Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “space systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Photoelastic tests on models of thermal protection system for space shuttle orbiter

The thermal protection system (TPS) of the space shuttle orbiter vehicle, consisting of ceramic tile/adhesive/strain isolator pad/adhesive/aluminum substructure, was modeled photoelasticity. A highly sensitive photoelastic material was used in the models to show the nature of the stress-transfer between the strain isolation pad (SIP) and the ceramic tile through the RTV-adhesive layer. Isochromatic fringe patterns were obtained for models subjected to tension and combined tension and bending. Tests indicated that the load-transfer between the SIP and the photoelastic material occurred at discrete locations causing stress concentrations in the photoelastic material. Stress concentration factors of the order of 1.9 were measured, but as the observed photoelastic response was an integrated effect through the model thickness, the local stress concentration factors at the SIP/tile interface could be even higher.

Prabhakaran, R.↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot tall rocket assembly—consisting primarily of two fuel tanks, an engine section, and four RS-25 rocket engines—capable of sending crew and large payloads to the moon and beyond with 1.6 million pounds of thrust. Currently, the Core Stage is in the B2 Test Stand at Stennis Space Center, undergoing a series of structural and functional tests, designated the Green Run test series. The ultimate goal of Green Run is to verify analytical models and confirm proper subsystem operation of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center modal test team. The desired free boundary condition of the Core Stage was achieved by suspending the massive spacecraft from the B2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound impact hammer for impact testing. Modal response was measured with 550 accelerometers channels distributed on both the Core Stage and the B2 Test Stand crane. Following one very long night of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 2.5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully extracted. The case-study presented in this paper will discuss the SLS Core Stage, the modal test setup and procedure, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Green Run↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

Advanced solar dynamic space power systems perspectives, requirements and technology needs

Projected NASA, Civil, Commercial, and Military missions will require space power systems of increased versatility and power levels. The Advanced Solar Dynamic (ASD) Power systems offer the potential for efficient, lightweight, survivable, relatively compact, long-lived space power systems applicable to a wide range of power levels (3 to 300 kWe), and a wide variety of orbits. The successful development of these systems could satisfy the power needs for a wide variety of these projected missions. Thus, the NASA Lewis Research Center has embarked upon an aggressive ASD reserach project under the direction of NASA's Office of Aeronautics and Space Technology (DAST). The project is being implemented through a combination of in-house and contracted efforts. Key elements of this project are missions analysis to determine the power systems requirements, systems analysis to identify the most attractive ASD power systems to meet these requirements, and to guide the technology development efforts, and technology development of key components.

Dustin, M. O.↗

Research and technology: Fiscal year 1984 report

Topics covered include extraterrestrial physics, high energy astrophysics, astronomy, solar physics, atmospheres, oceans, terrestrial physics, space technology, sensors, techniques, user space data systems, space communications and navigation, and system and software engineering.

Source record↗

Research and technology

Activities of the Goddard Space Flight Center are described in the areas of planets and interplanetary media, comets, astronomy and high-energy physics, solar physics, atmospheres, terrestrial physics, ocean science, sensors and space technology, techniques, user space data systems, space communications and navigation, and system and software engineering. Flight projects and mission definition studies are presented, and institutional technology is described.

Source record↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Space Launch System↗

Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is the intent of this paper to provide the visibility of relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also provide the capability to bound the variables providing engineering the insight required to control the system's engineering solution. An example of this visibility will be the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also the relationship visibility of selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement or accepting a larger parts count with the resulting higher reliability requirement. This paper will provide an understanding for the relationship of mean repair time (mean downtime) to maintainability, e.g., accessibility for repair, and both mean time between failure, e.g., reliability of hardware and the system inherent availability. Having an understanding of these relationships and resulting requirements before starting the architectural design concept definition will avoid considerable time and money required to iterate the design to meet the redesign and assessment process required to achieve the results required of the customer's space transportation system. In fact the impact to the schedule to being able to deliver the system that meets the customer's needs, goals, and objectives may cause the customer to compromise his desired operational goal and objectives resulting in considerable increased life cycle cost of the fielded space transportation system.

Rhodes, Russel E.↗

A Model-Based Expert System for Space Power Distribution Diagnostics

When engineers diagnose system failures, they often use models to confirm system operation. This concept has produced a class of advanced expert systems that perform model-based diagnosis. A model-based diagnostic expert system for the Space Station Freedom electrical power distribution test bed is currently being developed at the NASA Lewis Research Center. The objective of this expert system is to autonomously detect and isolate electrical fault conditions. Marple, a software package developed at TRW, provides a model-based environment utilizing constraint suspension. Originally, constraint suspension techniques were developed for digital systems. However, Marple provides the mechanisms for applying this approach to analog systems such as the test bed, as well. The expert system was developed using Marple and Lucid Common Lisp running on a Sun Sparc-2 workstation. The Marple modeling environment has proved to be a useful tool for investigating the various aspects of model-based diagnostics. This report describes work completed to date and lessons learned while employing model-based diagnostics using constraint suspension within an analog system.

Quinn, Todd M.↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the launch vehicle matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and its service module. The co-manifested payload is located below the Orion and its service module in a 10 m high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. Various approaches that utilize this comanifested payload capability to build up infrastructure in deep space have been explored in support of future asteroid, lunar, and Mars mission scenarios. This paper reports on the findings of the Advanced Concepts Office study team at NASA Marshall Space Flight Center (MSFC) working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume of the SLS. Findings include a set of module designs that can be developed in 10 mt increments to support these co-manifested payload missions along with a comparison of this approach to a large-module payload flight configuration for the SLS.

Smitherman, David↗

Enabling a Voice Management System for Space Applications, Design and Software Development

Sustainable missions, beyond low Earth orbit, will require autonomous capabilities in order to achieve NASA’s Artemis program objectives. Correspondingly, the crew must have a means to efficiently interact with these autonomous systems; this can be facilitated via voice and speech communications. Voice-based controls enable the user to access autonomous systems hands-free/eyes-free, allowing the user to better focus on critical tasks. The goal of this project was to explore the knowledge and technology needed to successfully design effective voice interfaces for autonomous systems. The main objective was to understand how a crew member, through voice interaction, could most efficiently and intuitively communicate with a notional autonomous vehicle system manager. This project leveraged prior research conducted by the University of Michigan’s Bioastronautics and Life Support System (BLiSS) team as part of a NASA Moon to Mars eXploration Systems and Habitation (M2M X-Hab) 2020 Academic Innovation Challenge. The X-Hab 2020 work from the BliSS Team resulted in an intuitive graphical user interface/user experience that was built on an Internet of Things (IOT) platform. The Voice User Interface (VUI) design for the M2M X-Hab 2021 project leveraged this technology and incorporated a voice-based assistant and NASA’s Platform for Autonomous Systems (NPAS) software. This required technologies to convert voice to text, conduct semantic interpretations, and convert responses from the autonomous system to text and to speech; additionally, the background noise environment of spacecraft was assessed, and a relatable personality for the autonomous system to facilitate human-like conversations was created. This work’s success was largely due to the diverse team that included expertise in Space Systems Engineering, Human Computer Interaction, Aerospace Engineering, Computer Science, Biomedical Engineering, and Applied Physics. The differing perspectives fostered elaborate discussions, resulting in the conception of three main interactions: (1) User-System, (2) NPAS-System, and (3) Environment-System. The system developed, i.e. the VUI, had to be unique, efficient, and intuitive; thus, the team crafted a personality for the system to enable human-like conversation. User surveys sent to students and young professionals were used to help determine these personality traits by capturing perspectives and expectations of the “Artemis Generation Astronauts”. To further simulate human-like conversations, the system had to be able to quickly interpret user speech and be able to integrate with NASA’s NPAS system for quick and reliable information transfer. Results of this research include (1) a working prototype user interface, that is compatible with NASA’s NPAS system; (2) software that demonstrates the ability to interpret user requests and respond appropriately; (3) the capability to implement fully expanded conversations between user and system using intuitive communication in four request categories; and (4) software and hardware recommendations that optimize the system’s ability to operate, i.e. be heard, in a noisy environment. The technologies chosen for this project’s demonstrations included the following: Raspberry Pi, RASA, Mozilla Deep Speech, Coqui, RTX Voice and Adobe XD. This work has laid the foundation for the development of VUI’s used for autonomy, and is intended to provide guidance for future VUI development.

Tara Vega↗

Use of Aquaporins to Achieve Needed Water Purity on the International Space Station for the Extravehicular Mobility Unit Space Suit System

With the retirement of the U.S. Space Shuttle fleet, the supply of extremely high quality water required for the Extravehicular Mobility Unit (EMU) space suit cooling on the International Space Station (ISS) will become a significant operational hardware challenge in the very near future. One proposed solution is the use of a filtration system consisting of a semipermeable membrane embedded with aquaporin proteins, a special class of transmembrane proteins that facilitate passive, selective transport of water in vivo. The specificity of aquaporins is such that only water is allowed through the protein structure, and it is this novel property that invites their adaptation for use in water filtration systems, specifically those onboard the ISS for the EMU space suit system. These proteins are also currently being developed for use in terrestrial filtration systems.

Hill, Terry R.↗

The Space Launch System -The Biggest, Most Capable Rocket Ever Built, for Entirely New Human Exploration Missions Beyond Earth's Orbit

NASA is developing the Space Launch System -- an advanced heavy-lift launch vehicle that will provide an entirely new capability for human exploration beyond Earth's orbit. The Space Launch System will provide a safe, affordable and sustainable means of reaching beyond our current limits and opening up new discoveries from the unique vantage point of space. The first developmental flight, or mission, is targeted for the end of 2017. The Space Launch System, or SLS, will be designed to carry the Orion Multi-Purpose Crew Vehicle, as well as important cargo, equipment and science experiments to Earth's orbit and destinations beyond. Additionally, the SLS will serve as a backup for commercial and international partner transportation services to the International Space Station. The SLS rocket will incorporate technological investments from the Space Shuttle Program and the Constellation Program in order to take advantage of proven hardware and cutting-edge tooling and manufacturing technology that will significantly reduce development and operations costs. The rocket will use a liquid hydrogen and liquid oxygen propulsion system, which will include the RS-25D/E from the Space Shuttle Program for the core stage and the J-2X engine for the upper stage. SLS will also use solid rocket boosters for the initial development flights, while follow-on boosters will be competed based on performance requirements and affordability considerations.

Shivers, C. Herb↗

Earth-to-Geostationary Orbit Transportation for Space Solar Power System Development

Space solar power satellites have the potential to provide abundant quantities of electricity for use on Earth. One concept, the Sun Tower, can be assembled in geostationary orbit from pieces transferred from Earth. The cost of transportation is one of the major hurdles to space solar power. This study found that autonomous solar-electric transfer is a good choice for the transportation from LEO to GEO.

Martin, James A.↗

Institutional arrangements

The practical application of space systems is considered in terms of institutional arrangements. The evolution of space systems is examined along with examples of institutional arrangements for space systems uses or applications. An institutional framework developed to assure the widest practicable application of space system is proposed and described. Recommendations are included.

Source record↗

NASA Center for Intelligent Robotic Systems for Space Exploration

NASA's program for the civilian exploration of space is a challenge to scientists and engineers to help maintain and further develop the United States' position of leadership in a focused sphere of space activity. Such an ambitious plan requires the contribution and further development of many scientific and technological fields. One research area essential for the success of these space exploration programs is Intelligent Robotic Systems. These systems represent a class of autonomous and semi-autonomous machines that can perform human-like functions with or without human interaction. They are fundamental for activities too hazardous for humans or too distant or complex for remote telemanipulation. To meet this challenge, Rensselaer Polytechnic Institute (RPI) has established an Engineering Research Center for Intelligent Robotic Systems for Space Exploration (CIRSSE). The Center was created with a five year $5.5 million grant from NASA submitted by a team of the Robotics and Automation Laboratories. The Robotics and Automation Laboratories of RPI are the result of the merger of the Robotics and Automation Laboratory of the Department of Electrical, Computer, and Systems Engineering (ECSE) and the Research Laboratory for Kinematics and Robotic Mechanisms of the Department of Mechanical Engineering, Aeronautical Engineering, and Mechanics (ME,AE,&M), in 1987. This report is an examination of the activities that are centered at CIRSSE.

Source record↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗