Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗

Trajectory Design Considerations for Exploration Mission 1

Exploration Mission 1 (EM-1) will be the first mission to send an uncrewed Orion Multi-Purpose Crew Vehicle (MPCV) to cislunar space in the fall of 2019. EM-1 was originally conceived as a lunar free-return mission, but was later changed to a Distant Retrograde Orbit (DRO) mission as a precursor to the Asteroid Redirect Mission. To understand the required mission performance (i.e., propellant requirement), a series of trajectory optimization runs was conducted using JSC's Copernicus spacecraft trajectory optimization tool. In order for the runs to be done in a timely manner, it was necessary to employ a parallelization approach on a computing cluster using a new trajectory scan tool written in Python. Details of the scan tool are provided and how it is used to perform the scans and post-process the results. Initially, a scan of daily due east launched EM-1 DRO missions in 2018 was made. Valid mission opportunities are ones that do not exceed the useable propellant available to perform the required burns. The initial scan data showed the propellant and delta-V performance patterns for each launch period. As questions were raised from different subsystems (e.g., power, thermal, communications, flight operations, etc.), the mission parameters or data that were of interest to them were added to the scan output data file. The additional data includes: (1) local launch and landing times in relation to sunrise and sunset, (2) length of eclipse periods during the in-space portion of the mission, (3) Earth line of sight from cislunar space, (4) Deep Space Network field of view looking towards cislunar space, and (5) variation of the downrange distance from Earth entry interface to splashdown. Mission design trades can also be performed based on the information that the additional data shows. For example, if the landing is in darkness, but the recovery operations team desires a landing in daylight, then an analysis is performed to determine how to change the mission design to meet this request. Also, subsystems request feasibility of alternate or contingency mission designs, such as adding an Orion main engine checkout burn or Orion completing all of its burns using only its auxiliary thrusters. This paper examines and presents the evolving trade studies that incorporate subsystem feedback and demonstrate the feasibility of these constrained mission trajectory designs and contingencies.

Dawn, Timothy F.↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

Testing with the Laser-Enhanced Arc Jet Facility (LEAF) at NASA Ames Research Center

NASA's new Laser-Enhanced Arcjet Facility (LEAF) employs 200 kilowatts of continuous-wave fiber lasers, combined with a 60-megawatt arc plasma jet, to simulate the combined radiative and convective heating is now operational and Orion heat-shield material is undergoing testing. This upgrade to the existing Interaction Heating Facility (IHF) involves the addition of high-power fiber lasers that project 1070nm radiative energy into the existing vacuum chamber. The optically expanded laser beam enters a side window of the test chamber to form either a uniform 150 x 150 mm or a 425 x 425 mm square spot on a wedge-shaped model holder. Combined heating levels of up to 180 W/cm2 convective with either 300 W/cm2 or 100 W/cm2 are achievable. This allows the arc jet and lasers to simulate dynamic entry-heating profiles encountered during entry by the Orion crew capsule for the lunar return conditions. New computational investigations are underway to explore testing with the objective of defining ablative material failure limit. Typical arc-jet testing is performed with test article that are stagnation or wedge geometries. The existing convective heating test facility combined with test article design limits how high a combined shear, heat-flux and pressure conditions can be achieved. With the addition of laser power of 200 kW, much higher combined conditions of high heat-flux, pressure and shear is achievable on a wedge or a swept-cylinder article. Such testing possibilities will allow us to progressively increase the combined conditions and explore when an ablative TPS material may fail. The presentation provides an overview of the LEAF and present results from the on-going Orion Testing.

Venkatapathy, Ethiraj↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

NASA’s Space Launch System: Enabling a New Generation of Lunar Exploration

Following two decades of operational experience in low-Earth orbit (LEO), NASA has turned its focus once again to deep space exploration. The Agency is building the Space Launch System (SLS) to take astronauts and cargo to the Moon and send robotic spacecraft deep into the solar system. Offering unmatched performance, departure energy and payload capacity, SLS is designed to evolve into progressively more powerful configurations, enabling a new generation of human exploration of the Moon in preparation for future missions to Mars. The first build of the Block 1 vehicle is nearly complete for Exploration Mission-1 (EM-1), the first integrated flight of SLS and the Orion crew vehicle. EM-1 will send an uncrewed Orion to a distant retrograde lunar orbit in order to test and verify new systems, and along the way will deploy 13 6U-class CubeSats in deep space along the upper stage disposal trajectory after separation from Orion. The Agency’s current plans call for the first three missions on the SLS manifest to utilize the Block 1 vehicle in crew and cargo configurations. A more powerful evolved vehicle, Block 1B, will provide additional mass and volume performance using a new Exploration Upper Stage (EUS). Block 1B will lift 34 to 40 metric tons (t) to trans-lunar injection (TLI), depending on crew or cargo configuration. The Block 1B crew configuration will offer as much payload volume as industry-standard 5 m-diameter fairings to co-manifested payloads in a Universal Stage Adapter (USA). The Block 1B cargo variant will accommodate 8.4 meter-diameter fairings in 62.7-foot (19.1 meter) or 90-foot (27.4 meter) lengths. Adding smallsat secondary payloads to ride along with primary and co-manifested payloads on future flights may be possible, depending on mass margins. Leveraging a flight-proven, well-understood propulsion system, SLS’s flexible architecture, unmatched performance and expansive payload accommodations will open exciting new mission possibilities in deep space. Launches of habitat modules for NASA’s new Gateway lunar outpost, the next generation of robotic spacecraft to the far reaches of the solar system, large-aperture deep space telescopes, probes to interstellar space and the return of astronauts to the Moon are all possible with SLS.

Creech, Stephen D.↗

Trends in Human Spaceflight: Failure Tolerance, High Reliability and Correlated Failure History

In a half century of human spaceflight, NASA has continuously refined agency safety and reliability requirements in response to mission demands, critical failures, and technology development. Early spacecraft, including Mercury, Gemini and Apollo vehicles, were highly reliant on dissimilar redundancy and demonstrated test margins. Later programs, such as the reusable Space Transportation System (STS) and International Space Station (ISS), introduced probabilistic studies and isolated two-failure tolerance to improve robustness at the expense of added complexity. More recently, the Orion Multi-Program Crew Vehicle (MPCV) program adopted universal single-failure tolerance with two categorical exceptions; Zero-Failure Tolerant (0FT) and Design for Minimum Risk (DFMR) hardware. Failure tolerance variances are defined and managed in accordance with agency human-rating requirements, and require concurrence from program Technical Authorities (TA) as well as the MPCV Safety and Mission Assurance Safety and Engineering Review Panel (MSERP). To understand and reaffirm standards applied to Apollo, Space Shuttle and Orion vehicles, Orion and Deep Space Gateway Safety and Mission Assurance (S&MA) representatives conducted accelerated research to compare unique safety and reliability criteria against ground and flight anomalies, based on information contained in post-mission reports and the Problem Reporting and Corrective Action (PRACA) database. In some cases, high-profile failures and narrow escapes have reinforced decisions to maintain or adapt safety requirements. In others, empirical trends have highlighted the need for vigilance and innovative safety guidelines. Given the inability to achieve absolute compliance with evolving safety and reliability requirements, the team conducted a targeted review of DFMR and 0FT propulsion elements within the framework of changing system design, inspection, materials and process developments to formulate conclusions on technological maturity, failure density, and net changes in safety risk. Based on the aggregate performance of high-reliability and failure-tolerant systems, the authors have attempted to establish best practices and guidelines to inform future program decisions. On a somewhat cautionary note, this study is not intended to direct a universal set of requirements for future missions based on prior lessons learned. Spacecraft safety is a multi-variable problem, and attempts to mitigate past failures will not guarantee future success. However, this assessment offers a retrospective review of policy changes, implementation and effectiveness. In the future, NASA, European Space Agency (ESA) and industry partners may benefit from a more robust correlation between requirements and performance, as space-faring nations work toward more challenging, complex and long-duration commercial and deep-space ventures.

Green, Carrie↗

Utilization of Micro Tube Heat Exchanger for Next Generation Phase Change Material Heat Exchanger Development

Abstract and not the Final document is attached. Low Lunar orbit presents a unique thermal environment with high planetary and high solar IR requirements. Orion requires a phase change material heat exchanger (PCM HX) to act as a supplemental heat rejection device (SHReD) during this orbit. As a result, Orion currently uses a PCMHX to meet heat rejection demands in low lunar orbit. This PCM HX weighs 145 lbs, a significant amount of weight on the Crew Module Adaptor. To reduce this weight, a new PCM HX and phase change material is being proposed. This new PCM HX, constructed by Mezzo technologies, was originally designed as a water based PCM HX but is now be repurposed for phase change materials with transition temperatures in Orion's set points and different freeze front propagations. Mezzo's PCM HX utilizes micro tubes which greatly increase the overall heat transfer efficiency allowing for a compact design and significant weight savings. A new phase change material is also being proposed which has a higher latent heat of fusion as well as a higher density. This paper investigates the design, testing, and analysis done on the new Mezzo PCM HX as well as the corresponding phase change material.

Foley, Lauren A.↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

A Flexible Lunar Architecture for Exploration (FLARE) Supporting NASA’s Artemis Program

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for a minimum of seven days and then return them safely to Earth. FLARE can be implemented whenever the component vehicles are operational. FLARE was developed as an alternative to NASA’s Human Landing System (HLS) reference architecture from the Design Analysis Cycle (DAC) #2 created in 2019. The DAC2 guidelines required utilization of the Gateway vehicle in a Near- Rectilinear Halo Orbit (NRHO). Instead, FLARE chooses a Low Lunar Frozen Polar Orbit (LLFPO) for lunar rendezvous of components, and an optional Gateway vehicle. The LLFPO provides a stable orbit that overflies the south pole every 2 h, ensuring easy access to the lunar surface for surface aborts with a much lower propellant requirement than NRHO. The minimum FLARE concept uses one Space Launch System (SLS) launch, one Orion, one European Service Module (ESM), and one human lander (launched on commercial vehicle(s)). FLARE adds the SpaceTug, based upon the mature and successful ULA “Common” Centaur Upper Stage vehicle, with modifications to create an Earth-Moon transfer vehicle. In the FLARE baseline mission, the SpaceTug provides propulsion needed to return the Orion + ESM from LLFPO to Earth. The SpaceTug also provides propulsion to deliver the separate human lander components – the Descent Element (DE) and the Ascent Element (AE) - from Low Earth Orbit (LEO) to LLFPO. The SLS Block 1 then launches the Orion + ESM and completes a rendezvous with the mated DE + AE components in LLFPO. FLARE offers optional phases beyond the baseline mission. The SpaceTug can deliver components of the planned Gateway, including the Power and Propulsion Element (PPE) and the Habitable and Logistics Outpost (HALO), to LLFPO. FLARE provides an option to deliver precursor equipment to the lunar surface to enhance and extend the human mission. With these components, including an inflatable habitation module and airlock, individual crew mobility vehicle(s), an In-Situ Resource Utilization (ISRU) demonstration, and science and technology experiments, the crew can explore and conduct science on the lunar surface for up to 14 days.

Moon 2024↗

The Ejectable Data Recorder: A Lean, Risk-Informed Approach for Hardware Development

NASA is developing the Orion spacecraft to transport crew from the Earth to the Moon as part of the Artemis series of missions. To provide a crew escape capability from pre-launch through ascent, the Orion vehicle is equipped with a Launch Abort System (LAS), built by Lockheed Martin, which pulls the capsule away from the launch vehicle in the event of an abort scenario. The Ascent Abort 2 (AA-2) test flight occurred on July 2, 2019,and tested a production version of the LAS to ensure that it can operate as intended, and to collect a large data set from hundreds of sensors on the vehicle to support Orion flight certification. In the original AA-2 architecture, a single-string set of communications antennas on the LAS would downlink all of the in-flight test data to ground stations. However, that communications architecture was predicted to have data dropouts during abort and jettison of the LAS, and would not support data transmission at all after LAS jettison. As a result, a comprehensive trade study was completed, yielding the addition of antennas on the crew module (CM), a buffer/rebroadcast capability for key portions of the flight, and an ejectable data recorder (EDR) subsystem. This EDR subsystem would serve as a backup to the radio frequency (RF) communications system, and would be non-flight critical, providing a unique capability that enabled management to take a different approach with the hardware and software development. The Crew Module and Separation Ring were developed as “Class 1”Flight Hardware, albeit with some tailoring approaches to enable efficiencies. The Class 1 designation requires full rigor for flight hardware and software, documenting everything that happens to a piece of hardware from procurement through disposal, requiring a full spectrum of acceptance tests, and the highest rigor of quality assurance processes. At the other end of the spectrum, Class 3hardware is controlled, but not intended for flight, and leaves the level of rigor up to the project manager. This classification is often used for research and development projects. Similarly,Class-1E has been recently defined at NASA for ISS payloads and technology development projects that are not flight critical and do not need the full rigor of Class 1 to be successful. The EDR subsystem was challenged at commencement to adopt a skunkworks and agile-like approach to hardware development, allowing for a different risk posture than the rest of the AA-2 hardware. After initially pursuing Class 1 processes, the EDR subsystem design evolved to incorporating numerous commercial components, leading to re-designation as a Class-1E subsystem. The resulting EDR subsystem was fully successful in meeting all flight system requirements, and achieved 100% retrieval of flight test data. This paper will discuss the risk posture of the EDR subsystem and the subsequent tailoring that was enacted as part of its Class-1E status.

EDR↗

Optical Communications Operations Concept for the Artemis II Crewed Mission to the Moon

NASA’s Artemis II mission will fly a human crew of 4 to the Moon aboard the Orion spacecraft for the first time since the Apollo missions. The Orion spacecraft includes an optical communication payload, known on board as “OpCom,” which is part of NASA’s Orion Artemis II Optical Communications (O2O) demonstration. OpCom will be controlled directly from the Mission Control System (MCC) in Houston and will support forward links up to 20 Mbps and return links up to 250 Mbps for at least 1 hour per mission day. It will be used to transfer files and provide real-time video SD and HD video to/from MCC. We describe the OpCom system architecture and operations concept.

optical communications↗

Backup Optical Navigation Attitude for Artemis-1 Backup Attitude Ground Tool

The Backup Optical Navigation Attitude (BONA) software was developed as a response to the Artemis1 Power Distribution Unit (PDU) hardware problems found early in 2021. The hardware problem, a capacitor installed incorrectly, removes the intended redundant path for which the PDU can relay its power and data to attached devices. Specific to the BONA context, the concern is that a failure of the single remaining path in this PDU would lead to an inability to communicate with one of the two-star trackers (STs) on Orion. By flight rule, being reduced to a single star tracker means an immediate turn around end-of-mission. The BONA software is not intended to extend the mission, but instead act as a single star tracker attitude confirmation tool. Insurance, if you will, for the Orion project that a ground tool is available to compare the single remaining ST results with optical navigation images retrieved during the mission. Engineers operating BONA in the Mission Control Center (MCC) Mission Evaluation Room (MER) will analyze the downlinked star field images and based on the stars identified and known time of image, derive vehicle attitude estimates, which can be compared with the ST results. Potentially, in extreme situations, and with expert recommendation, the derivations could lead to navigation state updates being commanded to Orion.

GNC↗

Extended Kalman Filter Performance on the Artemis-1 Mission

The Artemis Program is NASA’s campaign to explore the Moon and beyond. Artemis-1, the uncrewed exoLEO test flight of the Orion spacecraft, was completed in 2022. There were four navigation Extended Kalman Filters (EKFs) that are part of the Orion navigation system. The Atmospheric Extended Kalman Filter (ATMEKF) estimates the vehicle position, velocity, and attitude (referred to as the vehicle state) during the ascent and entry phases of flight. Once Orion is outside of Earths atmosphere, the Earth Orbit Extended Kalman Filter (EOEKF) and CisLunar Extended Kalman Filter (CLEKF) estimate the translational states, depending on the phase of flight, while the Attitude Extended Kalman Filter (ATTEKF) estimates the rotational state of the vehicle. The Kalman filters propagate the vehicle state forward in time using a combination of dynamics models and the output data from the Inertial Measurement Unit (IMU). The filters update the vehicle states and associated uncertainties, in the form of the covariance matrix, using pseudorange measurements from GPS (in ATMEKF/EOEKF), optical navigation measurements of the Earth or Moon (in CLEKF), and star tracker measurements (in ATTEKF). Simultaneously, the Kalman filters estimate error sources in the sensors, which are included in the state vectors as Exponentially Correlated Random Variables (ECRVs). This paper will summarize the performance of these filters during the Artemis-1 mission.

Artemis-1↗

Concept for 2033 Crewed Mars Orbital Mission with Venus Flyby

The 2033 Mars launch period provides a unique opportunity for a round trip mission with a total flight time of only 1.6 years. A concept is presented to perform a crewed Mars orbital mission in 2033 that would minimize development and mission risk by using conventional hypergolic in-space propulsion stages with a common design. The Mars mission vehicle would include a Mars transit habitat, an Orion spacecraft, and chemical propulsion stages. It would be launched by a combination of SLS and commercial rockets to be aggregated in high Earth orbit or at the Lunar Gateway. The crew would launch to the mission vehicle in Orion as the final element in the assembly. After transit to Mars, the crew would spend about 30 days in a high Mars orbit and then return to Earth via a Venus flyby and gravity assist. A sunshade would be deployed for thermal control of the mission vehicle inside 1 AU. The crew would return directly to Earth in the Orion crew module, with the transit habitat being expended. The 2033 mission would not be a “one-off”, but could be a pathfinder for crew transport for landing missions to follow, perhaps starting as early as 2037.

Woolley, Ryan↗