Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

STS-114 Flight Day 7 Highlights

The main event of Day 7 is an extravehicular activity (EVA) to remove a failed Control Moment Gyroscope (CMG) from the Z1 Truss of the International Space Station (ISS) (Commander Sergei Krikalev and NASA ISS Science Officer and Flight Engineer John Phillips), and install a replacement stored in the payload of Space Shuttle Discovery (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda). Discovery astronauts Noguchi and Robinson are assisted in suit-up by their fellow crew members, Noguchi is carried by the Space Station Remote Manipulator System between Discovery's payload bay and the Z1 truss in order to exchange the gyroscopes with help from the pistol grip tool. Mission Control speaks to him during the EVA in order to troubleshoot the power and data connectors for new CMG. When back in the open payload bay, Noguchi and Robinson pose for pictures of each other and the Earth.

Source record↗

STS-114: Discovery TCDT Flight Crew Test Media Event at Pad 39-B

The STS-114 Space Shuttle Discovery Terminal Countdown Demonstration Test (TCDT) flight crew is shown at Pad 39-B. Eileen Collins, Commander introduces the astronauts. Andrew Thomas, mission specialist talks about his primary responsibility of performing boom inspections, Wendy Lawrence, Mission Specialist 4 (MS4) describes her role as the robotic arm operator supporting Extravehicular Activities (EVA), Stephen Robinson, Mission Specialist 3 (MS3) talks about his role as flight engineer, Charlie Camarda, Mission Specialist 5 (MS5) says that his duties are to perform boom operations, transfer operations from the space shuttle to the International Space Station and spacecraft rendezvous. Soichi Noguchi, Mission Specialist 1 (MS1) from JAXA, introduces himself as Extravehicular Activity 1 (EVA1), and Jim Kelley, Pilot will operate the robotic arm and perform pilot duties. Questions from the news media about the safety of the external tank, going to the International Space Station and returning, EVA training, and thoughts about the Space Shuttle Columbia crew are answered.

Source record↗

STS-114: Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative; Mark Ferring, Lead ISS Flight Director; Cindy Begley, Lead Spacewalk Officer for the Mission were present. Phil reported that the vehicle continues to operate very cleanly, no system anomalies or issues, crew keeping up with the timelines, and small minor and major EVA activities went extremely well. He recapped previous day's activities such as: nitrogen transfer to the Station, and storing water and transferring it to the Space Station. Mark noted Mission Specialists Steven Robinson and Souichi Noguchi's superb job doing EVA. Cindy gave a technical detail of the CMG1 remove and replace activities with supporting video clips. News media focused their questions on technical details of flight activities and safety.

Source record↗

STS-114: Discovery Post MMT Briefing

Wayne Hale, Space Shuttle Deputy Program Manager, discusses the topics covered at the Mission Management Team (MMT) meeting. The topics include: 1) Wing leading edge reinforced carbon-carbon clearance; 2) Protruding blanket on the side of the Space Shuttle Discovery Orbiter; 3) Control Moment Gyroscope (CMG) replacement; 4) Transfer items; and 5) EVA procedures. Questions from the news media about the possibility of a CMG failure, Space Shuttle re-entry, gap fillers, and dangers during the EVA to repair the Space Shuttle Discovery are answered.

Source record↗

STS-114: Discovery Day 9 Mission Status Briefing

Paul Hill, STS-114 Lead Shuttle Flight Director; Mark Ferring, Lead ISS Flight Director; Cindy Begley, STS-114 Lead EVA Officer were present. Paul reported on the general accomplishments of the mission for the day: the transfer to two stations are complete, transfers back from station into logistics module into the mid-deck are about 75 % complete and definitely in schedule to finish the next day, everything with the external video cam and the RGMC return are complete. He noted that all crews are doing great by all means. Paul also gave a detailed explanation with supporting video clips regarding concern for Eileen's side of window. Mark and Cindy both gave technical details on Mission Specialists Steven Robinson and Souichi Noguchi's extravehicular activities (EVA). News media focused most of their questions on extravehicular activities.

Source record↗

STS-114: Discovery Mission Status Briefing

Phil Engelauf, STS-114 Mission Operations Representative, Mark Ferring, STS-114 Lead ISS Flight Director and Cindy Begley, STS-114 Lead EVA Officer is presented in this STS-114 Discovery mission status briefing. Mark Ferring talks about Control Moment Gyroscopes (CMG), Phil Engelauf discusses repair techniques for the Space Shuttle Discovery and Cindy Begley talks about the EVA's that Steve Robinson and Soichi Noguchi are performing. She also answers questions from the media about the spacewalker's ability to perform these tasks.

Source record↗

Options Studied for Managing Space Station Solar Array Electrical Hazards for Sequential Shunt Unit Replacement

The U.S. solar array strings on the International Space Station are connected to a sequential shunt unit (SSU). The job of the SSU is to shunt, or short, the excess current from the solar array, such that just enough current is provided downstream to maintain the 160-V bus voltage while meeting the power load demand and recharging the batteries. Should an SSU fail on-orbit, it would be removed and replaced with the on-orbit spare during an astronaut space walk or extravehicular activity (EVA) (see the photograph). However, removing an SSU during an orbit Sun period with input solar array power connectors fully energized could result in substantial hardware damage and/or safety risk to the EVA astronaut. The open-circuit voltage of cold solar-array strings can exceed 320 V, and warm solar-array strings could feed a short circuit with a total current level exceeding 240 A.

Delleur, Ann M.↗

Mechanically Strong, Lightweight Porous Materials Developed (X-Aerogels)

Aerogels are attractive materials for a variety of NASA missions because they are ultralightweight, have low thermal conductivity and low-dielectric constants, and can be readily doped with other materials. Potential NASA applications for these materials include lightweight insulation for spacecraft, habitats, and extravehicular activity (EVA) suits; catalyst supports for fuel cell and in situ resource utilization; and sensors for air- and water-quality monitoring for vehicles, habitats, and EVA suits. Conventional aerogels are extremely fragile and require processing via supercritical fluid extraction, which adds cost to the production of an aerogel and limits the sizes and geometries of samples that can be produced from these materials. These issues have severely hampered the application of aerogels in NASA missions.

Leventis, Nicholas↗

Freeze Tolerant Radiator for an Advanced EMU

During an Extravehicular Activity (EVA), the astronaut s metabolic heat and the heat produced by the Portable Life Support Unit (PLSS) must be rejected. This heat load is currently rejected by a sublimator, which vents up to eight pounds of water each EVA. However, for advanced space missions of the future, water venting to space needs to be minimized because resupply impacts from earth will be prohibitive. If this heat load could be radiated to space from the PLSS, which has enough surface area to radiate most of the heat, the amount of water now vented could be greatly reduced. Unfortunately, a radiator rejects heat at a relatively constant rate, but the astronauts generate a variable heat load depending on how hard they are working. Without a way to vary the heat removal rate, the astronaut would experience cold discomfort or even frostbite. A proven method allowing a radiator to be turned-down is to sequentially allow tubes that carry the heat transfer fluid to the radiator to freeze. A drawback of current freezable radiators using this method is that they are far to heavy for use on a PLSS, because they use heavy construction to prevent the tubes from bursting as they freeze and thaw. This creates the need for a large radiator to reject most of the heat but with a lightweight tube that doesn t burst as it freezes and thaws. The new freezable radiator for the Extravehicular Mobility Unit (EMU) has features to accommodate the expansion of the radiator fluid when it freezes, and still have the high tube to fin conductance needed to minimize the number and weight of the tubes. Radiator fluid candidates are water and a propylene glycol-water mixture. This design maintains all materials within their elastic limits so that large volume changes can be achieved without breaking the tube. This concept couples this elastic expansion with an extremely lightweight, extremely high conductivity carbon fiber fin that can carry the heat needed to thaw a frozen tube. By using most of the exposed surface area of the PLSS as a radiator, the system can reject about 75% of the highest heat load, and reduce the loss of water through sublimation by a factor of four. The proposed radiator and a small water tank can be no heavier than the current system.

Copeland, Robert J.↗

Space Shuttle UHF Communications Performance Evaluation

An extension boom is to be installed on the starboard side of the Space Shuttle Orbiter (SSO) payload bay for thermal tile inspection and repairing. As a result, the Space Shuttle payload bay Ultra High Frequency (UHF) antenna will be under the boom. This study is to evaluate the Space Shuttle UHF communication performance for antenna at a suitable new location. To insure the RF coverage performance at proposed new locations, the link margin between the UHF payload bay antenna and Extravehicular Activity (EVA) Astronauts at a range distance of 160 meters from the payload bay antenna was analyzed. The communication performance between Space Shuttle Orbiter and International Space Station (SSO-ISS) during rendezvous was also investigated. The multipath effects from payload bay structures surrounding the payload bay antenna were analyzed. The computer simulation tool based on the Geometrical Theory of Diffraction method (GTD) was used to compute the signal strengths. The total field strength was obtained by summing the direct fields from the antennas and the reflected and diffracted fields from the surrounding structures. The computed signal strengths were compared to the signal strength corresponding to the 0 dB link margin. Based on the results obtained in this study, RF coverage for SSO-EVA and SSO- ISS communication links was determined for the proposed payload bay antenna UHF locations. The RF radiation to the Orbiter Docking System (ODS) pyros, the payload bay avionics, and the Shuttle Remote Manipulator System (SRMS) from the new proposed UHF antenna location was also investigated to ensure the EMC/EMI compliances.

Hwu, Shian U.↗

Space Suit Electrocardiographic Electrode Selection: Are commercial electrodes better than the old Apollo technology?

The NASA Manned Space Program uses an electrocardiograph (ECG) system to monitor astronauts during extravehicular activity (EVA). This ECG system, called the Operational Bioinstrumentation System (OBS), was developed during the Apollo era. Throughout the Shuttle program these electrodes experienced failures during several EVAs performed from the Space Shuttle and International Space Station (ISS) airlocks. An attempt during Shuttle Flight STS-109 to replace the old electrodes with new commercial off-the-shelf (COTS) disposable electrodes proved unsuccessful. One assumption for failure of the STS-109 COTS electrodes was the expansion of trapped gases under the foam electrode pad, causing the electrode to be displaced from the skin. Given that our current electrodes provide insufficient reliability, a number of COTS ECG electrodes were tested at the NASA Altitude Manned Chamber Test Facility. Methods: OBS disposable electrodes were tested on human test subjects in an altitude chamber simulating an Extravehicular Mobility Unit (EMU) operating pressure of 4.3 psia with the following goals: (1) to confirm the root cause of the flight certified, disposable electrode failure during flight STS-109. (2) to identify an adequate COTS replacement electrode and determine if further modifications to the electrodes are required. (3) to evaluate the adhesion of each disposable electrode without preparation of the skin with isopropyl alcohol. Results: There were several electrodes that failed the pressure testing at 4.3psia, including the electrodes used during flight STS-109. Two electrodes functioned well throughout all testing and were selected for further testing in an EMU at altitude. A vent hole placed in all electrodes was also tested as a possible solution to prevent gas expansion from causing electrode failures. Conclusions: Two failure modes were identified: (1) foam-based porous electrodes entrapped air bubbles under the pad (2) poor adhesion caused some electrodes to fail

Redmond, M.↗

Expedition Memory: Towards Agent-based Web Services for Creating and Using Mars Exploration Data.

Explorers ranging over kilometers of rugged, sometimes "feature-less" terrain for over a year could be overwhelmed by tracking and sharing what they have done and learned. An automated system based on the existing Mobile Agents design [ I ] and Mars Exploration Rover experience [2], could serve as an "expedition memory" that would be indexed by voice as wel1 as a web interface, linking people, places, activities, records (voice notes, photographs, samples). and a descriptive scientific ontology. This database would be accessible during EVAs by astronauts, annotated by the remote science team, linked to EVA plans, and allow cross indexing between sites and expeditions. We consider the basic problem, our philosophical approach, technical methods, and uses of the expedition memory for facilitating long-term collaboration between Mars crews and Earth support teams. We emphasize that a "memory" does not mean a database per se, but an interactive service that combines different resources, and ultimately could be like a helpful librarian.

Clancey, William J.↗

Innovative Robot Archetypes for In-Space Construction and Maintenance

The space environment presents unique challenges and opportunities in the assembly, inspection and maintenance of orbital and transit spaceflight systems. While conventional Extra-Vehicular Activity (EVA) technology, out of necessity, addresses each of the challenges, relatively few of the opportunities have been exploited due to crew safety and reliability considerations. Extra-Vehicular Robotics (EVR) is one of the least-explored design spaces but offers many exciting innovations transcending the crane-like Space Shuttle and International Space Station Remote Manipulator System (RMS) robots used for berthing, coarse positioning and stabilization. Microgravity environments can support new robotic archetypes with locomotion and manipulation capabilities analogous to undersea creatures. Such diversification could enable the next generation of space science platforms and vehicles that are too large and fragile to launch and deploy as self-contained payloads. Sinuous manipulators for minimally invasive inspection and repair in confined spaces, soft-stepping climbers with expansive leg reach envelopes and free-flying nanosatellite cameras can access EVA worksites generally not accessible to humans in spacesuits. These and other novel robotic archetypes are presented along with functionality concepts

Rehnmark, Fredrik↗

Design and Certification of the Extravehicular Activity Mobility Unit (EMU) Water Processing Jumper

The Extravehicular Mobility Units (EMUs) onboard the International Space Station (ISS) experienced a failure due to cooling water contamination from biomass and corrosion byproducts forming solids around the EMU pump rotor. The coolant had no biocide and a low pH which induced biofilm growth and corrosion precipitates, respectively. NASA JSC was tasked with building hardware to clean the ionic, organic, and particulate load from the EMU coolant loop before and after Extravehicular Activity (EVAs). Based on a return sample of the EMU coolant loop, the chemical load was well understood, but there was not sufficient volume of the returned sample to analyze particulates. Through work with EMU specialists, chemists, (EVA) Mission Operations Directorate (MOD) representation, safety and mission assurance, astronaut crew, and team engineers, requirements were developed for the EMU Water Processing hardware (sometimes referred to as the Airlock Coolant Loop Recovery [A/L CLR] system). Those requirements ranged from the operable level of ionic, organic, and particulate load, interfaces to the EMU, maximum cycle time, operating pressure drop, flow rate, and temperature, leakage rates, and biocide levels for storage. Design work began in February 2005 and certification was completed in April 2005 to support a return to flight launch date of May 12, 2005. This paper will discuss the details of the design and certification of the EMU Water Processing hardware and its components

Peterson, Laurie J.↗

Rapid Cycling CO2 and H2O Removal System for EMU

NASA's planned future missions set stringent demands on the design of the Portable Life Support Systems (PLSS), requiring dramatic reductions in weight, decreased reliance on supplies and greater flexibility on the types of missions. Use of regenerable systems that reduce weight and volume of the EMU is of critical importance to NASA, both for low orbit operations and for long duration manned missions. The CO2 and humidity control unit in the existing PLSS design is relatively large, since it has to remove 8 hours worth of CO2. If the sorbent regeneration can be carried out during the extravehicular activity (EVA) with a relatively high regeneration frequency, the size of the sorbent canister and weight can be significantly reduced. TDA Research, Inc. (TDA) is developing a compact, regenerable sorbent-based system to control CO2 and humidity in the space suit ventilation loop. The sorbent can be regenerated using space vacuum during the EVA, eliminating all duration-limiting elements in the life support system. This paper summarizes the results of the sorbent development and testing, and evaluation efforts. The results of a preliminary system analysis are also included, showing the size and volume reductions provided by the new system.

Alptekin, Gokhan↗

Extravehicular Mobility Unit (EMU) / International Space Station (ISS) Coolant Loop Failure and Recovery

Following the Colombia accident, the Extravehicular Mobility Units (EMU) onboard ISS were unused for several months. Upon startup, the units experienced a failure in the coolant system. This failure resulted in the loss of Extravehicular Activity (EVA) capability from the US segment of ISS. With limited on-orbit evidence, a team of chemists, engineers, metallurgists, and microbiologists were able to identify the cause of the failure and develop recovery hardware and procedures. As a result of this work, the ISS crew regained the capability to perform EVAs from the US segment of the ISS.

Lewis, John F.↗

International Space Station (ISS) Major Constituent Analyzer (MCA) On-Orbit Performance

The Major Constituent Analyzer (MCA) is an essential part of the International Space Station (ISS) environmental control and life support system. The analyzer provides continuous readout of the partial pressures of six gases, nitrogen (N2), oxygen (O2), hydrogen (H2), carbon dioxide (CO2), methane (CH4) and water vapor (H2O) in the various ISS US. on-orbit modules. Continuous readout of the partial pressures of these gases is critical to verifying safe operation of the Atmosphere Revitalization (AR) system, Atmosphere Control System (ACS), and crew safety for Airlock Extravehicular Activities (EVAs). The MCA encountered some operational interruptions since being launched to orbit on Flight 5A in February 2001. Electronic, software, and hardware modifications and on-orbit crew maintenance of the MCA were necessary to restore its capability. This paper describes the modifications and the on-orbit maintenance performed to return the MCA to operational status, including brief explanations of the MCA failures and the associated hardware and electronic modifications. Operational procedures that were required to return the MCA to operational status, and the more recent successes of supporting both Russian and U.S. ISS EVA preparations, are also discussed

Reysa, Richard↗

STS-121: Discovery Spacewalk Overview Briefing

The briefing began with the introduction of Tomas Gonzalez-Torres (Lead Extra Vehicular Activity Officer). The spacewalk team included Pierce Sellers (EV-1), Mike Fossum (EV-2) and Mark Kelly (coordinator and pilot). Three new EMU's (space suits) were provided with hardware upgrades (warning systems). The 1st EVA would take place on flight day 5 and would include the exchange of the 3 EMU's. The 1st task was the installation of the blade locker, a device used to prevent severing of cables. The team will also install the Interface Umbilical System (IUS) which is an extension cord for the mobile transporter. EVA-2 task will be to replace the old Trailing Umbilical System (TUS) with a new one.

Source record↗