to determine the effect of the evaluated factors on the measured responses. The factors considered in the study were: percent of reverse osmosis permeate water recovery, influent coagulant dosage, and influent total dissolved solids (TDS) dosage. The measured responses evaluated were: operating time, average specific flux, and rejection of radioactive contaminants along with other elements. The ANOVA for the design of experiment results revealed that the operating time is affected by the percent water recovery to be achieved and the flocculant dosage over the range studied. The average specific flux and rejection for the radioactive contaminants were not affected by the factors evaluated over the range studied. The 3 month long on-site pilot testing on the impacted leachate revealed that the CRA-LTD leachate treatment process was robust and produced an effluent water quality that met the surface water discharge criteria mandated by the Canadian Nuclear Safety Commission and the local municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Near-Tank Treatment of Hanford Tank Waste: Pilot-Scale Testing - 12107

In order to reduce the number of high level waste canisters that will have to be produced by the Hanford Tank Waste Treatment and Immobilization Plant, supplemental waste treatment technologies are being investigated. One such technology is the Near-Tank Treatment System, which uses continuous sludge leaching, filtration, and ion exchange to process the waste in a simple, compact system. The Near Tank Treatment System is ideally suited for handling Hanford tanks with large amounts of boehmite, a difficult aluminum phase to dissolve. A pilot-scale Near Tank Treatment System was constructed and tested with a boehmite and iron oxyhydroxide waste simulant to evaluate the robustness and effectiveness of the system. The data from the pilot-scale tests were also used to assess scale-up from previously performed bench-scale tests. It should be noted that any work involving the use of simulated HLW has inherent limitations. For this work, every attempt was made to ensure that the simulant mimicked the actual waste performance as closely as possible. However, there are always limitations in the ability to The NTTS Demonstration Test established that all the subsystems could be operated concurrently to process the waste simulant. The NTTS had a stable performance during the Demonstration Test that required very little external manipulation once a steady state was achieved. The CSL demonstrated effectively 90% dissolution of the hard to leach boehmite phase. The cross flow filtration system was able to deliver decontaminated salt solution to the NTCR system. The NTCR system exceeded the design basis by providing effluent below the detection limit beyond the design basis required time. The NTTS system was successfully demonstrated and has shown that leaching and decontamination of the subsequent permeate can be readily achieved using relatively small footprint equipment in an at tank application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Confirmation Strategies for the Waste Isolation Pilot Plant - A Historical Perspective from an Operating Disposal Facility - 12248

Performance confirmation is an important element of the Waste Isolation Pilot Plant (WIPP) program. Performance confirmation was first used during the early WIPP site characterization phase to focus experimental activities that address the development of probabilistic repository performance models and to address stakeholder assurance needs. The program is currently used to analyze the conditions of the repository and its surroundings to ensure that the basis for the repository's long-term radioactive waste containment predictions is valid. This basis is related to the parameters, assumptions, conceptual and numerical models that are used to predict or validate the potential radioactive waste containment performance of the system. The concept of performance confirmation for the WIPP is one that has evolved since the first repository work was initiated decades ago and plays an important role in assuring adequate repository performance both now and in the long-term. The WIPP mission has progressed from a pilot project to an operational disposal facility and will progress to eventual site closure when disposal operations are completed. Performance confirmation is an important part of each of these progressions. The concept of disposing radioactive waste in a geologic repository today involves a complete understanding of many technical, political, regulatory, societal and economic elements. Many of these elements overlap and solving all relevant issues necessary to site, operate and decommission a disposal facility should be done with knowledge of each element's requirements and impacts. Performance confirmation is one tool that can help to coordinate many of these elements into a program that actively investigates what is thought to be adequately understood about the system and what information is lacking. A performance confirmation program is used to determine ways to challenge and verify those areas that are thought to be understood and to find ways to understand those areas that are not well understood. Performance confirmation programs have been used twice at WIPP, first during site characterization and PA development and later in a Compliance Monitoring program. At first, only certain technical aspects of the system were deemed important because it was a scientifically-based, government project. Early site characterization work was design to gather information about the geology and hydrology of the area and the mechanical properties of the natural barrier. The information would be used in a PA to determine the long-term containment performance of the disposal system. A performance confirmation element was used to identify the sensitive elements of the system that were certain, well understood or justified and those that were not. It identified experimental and analytical programs that could be used to reduce uncertainty, confirm sensitive assumptions and provide useful data. This performance confirmation program provided data to justify the adequacy of the information used in PA to demonstrate compliance with EPA's containment requirements. Performance confirmation will continue to be used in the post-closure period for at least 30 years and likely up to the end of the 100-year institutional controls period. As the technical basis for the repository matures throughout the operational period, the currently planned post-closure monitoring program will need to be reassessed prior to implementation. However, the intent of the program will be the same as it was for the previous programs, to ensure the ultimate goal of the repository. This goal is to safely isolate waste from the accessible environment and ensure public and environmental safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Re-evaluation of Waste Isolation Pilot Plant's Passive Institutional Controls Program - Status - 17116

The United States government set forth in 40CFR194.43 requirements for 'Passive Institutional Controls' for nuclear waste repositories. This regulation stated compliance applications for a repository 'shall include detailed descriptions of the measures that will be employed to preserve knowledge about the location, design and contents of the disposal system.' In the early 1990's the U.S. Department of Energy developed and proposed in the Compliance Certification Application of 1996 a robust and complex technical and engineering Passive Institutional Controls Program including such things as records management, large surface markers, salt berms, buried and above-ground information rooms and small subsurface markers/plaques. The Waste Isolation Pilot Plant Passive Institutional Control program meets the regulatory requirements and is certified by the U.S. Environmental Protection Agency. Presently this program is being re-evaluated in light of the Nuclear Energy Agency's, Records Knowledge and Memory initiative, shrinking government budgets, and the ethical/moral considerations of risks versus expenditures. This paper will discuss progress made to date in re-evaluating the Waste Isolation Pilot Plant Passive Institutional Controls program and expected plans for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Plant Test of Removal of Co-60 and Cs-137 from the Evaporator Concentrates of Forsmark unit 3 - 17158

A pilot plant test has been conducted to treat evaporator concentrates at Forsmark BWR NPP unit 3 in Sweden using Fortum's selective ion exchanger technology. The concentrate contains an array of radionuclides of which C-60 and Cs-137 are radiologically the most important ones. Concentrate also contained a high salt content ∼ 20 g/l and high organic carbon loading ∼ 1 g/l The pilot system consisted of pre-treatment (mechanical filters, activated carbon, UV oxidation) and Cs and Co selective ion exchangers. CsTreat ion exchanger was very effective in removing Cs from the evaporator concentrate: {sup 137}Cs activity was lowered from the initial value 280 MBq/m{sup 3} to below detection limit 550 Bq/m{sup 3}. Removing Co was more complicated: results suggest that Co is bound to organic chelating compounds, thus fairly compete oxidation of organic carbon was required in order to achieve good ion exchange results. Finally, after total organic carbon (TOC) was treated to below 50 ppm, {sup 60}Co activity was lowered from the initial value of 57 MBq/m{sup 3} to 2.7 kBq/m{sup 3}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influencing future exploratory drilling rates-a potential approach for the waste isolation pilot plant - 15307

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Corrections to the Spallings Volume Calculation on Waste Isolation Pilot Plant Performance Assessment - 16135

The numerical code DRSPALL (from direct release spallings) is written to calculate the volume of Waste Isolation Pilot Plant solid waste subject to material failure and transport to the surface (i.e., spallings) as a result of a hypothetical future inadvertent drilling intrusion into the repository. An error in the implementation of the DRSPALL finite difference equations was discovered and documented in a software problem report in accordance with the quality assurance procedure for software requirements. This paper describes the corrections to DRSPALL and documents the impact of the new spallings data from the modified DRSPALL on previous performance assessment calculations. Updated performance assessments result in more simulations with spallings, which generally translates to an increase in spallings releases to the accessible environment. Total normalized radionuclide releases using the modified DRSPALL data were determined by forming the summation of releases across each potential release pathway, namely borehole cuttings and cavings releases, spallings releases, direct brine releases, and transport releases. Because spallings releases are not a major contributor to the total releases, the updated performance assessment calculations of overall mean complementary cumulative distribution functions for total releases are virtually unchanged. Therefore, the corrections to the spallings volume calculation did not impact Waste Isolation Pilot Plant performance assessment calculation results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cigeo Pilot Phase - 19024

Within the incremental development of the Cigeo deep geological repository, the Pilot Phase (PP) concept emerged during the 2013 public debate on Cigeo. The PP is a period of time that covers the beginning of the project, after its construction license is granted. It mainly aims at acquiring and / or confirming in situ, in a representative environment and in the operating conditions of Cigeo, the data selected for the design and safety demonstration. In parallel, it will emphasize the gradual and cautious approach for starting a complex industrial installation such as Cigeo. The Pilot Phase which is scheduled for a total duration of at least a decade will include 'inactive' tests (without radioactive waste) and then radioactive waste package disposal operations. The PP should be considered as a phase during which additional knowledge will be obtained and demonstration that cannot be fully acquired within the Underground Research Laboratory will be completed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approach for High Methanol Substitution by Energy with Conventional and Bio Pilot Fuels

Green methanol is emerging as a promising route to decarbonize the commercial marine industry. However, methanol is not a drop-in fuel in the compression ignition engines that dominate the marine industry because it is difficult to ignite due to its low cetane number and high latent heat of vaporization. The most straight-forward way to use methanol in the compression ignition engines is to premix the methanol, such as with port fuel injection during the intake stroke, and igniting the methanol with a diesel pilot injection. Because diesel fuel is still used in this strategy, it does not fully displace the petroleum diesel fuel. To completely displace the petroleum-derived diesel fuel, this investigation presents experimental results comparing diesel and biodiesel pilot ignition in a dual-fuel strategy with methanol in a marine-variant of a Cat® C18 18 L engine with a 145 mm bore. Engine performance and emissions characteristics are presented that include effects of diesel vs. biodiesel across a series of fuel injection timing and other operating parameters, including intake manifold pressure and engine load. Results presented include in-cylinder pressure and combustion-related findings about heat release, methanol fuel energy substitution rates greater than 75% from 1 to 18 bar BMEP on a single cylinder engine at 1800 RPM. Criteria pollutants including particulate matter, NOx (NO and NO2), unburned fuel, and formaldehyde, as well as the overall BSFC and FSN of the combustion process relative to the baseline diesel operation.

Splitter, Derek [ORNL] (ORCID:0000000174044047)↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.

Pisupati, Sarma V [Center for Critical Minerals, T↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Western Red-tailed Skink Distribution in Southern Nevada: Pilot Study Results

The western red-tailed skink (Eumeces gilberti rubricaudatus) is a sensitive species that is on the Nevada Natural Heritage Program’s “Animal and Plant At-Risk Tracking List.” Information about this species is lacking, especially for southern Nevada. A pilot project was initiated in 2006 on portions of the Nevada Test Site (NTS) to (1) develop techniques for determining western red-tailed skink distribution, (2) determine if skinks are still present at historic locations, (3) evaluate habitat use by trapping in a variety of habitats, and (4) collect tissue samples for genetic analysis. Skink capture success was compared in trap arrays with and without drift fences. A total of 9 western red-tailed skinks were captured in 6,092 trap days (0.1%, 1 skink/677 trap days). No skinks were captured in trap arrays with drift fences, which suggests that funnel traps set near rocks or vegetation without drift fences is a viable technique for capturing skinks. This greatly reduces the effort and cost to capture skinks. Skinks were captured at one of the three historic locations. Captures occurred in a variety of habitats including springs, ephemeral washes, and dry rocky areas. Genetic analysis revealed that NTS skinks are part of the Inyo clade, and are most closely related to skinks from slightly further north in Esmeralda County, Nevada, and west into the Panamint and Inyo/White Mountains in California. Results from this pilot study will be used to develop a western red-tailed skink distribution study for the entire NTS.

59 BASIC BIOLOGICAL SCIENCES↗

The pilot way to Grid resources using glideinWMS

Grid computing has become very popular in big and widespread scientific communities with high computing demands, like high energy physics. Computing resources are being distributed over many independent sites with only a thin layer of Grid middleware shared between them. This deployment model has proven to be very convenient for computing resource providers, but has introduced several problems for the users of the system, the three major being the complexity of job scheduling, the nonuniformity of computer resources, and the lack of good job monitoring. Pilot jobs address all the above problems by creating a virtual private computing pool on top of Grid resources. This paper presents both the general pilot concept, as well as a concrete implementation, called glideinWMS, deployed in the Open Science Grid.

99 GENERAL AND MISCELLANEOUS↗

Performance Results for Massachusetts and Rhode Island Deep Energy Retrofit Pilot Community

Between December, 2009 and December, 2012, 42 deep energy retrofit (DER) projects were completed through a pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. Thirty-seven of these projects were comprehensive retrofits while five were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. Building Science Corporation developed a consistent "package" of measures in terms of the performance targeted for major building components. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Existing Whole-House Solutions Case Study: National Grid Deep Energy Retrofit Pilot, Massachusetts and Rhode Island

Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. Thirty-seven of these projects were comprehensive retrofits while five were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. Building Science Corporation developed a consistent "package" of measures in terms of the performance targeted for major building components. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects, and was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.

airtightness↗

National Grid Deep Energy Retrofit Pilot

Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗