Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

IOTA (Integrable Optics Test Accelerator): Facility and experimental beam physics program

The Integrable Optics Test Accelerator (IOTA) is a storage ring for advanced beam physics research currently being built and commissioned at Fermilab. It will operate with protons and electrons using injectors with momenta of 70 and 150 MeV/c, respectively. The research program includes the study of nonlinear focusing integrable optical beam lattices based on special magnets and electron lenses, beam dynamics of space-charge effects and their compensation, optical stochastic cooling, and several other experiments. In this article, we present the design and main parameters of the facility, outline progress to date and provide the timeline of the construction, commissioning and research. Finally, the physical principles, design, and hardware implementation plans for the major IOTA experiments are also discussed.

43 PARTICLE ACCELERATORS↗

CALIS—A CALibration Insertion System for the DarkSide-50 dark matter search experiment

This paper describes the design, fabrication, commissioning and use of a CALibration source Insertion System (CALIS) in the DarkSide-50 direct dark matter search experiment. CALIS deploys radioactive sources into the liquid scintillator veto to characterize the detector response and detection efficiency of the DarkSide-50 Liquid Argon Time Projection Chamber, and the surrounding 30 t organic liquid scintillator neutron veto. It was commissioned in September 2014 and has been used successfully in several gamma and neutron source campaigns since then. A description of the hardware and an excerpt of calibration analysis results are given below.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

First transmission of electrons and ions through the KATRIN beamline

The Karlsruhe Tritium Neutrino (KATRIN) experiment is a large-scale effort to probe the absolute neutrino mass scale with a sensitivity of 0.2 eV (90% confidence level), via a precise measurement of the endpoint spectrum of tritium β-decay. This work documents several KATRIN commissioning milestones: the complete assembly of the experimental beamline, the successful transmission of electrons from three sources through the beamline to the primary detector, and tests of ion transport and retention. In the First Light commissioning campaign of autumn 2016, photoelectrons were generated at the rear wall and ions were created by a dedicated ion source attached to the rear section; in July 2017, gaseous 83m Kr was injected into the KATRIN source section, and a condensed 83m Kr source was deployed in the transport section. In this paper we describe the technical details of the apparatus and the configuration for each measurement, and give first results on source and system performance. In conclusion, we have successfully achieved transmission from all four sources, established system stability, and characterized many aspects of the apparatus.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Volume III. DUNE far detector technical coordination

The preponderance of matter over antimatter in the early universe, the dynamics of the supernovae that produced the heavy elements necessary for life, and whether protons eventually decay -- these mysteries at the forefront of particle physics and astrophysics are key to understanding the early evolution of our universe, its current state, and its eventual fate. The Deep Underground Neutrino Experiment (DUNE) is an international world-class experiment dedicated to addressing these questions as it searches for leptonic charge-parity symmetry violation, stands ready to capture supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector technical design report (TDR) describes the DUNE physics program and the technical designs of the single- and dual-phase DUNE liquid argon TPC far detector modules. Volume III of this TDR describes how the activities required to design, construct, fabricate, install, and commission the DUNE far detector modules are organized and managed. This volume details the organizational structures that will carry out and/or oversee the planned far detector activities safely, successfully, on time, and on budget. It presents overviews of the facilities, supporting infrastructure, and detectors for context, and it outlines the project-related functions and methodologies used by the DUNE technical coordination organization, focusing on the areas of integration engineering, technical reviews, quality assurance and control, and safety oversight. Because of its more advanced stage of development, functional examples presented in this volume focus primarily on the single-phase (SP) detector module.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

GEM detectors for the CMS endcap muon system: status of three new detector stations

The High-Luminosity LHC (HL-LHC, or Phase-2 LHC) will deliver proton-proton collisions at 5–7.5 times the nominal LHC luminosity, with an expected number of 140–200 pp-interactions per bunch crossing (Pile-up or PU). To maintain the performance of muon triggering and reconstruction under high background, the forward part of the Muon Spectrometer of the CMS experiment will be upgraded with Gas Electron Multipliers (GEM) and improved Resistive Plate Chambers (iRPC) detectors. A first GEM station (GE1/1) was installed during Long Shutdown 2 (LS2, 2019–2021), a 2 nd station (GE2/1) of Triple-GEM detectors will be installed in winter 2023–24 and 2024–25, while a new 6-layer station (ME0) will be installed in the third Long Shutdown (LS3, 2026–2028). GE11 is considered an early Phase-2 upgrade as it will reduce the p T threshold by combining GEM and Cathode Strip Chamber (CSC) hits in the forward muon system at twice the LHC design luminosity ($\mathcal{L}$ = 2 · 10 34 cm -2 s -1 , 50 PU). After a successful start of Run-3 in 2022, with almost 40 fb -1 collected, the commissioning of the GE1/1 detector is nearly complete. Most chambers are operated stably with an efficiency in excess of 95%, next being the demonstration of the combined CSC-GEM trigger in 2023. The lessons learnt with the first large-area GEM station have lead to improvements in detector and electronics design for the Phase 2 detectors GE2/1 and ME0. This proceeding will discuss the progress made since last MPGD Conference (MPGD 2019), discussing the commissioning and early performance of GE1/1; the design improvements and start of construction of GE2/1; and the R&D currently ongoing for ME0.

47 OTHER INSTRUMENTATION↗

A large area 100-channel PICOSEC Micromegas detector with time resolution at the 20 ps level

Abstract The PICOSEC Micromegas precise timing detector is based on a Cherenkov radiator coupled to a photocathode operating in a semi-transparent mode and a Micromegas amplification structure. The first proof of concept single-channel prototype was able to achieve a time resolution below 25 ps. One of the crucial aspects in the development of precise timing gaseous detectors applicable in high-energy physics experiments is a modular design that enables large area coverage. The first 19-channel multi-pad prototype with an active area of approximately 10 cm 2 suffered from degraded timing resolution due to the non-uniformity of the preamplification gap thickness. A new 100 cm 2 detector module with 100 channels based on a rigid hybrid ceramic/FR4 Micromegas board for improved drift gap uniformity was developed. Initial measurements with 80 GeV/c muons showed improvements in timing response over the measured pads and a time resolution below 25 ps. More recent measurements with a thinner drift gap detector module and newly developed RF pulse amplifiers show that the pad centre resolution can be enhanced to the level of 17 ps. This work will present the development of the detector from structural simulations, design, and beam test commissioning with a focus on the timing performance of a thinner drift gap detector module in combination with new electronics using an automated timing scan method.

Utrobicic, A.↗

FRIB Cryogenic Distribution System and Status

The MSU-FRIB cryogenic distribution system supports the 2 K primary, 4 K primary, and 35 - 55 K shield operation of more than 70 loads in the accelerator and the experimental areas. It is based on JLab and SNS experience with bayonet-type disconnects between the loads and the distribution system for phased commissioning and maintenance. The linac transfer line, which features three separate transfer line segments for additional independence during phased commissioning at 4 K and 2 K, connects the folded arrangement of 49 cryomodules and 4 superconducting dipole magnets and a fourth transfer line supports the separator area cryo loads. The pressure reliefs for the transfer line process lines, located in the refrigeration room outside the tunnel/accelerator area, are piped to be vented outdoors. The transfer line designs integrate supply and return flow paths into a combined vacuum space. The main linac distribution segments are produced in a small number of standard configurations; a prototype of one such configuration has been fabricated at Jefferson Lab and has been installed at MSU to support testing of a prototype FRIB cryomodule.

Ganni, Venkatarao↗

Overview and status of the Long-Baseline Neutrino Facility Far Site cryogenics system

The Sanford Underground Research Facility (SURF) will host the Far Detector of the Deep Underground Neutrino Experiment (DUNE), an international multi-kiloton Long-Baseline neutrino experiment that will be installed about one and a half kilometers underground in Lead, SD. Detectors will be located inside four cryostats filled with almost 70,000 metric tons of ultrapure liquid argon, with a level of impurities lower than 100 parts per trillion of oxygen equivalent contamination. The cryogenics infrastructure supporting this experiment is provided by the Long-Baseline Neutrino Facility (LBNF). This contribution presents modes of operation, layout, and main features of the LBNF Far Site cryogenic system, which is composed of three subsystems: Infrastructure, Proximity, and Internal cryogenics. The Infrastructure cryogenics supports the needs of the cryostat and Proximity cryogenics. It includes the equipment to receive the argon in liquid phase, vaporize it and transfer it underground as a gas, the nitrogen system (composed of the refrigeration system, liquid nitrogen buffer tanks and liquid and gaseous nitrogen distribution), liquid and gaseous argon distribution and process controls. The Proximity cryogenics receives fluids from the Infrastructure cryogenics and delivers them to the Internal cryogenics at the required temperature, pressure, purity and mass flow rate. It includes the argon condensers, liquid and gaseous argon purification and regeneration systems, nitrogen and argon phase separators, piping, valves, and instrumentation. The Internal cryogenics comprises the liquid and gaseous argon distribution inside the cryostats for the commissioning, cool down, fill, and steady state operations of the cryostats and detectors. An international engineering team is designing these systems and will manufacture, install, commission, and qualify them. This contribution describes the main features, performance, functional requirements, and modes of operation of the LBNF Far Site cryogenics system. It also presents the status of the design, along with present and future needs to support the DUNE experiment.

43 PARTICLE ACCELERATORS↗

Performance Testing of the 4kW ESR 2 Refrigerator at JLab

Abstract The End Station Refrigerator 2 (ESR2), a refurbished cryoplant, will replace the ESR1. ESR2 is comprised of the cold box and compressors from the Superconducting Super Collider’s 4 kW, 4.5 K ASST-A plant. It also features a new 10 kL liquid helium dewar, a cryogenic distribution system and new control and utility systems. This plant was reconfigured to provide a cold helium supply at 15 K, 12 K, and 8 K for the experimental hall’s hydrogen targets. The most significant load will be during the MOLLER experiment, which will see a total hydrogen target load of 5 kW at 15 K. This paper details the commissioning results of the 4.5 K refrigeration system in various modes (maximum refrigeration, maximum liquefaction, and a 50/50 mix) at both 100 % and 50 % capacity. We will also evaluate the performance with an expected MOLLER load. Current performance will be compared with the historical commissioning data from the ASST-A plant.

Perry, C. [Cryogenics Department, Thomas Jefferson↗

Performance Testing of Jefferson Lab 12 GeV Helium Screw Compressors

Oil injected screw compressors have essentially superseded all other types of compressors in modern helium refrigeration systems due to their large displacement capacity, reliability, minimal vibration, and capability of handling helium's high heat of compression. At the present state of compressor system designs for helium refrigeration systems, typically two-thirds of the lost input power is due to the compression system. It is important to understand the isothermal and volumetric efficiencies of these machines to help properly design the compression system to match the refrigeration process. It is also important to identify those primary compressor skid exergetic loss mechanisms which may be reduced, thereby offering the possibility of significantly reducing the input power to helium refrigeration processes which are extremely energy intensive. This paper summarizes the results collected during the commissioning of the new compressor system for Jefferson Lab?s (JLab?s) 12 GeV upgrade. The compressor skid packages were designed by JLab and built to print by industry. They incorporate a number of modifications not typical of helium screw compressor packages and most importantly allow a very wide range of operation so that JLab?s patented Floating Pressure Process can be fully utilized. This paper also summarizes key features of the skid design that allow this process and facilitate the maintenance and reliability of these helium compressor systems.

Knudsen, P.↗

KEPLER SCIENCE OPERATIONS

Kepler's mission design includes a comprehensive plan for commissioning and science operations. The commissioning phase completed all critical tasks and accomplished all mission objectives within a week of the pre-launch plan. Since the start of science data collection, the nominal timeline has been interrupted by two safe-mode events, several losses of fine point, and some small pointing adjustments. The most important anomalies are understood and mitigated, so Kepler's technical performance has improved significantly over this period, and the prognosis for mission success is excellent. The Kepler data archive is established and hosting data for the science team, guest observers, and the public. The first data to become publicly available include the monthly full-frame images and the light curves for targets that are dropped from the exoplanet program or released after publication. Data are placed in the archive on a quarterly basis; the Kepler Results Catalog will be released annually starting in 2011.

07 ISOTOPE AND RADIATION SOURCES↗

GEMINI PLANET IMAGER OBSERVATIONS OF THE AU MICROSCOPII DEBRIS DISK: ASYMMETRIES WITHIN ONE ARCSECOND

We present Gemini Planet Imager (GPI) observations of AU Microscopii, a young M dwarf with an edge-on, dusty debris disk. Integral field spectroscopy and broadband imaging polarimetry were obtained during the commissioning of GPI. In our broadband imaging polarimetry observations, we detect the disk only in total intensity and find asymmetries in the morphology of the disk between the southeast (SE) and northwest (NW) sides. The SE side of the disk exhibits a bump at 1″ (10 AU projected separation) that is three times more vertically extended and three times fainter in peak surface brightness than the NW side at similar separations. This part of the disk is also vertically offset by 69 ± 30 mas to the northeast at 1″ when compared to the established disk midplane and is consistent with prior Atacama Large Millimeter/submillimeter Array and Hubble Space Telescope/Space Telescope Imaging Spectrograph observations. We see hints that the SE bump might be a result of detecting a horizontal sliver feature above the main disk that could be the disk backside. Alternatively, when including the morphology of the NW side, where the disk midplane is offset in the opposite direction ∼50 mas between 0.″4 and 1.″2, the asymmetries suggest a warp-like feature. Using our integral field spectroscopy data to search for planets, we are 50% complete for ∼4 M{sub Jup} planets at 4 AU. We detect a source, resolved only along the disk plane, that could either be a candidate planetary mass companion or a compact clump in the disk.

79 ASTRONOMY AND ASTROPHYSICS↗

Personal Dose Equivalent Conversion Coefficients For Photons To 1 GEV

The personal dose equivalent, H{sub p}(d), is the quantity recommended by the International Commission on Radiation Units and Measurements (ICRU) to be used as an approximation of the protection quantity Effective Dose when performing personal dosemeter calibrations. The personal dose equivalent can be defined for any location and depth within the body. Typically, the location of interest is the trunk where personal dosemeters are usually worn and in this instance a suitable approximation is a 30 cm X 30 cm X 15 cm slab-type phantom. For this condition the personal dose equivalent is denoted as H{sub p,slab}(d) and the depths, d, are taken to be 0.007 cm for non-penetrating and 1 cm for penetrating radiation. In operational radiation protection a third depth, 0.3 cm, is used to approximate the dose to the lens of the eye. A number of conversion coefficients for photons are available for incident energies up to several MeV, however, data to higher energies are limited. In this work conversion coefficients up to 1 GeV have been calculated for H{sub p,slab}(10) and H{sub p,slab}(3) using both the kerma approximation and by tracking secondary charged particles. For H{sub p}(0.07) the conversion coefficients were calculated, but only to 10 MeV due to computational limitations. Additionally, conversions from air kerma to H{sub p,slab}(d) have been determined and are reported. The conversion coefficients were determined for discrete incident energies, but analytical fits of the coefficients over the energy range are provided. Since the inclusion of air can influence the production of secondary charged particles incident on the face of the phantom conversion coefficients have been determined both in vacuo and with the source and slab immersed within a sphere in air. The conversion coefficients for the personal dose equivalent are compared to the appropriate protection quantity, calculated according to the recommendations of the latest International Commission on Radiological Protection (ICRP) guidance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Internal Radiation Dose Evaluation For An Unruptured Post Release Tristructural Istropic Fuel Particle for Advanced and Micro-reactor Applications

There are unique benefits from advanced/micro reactor designs and fuel types that offer safety features in the case of an accident that may reduce environmental consequences compared to conventional reactors and fuels. Several micro reactor designs, for both civilian and military applications, are proposed using tristructural-isotropic (TRISO) fuel. TRISO particles are a robust advanced nuclear fuel type that leads to the unique question of how unruptured, activated TRISO particles will interact with humans. Human exposure to nuclear fuel, or radionuclides, includes all pathways of exposure. However, TRISO particles are 0.9 mm in size, and that particle size restricts internal dose assessment to the ingestion pathway; eliminating the inhalation and dermal absorption pathways. Furthermore, activity of the TRISO particle was established by High Temperature Engineering Test Reactor simulations assuming the TRISO particle was one day post-release from the reactor. International Commission of Radiological Protection publications 100 and 133 were used to develop the internal dosimetry model for an unruptured TRISO particle for the International Commission of Radiological Protection reference male and female dose assessment. The rectosigmoid colon had the highest internal organ dose for both reference male (2.1 Sv) and reference female (2.3 Sv). The internal dose from ingestion of the scenario-defined TRISO particle was 0.25 Sv for the reference male and 0.29 Sv for the refence female, which exceeds the annual occupational effective dose limit of 0.05 Sv in the code of federal regulations, 10.CFR.20 Subpart C.

61 RADIATION PROTECTION AND DOSIMETRY↗

Atmospheric dispersion modeling: Challenges of the Fukushima Daiichi response

In this research, the U.S. Department of Energy’s (DOE) National Atmospheric Release Advisory Center (NARAC) provided a wide range of predictions and analyses as part of the response to the Fukushima Daiichi Nuclear Power Plant accident including: daily Japanese weather forecasts and atmospheric transport predictions to inform planning for field monitoring operations and to provide U.S. government agencies with ongoing situational awareness of meteorological conditions; estimates of possible dose in Japan based on hypothetical U.S. Nuclear Regulatory Commission scenarios of potential radionuclide releases to support protective action planning for U.S. citizens; predictions of possible plume arrival times and dose levels at U.S. locations; and source estimation and plume model refinement based on atmospheric dispersion modeling and available monitoring data.

54 ENVIRONMENTAL SCIENCES↗

International code of nomenclature of prokaryotes

Here, this volume contains the edition of the International Code of Nomenclature of Prokaryotes that was presented in draft form and available for comment at the Plenary Session of the Fourteenth International Congress of Bacteriology and Applied Microbiology (BAM), Montréal, 2014, together with updated lists of conserved and rejected bacterial names and of Opinions issued by the Judicial Commission. As in the past it brings together those changes accepted, published and documented by the ICSP and the Judicial Commission since the last revision was published. Several new appendices have been added to this edition. Appendix 11 addresses the appropriate application of the Candidatus concept, Appendix 12 contains the history of the van Niel Prize, and Appendix 13 contains the summaries of Congresses.

59 BASIC BIOLOGICAL SCIENCES↗

Resonance Ionization Spectroscopy Experiment at Facility for Rare Isotope Beams

This manuscript reports on the commissioning of the Resonance Ionization Spectroscopy Experiment (RISE) at the BEam COoler and LAser spectroscopy (BECOLA) facility at Facility for Rare Isotope Beams (FRIB). The instrument implements the collinear resonance ionization spectroscopy technique for sensitive measurements of isotope shifts and hyperfine structure of short-lived isotopes produced at FRIB. The existing BECOLA beamline was extended to integrate an electrostatic ion-beam bender and an ion detector at ultrahigh vacuum. An injection-seeded titanium-sapphire laser and a multiharmonic pulsed neodymium-doped yttrium aluminum garnet laser were installed to perform resonant excitation and selective ionization. Commissioning tests were performed to demonstrate the capabilities of the instrument by measuring the hyperfine structure of stable 27 Al produced in an offline ion source. The RISE instrument is ready and operational for future studies of short-lived isotopes at FRIB.

Atomic spectra↗

New Limits on Bosonic Dark Matter, Solar Axions, Pauli Exclusion Principle Violation, and Electron Decay from the Majorana Demonstrator

Here, we present new limits on exotic keV-scale physics based on 478 kg d of Majorana Demonstrator commissioning data. Constraints at the 90% confidence level are derived on bosonic dark matter (DM) and solar axion couplings, Pauli exclusion principle violating (PEPV) decay, and electron decay using monoenergetic peak signal limits above our background. We set our most stringent DM constraints for 11.8 keV mass particles, limiting g A e < 4.5 × 10 -13 for pseudoscalars and ( α ' / α ) < 9.7 × 10 -28 for vectors. We also report a 14.4 keV solar axion coupling limit of g$eff\atop{AN}$ × g A e < 3.8 × 10 -17 , a 1/2 β 2 < 8.5 × 10 - 48 limit on the strength of PEPV electron transitions, and a lower limit on the electron lifetime of τ e > 1.2 × 1 0 24 yr for e - → invisible.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗