Analysis of UF6 breeder reactor power plants

Gaseous UF6 fueled breeder reactor design and technical applications of such concepts are summarized. Special attention was given to application in nuclear power plants and to reactor efficiency and safety factors.

Clement, J. D.↗

Surveillance and Datalink Communication Performance Analysis for Distributed Separation Assurance System Architectures

This study investigates the effects of two technical enablers: Automatic Dependent Surveillance - Broadcast (ADS-B) and digital datalink communication, of the Federal Aviation Administration s Next Generation Air Transportation System (NextGen) under two separation assurance (SA) system architectures: ground-based SA and airborne SA, on overall separation assurance performance. Datalink performance such as successful reception probability in both surveillance and communication messages, and surveillance accuracy are examined in various operational conditions. Required SA performance is evaluated as a function of subsystem performance, using availability, continuity, and integrity metrics to establish overall required separation assurance performance, under normal and off-nominal conditions.

Chung, William W.↗

Trace Contaminant Control for the International Space Station's Node 1- Analysis, Design, and Verification

Trace chemical contaminant generation inside crewed spacecraft cabins is a technical and medical problem that must be continuously evaluated. Although passive control through materials selection and active control by adsorption and catalytic oxidation devices is employed during normal operations of a spacecraft, contaminant buildup can still become a problem. Buildup is particularly troublesome during the stages between the final closure of a spacecraft during ground processing and the time that a crewmember enters for the first time during the mission. Typically, the elapsed time between preflight closure and first entry on orbit for spacecraft such as Spacelab modules was 30 days. During that time, the active contamination control systems are not activated and contaminants can potentially build up to levels which exceed the spacecraft maximum allowable concentrations (SMACs) specified by NASA toxicology experts. To prevent excessively high contamination levels at crew entry, the Spacelab active contamination control system was operated for 53 hours just before launch.

Perry, J. L.↗

Techno-economic assessment for the production of algal fuels and value-added products: opportunities for high-protein microalgae conversion

Abstract Background Microalgae possess numerous advantages for use as a feedstock in producing renewable fuels and products, with techno-economic analysis (TEA) frequently used to highlight the economic potential and technical challenges of utilizing this biomass in a biorefinery context. However, many historical TEA studies have focused on the conversion of biomass with elevated levels of carbohydrates and lipids and lower levels of protein, incurring substantial burdens on the ability to achieve high cultivation productivity rates relative to nutrient-replete, high-protein biomass. Given a strong dependence of algal biomass production costs on cultivation productivity, further TEA assessment is needed to understand the economic potential for utilizing potentially lower-cost but lower-quality, high-protein microalgae for biorefinery conversion. Results In this work, we conduct rigorous TEA modeling to assess the economic viability of two conceptual technology pathways for processing proteinaceous algae into a suite of fuels and products. One approach, termed mild oxidative treatment and upgrading (MOTU), makes use of a series of thermo-catalytic operations to upgrade solubilized proteins and carbohydrates to hydrocarbon fuels, while another alternative focuses on the biological conversion of those substrates to oxygenated fuels in the form of mixed alcohols (MA). Both pathways rely on the production of polyurethanes from unsaturated fatty acids and valorization of unconverted solids for use as a material for synthesizing bioplastics. The assessment found similar, albeit slightly higher fuel yields and lower costs for the MA pathway, translating to a residual solids selling price of $899/ton for MA versus $1033/ton for MOTU as would be required to support a $2.50/gallon gasoline equivalent (GGE) fuel selling price. A variation of the MA pathway including subsequent upgrading of the mixed alcohols to hydrocarbon fuels (MAU) reflected a required solids selling price of $975/ton. Conclusion The slight advantages observed for the MA pathway are partially attributed to a boundary that stops at oxygenated fuels versus fungible drop-in hydrocarbon fuels through a more complex MOTU configuration, with more comparable results obtained for the MAU scenario. In either case, it was shown that an integrated algal biorefinery can be economical through optimal strategies to utilize and valorize all fractions of the biomass.

09 BIOMASS FUELS↗

GridLAB-D Technical Support Document: Residential Equivalent Thermal Parameter Model

GridLAB-D is a power distribution systems simulation and analysis tool developed by Pacific Northwest National Laboratory. Although GridLAB-D and its underlying residential load model has been used in a variety of power systems analyses, comprehensive documentation of the derivation of the residential house model has not been formally published. The purpose of this technical support document is to serve as a comprehensive resource for the thermal dynamics modeling and house definition implemented in GridLAB-D. It covers model derivation, parameter definitions, and implementation steps in the codebase.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preparing for Mars: The Evolvable Mars Campaign 'Proving Ground' Approach

As the National Aeronautics and Space Administration (NASA) prepares to extend human presence beyond Low Earth Orbit, we are in the early stages of planning missions within the framework of an Evolvable Mars Campaign. Initial missions would be conducted in near-Earth cis-lunar space and would eventually culminate in extended duration crewed missions on the surface of Mars. To enable such exploration missions, critical technologies and capabilities must be identified, developed, and tested. NASA has followed a principled approach to identify critical capabilities and a "Proving Ground" approach is emerging to address testing needs. The Proving Ground is a period subsequent to current International Space Station activities wherein exploration-enabling capabilities and technologies are developed and the foundation is laid for sustained human presence in space. The Proving Ground domain essentially includes missions beyond Low Earth Orbit that will provide increasing mission capability while reducing technical risks. Proving Ground missions also provide valuable experience with deep space operations and support the transition from "Earth-dependence" to "Earth-independence" required for sustainable space exploration. A Technology Development Assessment Team identified a suite of critical technologies needed to support the cadence of exploration missions. Discussions among mission planners, vehicle developers, subject-matter-experts, and technologists were used to identify a minimum but sufficient set of required technologies and capabilities. Within System Maturation Teams, known challenges were identified and expressed as specific performance gaps in critical capabilities, which were then refined and activities required to close these critical gaps were identified. Analysis was performed to identify test and demonstration opportunities for critical technical capabilities across the Proving Ground spectrum of missions. This suite of critical capabilities is expected to provide the foundation required to enable a variety of possible destinations and missions consistent with the Evolvable Mars Campaign.. The International Space Station will be used to the greatest extent possible for exploration capability and technology development. Beyond this, NASA is evaluating a number of options for Proving Ground missions. An "Asteroid Redirect Mission" will demonstrate needed capabilities (e.g., Solar Electric Propulsion) and transportation systems for the crew (i.e., Space Launch System and Orion) and for cargo (i.e., Asteroid Redirect Vehicle). The Mars 2020 mission and follow-on robotic precursor missions will gather Mars surface environment information and will mature technologies. NASA is considering emplacing a small pressurized module in cis-lunar space to support crewed operations of increasing duration and to serve as a platform for critical exploration capabilities testing (e.g., radiation mitigation; extended duration deep space habitation). In addition, "opportunistic mission operations" could demonstrate capabilities not on the Mars critical path that may, nonetheless, enhance exploration operations (e.g., teleoperations, crew assisted Mars sample return). The Proving Ground may also include "pathfinder" missions to test and demonstrate specific capabilities at Mars (e.g., entry, descent, and landing). This paper describes the (1) process used to conduct an architecture-driven technology development assessment, (2) exploration mission critical and supporting capabilities, and (3) approach for addressing test and demonstration opportunities encompassing the spectrum of flight elements and destinations consistent with the Evolvable Mars Campaign.

Bobskill, Marianne R.↗

Handbook for Dynamic Data Acquisition and Analysis - IES Recommended Practices 012.1

The original motivation for this Handbook came from personnel of The Aerospace Corporation (TAC), who are technical advisors to the Air Force Space and Missile Systems Center. Over the preceding two decades, TAC has observed a seemingly endless series of errors and anomalies in the acquisition and analysis of structural dynamic and aeroacoustic data.

Shock vibration acoustic noise↗

Analysis of short‐ and long‐term system response during gas production from a gas hydrate deposit at the UBGH2‐6 site of the Ulleung Basin in the Korean East Sea

Abstract This study is a continuation of an investigation into the feasibility of long‐term production from a marine hydrate accumulation that has the properties and conditions of the UBGH2‐6 (UBGH2, Ulleung Basin Gas Hydrates 2; 2 is the number of the scientific expedition) site at the Ulleung Basin in the Korean East Sea. The 12.7 m‐thick system is in deep water (2157 m), but at 140 m below the seafloor. It is characterized by alternating hydrate‐free clays and muds and hydrate‐rich sand layers. The layered stratigraphy and the presence of mud layers favours the use of vertical wells rather than horizontal wells for production. The analysis indicates that production from such a hydrate accumulation is technically feasible, but the gas production rates are generally low. Water production accompanying gas production from this deposit appears manageable under all the scenarios investigated in this study, however, the water‐to‐gas ratio is high. Subsidence at the ocean floor at the end of a 14 day test is quite limited. However, there is significant uncertainty in the predictions of the geomechanical system's behaviour because they are not based on measured system properties but only on estimates/assumptions from analogues. The long‐term production potential of the reservoir at the site investigated here appears challenging because of the limited effectiveness of dissociation and large water production, in addition to substantial subsidence.

Moridis, George J.↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

FY 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs. The Area 3 RWMS was placed in stand-by in 2006 and remained inactive in FY 2018. Resumption of waste disposal operations is planned for FY 2019. No proposed actions, new information, or discoveries affecting the Area 3 RWMS were identified in FY 2018. No significant changes have occurred since preparation of the most recent special analysis, which indicates a continuing reasonable expectation of meeting the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management.” No changes were made to documents supporting the Radioactive Waste Management Basis (RWMB) including the PA, CA, DAS, waste acceptance criteria (WAC), closure plan, monitoring plan, or maintenance plan. Monitoring results for the most recent year with available data, calendar year (CY) 2017, indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 3 RWMS Drainage Lysimeter Facility continue to be consistent with the conceptual site model (CSM). All Area 3 RWMS DAS conditions and secondary issues were closed in 2002. The Area 5 RWMS continued disposal operations within the Northern Expansion Area in FY 2018. Eighty-six changes involving proposed actions, new information, or discoveries affecting the Area 5 RWMS PA and CA were screened during FY 2018 in the Unreviewed disposal question (UDQ) process. Twenty-two changes required UDQ evaluations and two changes resulted in unreviewed composite analysis question evaluations. None of the proposed actions, new information, or discoveries had significant impacts on the PAs or CAs. All of the planned changes were implemented. No special analyses were performed, and no changes were made to documents supporting the RWMB including the PA, CA, DAS, WAC, closure plan, monitoring plan, or maintenance plan. Planning continued and construction commenced on development of the Western Expansion Area within the Radioactive Waste Management Complex. All Area 5 RWMS DAS conditions and secondary issues were closed in 2002. The cumulative effects of changes occurring since preparation of the Area 5 RWMS PA and CA were assessed with the current baseline PA/CA model. Model results indicate that there is a reasonable expectation that the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management,” can be met. No PA or CA mean result exceeds 50% of its performance objective. Monitoring results and R&D results continue to be consistent with the CSM. Monitoring results for CY 2017 indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 5 RWMS Weighing Lysimeter Facility continue to be consistent with the CSM. The FY 2018 review of Area 3 RWMS and Area 5 RWMS disposal operations supports the following conclusions: The Area 3 and Area 5 RWMS PA and associated CA assumptions and conclusions remain valid based on consideration of all changes identified or planned; The reasonable expectation that the Area 3 and Area 5 RWMSs will meet the performance objectives identified in DOE O 435.1, “Radioactive Waste Management”, remains valid; and The DAS, based on interpretation of the data collected, monitoring results, and other information, continues to be adequate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Energy Storage for Dispatchable Geothermal Power

Dispatchable generation refers to sources of electricity that can be turned on or off, or can adjust their power output accordingly to an order. Geothermal plants are usually used for base-load power rather than dispatchable power. Flexibility is a challenge for a geothermal plant because the heat source does not naturally respond quickly to changes in demand. The current state-of-the-art approach to address this challenge is to maintain the geothermal fluid flows at relatively steady rates while providing a bypass around the generation equipment as needed. Under part load, some of the geothermal fluid is pumped to the surface, bypasses the generation equipment, and is re-injected to the ground without extracting any useful enthalpy. This approach is robust but necessarily incurs high parasitic power draws at part load due to the constant, full-flow pumping power requirements. There are even more challenges and unknowns for steam and flash geothermal plants, which were the focus for this project. As a process improvement to this existing configuration of a dispatchable geothermal plant, we examined the use of a phase-change thermal-energy storage (TES) unit that will provide some “inertia” against temperature fluctuations. The TES phase change material (PCM) could be in the form of eutectic molten nitrate salts, organic sugar alcohols, or the like based on the required temperature. This configuration allowed the power plant to meet the ramp rate requirements while allowing the geothermal resource to drawn down at the duty-cycle-averaged extraction rate rather than the full-rated-output extraction rate. The project team performed an experimental and computational evaluation of a peak shaving technical approach that used thermal storage to switch between two nominal operating points: full rated power and 50% power. In the initial requirements definition phase, the team decided to examine the PCM/TES-enhanced geothermal plant in the context of a 40-MW two-stage flash plant operating in mid-Southern California. Steady-state process simulations were used to understand the equipment sizing and the energetics. Dynamic process simulations were used to understand the response rate of the system to changes in requested power output from the utility. The technical approach was also guided by a techno-economic analysis (TEA) and a high-level analysis of the reservoir. Recognizing that performance of the thermal storage was a key risk element, high-fidelity finite-element simulations of the PCM-TES heat exchanger were performed to better understand its performance and temporal response. These simulations were validated with a subscale PCM-TES experimental apparatus that mimicked the geometry of the full-scale system. The key outcomes of this Phase I project were that: 1) the PCM-TES heat exchanger met the target for gravimetric energy storage density, 2) the dispatchable geothermal plant met its target for response rate, 3) the peak shaving approach reduces the number of production wells and does not disturb the wellfield, and 4) the incentives for properly remunerating dispatchable operation were identified.

15 GEOTHERMAL ENERGY↗

Round 3 Update of Stress Testing Results for Organic Light-Emitting Diode Panels and Luminaires

Organic light-emitting diode (OLED) sources are a potential solid-state lighting technology for use in indoor lighting applications. Some of the advantages offered by OLEDs include thin profiles, low glare, diffuse lighting, and unique form factors. The U.S. Department of Energy (DOE) has released six technical reports focused on OLED technologies to provide information and analysis to the lighting industry. These reports include the evaluation of two different field deployment sites, a market analysis, a tear-down analysis, and two independent assessments of the performance of select commercially available OLED products. This report builds on earlier DOE efforts with OLED technology by updating information about previously benchmarked commercial OLED products. Specifically, this report provides updated findings about the robustness and reliability of commercial OLED products.

42 ENGINEERING↗

The Algae Testbed Public Private Partnership -ATP 3 (Final Closeout Report)

The Algae Testbed Public Private Partnership (ATP3) was proposed in response to the ADVANCEMENTS IN SUSTAINABLE ALGAL PRODUCTION (ASAP) FUNDING OPPORTUNITY NUMBER: DE-FOA-0000615 TOPIC AREA 2-DEVELOPMENT OF REGIONAL ALGAL FEEDSTOCK TESTBED (RAFT) PARTNERSHIPS in 2012. For six years, from 2013 through 2019, ATP 3 was operated as a multi-institutional effort funded by the Department of Energy to establish a network of operating testbeds that brought together world-class scientists, engineers and business executives whose goal it was to increase stakeholder access to high quality facilities by making available an unparalleled array of outdoor cultivation, downstream equipment, and laboratory facilities to the algal R&D community. ATP 3 utilized the same powerful combination of facilities and technical expertise to support TEA, LCA and resource modeling and analysis activities, helping to close critical knowledge gaps and inform robust analyses of the state of technology for algal based biofuels and bioproducts. ATP 3 included testbed facilities at Arizona State University’s (ASU) Arizona Center for Algae Technology and Innovation (AzCATI), and augmented by university and commercial facilities in Hawaii (Cellana), California (Cal Poly San Luis Obispo), Georgia (Georgia Institute of Technology), and Florida (Florida Algae), in addition to partners at the National Renewable Energy Laboratory, Sandia National Laboratories, Valicor Renewables (Michigan), University of Texas at Austin (Texas), Commercial Algae Management (Georgia), Harmon Consulting (Hawaii), Evodos (Netherlands), and Litree (China).

09 BIOMASS FUELS↗

Wind Energy Costs in Puerto Rico Through 2035

In 2019, Puerto Rico codified into law a 100% renewable electricity by 2050 target. Decision makers there need information about the costs and performance of wind energy technologies to incorporate into planning efforts for the future grid. After consulting with key technical stakeholders and accounting for unique conditions in Puerto Rico like increased hurricane risks, we customize NREL's Renewable Energy Potential model to calculate how capital expenditures, operational expenditures, net annual energy generation, and levelized cost of energy (LCOE) vary in time and space for wind energy projects around Puerto Rico. Wind turbines can add value by providing grid services through grid-forming inverters and complement solar energy generation with evening and nighttime electricity production, especially offshore. By 2035, we expect average costs of land-based and offshore wind energy in Puerto Rico to reach $\$$69/MWh (6.9 cents/kWh) and $\$$100/MWh (10 cents/kWh), respectively. While these projections do not include transmission system upgrade costs, they do suggest that low-cost, clean electricity is possible for Puerto Rico.

17 WIND ENERGY↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY2021

This Fiscal Year (FY) 2021 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA) and associated operating disposal-authorization statement (ODAS) technical basis documents for the Remote Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory. Annual review of the adequacy of the PA and CA for the RHLLW Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2021, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility closure design, or institutional controls. Sixteen total waste-canister shipments were received at the RHLLW Disposal Facility, and 16 total waste canisters were emplaced.