Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “telemetry systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

A knowledge-based system for monitoring the electrical power system of the Hubble Space Telescope

The design and the prototype for the expert system for the Hubble Space Telescope's electrical power system are discussed. This prototype demonstrated the capability to use real time data from a 32k telemetry stream and to perform operational health and safety status monitoring, detect trends such as battery degradation, and detect anomalies such as solar array failures. This prototype, along with the pointing control system and data management system expert systems, forms the initial Telemetry Analysis for Lockheed Operated Spacecraft (TALOS) capability.

Eddy, Pat↗

The Deep Space Network information system in the year 2000

The Deep Space Network (DSN), the largest, most sensitive scientific communications and radio navigation network in the world, is considered. Focus is made on the telemetry processing, monitor and control, and ground data transport architectures of the DSN ground information system envisioned for the year 2000. The telemetry architecture will be unified from the front-end area to the end user. It will provide highly automated monitor and control of the DSN, automated configuration of support activities, and a vastly improved human interface. Automated decision support systems will be in place for DSN resource management, performance analysis, fault diagnosis, and contingency management.

Markley, R. W.↗

Gemini Program Mission Report for Gemini-Titan 1 (GT-1)

The Gemini-Titan 1 (GT-1) space vehicle was comprised of the Gemini spacecraft and the Gemini launch vehicle. The Gemini launch vehicle is a two-stage modified Titan II ICBM. The major modifications are the addition of a malfunction detection system and a secondary flight controls system. The Gemini spacecraft, designed to carry a crew of two men on earth orbital and rendezvous missions, was unmanned for the flight reported herein (GT-1). There were no complete Gemini flight systems on board; however, the C-band transponder and telemetry transmitters were Gemini flight subsystems. Dummy equipment, having a mass and moment of inertia equal to flight system equipment, was installed in the spacecraft. The Spacecraft was instrumented to obtain data on spacecraft heating, structural loading, vibration, sound pressure levels, and temperature and pressure during the launch phase.

Source record↗

Flight-test experience in digital control of a remotely piloted vehicle.

The development of a remotely piloted vehicle system consisting of a remote pilot cockpit and a ground-based digital computer coupled to the aircraft through telemetry data links is described. The feedback control laws are implemented in a FORTRAN program. Flight-test experience involving high feedback gain limits for attitude and attitude rate feedback variables, filtering of sampled data, and system operation during intermittent telemetry data link loss is discussed. Comparisons of closed-loop flight tests with analytical calculations, and pilot comments on system operation are included.

Edwards, J. W.↗

Automated Activation and Deactivation of a System Under Test

The MPLM Automated Activation/Deactivation application (MPLM means Multi-Purpose Logistic Module) was created with a three-fold purpose in mind: 1. To reduce the possibility of human error in issuing commands to, or interpreting telemetry from, the MPLM power, computer, and environmental control systems; 2. To reduce the amount of test time required for the repetitive activation/deactivation processes; and 3. To reduce the number of on-console personnel required for activation/ deactivation. All of these have been demonstrated with the release of the software. While some degree of automated end-item commanding had previously been performed for space-station hardware in the test environment, none approached the functionality and flexibility of this application. For MPLM activation, it provides mouse-click selection of the hardware complement to be activated, activates the desired hardware and verifies proper feedbacks, and alerts the user when telemetry indicates an error condition or manual intervention is required. For MPLM deactivation, the product senses which end items are active and deactivates them in the proper sequence. For historical purposes, an on-line log is maintained of commands issued and telemetry points monitored. The benefits of the MPLM Automated Activation/ Deactivation application were demonstrated with its first use in December 2002, when it flawlessly performed MPLM activation in 8 minutes (versus as much as 2.4 hours for previous manual activations), and performed MPLM deactivation in 3 minutes (versus 66 minutes for previous manual deactivations). The number of test team members required has dropped from eight to four, and in actuality the software can be operated by a sole (knowledgeable) system engineer.

Poff, Mark A.↗

The SAMPEX Data Processing Unit

The paper discusses salient features of the SAMPEX Data Processing Unit (DPU), the primary function of which is to collect sensor data to create telemetry packets for transmission to the solid-state recorder located within the Small Explorer Data System. Particular attention is given to the sensor interface electronics, the space command interface, the spacecraft telemetry interface, and the memory mapper of the DPU system; the task scheduling concept; and system reconfiguring. A block diagram of the DPU system is included.

Mabry, D. J.↗

On the group delay effect of DSN microwave components on multimegabit telemetry

When the gain and phase shift characteristics of the overall system between the modulator and demodulator are given, the group delay effect for the intended data rate can be assessed by examining the equation for the recovered signal for several rectangular pulse inputs with different duty cycles. For example, the group delay loss of 30 Mbit/sec telemetry with only a Block II X-band maser is less than 0.2 dB even with a 10-MHz center frequency offset.

Lee, P. J.↗

An 8.4-GHz dual-maser front-end system for Parkes reimplementation

An 8.4-GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters was reimplemented at Parkes as part of the Parkes Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency and installed on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the Deep Space Network as part of the Parkes Canberra Telemetry Array to enhance the data return from the Voyager Uranus encounter. At the conclusion of these projects in 1986, part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. New design and implementation required to make the system operable at Parkes included new microwave front-end control cabinets, closed-cycle refrigeration monitor system, noise-adding radiometer system, front-end controller assembly, X81 local oscillator multiplier, and refurbishment of the original dual 8.4-GHz traveling-wave masers and waveguide feed system. The front-end system met all requirements during the encounter and was disassembled in October 1989 and returned to JPL.

Trowbridge, D. L.↗

The advanced receiver 2: Telemetry test results in CTA 21

Telemetry tests with the Advanced Receiver II (ARX II) in Compatibility Test Area 21 are described. The ARX II was operated in parallel with a Block-III Receiver/baseband processor assembly combination (BLK-III/BPA) and a Block III Receiver/subcarrier demodulation assembly/symbol synchronization assembly combination (BLK-III/SDA/SSA). The telemetry simulator assembly provided the test signal for all three configurations, and the symbol signal to noise ratio as well as the symbol error rates were measured and compared. Furthermore, bit error rates were also measured by the system performance test computer for all three systems. Results indicate that the ARX-II telemetry performance is comparable and sometimes superior to the BLK-III/BPA and BLK-III/SDA/SSA combinations.

Hinedi, S.↗

Advanced X-ray Astrophysics Facility (AXAF) ground systems support

The NASA Marshall Space Flight Center is currently developing an Advanced Data System in an effort to address the requirements of ground data systems for future missions. The Advanced Data System will be required to provide real-time telemetry acquisition and display capabilities, as well as commanding and off-line mission planning functions. This paper discusses the requirements of the ground data systems in support of the AXAF mission, and presents the conceptual design of those systems.

Chubb, S. A.↗

A New Blind Pointing Model Improves Large Reflector Antennas Precision Pointing at Ka-Band (32 GHz)

The National Aeronautics and Space Administration (NASA), Jet Propulsion Laboratory (JPL)-Deep Space Network (DSN) subnet of 34-m Beam Waveguide (BWG) Antennas was recently upgraded with Ka-Band (32-GHz) frequency feeds for space research and communication. For normal telemetry tracking a Ka-Band monopulse system is used, which typically yields 1.6-mdeg mean radial error (MRE) pointing accuracy on the 34-m diameter antennas. However, for the monopulse to be able to acquire and lock, for special radio science applications where monopulse cannot be used, or as a back-up for the monopulse, high-precision open-loop blind pointing is required. This paper describes a new 4th order pointing model and calibration technique, which was developed and applied to the DSN 34-m BWG antennas yielding 1.8 to 3.0-mdeg MRE pointing accuracy and amplitude stability of 0.2 dB, at Ka-Band, and successfully used for the CASSINI spacecraft occultation experiment at Saturn and Titan. In addition, the new 4th order pointing model was used during a telemetry experiment at Ka-Band (32 GHz) utilizing the Mars Reconnaissance Orbiter (MRO) spacecraft while at a distance of 0.225 astronomical units (AU) from Earth and communicating with a DSN 34-m BWG antenna at a record high rate of 6-megabits per second (Mb/s).

DSN↗

Thomas Leps Internship Abstract

An optical navigation system is being flown as the backup system to the primary Deep Space Network telemetry for navigation and guidance purposes on Orion. This is required to ensure Orion can recover from a loss of communication, which would simultaneously cause a loss of DSN telemetry. Images taken of the Moon and Earth are used to give range and position information to the navigation computer for trajectory calculations and maneuver execution. To get telemetry data from these images, the size and location of the moon need to be calculated with high accuracy and precision. The reentry envelope for the Orion EM-1 mission requires the centroid and radius of the moon images to be determined within 1/3 of a pixel 3 sigma. In order to ensure this accuracy and precision can be attained, I was tasked with building precise dot grid images for camera calibration as well as building a hardware in the loop test stand for flight software and hardware proofing. To calibrate the Op-Nav camera a dot grid is imaged with the camera, the error between the image dot location and the actual dot location can be used to build a distortion map of the camera and lens system so that images can be fixed to display truth locations. To build the dot grid images I used the Electro Optics Lab optical bench Bright Object Simulator System, and gimbal. The gimbal was slewed to a series of elevations and azimuths. An image of the collimated single point light source was then taken at each position. After a series of 99 images were taken at different locations the single light spots were extracted from each image and added to a composite image containing all 99 points. During the development of these grids it was noticed that an intermittent error in the artificial "star" locations occurred. Prior to the summer this error was attributed to the gimbal having glitches in it's pointing direction and was going to be replaced, however after further examining the issue I determined it to be a software issue. I have since narrowed the likely source of the error down to a Software Development Kit released by the camera supplier PixeLink. I have since developed a workaround in order to build star grids for calibration until the software bug can be isolated and fixed. I was also tasked with building a Hardware in the Loop test stand in order to test the full Op-Nav system. A 4k screen displays simulated Lunar and Terrestrial images from a possible Orion trajectory. These images are then projected through a collimator and then captured with an Op-Nav camera controlled by an Intel NUC computer running flight software. The flight software then analyzes the images to determine attitude and position, this data is then reconstructed into a trajectory and matched to the simulated trajectory in order to determine the accuracy of the attitude and position estimates. In order for the system to work it needs to be precisely and accurately aligned. I developed an alignment procedure that allows the screen, collimator and camera to be squared, centered and collinear with each other within a micron spatially and 5 arcseconds in rotation. I also designed a rigid mount for the screen that was machined on site in Building 10 by another intern. While I was working in the EOL we received a $500k Orion startracker for alignment procedure testing. Due to my prior experience in electronics development, as an ancillary duty, I was tasked with building the cables required to operate and power the startracker. If any errors are made building these cables the startracker would be destroyed, I was honored that the director of the lab entrusted such a critical component with me. This internship has cemented my view on public space exploration. I always preferred public sector to privatization because, as a scientist, the most interesting aspects of space for me are not necessarily the most profitable. I was concerned that the public sector was faltering however, and that in order to improve human space exploration I would be forced into private sector. I now know that, at least at JSC, human spaceflight is still progressing, and exciting work is still being done. I am now actively seeking employment at JSC after I complete my Ph.D and have met with my branch chiefs and mentor to discuss transitioning to a grad Co-op position.

Leps, Thomas↗

NASA ground communications

As part of the Communications Requirements and Constraints, NASA's two major Ground Data Networks were briefly described. The NASA Communication Network, called NASCOM, is the worldwide operational telecommunications system which interconnects as the tracking and telemetry acquisition sites, launch areas, mission and project control centers, data capture facilities, and network control centers in support of space flight. For the Space Station era, NASCOM plans are set for higher data rate service utilizing data packet switched technology. Increased use of fiber optics is expected in a much more diverse network topology. The second major ground network, the Program Support Communications Network (PSCN), interconnects all NASA Centers and NASA contractor locations for intercenter non-operation communications. The primary functions are to transport voice, video, data and facsimile information for intercenter coordination, and to provide user access to space science and applications data bases. For the Space Station era, PSCN plans address the significant increase in forecast requirements for science data distribution and access to the Numerical Aerodynamics Simulator, and increased use of the Video Teleconference System.

Roeder, John↗

The experiment of CCSDS packet telemetry using a highly elliptical orbit satellite 'Hiten'

This paper describes the outline of the telemetry scheme proposed by the Consultative Committee of Space Data Systems (CCSDS), and the on-orbit experiment which was carried out to show the applicability of the CCSDS packet telemetry scheme using the Japan's satellite Hiten in a highly elliptical orbit. The telemetry data which are generated by the instruments are packetized in Hiten and reformed to the original data in earth stations successfully. The experimental results showed that the standardized scheme is helpful in allowing for tracking cross support between organizations, and the concatenated code is quite effective to transmit data in a low C/N condition.

Takano, Tadashi↗

The Seasat-A synthetic aperture radar design and implementation

The Seasat-A Synthetic Aperture Imaging Radar System is the first imaging radar system intended to be used as a scientific instrument designed for orbital use. The requirement of the radar system is to generate continuous radar imagery with a 100 kilometer swath with 25 meter resolution from an orbital altitude of 800 kilometers. These requirements impose unique system design problems and a description of the implementation will be given. The end-to-end data system will be described, including interactions of the spacecraft, antenna, sensor, telemetry link, recording subsystem, and data processor. Some of the factors leading to the selection of critical system parameters will be listed. The expected error sources leading to degradation of image quality will be described as well as estimates given of the expected performance from data obtained during ground testing of the completed subsystems.

Jordan, R.↗

Computer based control of the Superfluid Helium On-Orbit Transfer Space Shuttle experiment

Ground software that is being developed for the control of the Superfluid Helium On-Orbit Transfer (SHOOT) project is discussed. Special attention is given to two software development projects for SHOOT support: (1) the SHOOT Command and Monitoring System, which will provide a real-time highly interactive interface for the SHOOT principal investigator to control the experiment and to analyze and display its telemetry; and (2) the SHOOT Aft Flight Deck Operating System, which is comprised of several monitoring programs to give the astronaut mission specialist on-orbit visibility into SHOOT systems, and an intelligent-rule-based system that will control a He transfer without ground intervention. Major accomplishments of the SHOOT project to date include two successful interface tests with the Goddard Space Flight Center developed breadboard electronics and prototype software.

Castellano, T. P.↗

OOD/OOP experience in the Science Operations Center part of the ground system for X ray Timing Explorer mission

The Science Operations Center (SOC) for the X-ray Timing Explorer (XTE) mission is an important component of the XTE ground system. Its mandate includes: (1) command and telemetry for the three XTE instruments, using CCSDS standards; (2) monitoring of the real-time science operations, reconfiguration of the experiment and the instruments, and real-time commanding to address the targets of opportunity (TOO) and alternate observations; and (3) analysis, processing, and archival of the XTE telemetry, and the timely delivery of the data products to the principal investigator (PI) teams and the guest observers (GO). The SOC has two major components: the science operations facility (SOF) that addresses the first two objectives stated above and the guest observer facility (GOF) that addresses the third. The SOF has subscribed to the object oriented design and implementation; while the GOF uses the traditional approach in order to take advantage of the existing software developed in support of previous missions. This paper details the SOF development using the object oriented design (OOD), and its implementation using the object oriented programming (OOP) in C++ under Unix environment on client-server architecture using Sun workstations. It also illustrates how the object oriented (OO) and the traditional approaches coexist in SOF and GOF, the lessons learned, and how the OOD facilitated the distributed software development collaboratively by four different teams. Details are presented for the SOF system, its major subsystems, its interfaces with the rest of the XTE ground data system, and its design and implementation approaches.

Choudhary, Abdur Rahim↗