Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Characterization of Novel Spacecraft Materials aboard the Materials International Space Station Experiment-Flight Facility (Preliminary Results)

This work will encompass the preflight characterization of 15 novel and heritage materials currently under observation on the Materials International Space Station Experiment-Flight Facility (MISSE-FF). MISSE-FF has been upgraded to perform active reflectance measurements of the materials. Images taken in RGB/IR colors are compared to results from an extensive ground testing campaign to obtain quantitative on-orbit material evolution data. Identical materials samples are to be flown on the ram, wake, and zenith faces of MISSE-FF, enabling deconvolution of the energetic electron, proton, atomic oxygen, and ultraviolet damage pathways. Energy deposition from the space environment leads to chemical changes in the material that in turn alter the optical properties. The same chemical damage that manifests as changes in optical reflectance and absorptance also leads to changes in myriad physical properties such as mechanical strength, electrical conductivity, and chemical reactivity. Therefore, flight materials are able to be characterized based on their unique reflectance spectra by comparing on-orbit measurements of optical reflectance with extensive terrestrial experiments, which help to correlate changes in reflectance with respect to changes in other material properties. The MISSE program has been a part of the International Space Station National Laboratory for many years and has been instrumental in understanding space weather modification of material properties. However, MISSE-FF has been limited to passive experiments with only pre/post flight material studies possible. In advance of the MISSE-16 experiment, the flight facility has received a major upgrade to provide daily spectral observations by way of a RGB/IR camera and a tunable light source. The MISSE-16 mission launched in February 2022 and carries 15 material samples for 6 months of the low Earth orbital exposure. Identical materials samples are to be flown on the ram, wake, and zenith faces of MISSE-FF, enabling deconvolution of the energetic electron, proton, atomic oxygen, and ultraviolet damage pathways. This paper discusses the MISSE-16 experiment, highlights the first use of the facility upgrades, and presents results from the extensive preflight material characterization that includes directional hemispherical reflectance, bidirectional reflectance, AFM, SEM, and electrical conductivity. Additionally, data showing the modification of these properties by ground-based exposure to space-like electron and atomic oxygen flux will be discussed. Finally, updates on deployment and initial check-out of the experiment on MISSE-FF will be presented. It is the ultimate goal of this program to provide validation for the development of ground based space weather simulation facilities and techniques.

Ryan Hoffman↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover Final Submission

NASA's Mars 2020 Perseverance Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions to Mars. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality: seven new and/or upgraded scientific payloads, an upgraded arm and sampling system, and a Helicopter demonstration. These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagn

Gonzales, Edward C↗

Electromagnetic Compatibility Test and Analysis Campaign of NASA's Mars 2020 Rover

NASA's Mars 2020 Rover—with a launch window opening July 2020, and landing expected February 2021—has mission objectives to look for evidence of habitability, seek biosignatures of past life, collect and cache samples for possible future return to Earth, and prepare for future human missions. The Rover platform is similar to the previous Mars Science Laboratory (MSL) “Curiosity” rover that landed in 2012 but contains a new suite of scientific instruments and upgrades to existing functionality. The scientific payload includes a trio of chemical analysis tools (PIXL, SHERLOC, SuperCam), a ground penetrating radar (RIMFAX), an upgraded weather station (MEDA), upgraded high resolution camera (MastCam-Z), and an oxygen-producing experiment (MOXIE). These changes—along with new efficiency goals to operate more Rover subsystems concurrently and thus collect more science—presented new electromagnetic compatibility (EMC) challenges. In this paper, we will describe the campaign to ensure Mars 2020 mission success from an electromagnetic environment perspective: 1) confirming existing MSL heritage subsystems and EMC requirements were compatible with the new Mars 2020 mission objectives, 2) engaging with engineers and scientists early in the project to identify and evaluate risks before hardware assembly and performing ambitious risk reduction tests, 3) undertaking a comprehensive subsystem qualification test program based on tailored MIL-STD-461F requirements, occasionally leading to redesign, 4) synthesizing the data collected to perform detailed analyses toward the goal of making risk-informed decisions at a system level. The spacecraft has successfully completed all three planned system level tests, demonstrating self-compatibility with minimal impact to operations from electromagnetic interference in all mission phases.

Gonzales, Edward C↗

Status of the Advanced Oxygen Generation Assembly Design

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce system weight, crew maintenance time and spares mass while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

Oxygen Generation Assembly↗

Status of the Advanced Oxygen Generation Assembly

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce spares mass and crew maintenance time while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

ECLSS↗

NASA Orbital Debris Engineering Model ORDEM 3.2 – Software User Guide

This National Aeronautics and Space Administration (NASA) Orbital Debris Engineering Model (ORDEM) 3.2 Software User Guide accompanies delivery of the latest upgraded version of the model, ORDEM 3.2. The user guide also provides a top-level program description and a list of capabilities. It includes descriptions of runtime error and information codes, input/output file formats, runtimes for different orbit configurations, and how to use uncertainty files. ORDEM 3.2 supersedes the previous NASA Orbital Debris Program Office (ODPO) models – ORDEM 3.0 (Stansbery, et al. 2014) and ORDEM2000 (Liou, et al. 2002). The availability of new sensor and in situ data, re-analysis of older data, and development of new analytical techniques has enabled the construction of this more comprehensive and sophisticated model. An upgraded graphical user interface (GUI) is integrated with the software. This upgraded GUI uses project-oriented organization and provides the user with graphical representations of numerous output data products. For example, these range from the conventional flux vs. average debris size (or altitude bin) for chosen analysis orbits (or views) to the more complex color-contoured, two-dimensional (2-D) directional flux diagrams in local spacecraft elevation and azimuth. The current model, ORDEM 3.2, supports spacecraft as well as telescope/radar project assessments. ORDEM 3.2 contains updated debris populations covering low Earth orbit (LEO, up to 2000 km altitude) to geosynchronous orbit (GEO, up to 40,000 km altitude) and can assess debris calculations up to year 2050, extending coverage past the previous limit of 2035 in ORDEM 3.0. Although populations differ from its predecessor, ORDEM 3.2 is functionally the same as ORDEM 3.0 and can support ORDEM 3.0 projects through backward compatibility.

Andrew Vavrin↗

Defining the Operational Envelope for Air Flows in the Miniature Arc-Jet Research Chamber (mARC II)

The second-generation 30 kW miniature Arc-jet Research Chamber (mARC II) at NASA Ames Research Center produces high enthalpy flows relevant for entry systems ground testing. The mARC II facility has recently undergone upgrades, including the installation of a new vacuum system to address the issues preventing it from maintaining underexpanded flow under test conditions. In this work, we present data obtained from an Integrated Systems Testing campaign and provide an initial assessment of arc-jet performance following the upgrades. Air is used as the working gas for the standard mARC II arc-heater configuration with two constrictor disks. Seven runs were investigated for five test conditions to assess the lowest achievable stagnation point heat fluxes for air flow rates of 0.15 or 0.25 g s −1 . The heat flux was measured using a water-cooled Gardon gauge (Ø4.76 mm, 3/16" hemispherical) at 70 mm from the nozzle exit plane. The new vacuum system produced test box pressures in the medium (fine) vacuum range (~0.03 torr, 4 Pa) prior to gas addition and successfully maintained underexpanded flow after gas addition. The upgrade yielded a ~4X reduction in heat flux relative to the previous system for the same set test conditions. We report the lowest heat fluxes measured in mARC II to date, ranging from 26 to 81 W cm −2 , for sonic flow enthalpies of 4–14 MJ kg −1 . Bulk enthalpies estimated using an energy balance method (EB 2 ) are reported for the first time using mARC II.Initial data suggests EB 2 generally estimates lower enthalpies than sonic flow methods for mARC II. Lastly, laminar axisymmetric Navier–Stokes simulations were performed using the NASA DPLR code. Numerical heat flux results show good agreement with experiments at low arc powers (3–15% difference at the minimum set arc current), but discrepancy increases with arc power (49% difference at the maximum set arc current).

Pitot tube↗

Defining the Operational Envelope for Air Flows in the Miniature Arc-Jet Research Chamber (mARC II)

The second-generation 30 kW miniature Arc-jet Research Chamber (mARC II) at NASA Ames Research Center produces high enthalpy flows relevant for entry systems ground testing. The mARC II facility has recently undergone upgrades, including the installation of a new vacuum system to address the issues preventing it from maintaining underexpanded flow under test conditions. In this work, we present data obtained from an Integrated Systems Testing campaign and provide an initial assessment of arc-jet performance following the upgrades. Air is used as the working gas for the standard mARC II arc-heater configuration with two constrictor disks. Seven runs were investigated for five test conditions to assess the lowest achievable stagnation point heat fluxes for air flow rates of 0.15 or 0.25 g s −1 . The heat flux was measured using a water-cooled Gardon gauge (Ø4.76 mm, 3/16" hemispherical) at 70 mm from the nozzle exit plane. The new vacuum system produced test box pressures in the medium (fine) vacuum range (~0.03 torr, 4 Pa) prior to gas addition and successfully maintained underexpanded flow after gas addition. The upgrade yielded a ~4X reduction in heat flux relative to the previous system for the same set test conditions. We report the lowest heat fluxes measured in mARC II to date, ranging from 26 to 81 W cm −2 , for sonic flow enthalpies of 4–14 MJ kg −1 . Bulk enthalpies estimated using an energy balance method (EB 2 ) are reported for the first time using mARC II.Initial data suggests EB 2 generally estimates lower enthalpies than sonic flow methods for mARC II. Lastly, laminar axisymmetric Navier–Stokes simulations were performed using the NASA DPLR code. Numerical heat flux results show good agreement with experiments at low arc powers (3–15% difference at the minimum set arc current), but discrepancy increases with arc power (49% difference at the maximum set arc current).

arc-jet↗

Status of the Advanced Oxygen Generation Assembly

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce spares mass and crew maintenance time while increasing reliability. Over the past year, the team has performed additional design reviews, testing and analysis in an effort to optimize upgrade efforts and achieve the best value that meets Exploration mission requirements. Upgrades that will be incorporated include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed, and incorporation of recirculation loop nitrogen purging and water flushing. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a relevant flight environment.

Kevin Takada↗

Design and performance of an in-vacuum, magnetic field mapping system for the Muon g-2 experiment

The E989 Muon g-2 experiment at Fermilab aims to measure the anomalous magnetic moment, a$_\mu$, of the muon with a precision of 140 parts-per-billion. This requires a precise measurement of both the anomalous spin precession frequency, $\omega_a$, and the average magnetic field in terms of the equivalent, free proton Larmor frequency, $\omega_p$. The measurement of $\omega_p$ with a total systematic uncertainty of 70 parts-per-billion involves a combination of various NMR probes. There are 378 probes in fixed locations constantly monitoring field drifts. A water-based probe provides the calibration in terms of $\omega_p$. A crucial element for the multi-step measurement of $\omega_p$ is the regular mapping of the magnetic field over the muon storage region. The former E821 experiment at Brookhaven employed an in-vacuum field mapping system equipped with 17 NMR probes, which was developed by the University of Heidelberg. We have refurbished and upgraded this system with new probes and electronics. The upgrades include a new communication scheme incorporating time-division multiplexing to separate the important NMR reference clock from the data communication. The addition digitization of the NMR signals replaced the hardware-implemented zero-crossing counting of the E821 system. The digitized signals offer new capabilities in the NMR frequency analysis and its related systematic uncertainties. While the mechanical systems that move the field mapper around the ring have been mostly refurbished, the motion control system was completely replaced with a custom-built electronics centered around a commercial Galil motion controller. Both the field mapping NMR system and its motion control were successfully commissioned at Fermilab and have been in reliable operation during the first data taking periods. This article provides details of the upgrades of the field mapper and its performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

TEA Modeling to Quantify Economic Implications for Biorefinery Processing of Isolated Anatomical Fractions of Corn Stover

The Feedstock-Conversion Interface Consortium (FCIC; https://www.energy.gov/sites/prod/files/2020/01/f70/beto-fcic-overview-web.pdf), a collaboration of nine national laboratory partners, seeks to understand impacts of feedstock attributes on biorefinery performance. It is hypothesized that different individual anatomical fractions of corn stover vary in composition and recalcitrance, such that processing each fraction on its own through dedicated campaigns may enable better biorefinery economics overall relative to processing the whole stover material. This presentation focuses on techno-economic analysis (TEA) modeling to quantify the yield and cost ramifications for processing isolated anatomical fractions of corn stover through a low-temperature conversion biorefinery, reflecting a biochemical processing pathway consisting of biomass deconstruction through pretreatment and enzymatic hydrolysis, sugar fermentation and upgrading to hydrocarbon fuels, and lignin upgrading to value-added coproducts. Commercial-scale process simulation and economic evaluation leveraged experimental and analytical data from FCIC researchers for conversion of whole corn stover plus three individual anatomical fractions (cobs, husks, and stalks) across key steps of the conversion process. Our assessment found encouraging potential for biorefinery economic gains that may be achieved through this approach. TEA results indicated fuel yields varying from 29-44 gallons gasoline equivalent (GGE)/dry ton for the individual anatomical fractions compared to whole stover at 34 GGE/ton, equating to minimum fuel selling prices (MFSPs) between $6.37-$10.18/GGE for the fractions versus $8.76/GGE for whole stover (when lignin is burned), or $9.15-$15.19/GGE for the fractions versus $13.11/GGE for whole stover (when lignin is upgraded to coproducts, based on current experimental performance levels). Cobs and husks demonstrated the ability to achieve the highest fuel yields and lowest MFSPs, outperforming whole stover, while stalks led to the opposite result, as a composite reflection of compositional differences and process convertibility. Notably, even when taking the weighted average of the results reflecting each anatomical fraction weighted by its corresponding makeup of corn stover, this feasibility TEA screening supports feedstock cost allowances on the order of roughly $22-$29/ton as may reflect accommodating additional biomass fractionation equipment during feedstock pre-processing upstream of the conversion biorefinery gate to separate corn stover into such constituent fractions. Or viewed differently, the weighted average MFSP for the fractions was found to be $0.31-$0.32/GGE lower than the MFSP for the whole stover basis across either lignin scenario, when maintaining a fixed biomass feedstock cost. These findings highlight favorable implications for biorefinery economics as may be achieved by moving to a staged campaign approach for processing different corn stover fractions sequentially. Further opportunities exist for future work to fill in data gaps for remaining anatomical constituents (e.g. leaves) that were not included in the initial experimental studies, though are expected to maintain similar trends.

biochemical processing pathway↗

Sustainable Biofuels for Low-Carbon Maritime Transportation

The marine shipping sector heavily depends on fossil fuels and is one of the largest petroleum fuel consumers [1,2]. The annual global marine fuel consumption was estimated to be around 400 million metric tons in 2019 (2.5 billion barrels). Moreover, ocean shipping is one of the most significant contributors to sulfur oxides, nitrogen oxides, and particulate matter emissions. Global shipping contributes 13% of human-caused sulfur emissions and 2.6% of anthropogenic carbon dioxide emissions. As a major source of pollutant emissions, the marine industry faces several challenges related to emission regulations. The International Maritime Organization (IMO) has established a framework for reducing the carbon intensity of shipping: 40% reduction relative to 2008 levels by 2030 and 70% reduction by 2050. As the aviation sector, the maritime shipping sector is difficult to decarbonize through electrification. Biofuels offer the best opportunities for decarbonizing marine shipping in the near and medium-term. Advanced biofuels such as pyrolysis bio-oil offer the low-cost potential for meeting carbon reduction goals. For instance, the pyrolysis bio-oil exhibited promising marginal CO2 abatement costs at less than $100/tonne CO2-equivalent at a heavy fuel oil price greater than $1.10/gal [1]. As a potential biofuel option for low-carbon maritime shipping, this presentation focuses on a comparative techno-economic analysis (TEA) of bio-oils produced via a fast pyrolysis-based conversion pathway. The pathway converts a 50/50 blend of forest residues and clean pine to bio-oil via three process options: fast pyrolysis without vapor upgrading, and fast pyrolysis with vapor phase upgrading over ZSM-5 zeolite catalyst and Pt/TiO2 catalyst. The process configuration and operation variation led to different capital and operating costs, as well as the resulting raw bio-oil’s yield and quality, e.g., the water content, total acid number, and carboxylic acid number. The study also determined the minimum upgrading of bio-oils required to enable blending with very low sulfur fuel oil (VLSFO), with the associated costs reflected in TEA. This study shows that bio-oil could be a cost-effective fuel option for decarbonizing maritime shipping. Further research is required with respect to biofuel blending properties, such as compatibility with existing fuel system infrastructure and suitable engine performance.

BIOMASS FUELS↗

Representing the Future Role of Hydropower and Pumped Storage Hydropower (PSH) in Electricity Planning Tools

Existing tools for long-term electric sector planning struggle to represent hydropower's nuanced site-specific technical and operating characteristics, which depend on technical specifications as well as water management practices and regulations. As a result, long-term planning models and tools insufficiently characterize hydropower value and incentives, and they cannot fully represent the role hydropower can play in a future electricity system that could include a high penetration of variable wind and solar generation, battery storage, and other low-carbon technologies. This presentation demonstrates the culmination of a multi-year effort to enhance hydropower representations in electricity planning models at the National Renewable Energy Laboratory (NREL), as part of the U.S. Department of Energy (USDOE) HydroWIRES Initiative. New modeling techniques are demonstrated using the NREL Regional Energy Deployment System (ReEDS), an open-access electric sector capacity expansion model used extensively in a wide range of technology deployment and integration analysis, including the 2016 USDOE Hydropower Vision. ReEDS uses a least-cost optimization approach to understand investment and operation of electricity generation, storage, and transmission technologies under future scenarios of electricity technology innovation, demand, policy, and other sectoral drivers. ReEDS was modified to better represent value and opportunities for both pumped storage hydropower (PSH) and hydropower systems without pumping. We incorporated a new national closed-loop PSH resource and cost assessment to explore new PSH deployment opportunities and added plant-level data to better represent the existing PSH fleet. New upgrade pathways enable opportunities for enhanced hydropower flexibility by adding pumps, upgrading dispatchability, increasing capacity, or increasing energy availability. The model was also modified to better represent the value of long-duration energy storage beyond diurnal time scales, allowing both hydropower and PSH to better balance energy supply and demand variations in high-renewable systems. These new features are demonstrated under reference and high-renewable futures and a range of sensitivity scenarios to understand which hydropower and PSH deployment and upgrade opportunities are the most attractive. These scenarios indicate potential for new closed-loop PSH deployment and for hydropower flexibility improvements to have important impacts on long-term electricity system emissions and economic outcomes. Increasing flexibility of the existing hydropower fleet can reduce the need to invest in new flexible grid technologies and help achieve decarbonization goals. Systems with sufficient energy storage could also be valuable for balancing seasonal differences in renewable energy availability, particularly from solar energy. The methods developed for ReEDS and subsequent scenario results reveal important considerations for future hydropower and grid system planning, and all data and code is freely available in a public code repository for use throughout the hydropower industry.

capacity expansion↗

Biochemical Process Modeling and Simulation (BPMS)

The Biochemical Process Modeling and Simulation project aims to reduce the cost and time of research by applying theory, modeling, and simulation to the most relevant bottlenecks in the biochemical process. We use molecular modeling, quantum mechanics, metabolic modeling, fluid dynamics, and reaction-diffusion methods in close collaboration with pretreatment, hydrolysis, upgrading, and TEA. The project's outcomes are increased yields and efficiency of the biochemical process, added value to products, and reduced price of fuels by specifically targeting catalytic efficiency, reactor design, enzyme efficiency, and microbial design. We work closely with experimental projects to identify problems and iterate with experiments to find and refine solutions. By working with experimentalists, we decide on problems that can be solved with simulation that could otherwise not be solved or would take too long with experiment alone to reach BETO's targets. Over the years, we have produced solutions that have resulted in determining the most likely fatty-acid derivative for passive transport out of bacteria that upgrade biomass, and we have also designed enzyme mutations for enhanced lignin upgrading. Metabolic models have been developed to tune the activity of 2,3 butanediol production for the 2030 target. A computational method to deliver understanding of how complex omics data can be interpreted in the metabolic pathways of organisms used in the Agile Biofoundry. We have found methods to overcome specific barriers and continue to develop those methods. Our reactor studies have guided the design of both the microbes and reactors for aerobic and micro-aerobic production at all scales and have been instrumental in improving the accuracy of techno-economic analysis models. This project is essential in the process of selecting the final processes for 2030 SAF production targets. More specifically, recently, we have: 1) Predicted the strength of the basic structural interactions in commodity plastics to provide guidance for plastics upcycling strategies. 2) Developed computational tool to improve the characterization of lignin-derived compounds 3) Developed new methodologies to enable Machine Learning-based Directed Evolution for protein engineering. 4) Developed Machine Learning methods to predict protein promiscuity and mutations to further improve microbial and enzymatic driven processes and demonstrated the utility of ML approaches to engineering proteins from sparse experimental datasets. 5) Developed new methods to enable high-fidelity simulation of aerobic fermentation at industrial scale and resolving mismatch of time scales through subcycling/operator splitting 7) Identified the difficulty in preventing local high-oxygen conditions in industrial bubble columns, which leads to less-desirable acetoin production, suggesting future research directions in alternative reactor configurations (e.g loop reactors, shallow-channel reactors).

BIOMASS FUELS↗

Criticality Alarm Systems at the Idaho Chemical Processing Plant

The Idaho Chemical Processing Plant (ICPP) has a number of criticality alarm systems (CAS) in the various facilities. The complexity of the plant creates some unique CAS problems. A detailed review of the CAS has been made to determine the level of compliance with ANSI 8.3-1986. A major CAS upgrade project is currently in the design stage which will expand coverage and bring all CAS monitoring unshielded areas into full compliance with ANSI 8.3-1986. Because DOE Orders do not contain an exclusion that exempts the need for CAS coverage in shielded areas as provided in ANSI 8.3-1986, a future CAS upgrade project is in the planning stage which will also upgrade the CAS coverage in shielded portions of the plant.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

9.3 Microns: Toward a Next-Generation CO2 Laser for Particle Accelerators

We present realistic theoretical predictions of the performance of the next-generation long-wave infrared (LWIR) laser for advanced particle acceleration research at the Accelerator Test Facility (ATF) of Brookhaven National Laboratory. Two upgrades are planned for the present ATF CO2 laser, which currently produces up to 5 TW peak power in 2 ps pulses at 9.2 μm. For the first upgrade, the deployment of a ten-millijoule solid-state seed laser at 9.3 μm will reduce the pulse duration 4 times, to 500 fs, and increase the peak power to 15 TW. The second upgrade will be the implementation of the postcompression of this pulse. This will reduce the pulse duration to three optical cycles (100 fs) and increase the usable peak power to 25 TW.

43 PARTICLE ACCELERATORS↗

Processes for the conversion of mixed oxygenates feedstocks to hydrocarbon fuels

A method for forming a desired hydrocarbon fuel product from a mixed oxygenate feedstock by utilizing chemical processes to form ketones from the oxygenate feed, upgrade the ketones, recycle selected upgraded ketones through the upgrading process to obtain a desired intermediate and hydrogenating the desired intermediate to obtain the desired hydrocarbon fuel product. In various alternative configurations and embodiments this can be accomplished in a number of ways, and originate in a number of different positions and occasions.

Kallupalayam Ramasamy, Karthikeyan↗

The CMS Phase 2 Outer Tracker Analyzer of Test Outputs - POTATO!

The Phase-2 upgrade of the Large Hadron Collider (LHC), also known as the High-Luminosity LHC (HL-LHC) is designed to achieve peak instantaneous luminosities which is about an order of magnitude higher than the nominal design value of $10^{34}~cm^{-2}s^{-1}$ delivering a total of atleast $3000 fb^{-1}$ data over 10 years of operation at $\sqrt{s}~=~14~TeV$. One crucial aspect of the CMS Phase-2 detector upgrade is the replacement of the existing tracking detector in order to deal with the extreme HL-LHC conditions, retaining and further expanding the physics performances achieved in the previous years. The outer part of the upgraded tracker (OT), will be equipped with over 13,000 macro Pixel-Strip (PS) and Strip-Strip (2S) modules! Module production is distributed across centers worldwide and necessitates coordinated efforts and standardized procedures. Along with production and assembly of the modules, Fermilab OT group is also working on a tool, Phase 2 Outer Tracker Analyzer of Test Outputs (POTATO) that will analyze, grade, upload and manage the large quantity of files to be stored in the centralized Database (DB). In this contribution a brief overview of the module testing and the power and dire need of POTATO to handle this large number of test outputs will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗