Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Automation of Data Collection Methods for Online Monitoring of Nuclear Power Plants

Maintenance activities in the United States nuclear power industry are mainly centered on preventive and corrective maintenance. Predictive maintenance, which is a variable time basis maintenance strategy that is dependent on the condition of the equipment, is less utilized but potentially more effective. In the current maintenance practices, the nuclear power plants rely on manual processes to supply information to a human decision making process. The plants have several processes that generate information that is not typically used beyond the intended target for collecting that information. This information is a source of data that is manually collected by labor intensive tasks. The data is therefore expensive to collect, yet limited in use. The industry has realized the opportunity present in reducing the labor intensive tasks by automating them and increasing the uses of the data collected by either developing advanced predictive maintenance methods using data-driven decision making that could span from trending to machine learning and artificial intelligence. This shift in maintenance strategy may result in high cost saving impact. In addition to reducing labor requirements and frequency of maintenance activities, this shift in strategy will reduce the materials portion of the operations and maintenance cost as well. The aim of this specific effort is to focus on the automation of data collection process. It is part of a series of planned efforts to target multiple elements of migrating the current preventive maintenance approach in nuclear power plants to a data-driven approach. These elements include data collection, management, analysis, visualization, in addition to value analysis and change enabling. The other five elements of migration were not considered because they are planned to be explicitly studied in multiple parallel efforts. Challenges including regulations requirements or limitations are planned in a future effort that focuses on change enabling. The risk and benefit/cost of the approach shift is planned in another effort targeted towards value. The storage, communication, computational power, data architecture, and protection are part of the information infrastructure and are planned in dedicated data management effort. The best means to present the data for assisted human decision making is planned in a data visualization effort. The data interpretation and patterns recognition for machine decision making is planned through multiple efforts in data analytics over the following years. This work identified seventeen data sources collection methods in nuclear power plants that could be automated for an integrated data platform that enables comprehensive and informed decision making. For each of the identified seventeen data sources, the base, modern, and state of the art states were described. The current state of data collection used by most utilities was identified as the "base state". The current achievable state was identified as the "modern state", a state that has either been achieved by at least some US utilities or in other industries. The future state that requires research and development to reach was identified as the "state of the art" state. The described states used an out-of-the-box thinking approach. This effort found that there is a hug potential for task automation and data fidelity improvements by evolving the current industry data collection methods. The majority of the processes analyzed were found to be manual and labor intensive and fell in the base state. As a result, the modern state often targeted reducing the manual logging efforts by using electronic and semi-intelligent means or complementing the work with sensors and mobile or fixed technologies that can reduce the demand of labor activities. The state of the art state involved applications advanced methods of data correlation, data mining, and machine learning along with increasing the spatial distribution and fidelity of data, coupling multiple data sources, and enabling the use of sophisticated mobile devices and machine comprehension methods.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗

Performance Evaluation of Comparative Vacuum Monitoring and Piezoelectric Sensors for Structural Health Monitoring of Rotorcraft Components

The costs associated with the increasing maintenance and surveillance needs of aging structures are rising at an unexpected rate. Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today’s extensive fleet of aging aircraft and space vehicles. Aircraft maintenance and repairs represent about a quarter of a commercial fleet’s operating costs. The application of Structural Health Monitoring (SHM) systems using distributed sensor networks can reduce these costs by facilitating rapid and global assessments of structural integrity. The use of in-situ sensors for real-time health monitoring can overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. The ease of monitoring an entire on-board network of distributed sensors means that structural health assessments can occur more often, allowing operators to be even more vigilant with respect to flaw onset. SHM systems also allow for condition-based maintenance practices to be substituted for the current time-based or cycle-based maintenance approach thus optimizing maintenance labor. The Federal Aviation Administration has conducted a series of SHM validation and certification programs intended to comprehensively support the evolution and adoption of SHM practices into routine aircraft maintenance practices. This report presents one of those programs involving a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Sikorsky, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp., Acellent Technologies Inc., and the Federal Aviation Administration (FAA) carried out a trial validation and certification program to evaluate Comparative Vacuum Monitoring (CVM) and Piezoelectric Transducers (PZT) as a structural health monitoring solution to specific rotorcraft applications. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM and PZT systems into rotorcraft maintenance programs and the document revisions necessary to allow for their routine use as an alternate means of performing periodic structural inspections. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically relevant experimental effort to quantify the reliability of a CVM system applied to Sikorsky S-92 fuselage frame application and a PZT system applied to an S-92 main gearbox mount beam application. The applications included both local and global damage detection assessments. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for SHM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and is acceptable to both the aviation industry and regulatory bodies. The validation work completed in this program demonstrated the ability of both CVM and PZT SHM systems to detect cracks in rotorcraft components. It proved the ability to use final system response parameters to provide a Green Light/Red Light (“GO” – “NO GO”) decision on the presence of damage. In additional to quantifying the performance of each SHM system for the trial applications on the S-92 platform, this study also identified specific methods that can be used to optimize damage detection, guidance on deployment scenarios that can affect performance and considerations that must be made to properly apply CVM and PZT sensors. These results support the main goal of safely integrating SHM sensors into rotorcraft maintenance programs. Additional benefits from deploying rotorcraft Health and Usage Monitoring Systems (HUMS) may be realized when structural assessment data, collected by an SHM system, is also used to detect structural damage to compliment the operational environment monitoring. The use of in-situ sensors for health monitoring of rotorcraft structures can be a viable option for both flaw detection and maintenance planning activities. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM and PZT technology. It will also streamline future regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

A resilient network recovery framework against cascading failures with deep graph learning

Because of the increasing importance and dependencies of infrastructure networks and the potential for massive cascading failures in real-world network systems, maintenance optimization to effectively reduce system performance loss caused by diverse disruptions is of significant interest among researchers and practitioners. In this work, a new recovery framework was developed to rapidly identify important system components for maintenance to improve network resilience against cascading failures. Here this work provides distinct advantages to determine an optimal maintenance priority by combining real-time network structure importance with other maintenance prioritization based on customer preference. This approach adopts structural graph embedding and deep reinforcement learning to extract real-time network topology information (such as minimum vertex cover) to update the maintenance priority during the recovery process. Based on the case studies on synthetic networks and a US airport network, the proposed recovery framework with real-time network topology awareness shows better performance than other maintenance prioritization strategies regarding resilience enhancement. This work improves the understanding of how the changing network structure influences maintenance effects. It also provides insights of the practical usefulness of advanced deep learning on helping optimal maintenance prioritization to effectively reduce the intensity and extent of cascading failures.

42 ENGINEERING↗

Wireless Sensor Modalities at a Nuclear Plant Site to Collect Vibration Data

One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of their conditions. This has resulted in a labor-centric business model to achieve high capacity factors. To build an optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support this transition. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation. The goal of this project is to address challenges in the area of digital monitoring, i.e., the application of advanced sensor technologies (particularly wireless sensor technologies) and science-based data analytic capabilities to advance online monitoring and predictive maintenance in nuclear plants to improve plant performance (efficiency gain and economic competitiveness). To achieve the project goal, in partnership with Exelon Generating Company (Exelon), researchers from Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) are performing research and development (R&D) to demonstrate application of wireless sensors using the distributed antenna system and advanced data analytics to achieve predictive maintenance. In the report, wireless vibration sensors, vibration data and its indicator are described. The wireless vibration sensors presented in this report support three types of wireless communication, namely, Wi-Fi, cellular, and 900 MHz. These wireless vibration sensors are considered by partner plant site for installation on plant asset to enable online vibration monitoring to replace periodic measurements. These vibration data along with other plant process data will be utilized to develop diagnostic and prognostic models.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗

Data-Mining Toolset Developed for Determining Turbine Engine Part Life Consumption

The current practice in aerospace turbine engine maintenance is to remove components defined as life-limited parts after a fixed time, on the basis of a predetermined number of flight cycles. Under this schedule-based maintenance practice, the worst-case usage scenario is used to determine the usable life of the component. As shown, this practice often requires removing a part before its useful life is fully consumed, thus leading to higher maintenance cost. To address this issue, the NASA Glenn Research Center, in a collaborative effort with Pratt & Whitney, has developed a generic modular toolset that uses data-mining technology to parameterize life usage models for maintenance purposes. The toolset enables a "condition-based" maintenance approach, where parts are removed on the basis of the cumulative history of the severity of operation they have experienced. The toolset uses data-mining technology to tune life-consumption models on the basis of operating and maintenance histories. The flight operating conditions, represented by measured variables within the engine, are correlated with repair records for the engines, generating a relationship between the operating condition of the part and its service life. As shown, with the condition-based maintenance approach, the lifelimited part is in service until its usable life is fully consumed. This approach will lower maintenance costs while maintaining the safety of the propulsion system. The toolset is a modular program that is easily customizable by users. First, appropriate parametric damage accumulation models, which will be functions of engine variables, must be defined. The tool then optimizes the models to match the historical data by computing an effective-cycle metric that reduces the unexplained variability in component life due to each damage mode by accounting for the variability in operational severity. The damage increment due to operating conditions experienced during each flight is used to compute the effective cycles and ultimately the replacement time. Utilities to handle data problems, such as gaps in the flight data records, are included in the toolset. The tool was demonstrated using the first stage, high-pressure turbine blade of the PW4077 engine (Pratt & Whitney, East Hartford, CT). The damage modes considered were thermomechanical fatigue and oxidation/erosion. Each PW4077 engine contains 82 first-stage, high-pressure turbine blades, and data from a fleet of engines were used to tune the life-consumption models. The models took into account not only measured variables within the engine, but also unmeasured variables such as engine health parameters that are affected by degradation of the engine due to aging. The tool proved effective at predicting the average number of blades scrapped over time due to each damage mode, per engine, given the operating history of the engine. The customizable tools are available to interested parties within the aerospace community.

Litt, Jonathan S.↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Guide to Operating and Maintaining EnergySmart Schools

Through a commitment to high performance, school districts are discovering that smart energy choices can create lasting benefits for students, communities, and the environment. For example, an energy efficient school district with 4,000 students can save as much as $160,000 a year in energy costs. Over 10 years, those savings can reach $1.6 million, translating into the ability to hire more teachers, purchase more textbooks and computers, or invest in additional high performance facilities. Beyond these bottomline benefits, schools can better foster student health, decrease absenteeism, and serve as centers of community life. The U.S. Department of Energy's EnergySmart Schools Program promotes a 30 percent improvement in existing school energy use. It also encourages the building of new schools that exceed code (ASHRAE 90.11999) by 50 percent or more. The program provides resources like this Guide to Operating and Maintaining EnergySmart Schools to assist school decisionmakers in planning, financing, operating, and maintaining energy efficient, high performance schools. It also offers education and training for building industry professionals. Operations and maintenance refer to all scheduled and unscheduled actions for preventing equipment failure or decline with the goal of increasing efficiency, reliability, and safety. A preventative maintenance program is the organized and planned performance of maintenance activities in order to prevent system or production problems or failures from occurring. In contrast, deferred maintenance or reactive maintenance (also called diagnostic or corrective maintenance) is conducted to address an existing problem. This guide is a primary resource for developing and implementing a districtor schoolwide operations and maintenance (O&M) program that focuses on energy efficiency. The EnergySmart Schools Solutions companion CD contains additional supporting information for design, renovation, and retrofit projects. The objective of this guide is to provide organizational and technical information for integrating energy and high performance facility management into existing O&M practices. The guide allows users to adapt and implement suggested O&M strategies to address specific energy efficiency goals. It recognizes and expands on existing tools and resources that are widely used throughout the high performance school industry. External resources are referenced throughout the guide and are also listed within the EnergySmart Schools O&M Resource List (Appendix J). While this guide emphasizes the impact of the energy efficiency component of O&M, it encourages taking a holistic approach to maintaining a high-performance school. This includes considering various environmental factors where energy plays an indirect or direct role. For example, indoor air quality, site selection, building orientation, and water efficiency should be considered. Resources to support these overlapping aspects will be cited throughout the guide.

54 ENVIRONMENTAL SCIENCES↗

West Texas A&M University Pantex Internship Final Report: How to Apply RCM MENG-4097

This summer internship here at Pantex pertained to how one may approach equipment and apply Reliability Centered Maintenance. Reliability Centered Maintenance (RCM), is a strategy for maintenance first used in the 1960’s. Within this strategy there are three methods of maintenance, preventative, run-till-failure, and condition based and these will be what a part may be categorized into. When approaching equipment/parts to decide which category they fall into they must go under a five procedures, Criticality, Fault Tree Analysis, Task Analysis, Effectiveness, and Cost. The pilot project was to test the maintenance strategies on the preventative maintenance [PM’s] work orders used on Air Handling Units (AHU) and Dehumidifying Units (DHU) here at the Pantex Plant. This was accomplished by making recommendations on the preventative maintenance work orders.

99 GENERAL AND MISCELLANEOUS↗

Application and Certification of Comparative Vacuum Monitoring Sensors for Structural Health Monitoring of 737 Wing Box Fittings

Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today's extensive fleet of aging aircraft and space vehicles. The use of in-situ sensors for real-time health monitoring of aircraft structures are a viable option to overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. Prevention of unexpected flaw growth and structural failure can be improved if on-board health monitoring systems are used to continuously assess structural integrity. Such systems are able to detect incipient damage before catastrophic failures occurs. Condition-based maintenance practices could be substituted for the current time-based maintenance approach. Other advantages of on-board distributed sensor systems are that they can eliminate costly, and potentially damaging, disassembly, improve sensitivity by producing optimum placement of sensors and decrease maintenance costs by eliminating more time- consuming manual inspections. This report presents a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Boeing, Delta Air Lines, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp. and the Federal Aviation Administration (FAA) carried out a certification program to formally introduce Comparative Vacuum Monitoring (CVM) as a structural health monitoring solution to a specific aircraft wing box application. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM into an airline maintenance program and the document revisions necessary to allow for routine use of CVM as an alternate means of performing periodic structural inspects. To carry out the validation process, knowledge of aircraft maintenance practices was coupled with an unbiased, independent evaluation. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically-relevant experimental effort to quantify the reliability of the CVM system applied to the Boeing 737 Wing Box fitting application. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for CVM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and also is acceptable to both the aviation industry and regulatory bodies. This report presents the use of several different statistical methods, some of them adapted from NDI performance assessments and some proposed to address the unique nature of damage detection via SHM systems, and discusses how they can converge to produce a confident quantification of SHM performance An important element in developing SHM validation processes is a clear understanding of the regulatory measures needed to adopt SHM solutions along with the knowledge of the structural and maintenance characteristics that may impact the operational performance of an SHM system. This report describes the major elements of an SHM validation approach and differentiates the SHM elements from those found in NDI validation. The activities conducted in this program demonstrated the feasibility of routine SHM usage in general and CVM in particular for the application selected. They also helped establish an optimum OEM-airline-regulator process and determined how to safely adopt SHM solutions. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM technology. It will also streamline the regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (4th Annual Report)

Nuclear plant sites collect and store large volumes of data collected from various equipment and systems. These datasets typically include plant process parameters, maintenance records, technical logs, online monitoring data, and equipment failure data. The collection of such data affords an opportunity to leverage data-driven machine learning and artificial intelligence technologies to provide diagnostic and prognostic capabilities within the nuclear power industry to reduce operating and maintenance costs. In this way, nuclear energy can become more economically competitive with other energy sources, and premature closures can be avoided. From a maintenance standpoint, savings can be achieved by leveraging machine learning and artificial intelligence technologies to develop data-driven algorithms to better diagnose and predict potential faults within the system. Improved model accuracy can lead to reductions in unnecessary maintenance and more efficient planning of future maintenance, thus lowering the costs associated with parts, labor, and unnecessary planned, forced, or extended outages. From an operations perspective, cost savings can be generated by shifting from route-based monitoring to wireless technologies for online monitoring, and by transitioning from onsite- to cloud-based computing and storage services. Wireless monitoring would reduce the operator manhours required for taking routine measurements, while cloud computing services would generate cost savings by reducing the amount of hardware needing to be purchased and maintained—all while scaling to both computational and storage demands. This report summarizes this project’s effort to shift from costly, labor-intensive preventative maintenance to cheaper predictive maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design guidelines for remotely maintainable equipment

The quantity and complexity of on-orbit assets will increase significantly over the next decade. Maintaining and servicing these costly assets represent a difficult challenge. Three general methods are proposed to maintain equipment while it is still in orbit: an extravehicular activity (EVA) crew can perform the task in an unpressurized maintenance area outside any space vehicle; an intravehicular activity (IVA) crew can perform the maintenance in a shirt sleeve environment, perhaps at a special maintenance work station in a space vehicle; or a telerobotic manipulator can perform the maintenance in an unpressurized maintenance area at a distance from the crew (who may be EVA, IVA, or on the ground). However, crew EVA may not always be possible; the crew may have other demands on their time that take precedence. In addition, the orbit of the tasks themselves may be impossible for crew entry. Also crew IVA may not always be possible as option for equipment maintenance. For example, the equipment may be too large to fit through the vehicle airlock. Therefore, in some circumstances, the third option, telerobotic manipulation, may be the only feasible option. Telerobotic manipulation has, therefore, an important role for on-orbit maintenance. It is not only used for the reasons outlined above, but also used in some cases as backup to the EVA crew in an orbit that they can reach.

Clarke, Margaret M.↗

Performance of Water Recirculation Loop Maintentance Components for the Advanced Spacesuit Water Membrane Evaporator

Water loop maintenance components to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop have undergone a comparative performance evaluation with a second SWME water recirculation loop with no water quality maintenance. Results show the benefits of periodic water maintenance. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the evaluation of water recirculation maintenance components was to further enhance this advantage through the leveraging of fluid loop management lessonslearned from the International Space Station (ISS). A bed design that was developed for a UTAS military application, and considered for a potential ISS application with the Urine Processor Assembly, provided a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The maintenance cycle included the use of a biocide delivery component developed for ISS to introduce a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.

Rector, Tony↗