Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Development of a machine vision system for automated structural assembly

Research is being conducted at the LaRC to develop a telerobotic assembly system designed to construct large space truss structures. This research program was initiated within the past several years, and a ground-based test-bed was developed to evaluate and expand the state of the art. Test-bed operations currently use predetermined ('taught') points for truss structural assembly. Total dependence on the use of taught points for joint receptacle capture and strut installation is neither robust nor reliable enough for space operations. Therefore, a machine vision sensor guidance system is being developed to locate and guide the robot to a passive target mounted on the truss joint receptacle. The vision system hardware includes a miniature video camera, passive targets mounted on the joint receptacles, target illumination hardware, and an image processing system. Discrimination of the target from background clutter is accomplished through standard digital processing techniques. Once the target is identified, a pose estimation algorithm is invoked to determine the location, in three-dimensional space, of the target relative to the robots end-effector. Preliminary test results of the vision system in the Automated Structural Assembly Laboratory with a range of lighting and background conditions indicate that it is fully capable of successfully identifying joint receptacle targets throughout the required operational range. Controlled optical bench test results indicate that the system can also provide the pose estimation accuracy to define the target position.

Sydow, P. Daniel↗

A space crane concept for performing on-orbit assembly

The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.

John T Dorsey↗

Precise positioning and compliance synthesis for automatic assembly using Lorentz levitation

Many manufacturing assembly tasks require fine compliant motion and fast, accurate positioning. Conventional robots perform poorly in these tasks because of their large mass, friction and backlash in gears, cogging in drive motors and other deleterious effects. Even robots equipped with special control systems enabling compliant operation offer only partial solutions. It is difficult or impossible to automate many product assemblies requiring fine, compliant motion. This problem can be greatly alleviated by dividing the manipulation system into coarse and fine domains. In this scenario, a standard industrial robot can serve as a coarse positioner which in turn carries a six degrees of freedom fine motion wrist. Thus the robot can access a workspace measured in meters at low bandwidth and low resolution while the wrist can move over millimeters at high bandwidth and high resolution during the final phase of the assembly operation. Work indicates that fine motion wrists using Lorentz levitation can greatly augment the accuracy and dexterity of robots because they are frictionless, have high bandwidths and have a single back drivable moving part. Also, since there is no contact between the moving and stationary parts, wear and contamination can be eliminated. The use of six Lorentz force actuators in combination with real time position and orientation sensing offers several important advantages over magnetic bearing approaches.

Hollis, R. L.↗

Lunar vehicle assembly and processing on Space Station Freedom

A concept is proposed that permits the accommodation of lunar vehicles on Space Station Freedom (SSF) within the context of the Human Exploration Initiative. The facility required for lunar-vehicle processing is defined with references to the types of support equipment assumed for these tasks. Attention is given to the SSF Assembly Complete, verification of the Lunar Transfer Vehicles (LTVs), and the attachments of reusable vs expendable LTVs. The impact of the assembly and processing operations is delineated with specific qualifications for revising the allowances for vehicle mass and controllability, reboost fuel needs, microgravity activities, and flight attitude. EVA working time is estimated for overhead and truss-assembly operations at about 3 months to support reusable LTV operations on the SSF. An Assembly/Servicing Facility is proposed for these activities with specific hardware options, and a hydrogen-oxygen propulsion system is proposed to make these activities more efficient.

Troutman, Patrick A.↗

Impact of restructuring on Space Station Freedom assembly sequence

The Space Station Freedom program and the process used to develop an assembly sequence are overviewed, with special attention given to the outcome of the recent restructuring activity and the positive impact it had on the Space Station design and the assembly sequence. The many technically complex and challenging aspects of the assembly sequence planning are examined, including the launch vehicle integration, the spacecraft systems capability development, and the availability of resources. It is shown that the restructuring reduced the size and the complexity of the Space Station, while the increase of ground integration through the use of preintegrated truss and shortened modules offers a reduced program risk and reduced demands on the STS.

Chung, Steven Y.↗

On-orbit assembly of Mars transfer vehicles

Developmental efforts conducted under NASA-Marshall aegis toward on-orbit assembly for manned Mars mission transfer vehicles (MTV) are presented. The MTV types considered encompass those with cryogenic/aerobraking propulsion, all-cryogenic propulsion, nuclear-thermal propulsion (NTP), nuclear-electric propulsion (NEP), and solar-electric propulsion (SEP). Attention is given to NTP, NEP, and SEP MTVs, in light of the requirements posed by the assembly environment and assembly platform designs. Much important design-related information is being derived from the Long Duration Exposure Facility.

Rao, Niranjan S.↗

A hierarchical planner for space truss assembly

A hierarchical planning paradigm for space truss assemblies is proposed which generates sequences of assembly operations and is suitable for human, teleoperator, and autonomous robotic implementation. Subgoals satisfying geometric (accessibility) and structural (rigidity) constraints are developed using a hierarchical state representation, and special cost functions are used to conduct a search for locally optimal sequences. Results of two case studies involving assemblies with up to 31 nodes and 102 struts are presented.

Mathur, Rajive K.↗

Pressure-Coupled Acoustic-Transducer Assembly

Improved acoustic-transducer assembly easy to assemble, relocatable, and used at high temperatures. In assembly, piezoelectric acoustic transducer pressure-coupled to delay line or fixture through soft metal like aluminum, copper or gold. Transducer subassembly includes layered structure of coupling material, transducer, thin disk of coupling material acting as cushion for transducer, electrode disk with coaxial cable lead attached, insulation/damping material, and pressure plate. Pressure coupling precludes problem of matching coefficients of thermal expansion of transducer, coupling material, and delay line.

Parker, F. Raymond↗

A smart end-effector for assembly of space truss structures

A unique facility, the Automated Structures Research Laboratory, is being used to investigate robotic assembly of truss structures. A special-purpose end-effector is used to assemble structural elements into an eight meter diameter structure. To expand the capabilities of the facility to include construction of structures with curved surfaces from straight structural elements of different lengths, a new end-effector has been designed and fabricated. This end-effector contains an integrated microprocessor to monitor actuator operations through sensor feedback. This paper provides an overview of the automated assembly tasks required by this end-effector and a description of the new end-effector's hardware and control software.

Doggett, William R.↗

Qualification of the gritblast assembly and process for the inside diameter of the RSRM forward and aft domes

This gritblast assembly shall be used when refurbishing the Inside Diameter (ID) of RSRM forward and aft domes. Initial blasting is used to remove corrosion and adhesive not removed during the insulation washout. Final blasting is conducted just prior to part finalization in order to remove residual contamination and prepare the ID surface for bonding. The media used in this gritblaster is DuPont Zirclean Blasting Abrasive. It is possible to use other media in this gritblast assembly, however the only facility that has the control capability for this assembly is the Zirclean blast booth. This blast booth can not use other media without the occurrence of contamination. This automated process shall replace the manually controlled gritblasting that is currently in operation. Manual gritblasting does not provide the consistency, control, and safety that an automated process is capable of delivering.

Nolan, Michael J.↗

Protective helmet assembly

The invention is a protective helmet assembly with improved safety and impact resistance, high resistance to ignition and combustion, and reduced offgassing. The assembly comprises a hard rigid ballistic outer shell with one or more impact absorbing pads fitted to the interior surface. The pads are made of open cell flexible polyimide foam material, each of which is attached to the inner surface of the ballistic outer shell by cooperative VELCRO fastener strips of hook-and-loop material affixed respectively to the rigid outer shell and the impact absorbing pads. The helmet assembly with shell and pads is sized to fit relatively close over a wearer's head.

Dawn, Frederic S.↗

Emergency egress requirements for caution and warning, logistics, maintenance, and assembly stage MB-6 of Space Station Freedom

The safety and survival of the crewmembers has been the prime concern of NASA. Previous studies have been conducted mainly for emergencies occurring during the operating mode of the fully assembled Station. The present study was conducted to evaluate the emergency requirements for the caution and warning, logistics, maintenance, and assembly stage MB-6 of the Station in space. Effective caution and warning is essential to achieve safe egress in emergencies. In order to survive a long period in space, the safety and emergency requirements for maintenance, logistics, and extravehicular assembly operation in space must be met.

Ray, Paul S.↗

Space Station Freedom assembly and operation at a 51.6 degree inclination orbit

This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.

Troutman, Patrick A.↗

Controls of interaction dynamics of orbital assembly

Building structures and spacecraft in orbit will require technologies for positioning, docking/berthing, and joining orbital structures. A fundamental problem underlying the operation of docking and berthing is that of controlling the contact dynamics of mechanical structures actuated by active mechanisms such as robotic devices. Control systems must be designed to control these active mechanisms so that both the free space motions and contact motions are stable and satisfy specifications on position accuracy and bounds on contact forces. For the large orbital structures of the future, the problem of interactive dynamics and control is fundamentally different in several ways than it was for spacecraft docking in the past. First, future space structures must be treated as flexible structures - the operations of docking, berthing, and assembly will need to respect the vibrations of the structures. Second, the assembly of these structures will require multiple-point contact, rather than the essentially single-point positioning of conventional spacecraft docking. Third, some assembly operations require the subassemblies to be brought and held in contact so that successful joining can be accomplished. A preliminary study of contact stability and compliance control design has resulted in the development of an analytical method and a design method to analyze stability. The analytical method analyzes the problem of stability when an actively-controlled structure contacts a passive structure. This method makes it possible to accurately estimate the stiffness of the passive structures with which the contact motion will become unstable. The analytic results suggest that passivity is neither achievable in practice, nor necessary as a design concept. A contact control system need only be passive up to a certain frequency; beyond that frequency the system can be stabilized with sufficiently small gains. With this concept the Center developed a design methodology for achieving desired compliant contact motions. This design method is based on H-infinity norm optimization, which makes it possible to consider both driving point mechanical impedance and systems robustness to modeling uncertainty. A laboratory facility was set up to verify experimentally the analytical and design theory.

Su, Renjeng↗

Automated assembly of a tetrahedral truss structure using machine vision

The Automated Structures Assembly Laboratory is a unique facility at NASA Langley Research Center used to investigate the robotic assembly of truss structures. Two special-purpose end-effectors have been used to assemble 102 truss members and 12 panels into an 8-meter diameter structure. One end-effector is dedicated to truss member insertion, while a second end-effector is used to install panels. Until recently, the robot motions required to construct the structure were developed iteratively using the facility hardware. Recent work at Langley has resulted in a compact machine vision system capable of providing position information relative to targets on the structure. Use of the vision system to guide the robot from an approach point 10 to 18 inches from the structure, offsetting model inaccuracies, permits robot motion based on calculated points as a first step toward use of preplanned paths from an automated path planner. This paper presents recent work at Langley highlighting the application of the machine vision system during truss member insertion.

Doggett, William R.↗

Structural concepts for a lunar transfer vehicle aerobrake which can be assembled on orbit

A multidisciplinary conceptual study was conducted to define a reusable Lunar transfer vehicle (LTV) aerobrake which could be launched on a Space Shuttle or Titan IV and assembled on orbit at Space Station Freedom. A major objective of this study was to design an aerobrake, with integrated structure and thermal protection systems, which has a mass less than 20 percent (9040 lb) of the LTV lunar return mass. This paper describes the aerobrake segmentation concepts, the structural concepts, a joint concept for assembly, and a structural design with analysis of the aerobrake. Results show that a 50-foot diameter LTV aerobrake can be designed for on-orbit assembly which will achieve the 20 percent mass budget.

Dorsey, John T.↗

STS-49 - A demonstration of EMU operational capabilities for Space Station Freedom assembly

One of the primary objectives for Space Shuttle mission STS-49 is to perform three EVAs on consecutive days in a manner similar to those planned for Space Station Freedom (SSF) assembly missions. The preparation and completion of this mission will serve as a pathfinder for future EVA intensive SSF assembly flights. Several operational issues pertaining to the EMU have been addressed in preparation for this mission. Provisioning and orbiter stowage of the EMU and associated hardware have been optimized for four EVA crewmembers. EMU preparatory and maintenance activities have been streamlined to help minimize crew overhead and have been carefully integrated into a very demanding mission timeline. The constraints and limitations have been assessed in providing a backup EMU capability for each EVA crewmember. Several EMU concerns have also been addressed in supporting new EVA task requirements, such as large mass handling and performing SSF assembly operations over the crew cabin and nose of the Shuttle orbiter.

Bleisath, Scott A.↗

In-Space Assembly and Construction Technology Project Summary: Infrastructure Operations Area of the Operations Technology Program

Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.

Bush, Harold↗