Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Melt spreading code assessment, modifications, and application to the EPR core catcher design.

The Evolutionary Power Reactor (EPR) is under consideration by various utilities in the United States to provide base load electrical production, and as a result the design is undergoing a certification review by the U.S. Nuclear Regulatory Commission (NRC). The severe accident design philosophy for this reactor is based upon the fact that the projected power rating results in a narrow margin for in-vessel melt retention by external cooling of the reactor vessel. As a result, the design addresses ex-vessel core melt stabilization using a mitigation strategy that includes: (1) an external core melt retention system to temporarily hold core melt released from the vessel; (2) a layer of 'sacrificial' material that is admixed with the melt while in the core melt retention system; (3) a melt plug in the lower part of the retention system that, when failed, provides a pathway for the mixture to spread to a large core spreading chamber; and finally, (4) cooling and stabilization of the spread melt by controlled top and bottom flooding. The overall concept is illustrated in Figure 1.1. The melt spreading process relies heavily on inertial flow of a low-viscosity admixed melt to a segmented spreading chamber, and assumes that the melt mass will be distributed to a uniform height in the chamber. The spreading phenomenon thus needs to be modeled properly in order to adequately assess the EPR design. The MELTSPREAD code, developed at Argonne National Laboratory, can model segmented, and both uniform and nonuniform spreading. The NRC is thus utilizing MELTSPREAD to evaluate melt spreading in the EPR design. MELTSPREAD was originally developed to support resolution of the Mark I containment shell vulnerability issue. Following closure of this issue, development of MELTSPREAD ceased in the early 1990's, at which time the melt spreading database upon which the code had been validated was rather limited. In particular, the database that was utilized for initial validation consisted of: (1) comparison to an analytical solution for the dam break problem, (2) water spreading tests in a 1/10 linear scale model of the Mark I containment by Theofanous et al., and (3) steel spreading tests by Suzuki et al. that were also conducted in a geometry similar to the Mark I. The objective of this work was to utilize the MELTSPREAD code to check the assumption of uniform melt spreading in the EPR core catcher design. As a starting point for the project, the code was validated against the worldwide melt spreading database that emerged after the code was originally written in the very early 1990's. As part of this exercise, the code was extensively modified and upgraded to incorporate findings from these various analytical and experiment programs. In terms of expanding the ability of the code to analyze various melt simulant experiments, the options to input user-specified melt and/or substrate material properties was added. The ability to perform invisicid and/or adiabatic spreading analysis was also added so that comparisons with analytical solutions and isothermal spreading tests could be carried out. In terms of refining the capability to carry out reactor material melt spreading analyses, the code was upgraded with a new melt viscosity model; the capability was added to treat situations in which solid fraction buildup between the liquidus-solidus is non-linear; and finally, the ability to treat an interfacial heat transfer resistance between the melt and substrate was incorporated. This last set of changes substantially improved the predictive capability of the code in terms of addressing reactor material melt spreading tests. Aside from improvements and upgrades, a method was developed to fit the model to the various melt spreading tests in a manner that allowed uncertainties in the model predictions to be statistically characterized. With these results, a sensitivity study was performed to investigate the assumption of uniform spreading in the EPR core catcher that addressed parametric variations in: (1) melt pour mass, (2) melt composition, (3) melt pour rate, (4) pour configuration (i.e., homogeneous vs. stratified metal-oxide phases), (5) melt temperature, (6) cavity condition (wet vs. dry), (7) spreading channel inclination angle, and finally (8) uncertainties in the melt viscosity correlation that are based on comparisons with the reactor material melt spreading database. Although differences were found in the rate of spreading and the degree to which the sacrificial concrete in the spreading room is ablated during the transients, in all cases the melt eventually (over a period of minutes) spreads to a uniform depth in the system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technical Review Report for the Justification for 233U Content Envelope Safety Analysis Report for Packaging Model 9975-85, Addendum 2

This report documents the review of Addendum 2, Justification for {sup 233}U Content Envelope, Safety Analysis Report for Packaging, prepared by Savannah River Packaging Technology (SRPT) of Savannah River National Laboratory (SRNL),--the Submittal--at the request of the Department of Energy's (DOE) National Nuclear Security Agency's (NNSA) Albuquerque Operations Office, for the shipment of 233U-bearing material from Los Alamos National Laboratory (LANL), in support of the Technical Area 18 (TA-18) Materials Relocation Program. This Addendum supplements the Safety Analysis Report for Packaging (SARP), Revision 0, and Addendum 1 to Revision 0 of the 9975 SARP (called Revision 0 of the 9975 SARP in this Addendum). The {sup 233}U-bearing items are currently stored at TA-18, awaiting shipment in the Model 9975-85 Package as a new Content Envelope, C.9. Following acceptance of this Addendum by the DOE-Headquarters Certifying Official (EM-60), and subsequent revision to the current Certificate of Compliance (CoC), the new contents will be authorized for shipment in the Model 9975-85 Package. The new Content Configuration, C.9, along with the optional Shielded-Pig Convenience Container Configuration, will be incorporated into the next revision of the Model 9975-85 Package SARP. In addition to the {sup 233}U-bearing items stored at TA-18, kilogram quantities of {sup 233}U-bearing materials are stored at Oak Ridge National Laboratory (ORNL). About one quarter of the items is Highly Enriched Uranium (HEU) as U{sub 3}O{sub 8} with {sup 233}U and {sup 232}U. Highly Enriched Uranium implies a {sup 236}U enrichment of >93%. The remaining material located at ORNL is pure {sup 233}U (>90%) with varying amounts of {sup 232}U. The form of the material is U{sub 3}O{sub 8}, UO{sub 3}, UO{sub 2}, and U metal. Additional DOE Sites may also have {sup 233}U-bearing materials for shipment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technical Review Report for the Justification for Shipment of Sodium-Bonded Carbide Fuel Pins in the T-3 Cask

This report documents the review of the Fluor Submittal (hereafter, the Submittal), prepared by Savannah River Packaging Technology (SRPT) of Savannah River National Laboratory (SRNL), at the request of the Department of Energy's (DOE) Richland Operations Office, for the shipment of unirradiated and irradiated sodium-bonded carbide fuel pins. The sodium-bonded carbide fuel pins are currently stored at the Fast Flux Test Facility (FFTF) awaiting shipment to Idaho National Laboratory (INL). Normally, modified contents are included into the next revision of the SARP. However, the contents, identified to be shipped from FFTF to Idaho National Laboratory, are a one-way shipment of 18 irradiated fuel pins and 7 unirradiated fuel pins, where the irradiated and unirradiated fuel pins are shipped separately, and can be authorized with a letter amendment to the existing Certificate of Compliance (CoC).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Review Report for the Mound 1KW Package Safety Analysis Report for Packaging Waiver for the Use of Modified Primary Containment Vessel (PCV)

This Technical Review Report (TRR) documents the review, performed by the Lawrence Livermore National Laboratory (LLNL) staff, at the request of the U.S. Department of Energy (DOE), on the Waiver for the Use of Modified Primary Containment Vessels (PCV). The waiver is to be used to support a limited number of shipments of fuel for the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) Project in support of the National Aeronautics and Space Administration's (NASA's) Mars Science Laboratory (MSL) mission. Under the waiver, an inventory of existing national security PCVs will be converted to standard PCVs. Both types of PCVs are currently approved for use by the Office of Nuclear Energy. LLNL has previously reviewed the national security PCVs under Mound 1KW Package Safety Analysis Report for Packaging, Addendum No. 1, Revision c, dated June 2007 (Addendum 1). The safety analysis of the package is documented in the Safety Analysis Report for Packaging (SARP) for the Mound 1KW Package (i.e., the Mound 1KW SARP, or the SARP) where the standard PCVs have been reviewed by LLNL. The Mound 1KW Package is certified by DOE Certificate of Compliance (CoC) number USA/9516/B(U)F-85 for the transportation of Type B quantities of plutonium heat source material. The waiver requests an exemption, claiming safety equivalent to the requirements specified in 10 CFR 71.12, Specific Exemptions, and will lead to a letter amendment to the CoC. Under the waiver, the Office of Radioisotope Power Systems, NE-34, is seeking an exemption from 10 CFR 71.19(d)(1), Previously Approved Package,[5] which states: '(d) NRC will approve modifications to the design and authorized contents of a Type B package, or a fissile material package, previously approved by NRC, provided--(1) The modifications of a Type B package are not significant with respect to the design, operating characteristics, or safe performance of the containment system, when the package is subjected to the tests specified in {section}71.71 and 71.73.' The LLNL staff had previously reviewed a request from Idaho National Laboratory (INL) to reconfigure national security PCVs to standard PCVs. With a nominal 50% reduction in both the height and the volume, the LLNL staff initially deemed the modifications to be significant, which would not be allowed under the provisions of 10 CFR 71.19(d)(1)--see above. As a follow-up, the DOE requested additional clarification from the Nuclear Regulatory Commission (NRC). The NRC concluded that the reconfiguration would be a new fabrication, and that an exemption to the regulations would be required to allow its use, as per the requirements specified in 10 CFR 71.19(c)(1), Previously Approved Package: '(c) A Type B(U) package, a Type B(M) package, or a fissile material package previously approved by the NRC with the designation '-85' in the identification number of the NRC CoC, may be used under the general license of {section}71.17 with the following additional conditions: (1) Fabrication of the package must be satisfactorily completed by December 31, 2006, as demonstrated by application of its model number in accordance with 71.85(c).' Although the preferred approach toward the resolution of this issue would be for the applicant to submit an updated SARP, the applicant has stated that the process of updating the Model Mound 1KW Package SARP is a work that is in progress, but that the updated SARP is not yet ready for submittal. The applicant has to provide a submittal, proving that the package meets the '-96' requirements of International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1, in order to fabricate approved packagings after December 31, 2006. The applicant has further stated that all other packaging features, as described in the currently approved Model Mound 1KW Package SARP, remain unchanged. This report documents the LLNL review of the waiver request. The specific review for each SARP Chapter is documented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FY08 VPP Program Evaluation

The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

03 NATURAL GAS↗

Technical Review Report for the Model 9978-96 Package Safety Analysis Report for Packaging (S-SARP-G-00002, Revision 1, March 2009)

This Technical Review Report (TRR) documents the review, performed by Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the Department of Energy (DOE), on the 'Safety Analysis Report for Packaging (SARP), Model 9978 B(M)F-96', Revision 1, March 2009 (S-SARP-G-00002). The Model 9978 Package complies with 10 CFR 71, and with 'Regulations for the Safe Transport of Radioactive Material-1996 Edition (As Amended, 2000)-Safety Requirements', International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9978 Packaging is designed, analyzed, fabricated, and tested in accordance with Section III of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PVC). The review presented in this TRR was performed using the methods outlined in Revision 3 of the DOE's 'Packaging Review Guide (PRG) for Reviewing Safety Analysis Reports for Packages'. The format of the SARP follows that specified in Revision 2 of the Nuclear Regulatory Commission's Regulatory Guide 7.9, i.e., 'Standard Format and Content of Part 71 Applications for Approval of Packages for Radioactive Material'. Although the two documents are similar in their content, they are not identical. Formatting differences have been noted in this TRR, where appropriate. The Model 9978 Packaging is a single containment package, using a 5-inch containment vessel (5CV). It uses a nominal 35-gallon drum package design. In comparison, the Model 9977 Packaging uses a 6-inch containment vessel (6CV). The Model 9977 and Model 9978 Packagings were developed concurrently, and they were referred to as the General Purpose Fissile Material Package, Version 1 (GPFP). Both packagings use General Plastics FR-3716 polyurethane foam as insulation and as impact limiters. The 5CV is used as the Primary Containment Vessel (PCV) in the Model 9975-96 Packaging. The Model 9975-96 Packaging also has the 6CV as its Secondary Containment Vessel (SCV). In comparison, the Model 9975 Packagings use Celotex{trademark} for insulation and as impact limiters. To provide a historical perspective, it is noted that the Model 9975-96 Packaging is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then-newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The Model 9978 Package has six Content Envelopes: C.1 ({sup 238}Pu Heat Sources), C.2 ( Pu/U Metals), C.3 (Pu/U Oxides, Reserved), C.4 (U Metal or Alloy), C.5 (U Compounds), and C.6 (Samples and Sources). Per 10 CFR 71.59 (Code of Federal Regulations), the value of N is 50 for the Model 9978 Package leading to a Criticality Safety Index (CSI) of 1.0. The Transport Index (TI), based on dose rate, is calculated to be a maximum of 4.1.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical Review Report for the Application for Contents Amendment for Shipping Isentropic Compression Experiment (ICE) Apparatus in 9977 Packaging

This report documents the review of Application for Contents Amendment for Shipping Isentropic Compression Experiment (ICE) Apparatus in 9977 Packaging, prepared by Savannah River Packaging Technology (SRPT) of Savannah River National Laboratory (SRNL) of Savannah River Nuclear Solutions, LLC, -- the Submittal -- at the request of the Department of Energy's (DOE) National Nuclear Security Agency's (NNSA) Albuquerque Facility Operations Division, for the shipment of the ICE apparatus from Los Alamos National Laboratory (LANL), to Sandia National Laboratory (SNL). The ICE apparatus consists of a stainless steel assembly containing about 8 grams of {sup 239}Pu or its dose equivalent as noted in Table 1, Comparison of 9977 Content C.1 and the ICE Radioactive Contents, of the Submittal. The ICE target is mounted on the transport container assembly base. A Viton{sup R} O-ring seals the transport container base to the transport container body. Another Viton{sup R} O-ring seals the transport container handle to the transport container body. The ICE apparatus weighs less than 30 pounds and has less than 0.6 watts decay heat rate. For the Model 9977 Package, the maximum payload weight is 100 pounds and the maximum decay heat rate is 19 watts. Thus, the maximum payload weight and the maximum decay heat rate for the Model 9977 Package easily bound those for the ICE apparatus. This Addendum supplements the Safety Analysis Report for Packaging (SARP), Revision 2, for the Model 9977 Package and Addendum 1, Revision 2, to Revision 2 of the Model 9977 Package SARP. The ICE apparatus is considered as part of Content Envelope C.6, Samples and Sources, under the submittal for the Model 9978 Package SARP currently under review. The Staff at Lawrence Livermore National Laboratory (LLNL) recommends that the Submittal be approved by the DOE-Headquarters Certifying Official (EM-60), and incorporated into a subsequent revision to the current Certificate of Compliance (CoC), to the Model 9977-96 Packaging.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview of Deployed EDS Technologies

The term explosive detection system (EDS) is used by the TSA to describe equipment that is certified to detect explosives in checked bags. The EDS, as certified, by the TSL must consist of device for interrogating a bag and an automated detection algorithm (ATD) for evaluating the results of the interrogation. We only consider CT as the interrogation device in this report. A schematic drawing of a CT-based EDS is shown in Figure 2. The output of the ATD is the binary decision of alarm or non-alarm. Alarms may true- or false-positives. Non-alarms may be true- or false-negatives. False positives are also denoted false alarms. The true detection means that the ATD reports an alarm when a threat is present in the scanned bag. The probability of detecting a threat given that a threat is present is denoted the probability of detection (PD). The probability of false alarm (PFA) is the case when an alarm is reported when a threat is not present in a bag. Certification in this context means passing tests for PD and PFA at the TSL. The results of the EDS include CT cross-sectional images of the bag and specifics about the alarmed objects generated by ATD. These results are presented on a display so that a person may override the decision of ATD and declare the alarm to be a non-alarm. This process is denoted clearing. Bags that are not cleared by the person are sent to a secondary inspection process. Here the bags may be opened or assessed with explosive trace detection (ETD) in order to clear the bags. Bags that are not cleared at this point are evaluated by an ordinance disposal team. The CT scanner along with ATD is denoted Level 1 screening. The process of clearing on a display is denoted Level 2 screening. Secondary inspection is denoted Level 3 screening. Vendors of the deployed EDSs supply the TSA with equipment for all three levels. Therefore, the term EDS may include the equipment provided for Levels 1, 2 and 3. A schematic diagram of an EDS and the levels of screening are shown in Figure 7. The decision processes used as a bag is scanned and cleared is shown in Figure 8. Shield alarms and exceptions are discussed below. Since most alarms are false alarms, the probability of alarm is often times denoted the probability of a false alarm. The expenses associated with clearing false alarms occur in Levels 2 and 3.

42 ENGINEERING↗

Advanced Simulation and Computing FY10-11 Implementation Plan Volume 2, Rev. 0

The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: Objective 1 Robust Tools--Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements. Objective 2 Prediction through Simulation--Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile. Objective 3 Balanced Operational Infrastructure--Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

99 GENERAL AND MISCELLANEOUS↗

Evaluation Report on "The Department's Unclassified Cyber Security Program"

Industry experts report that security challenges and threats are continually evolving as malicious activity has become more web-based and attackers are able to rapidly adapt their attack methods. In addition, the number of data breaches continues to rise. In an effort to mitigate and address threats and protect valuable information, the Department of Energy anticipated spending about $275 million in Fiscal Year (FY) 2009 to implement cyber security measures necessary to protect its information technology resources. These systems and data are designed to support the Department's mission and business lines of energy security, nuclear security, scientific discovery and innovation, and environmental responsibility. The Federal Information Security Management Act of 2002 (FISMA) provides direction to agencies on the management and oversight of information security risks, including design and implementation of controls to protect Federal information and systems. As required by FISMA, the Office of Inspector General conducts an annual independent evaluation to determine whether the Department's unclassified cyber security program adequately protects its information systems and data. This memorandum and the attached report present the results of our evaluation for FY 2009. The Department continued to make incremental improvements in its unclassified cyber security program. Our evaluation disclosed that most sites had taken action to address weaknesses previously identified in our FY 2008 evaluation report. They improved certification and accreditation of systems; strengthened configuration management of networks and systems; performed independent assessments; and, developed and/or refined certain policies and procedures. In addition, the Department instituted a centralized incident response organization designed to eliminate duplicative efforts throughout the Department. As we have noted in previous reports, the Department continued to maintain strong network perimeter defenses against malicious intruders and other externals threats. These are positive accomplishments. However, in our judgment, additional action is required to further enhance the Department's unclassified cyber security program and help reduce risks to its systems and data. For example, our current review identified opportunities for improvements in areas such as security planning and testing, systems inventory, access controls, and configuration management. In particular, we issued a number of findings at sites managed by the National Nuclear Security Administration (NNSA). We also identified weaknesses across various Department program elements. Issues that warrant further attention include: (1) Weaknesses such as outdated security plans and not completing annual security control self-assessments were identified at several sites; (2) The Department had not yet resolved systems inventory issues and had yet to deploy a complex-wide automated asset management tool to help track information technology resources and identify interfaces between systems or networks; (3) Although certain improvements had been made to enhance access controls, we noted deficiencies such as a lack of periodic account reviews and inadequate password management at a number of sites; and (4) Previously identified weaknesses in configuration management had been corrected, however, we found problems related to weak administrator account settings and failure to install software patches, as well as incomplete implementation of the Federal Desktop Core Configuration. These internal control weaknesses existed, at least in part, because certain cyber security roles and responsibilities were not clearly delineated. Program officials also had not effectively performed monitoring and review activities essential for evaluating the adequacy of cyber security performance. In some cases, officials had not ensured that weaknesses discovered during audits and other evaluations were recorded and tracked to resolution in the organizations' Plans of Action and Milestones. Our testing disclosed that about 39 percent of existing corrective action milestones had missed estimated remediation dates, with many exceeding planned completion dates by at least one year. As a consequence, the risk of compromise to the Department's information and systems remained higher than necessary. To assist the continuing efforts to improve, we made several recommendations designed to help the Department's managers to strengthen the unclassified cyber security program and, thereby, protect its computer resources from unauthorized modification, loss, or disclosure of information. Due to security considerations, information on specific vulnerabilities and locations has been omitted from this report. Management officials at the sites evaluated were provided with detailed information regarding identified vulnerabilities, and, in many instances, initiated corrective actions.

99 GENERAL AND MISCELLANEOUS↗

Wind power forecasting : state-of-the-art 2009.

Many countries and regions are introducing policies aimed at reducing the environmental footprint from the energy sector and increasing the use of renewable energy. In the United States, a number of initiatives have been taken at the state level, from renewable portfolio standards (RPSs) and renewable energy certificates (RECs), to regional greenhouse gas emission control schemes. Within the U.S. Federal government, new energy and environmental policies and goals are also being crafted, and these are likely to increase the use of renewable energy substantially. The European Union is pursuing implementation of its ambitious 20/20/20 targets, which aim (by 2020) to reduce greenhouse gas emissions by 20% (as compared to 1990), increase the amount of renewable energy to 20% of the energy supply, and reduce the overall energy consumption by 20% through energy efficiency. With the current focus on energy and the environment, efficient integration of renewable energy into the electric power system is becoming increasingly important. In a recent report, the U.S. Department of Energy (DOE) describes a model-based scenario, in which wind energy provides 20% of the U.S. electricity demand in 2030. The report discusses a set of technical and economic challenges that have to be overcome for this scenario to unfold. In Europe, several countries already have a high penetration of wind power (i.e., in the range of 7 to 20% of electricity consumption in countries such as Germany, Spain, Portugal, and Denmark). The rapid growth in installed wind power capacity is expected to continue in the United States as well as in Europe. A large-scale introduction of wind power causes a number of challenges for electricity market and power system operators who will have to deal with the variability and uncertainty in wind power generation when making their scheduling and dispatch decisions. Wind power forecasting (WPF) is frequently identified as an important tool to address the variability and uncertainty in wind power and to more efficiently operate power systems with large wind power penetrations. Moreover, in a market environment, the wind power contribution to the generation portofolio becomes important in determining the daily and hourly prices, as variations in the estimated wind power will influence the clearing prices for both energy and operating reserves. With the increasing penetration of wind power, WPF is quickly becoming an important topic for the electric power industry. System operators (SOs), generating companies (GENCOs), and regulators all support efforts to develop better, more reliable and accurate forecasting models. Wind farm owners and operators also benefit from better wind power prediction to support competitive participation in electricity markets against more stable and dispatchable energy sources. In general, WPF can be used for a number of purposes, such as: generation and transmission maintenance planning, determination of operating reserve requirements, unit commitment, economic dispatch, energy storage optimization (e.g., pumped hydro storage), and energy trading. The objective of this report is to review and analyze state-of-the-art WPF models and their application to power systems operations. We first give a detailed description of the methodologies underlying state-of-the-art WPF models. We then look at how WPF can be integrated into power system operations, with specific focus on the unit commitment problem.

17 WIND ENERGY↗

Energy Security and Restoration Exercise Program/Best Practices and Information Sharing

The first year of this cooperative agreement focused on the following elements: curriculum development and presentation, curriculum maintenance, enhancements, and effectiveness, and smart card initiative. During the second year of this grant, with redirection from DOE, the IUOE modified its mission statement under the cooperative agreement. It states: 'The mission of the IUOE is to provide expertise to provide best practices, information sharing, and develop scenarios and conduct exercises ranging in size and complexity from table top to national level to prepare all stakeholders to protect and restore energy infrastructure should an event, terrorist or natural, occur'. The Program developed a number of products under this Cooperative Agreement. These products include: FOSTER (Facility Operations Safety Training Event Response) Curriculum and Training Models, Alternative Energy Supply - Generators Training Module, Liquefied Natural Gas Training Module, Education Program - Distributed Generations, Compendium of Resources and References, Energy Security and Restoration Training Manual, Manual of Situations and Scenarios Developed for Emergency Exercises, Manual of Best Practices/Lessons Learned for Energy Load Management, Training Plan, Strategic Information and Exercise Plan, National Certification Plan Report, and a Smart Card Project Report.

03 NATURAL GAS↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Di-J/Ψ Studies, Level 3 Tracking and the D0 Run IIb Upgrade

The D0 detector underwent an upgrade to its silicon vertex detector and triggering systems during the transition from Run IIa to Run IIb to maximize its ability to fully exploit Run II at the Fermilab Tevatron. This thesis describes improvements made to the tracking and vertexing algorithms used by the high level trigger in both Run IIa and Run IIb, as well as a search for resonant di-J/Ψ states using both Run IIa and Run IIb data. Improvements made to the tracking and vertexing algorithms during Run IIa included the optimization of the existing tracking software to reduce overall processing time and the certification and testing of a new software release. Upgrades made to the high level trigger for Run IIb included the development of a new tracking algorithm and the inclusion of the new Layer 0 silicon detector into the existing software. The integration of Layer 0 into the high level trigger has led to an improvement in the overall impact parameter resolution for tracks of ~50%. The development of a new parameterization method for finding the error associated to the impact parameter of tracks returned by the high level tracking algorithm, in association with the inclusion of Layer 0, has led to improvements in vertex resolution of ~4.5 μm. A previous search in the di-J/Ψ channel revealed a unpredicted resonance at ~13.7 GeV/c 2 . A confirmation analysis is presented using 2.8 fb -1 of data and two different approaches to cuts. No significant excess is seen in the di-J/Ψ mass spectrum.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Technical Review Report for the Justification for 9975 Gram Based Content Envelopes, C.10 and C.11

The Department of Energy (DOE) desires to ship Model 9975-85 and Model 9975-96 Packages loaded with Pu/U metal and Pu/U oxide materials as identified in new Content Envelopes C.10 and C.11. The new Content Envelopes C.10 and C.11 consist of radioisotopes and impurities that are similar to the existing C.3, Pu/U metal, and C.4, Pu/U oxide, Content Envelopes but that list the radioisotopes as gram values in lieu of the existing weight percent of radioactive material mass values listed for the C.3 and C.4 Content Envelopes. Authorization for shipment requires acceptance of this report by the DOE-Headquarters (HQ) Certifying Official (EM-10/EM-2) as an Addendum to WSRC-SA-2002-00008, Revision 0, S-SARA-G-00001, Addendum 1, Revision 0, and S-SARA-G-00002 Addendum 2, Revision 1, of the Model 9975-85 Package Safety Analysis Report for Packaging (SARP). This Addendum also applies to S-SARP-G-00003, Revision 0, of the Model 9975-96 Package SARP. These documents are collectively referred to as the existing Model 9975 Package SARP. The safety basis described addresses specific supplements to the currently approved safety basis. Justification is made for shipping the new Content Envelopes C.10 and C.11 under this Addendum. Following acceptance of this Addendum by EM-10/EM-2 and subsequent revision to the current Certificates of Compliance (CoCs), the new contents will be authorized for shipment in the Model 9975 Package. The new Content Envelopes will be incorporated into the next revision to the Model 9975-85 and Model 9975-96 Package SARPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Simulation and Computing FY09-FY10 Implementation Plan Volume 2, Rev. 1

The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: (1) Robust Tools - Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements; (2) Prediction through Simulation - Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile; and (3) Balanced Operational Infrastructure - Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

99 GENERAL AND MISCELLANEOUS↗

Advanced Simulation and Computing FY10-FY11 Implementation Plan Volume 2, Rev. 0.5

The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering (D&E) programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to study advanced nuclear weapons design and manufacturing processes, to analyze accident scenarios and weapons aging, and to provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is focused on increasing its predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (focused on sufficient resolution, dimensionality and scientific details); to quantify critical margins and uncertainties (QMU); and to resolve increasingly difficult analyses needed for the SSP. Moreover, ASC has restructured its business model from one that was very successful in delivering an initial capability to one that is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools. ASC must continue to meet three objectives: (1) Robust Tools - Develop robust models, codes, and computational techniques to support stockpile needs such as refurbishments, SFIs, LEPs, annual assessments, and evolving future requirements; (2) Prediction through Simulation - Deliver validated physics and engineering tools to enable simulations of nuclear weapons performance in a variety of operational environments and physical regimes and to enable risk-informed decisions about the performance, safety, and reliability of the stockpile; and (3) Balanced Operational Infrastructure - Implement a balanced computing platform acquisition strategy and operational infrastructure to meet Directed Stockpile Work (DSW) and SSP needs for capacity and high-end simulation capabilities.

99 GENERAL AND MISCELLANEOUS↗