Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,207 records · Page 67

Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

Environmental and health impacts are presented for activities associated with transient testing of nuclear fuel and material using two candidate test reactors. Transient testing involves irradiation of nuclear fuel or materials for short time-periods under high neutron flux rates. The transient testing process includes transportation of nuclear fuel or materials inside a robust shipping cask to a hot cell, removal from the shipping cask, pre-irradiation examination of the nuclear materials, assembly of an experiment assembly, transportation of the experiment assembly to the test reactor, irradiation in the test reactor, transport back to the hot cell, and post-irradiation examination of the nuclear fuel or material. The potential for environmental or health consequences during the transportation, examination, and irradiation actions are assessed for normal operations, off-normal (accident) scenarios, and transportation. Impacts to the environment (air, soil, and groundwater), are assessed during each phase of the transient testing process. This report documents the evaluation of potential consequences to the general public. This document supports the Environmental Assessment (EA) required by the U.S. National Environmental Policy Act (NEPA) (42 USC Subsection 4321 et seq.).

54 ENVIRONMENTAL SCIENCES↗

Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

99 GENERAL AND MISCELLANEOUS↗

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through. FY 2013 • Evaluation of new or revised waste streams by special analysis. • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pathway Aggregation in the Risk Assessment of Proliferation Resistance and Physical Protection (PR&PP) of Nuclear Energy Systems

The framework for Proliferation Resistance and Physical Protection (PR & PP) evaluation is to define a set of challenges, to obtain the system responses, and to assess the outcomes. The assessment of outcomes heavily relies on pathways, defined as sequences of events or actions that could potentially be followed by a State or a group of individuals in order to achieve a proliferation objective, with the defined threats as initiating events. There may be large number of segments connecting pathway stages (e.g. acquisition, processing, and fabrication for PR) which can lead to even larger number of pathways or scenarios through possible different combinations of segment connections, each with associated probabilities contributing to the overall risk. Clustering of these scenarios in specified stage attribute intervals is important for their tractable analysis and outcome assessment. A software tool for scenario generation and clustering (OSUPR) is developed that utilizes the PRCALC code developed at the Brookhaven National Laboratory for scenario generation and the K- means, mean shift and adaptive mean shift algorithms as possible clustering schemes. The results of the study using the Example Sodium Fast Breeder as an example system show that clustering facilitates the probabilistic or deterministic analysis of scenarios to identify system vulnerabilities and communication of the major risk contributors to stakeholders. The results of the study also show that the mean shift algorithm has the most potential for assisting the analysis of the scenarios generated by PRCALC.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Development Impact Assessment (DIA) Case Study. South Africa

This case study reviews South Africa’s experience in considering the impacts of climate change action on development goals, focusing on the South African energy sector and development impact assessments (DIAs) that have and could be used to influence energy policy or inform the selection of energy activities. It includes a review of assessments—conducted by government ministries, technical partners, and academic institutes and non-governmental organizations (NGOs)—that consider employment, health, and water implications of possible energy sector actions, as well as multi-criteria impact assessments.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficiency, Water Efficiency, and Renewable Energy Site Assessment: Mendenhall Glacier Visitor Center, Juneau, Alaska

This report summarizes results from the energy efficiency, water efficiency, and renewable energy site assessment of the Mendenhall Glacier Visitor Center and site in Juneau, Alaska. The assessment is an American Society of Heating, Refrigerating, and Air-Conditioning Engineers Level 2 audit and meets Energy Independence and Security Act requirements. A team led by the U.S. Department of Energy's National Renewable Energy Laboratory conducted the assessment with U.S. Forest Service personnel August 19-20, 2015, as part of ongoing efforts by USFS to reduce energy and water use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2016 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan.The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for federal fiscal year (FY) 2016. This annual summary report presents results and conclusions of the FY 2016 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2016 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2016, Evaluation of new or revised waste streams by special analysis, and Development and acceptance of version 4.200 of the Area 5 RWMS GoldSim PA/CA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2016 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2016 PA results, generated with the Area 5 RWMS v4.200 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. All results remain less than 50% of their performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2016. A new Corrective Action Unit (CAU), CAU 576, with corrective action sites near the Area 3 RWMS and Area 5 RWMS was identified in FY 2016. The sites are currently under investigation and not expected to be important sources for the CA. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs’ results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (CAU 97) source, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) source in the Area 5 RWMS CA is planned pending the completion of the CAU 98 Closure Report in FY 2017. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMSs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GeoRePORT Protocol Volume II: Geological Assessment Tool

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (resource grade) and the progress of research and development over the lifetime of the project (project readiness level). By assessing the major characteristics of a geothermal resource and categorizing the techniques used and how well the research technique was implemented, users can report a resource grade. The resource grade covers multiple geological, technological, and socioeconomic attributes that can be compared across play types and geothermal areas. Resource grade and project readiness level are reported for three assessment categories: geological, technical, and socioeconomic. This protocol document applies to the Geologic Assessment Tool and is intended for use with an excel-based spreadsheet tool, published separately.

15 GEOTHERMAL ENERGY↗

GeoRePORT Protocol Volume III: Technical Assessment Tool

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (resource grade) and the progress of research and development over the lifetime of the project (project readiness level). By assessing the major characteristics of a geothermal resource and categorizing the techniques used and how well the research technique was implemented, users can report a resource grade. The resource grade covers multiple geological, technological, and socioeconomic attributes that can be compared across play types and geothermal areas. Resource grade and project readiness level are reported for three assessment categories: geological, technical, and socioeconomic. This protocol document applies to the Technical Assessment Tool and is intended for use with an excel-based spreadsheet tool, published separately.

15 GEOTHERMAL ENERGY↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UF Industrial Assessment Center - Budget Periods 2017-2021. Final Report

This report summarizes the work performed at the University of Florida’s Industrial Assessment Center (UF-IAC) during the five budget periods (BPs) in the years 2017 through 2021 under DOE Award No. DE-EE0007707. The objective of the work is to perform industrial assessments to small- and medium-sized manufacturing facilities in the State of Florida and to train students in industrial energy management and in performing industrial assessments. Specific details about the activities of the UF-IAC (referred to as the Center) during that time can be found in the 20 quarterly reports that were submitted throughout the duration of the contract. The project start and end dates are September 1, 2016 and August 31, 2021, respectively. The project was granted a six-month no-cost extension till February 28, 2022, to accommodate unexpected delays due to the COVID-19 pandemic. This project was performed by the University of Florida (PI: Dr. SA Sherif). The scope of work includes six milestone whose description and outcomes are listed in the Statement of Project Objectives (SOPO).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Advanced Reactor Supply Chain Assessment (GAIN Report)

Several net-zero scenario evaluations predict a rapid ramp up of nuclear energy in the coming decades. If this materializes, it will most likely strain the supply chains associated with the potential advanced reactor concepts awaiting deployment. To help assess the current and potential capacities of the various advanced reactor supply chains, the Gateway for Accelerated Innovation in Nuclear (GAIN) conducted a survey of companies able to produce components for advanced reactors in the near future (namely for sodium, gas-cooled, and molten salt reactors). Using an aggressive nuclear deployment scenario, the objective was to assess the ability of the various supply chains to meet the considerable demand projections for certain key components (vessels, heat exchangers, pumps, graphite, and sensors) and identify potential challenges. While individual companies were unable to meet the most optimistic nuclear deployment rate projections, it was found that on aggregate, a United States-based supply chain projected that expansion could be ramped up to meet a larger future demand of these components. However, meeting projected demand for several more complex items (namely gas or salt heat exchangers) was found to be more challenging. Deploying new reactors at scale necessitates the production of more and more supply chain components, requiring a ramp up in production. Supply chain companies were surveyed, and respondents appeared less able to meet short term demand (next year) versus longer-term demand projections (5 and 10 years). This reflects the need to obtain orders with adequate lead times (can range from 3 to 30 months). Future demand will need to be met by expanding existing capacity. These expansions will require suppliers to raise capital or secure other types of support (federal loans or grants) to invest in facilities, equipment, and workforce. Individual suppliers indicated financial investments could be in the range of $\$ $100 million to $\$ $1 billion for their own facilities (depending on the type of facility). The biggest risk, according to respondents, related to general uncertainties surrounding the future nuclear industry and whether the potential demand projections will materialize into real demand that is actionable from a business perspective. Businesses do not seem willing to take investments risks without clear orders. If businesses are not able to invest to expand the supply, it will either delay the deployment of advanced nuclear technology, or the supply chain will be met by suppliers outside of the United States. This report only focuses on the domestic supply chain’s ability to meet the various projections stipulated here for the specific assessed components (vessels, heat exchangers, pumps, graphite, and sensors). The report does not cover all reactor designs or all components that may ultimately be needed for any one reactor design. It also does not address whether any specific aspect of the supply chain will be cost competitive in the global market, nor how potential state-backed entities could affect the expansion of a United States-based supply chain. The largest challenges in ramping up capacity among respondents appear to be workforce related. This includes workforce availability, experience, training, and turnover. In addition to facility investment, suppliers will also need to invest heavily in long-term workforce training to meet production goals. This issue is not nuclear-specific, and the expansion of any supply chain will likely face similar challenges. While suppliers evaluated expected normal business demand from other markets outside of nuclear, it is possible that other market segments could expand more than predicted and compete for the same suppliers. One potential market that may compete for the same supplier resources is the United States military, as many of these suppliers support both the commercial nuclear sector as well as the Navy with reactors and components. In summary, suppliers in the United States believe that there is a way to increase production in order to begin meeting the demand which will exist for advanced reactors—as long as appropriate investments can be made in the supply chain in an appropriate timeframe. Based on the capacity projections and lead times, investment will be needed to meet the 5-year and 10-year production targets. Therefore, if significant nuclear deployment is to occur in the 2030s, investment and ramp up of the advanced nuclear supply chain will need to begin in the near future for the United States to successfully deploy these advanced reactors with domestic supply chains.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL Radiological Response Training Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at the Idaho National Laboratory (INL) Radiological Response Training Range (RRTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K2O, LaBr3, KBr, Cu, Zr, F, Ga, Ga2O3, NaNO2, Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated assuming 12 tests are conducted annually using all 11 material types for a period of 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradioactive chemical

54 ENVIRONMENTAL SCIENCES↗

Assessment of Potential Dose and Environmental Impacts from Proposed Testing at the INL National Security Test Range

This assessment uses screening-level models to calculate potential environmental impacts from proposed tests at two locations at the Idaho National Laboratory (INL) National Security Test Range (NSTR) site. Proposed tests could be conducted using 11 different radioactive material types that include K 2 O, LaBr 3 , KBr, Cu, Zr, F, Ga, Ga 2 O 3 , NaNO 2 , Ga-68, and Tc-99m. The tests could potentially release radioactive material to the atmosphere and radionuclides and other contaminants to the soil, which could leach into the unsaturated zone and migrate to the aquifer. Atmospheric transport of radionuclides to potential human receptors and time-integrated air concentrations were calculated with a Gaussian plume model and three years of hourly meteorological data. Potential surface-soil impacts were calculated with the computer program mixing-cell model (MCM). Groundwater impacts were calculated with the computer programs MCM and GWSCREEN. Radiological doses from potential atmospheric releases were calculated for public receptors off the INL Site and for workers at nearby INL facilities. Results were compared to regulatory dose limits. Maximum potential groundwater concentrations were estimated in the aquifer below the NSTR site and compared to drinking water standards or risk-based screening levels for resident tap water. Soil concentrations were calculated and compared to risk-based screening levels for workers and potential future residents. All impacts were estimated based on the assumption that 12 tests are conducted annually using all 11 material types for 15 years. This document provides the resources to enable a subject matter expert in the field of environmental assessments to replicate the modeling and calculations. The methodology and parameters are presented in the text. All electronic files, including computer-code input, output, executable files, batch files, scripts, and spreadsheet files, are contained in a zip file that can be accessed by selecting “Additional Information” (select Native File) in the INL Electronic Document Management System (EDMS). It is highly unlikely the test scenarios evaluated in this ECAR will adversely impact human health based on comparisons of calculated dose and concentration against regulatory standards and risk-based screening levels. Conservative estimates of dose to workers and the public from atmospheric transport of possible radionuclide releases are far below federal radiation protection standards. Conservative estimates of potential contaminant concentrations in groundwater are less than federal drinking water standards or screening levels. Predicted radionuclide concentrations in surface soils are below risk-based screening levels, except for Ge-68 (material Ga-68) for the worker. The Ge-68 soil concentration can be made less than the worker PRG, if the number of annual tests using Ga-68 is reduced from 12 to 6. However, the sum of ratios still exceeds one because of the high K-40 ratio. If the EF of the worker (number of days the worker is in the contaminated testing area) is reduced from 225 days/yr (default value for full time worker) to 112 days/yr, the Ge-68 ratio is less than one and the sum of ratios is less than one. Actual radiation doses and groundwater and surface-soil concentrations are likely to be much less than those calculated because of the conservative assumptions and parameters employed in the modeling. For example, atmospheric-transport calculations assume the entire inventory of each material type is readily released to the atmosphere and no plume deposition, depletion, or radioactive decay occurs during transport. The calculations also assume the same meteorological conditions (e.g., wind velocity, wind direction, stability class) that produce the maximum 95th percentile concentration (i.e., concentration representing the 95th percentile of a distribution of concentrations derived from 3 years of hourly meteorological data) at each receptor location are the same for all 12 tests during the year, and each receptor is assumed to be present during all 12 tests. The surface-soil assessment assumes the entire inventory of each test is deposited in the top 5 cm of soil. No atmospheric dispersal is assumed, and the radionuclides are subject only to leaching and radioactive decay. The groundwater-pathway modeling is conservative in that it is one-dimensional in the unsaturated zone (no lateral spreading/dilution) and assumes the entire inventory of contaminants infiltrates into the ground at the same location for every test. This is especially conservative for particulate radionuclides because they would have to dissolve or corrode first and some would be dispersed into the atmosphere. The groundwater receptor is also assumed to consume water directly from a hypothetical well positioned in the location of maximum concentration. In addition, conservative degradation rates were used, and volatilization was not considered for the nonradradioactive chemicals modeled. And finally, the calculations assume all 12 tests will be performed at the same place at both locations, and all 11 radioactive material types will be used for each test. This is conservative because it is anticipated that no more than two material types will be used per test.

99 GENERAL AND MISCELLANEOUS↗

Development of a Technical, Economic, and Risk Assessment Tool for the Evaluation of Work Reduction Opportunities

Efficient and cost-effective operation of a nuclear power plant (NPP) is essential to ensuring long-term economical and safe operation. Multiple cost saving opportunities exist, referred to here as work reduction opportunities (WRO). These WROs reduce plant operating costs by employing various cost-effective strategies (e.g., implementation of modern technologies). Identifying and objectively screening WROs is an essential task to help reduce overall costs. However, there is no comprehensive framework for assessing WROs in the nuclear industry and evaluating their impact on plant operations. This report presents a novel framework for systematically evaluating WROs from a technical, economic, and risk perspective. As NPPs continue to add new technology and implement modernization strategies into their current processes, potential WROs are commonly identified. Although most WROs have the potential to reduce costs, not all opportunities will result in significant cost savings due to unforeseen risks, large implementation costs, or benefits that fall short of expectations. Examples of this can be the result of a technology that is not fully developed, uncertainty in the amount of cost reduction, or difficulties introducing a new process into an organization. These uncertainties can manifest several ways and can result in a WRO with limited cost savings or even a loss of investment. The framework developed emphasizes the importance of effectively screening the WROs from a holistic perspective to objectively identify inefficiencies and ensure a positive impact to the organization. This report presents the Technical, Economic, and Risk Assessment (TERA) as a key methodology for the screening and evaluation of potential WROs. The TERA framework begins with a screening phase where the process is examined through a hybrid combination of Lean Six Sigma and Integrated Operations for Nuclear (ION) guiding principles. This framework examines the current processes using the Lean Six Sigma SIPOC (Suppliers, Inputs, Process, Outputs, Consumers) methodology but retains the ION key elements of People, Technology, Process, and Governance as important factors to the nuclear decision-making process. By combining the principles of Lean Six Sigma and ION, the developed screening process is specific to the nuclear industry in that it systematically evaluates WROs in order to implement new technology that is comprehensively evaluated. The TERA begins by mapping current processes as they relate to WROs and examining the inefficiencies. Furthermore, the created process map can be used to identify and evaluate potential solutions. Using key performance indicators (KPIs), the TERA evaluates each area—technology, economics, and risk—for uncertainties and to perform cost-benefit analysis. The results of the TERA are important KPIs that allow for an evaluation of different processes and technology implementations. This assessment enables decision-makers to compare various WROs based on metrics and then make informed decisions for which opportunity to implement first. This research includes not only the creation of the TERA framework, but also the evaluation of its performance. A case study for screening potential WROs at Southern Nuclear Company is presented that utilizes the TERA methodology. Through the use of TERA, various WROs were screened, and the solutions evaluated for cost-benefit expectations. The report concludes by summarizing the overall effort and implications for utility modernization. The performance of the screening and TERA are discussed as well as the impact on the nuclear industry. The TERA process enables utilities to evaluate and inform investment decisions for WROs and mitigate any potential risks. Through this research, we provide utilities with a valuable framework to optimize operations, reduce costs, and drive continuous process improvement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Security Self-Assessment Toolkit for Nuclear Materials Facilities: Focus on Insider Threat Mitigation

Theft or sabotage of weapons-usable nuclear materials is a global concern. To minimize this threat, establishing and maintaining an effective nuclear security regime is required to protect against criminal or other negligent acts. Use of a formalized insider threat mitigation program is one such security measure. Individuals who have or held authorized access to an organization's critical assets, such as nuclear materials, are considered "insiders." Insider threats, or insider adversaries, are motivated individuals who possess access, authority, and knowledge to conduct a malicious act or facilitate that of an external party. To thwart insider threats (both intentional and unintentional), organizations can formalize an enterprise-wide approach to identify and mitigate the unique risks presented by insiders. This report provides an approach to evaluate an insider threat mitigation program at facilities with nuclear materials. Formal program evaluations serve many purposes and can be designed using several different methods and techniques. This report presents a self-assessment approach to program evaluation whereby an organization can assess its strengths, identify key gaps, and set priorities for ongoing improvement efforts to mitigate insider threats. Results of the self-assessment can provide critical information to contribute to the continuous improvement of an organization’s insider threat mitigation program within eight specific domain areas.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Task 12 PV Sustainability - Environmental Life Cycle Assessment of Residential PV and Battery Storage Systems

Using a life cycle assessment (LCA), the environmental impacts from generating 1 kWh of electricity for self-consumption via a photovoltaic-battery system are determined. The system includes a 10 kWp multicrystalline-silicon photovoltaic (PV) system (solar irradiation about 1350 kWh/m2/year and annual yield 1000 kWh/kWp), an iron phosphate lithium-ion (LiFePO4) battery, and other components such as the control system, battery housing, and two inverters (one for the PV system and one for the battery system). Three options for the AC-coupled system with changing battery capacities (5, 10, or 20 kWh nominal capacity) are investigated. The environmental impacts are assessed using the indicators greenhouse gas emissions and cumulative energy demand (separated into total and non-renewable cumulative energy demand). In addition, the four most important impact categories for PV electricity - respiratory inorganics (particulate matter), acidification, energy carrier resource use, and minerals and metals resource use - are assessed according to the environmental footprint (EF) method. Data are drawn from the DETEC data DQRv2:2018, recent literature, and product details provided by manufacturers. The results show larger environmental impacts of PV-battery systems with increasing battery capacity; for capacities of 5, 10, and 20 kWh, the cumulative greenhouse gas emissions from 1 kWh of electricity generation for self-consumption via a PV-battery system are 80, 84, and 88 g CO 2- eq/kWh, respectively. The cumulative greenhouse gas emissions of PV electricity consumed directly or fed into the grid are 54 g CO 2 -eq/kWh. The corresponding total cumulative energy demands are 5.27, 5.40, and 5.50 MJ oil-eq/kWh, with non-renewable energy carriers contributing 1.16, 1.22, and 1.29 MJ oil-eq/kWh. In the investigated EF impact categories, we similarly observe a larger environmental burden with increasing battery capacity, except in the use of minerals and metals. Our sensitivity analyses show that using a nickel cobalt manganese oxide (NCM) lithium-ion battery, instead of an LiFePO 4 battery, leads to a comparable environmental impact in terms of greenhouse gas emissions and cumulative energy demand. However, the NCM battery increases the impact in the EF categories of acidification and respiratory inorganics by 7 and 10%, respectively, whereas energy carrier resource use decreases by 4% and minerals and metals resource use decrease by 1%. Using a copper indium selenium (CIS) PV panel instead of a multicrystalline-silicon decreases greenhouse gas emissions by 24%, non-renewable cumulative energy demand by 13%, and particulate matter emissions by 60% (the largest decrease). Furthermore, the calculated environmental impacts are sensitive to the assumed battery lifetime. A decrease from 5000 to 3000 charge cycles increases non-renewable cumulative energy demand by 24% and greenhouse gas emissions by 16%. Increasing from 5000 to 7000 charge cycles decreases the environmental impacts by 6% and 7% in terms of non-renewable cumulative energy demand and greenhouse gas emissions, respectively. A utility-scale battery system case study shows that using batteries to store PV electricity overproduction reduces greenhouse gas emissions compared to using natural gas backup electricity generation.

14 SOLAR ENERGY↗