Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “simultaneous operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

UNREVIEWED DISPOSAL QUESTION EVALUATION: CENTER SLIT TRENCHES ONE THROUGH FIVE OPERATIONAL COVERS REANALYSIS

Operational inventory limits for the disposal of solid low-level waste in Slit Trenches 1-7 were established by the Special Analysis (SA) performed by Collard and Hamm (2008). To determine disposal limits for the Slit Trenches, the SA followed the methodology used in the 2008 PA (WSRC, 2008) which assumed that the inventories in each trench were instantaneously placed in 12/1995, which is the date when SLIT1 began operation. The 2008 SA analyzed the impact from placing storm-water runoff covers simultaneously over Slit Trenches 1-7 at 5, 10 and 15 years after the inventory was introduced. To include a measure of conservatism in the limits, the lowest of the limits calculated for any storm-water runoff cover placement time or that calculated in the original 2008 PA was chosen as the operational limit for each radionuclide. Through the availability of funding provided by the American Recovery and Reinvestment Act (ARRA), storm-water runoff covers were placed over Slit Trenches 1-5 in December 2010. SRNL was requested to perform a UDQE for this accelerated action. Table 1 below lists the operational dates for Slit Trenches 1-5 and the time elapsed between when the first waste package was disposed in each Slit Trench and when the storm-water runoff covers were placed. As shown in Table 1, SLIT1 was covered 15.0 years after the date of the first waste package disposal. SLIT2 was covered 9.2 years after the date of the first waste package disposal in SLIT2 which falls within the window of {+-} 1.0 year within which the 2008 SA cover time analysis was assumed to be valid (Crowley and Butcher, 2008). Therefore, the analysis of SLIT1 and SLIT2 in the 2008 SA is considered adequate. However, the cover timings for SLIT3, SLIT4 and SLIT5 are from 2.2 to 1.6 years beyond the nearest cover time of 5 years assumed in the 2008 SA analysis and fall outside of the acceptable one-year margin. Therefore, an additional study was conducted by Collard et al. (2011) that assessed the impact on Slit Trench performance from a covering date that is between 12/2010 and 9/2011. Accelerated placement of storm-water runoff covers over Slit Trenches 1-5 put the cover timing outside of the range considered in the 2008 SA (Collard and Hamm, 2008) which establishes Slit Trench disposal limits. Results from a recent study (Collard et al., 2011) demonstrate that the actual cover installation in December 2010 produces acceptable Slit Trench performance. Additionally, covering Slit Trench 5 separately from Slit Trenches 6 and 7, which will be operationally closed at a later date, does not adversely affect performance of the operationally closed trenches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Should We Enhance the Observing Systems or Improve Coordination Among the Operating Agencies: What is Needed the Most for Security--A Philosophical Discussion

As an integrated observing strategy, the concept of sensorweb for Earth observations is appealing in many aspects. For instance, by increasing the spatial and temporal coverage of observations from space and other vantage points, one can eventually aid in increasing the accuracy of the atmospheric models which are precursor to hurricane track prediction, volcanic eruption forecast, and trajectory path of transcontinental transport of dust, harmful nuclear and chemical plumes. In reality, there is little analysis available in terms of benefits, costs and optimized set of sensors needed to make these necessary observations. This is a complex problem that must be carefully studied and balanced over many boundaries such as science, defense, early warning, security, and surveillance. Simplistically, the sensorweb concept from the technological point of view alone has a great appeal in the defense, early warning and security applications. In fact, it can be relatively less expensive in per unit cost as opposed to building and deploying it for the scientific use. However, overall observing approach should not be singled out and aligned somewhat orthogonally to serve a particular need. On the other hand, the sensorweb should be designed and deployed to serve multiple subject areas and customers simultaneously; and can behave as directed measuring systems for both science and operational entities. Sensorweb can be designed to act as expert systems, and/or also provide a dedicated integrated surveillance network. Today, there is no system in the world that is fully integrated in terms of reporting timely multiple hazards warnings, computing the loss of life and property damage estimates, and is also designed to cater to everyone's needs. It is not an easier problem to undertake and more so is not practically solvable. At this time due to some recent events in the world, the scientific community, social scientists, and operational agencies are more cognizant and getting together to address such colossal problems. Increasing our knowledge of the home planet, via amplified set of observations, is certainly a right step in a right direction. Furthermore, this is a pre-requisite in understanding multiple hazard phenomenas. This paper examines various sensorweb options and observing architectures that can be useful specifically in addressing some of these complex issues. The ultimate goal is to serve the society by providing potential natural hazards information to the decision makers in the most expeditious manner so they can prepare themselves to mitigate potential risks to human life, livestock and property.

Habib, Shahid↗

Combined effective field theory interpretation of Higgs boson, electroweak vector boson, top quark, and multijet measurements

Constraints on Wilson coefficients (WCs) corresponding to dimension-6 operators of the standard model effective field theory (SMEFT) are determined from a simultaneous fit to seven sets of CMS measurements probing Higgs boson, electroweak vector boson, top quark, and multijet production. Measurements of electroweak precision observables are also included and provide complementary constraints to those from the CMS experiment. The CMS measurements, using LHC proton-proton collision data at $\sqrt{s}=13\,\text {Te}\text {V} $, corresponding to integrated luminosities of 36.3 or 138$\,\text {fb}^{-1}$, are chosen to provide sensitivity to a broad set of operators, for which consistent SMEFT predictions can be derived. These are primarily measurements of differential cross sections which are parameterized as functions of the WCs. In measurements targeting ${\text {t}} (\bar{\textrm{t}})\text {X} $ production, SMEFT effects are modelled at the detector level. Individual constraints on 64 WCs, and constraints on 43 linear combinations of WCs, are obtained.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Data Acquisition and Prompt Analysis System for High Altitude Balloon Experiments

An inexpensive and simple data acquisition system has been developed for balloon borne experiments and has been tested with a gamma ray detector in a balloon flight launched from Palestine, Texas. The detector used for the test consisted of an NaI(T1) scintillation crystal encased in a 1/8 in. plastic scintillator-charged particle shield. The combination was viewed by a single photomultiplier and charged particle gating was accomplished by a conventional phoswich discriminator. The pulse height analysis of the NaI events, not associated with prompt charged particle interactions, is accomplished by converting to a time spectrum using an airborne height to time converter. A range of pulse widths from 5 microseconds to 250 microseconds corresponds to energy losses in NaI from 100 to 1000 keV. The time spectrum information, along with charged particle events and barometric pressure, is fed to a mixer which modulates a 252.4 Mc FM transmitter. The original scintillator spectrum is recovered on the ground utilizing conversion circuitry at the receiver video output and a 128 channel commercial pulse height analyzer. The charged particle events of standard time width are stored with the spectrum at a fixed channel position and are therefore represented by a sharp line riding on the lower part of the NaI energy loss spectrum. An energy loss greater than 1000 keV is presented by the maximum pulse width of the converter and stored in the last analyzer channel. Barometric pressure data is transmitted by low frequency modulation of the sme FM carrier. In flight operation, the receiver video output can be recorded on a wide band tape recorder and simultaneously analyzed by the 128 channel analyzer, or the telemetered data can be analyzed later. The flight system features high pulse resolution, essentially instantaneous time response, high data rate, and flexibility; and is of modest cost. A detailed description of the system and operating performance is discussed.

Sarkady, A. A.↗

Availability analysis of the traveling-wave maser amplifiers in the deep space network. Part 1: The 70-meter antennas

The results of the reliability and availability analyses of the individual S- and X-band traveling-wave maser (TWM) assemblies and their operational configurations in the 70-meter antennas of NASA's Deep Space Network (DSN) are described. For the period 1990 through 1991, the TWM availability parameters for the Telemetry Data System are: mean time between failures (MTBF), 930 hr; mean time to restore services (MTTRS), 1.4 hr; and the average availability, 99.85 percent. In previously published articles, the performance analysis of the TWM assemblies was confined to the determination of the parameters specified above. However, as the mean down time (MDT) for the repair of TWM's increases, the levels of the TWM operational availabilities and MTTRS are adversely affected. A more comprehensive TWM availability analysis is presented to permit evaluation of both MTBF and MDT effects. Performance analysis of the TWM assemblies, based on their station monthly failure reports, indicates that the TWM's required MTBF and MDT levels of 3000 hr and 36 to 48 hr, respectively, have been achieved by the TWM's only at the Canberra Deep Space Station (DSS 43). The Markov Process technique is employed to develop suitable availability measures for the S- and X-band TWM configurations when each is operated in a two-assembly standby mode. The derived stochastic expressions allow for the evaluation of those configurations' simultaneous availability for the Antenna Microwave Subsystem. The application of these expressions to demonstrate the impact of various levels of TWM maintainability (or MDT) on their configurations' operational availabilities is presented for each of the 70-m antenna stations.

Issa, T. N.↗

Design of a near-IR coherent lidar for high spatial and velocity resolution wind measurement

A coherent Doppler lidar based on a CW diode-pumped, injection seeded, Th:YAG laser operating at approx. 2.02 microns is currently under development. This system is optimized for measurements of boundary layer winds with high spatial, temporal, and velocity resolution. Initially, the system will run alongside a new high repetition rate (5-10 kHz) CO2 mini-Master Oscillator Power Amplifier (mini-MOPA) Doppler lidar, which will provide simultaneous range-resolved Differential Absorption Lidar (DIAL) water vapor measurements. Water vapor DIAL operation of the 2 micron system is being considered as a future option. The anticipated specifications and the preliminary design are discussed.

Grund, Christian J.↗

High-resolution velocimetry in energetic tidal currents using a convergent-beam acoustic Doppler profiler

An array of convergent acoustic Doppler velocimeters has been developed and tested for the high resolution measurement of three-dimensional tidal flow velocities in an energetic tidal site. This configuration has been developed to increase spatial resolution of velocity measurements in comparison to conventional acoustic Doppler profilers (ADPs) which characteristically use diverging acoustic beams emanating from a single instrument. This is achieved using converging acoustic beams with a sample volume at the focal point of 0.03 m 3 . The array is also able to simultaneously measure three-dimensional velocity components in a profile throughout the water column, and as such is referred to herein as a converging-beam acoustic Doppler profiler (CADP). Mid-depth profiling is achieved through integration of the sensor platform with the operational Alstom 1MW DeepGen-IV Tidal Turbine. This proof-of-concept paper outlines system configuration and comparison to measurements provided by co-installed reference instrumentation. Comparison of CADP to standard ADP velocity measurements reveals a mean difference of 8 mm/s, standard deviation of 18 mm/s, and order-of-magnitude reduction in realizable length-scale. CADP focal point measurements compared to a proximal single-beam reference show peak cross-correlation coefficient of 0.96 over 4.0 s averaging period and a 47% reduction in Doppler noise. The dual functionality of the CADP as a profiling instrument with a high resolution focal point make this configuration a unique and valuable advancement in underwater velocimetry enabling improved turbulence, resource and structural loading quantification and validation of numerical simulations. Alternative modes of operation have been implemented including noise-reducing bi-static sampling. Since waves are simultaneously measured it is expected that derivatives of this system will be a powerful tool in wave-current interaction studies.

47 OTHER INSTRUMENTATION↗

AstroNet: A Tool Set for Simultaneous, Multi-Site Observations of Astronomical Objects

Earth-based, fully automatic "robotic" telescopes have been in routine operation for a number of years. As their number grows and their distribution becomes global, increasing attention is being given to forming networks of various sorts that will allow them, as a group, to make observations 24 hours a day in both hemispheres. We have suggested that telescopes based in space be part of this network. We further suggested that any telescope on this network be capable of asking, almost in real time, that other robotic telescopes perform support observations for them. When a target of opportunity required support observations, the system would determine which telescope(s) in the network would be most appropriate to make the observations and formulate a request to do so. Because the network would be comprised of telescopes located in widely distributed regions, this system would guarantee continuity of observations This report summarizes our efforts under this contract. We proposed to develop a set of data collection and display tools to aid simultaneous observation of astronomical targets from a number of observing sites. We planned to demonstrate the usefulness of this toolset for simultaneous multi-site observation of astronomical targets. Possible candidates or the proposed demonstration included the Extreme Ultraviolet Explorer (EUVE), International Ultraviolet Explorer (IUE), and ALEXIS, sounding rocket experiments. Ground-based observatories operated by the University of California, Berkeley, the Jet Propulsion Laboratory, and Fairborn Observatory in Mesa, Arizona were to be used to demonstrate the proposed concept. Although the demonstration was to have involved astronomical investigations, the tools were to have been applicable to a large number of scientific disciplines. The software tools and systems developed as a result of the work were to have been made available to the scientific community.

Chakrabarti, Supriya↗

A Novel State-Constrained Primary Control for Grid-Forming Inverters

The problem of operating an AC microgrid with purely inverter-based generating units is considered, and a novel vector control for the constrained grid-forming (GFM) inverters is proposed. The design aims to achieve the primary control objectives of the GFM inverters: voltage establishment, synchronization, and voltage/frequency regulation. It is novel that the proposed control also ensures all operational variables constrained both real-time and for all the time except for low voltage during the period of grid forming. The constraints include frequency, output AC voltage, input DC power, and active/reactive power injections to the grid. Here, in this paper, outcomes of a detailed simulation are presented to demonstrated that the above design objectives are met and that the overall performance is superior due to its unique ability of simultaneously controlling the whole vectors of the inverter state and output.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An airborne compatible photofragmentation two-photon laser-induced fluorescence instrument for measuring background tropospheric levels of NO, NO(x), and NO2

The operating principle, design, and performance of a two-photon LIF (TP-LIF) sensor for simultaneous measurements of NO, NO(x) (NO + NO2), and NO2 are described. In this instrument, NO is first measured by direct spectroscopic TP-LIF detection; NO2 is converted to NO by photofragmentation using an XeF excimer laser operating at 353 nm; and the resulting NO is then detected quantitatively by TP-LIF. The detection limits of the instrument are found to be 3.5 parts per trillion by volume (pptv) of NO and 10 pptv for NO2, with integration times of 2 and 6 min, respectively. The in-flight performance of the instrument was evaluated during the NASA Global Tropospheric Experiment Chemical Instrumentation Test and Evaluation 2 program in summer 1986, as reported by Gregory et al. (1990).

Sandholm, S. T.↗

Design and experimental demonstration of feedback adaptive RMP ELM controller toward complete long pulse ELM suppression on KSTAR

Operation of a fusion power plant requires robust edge localized mode (ELM) suppression simultaneously with high plasma performance. In this study, we describe a novel feedback adaptive resonant magnetic perturbation (RMP) ELM controller designed to address this problem by achieving optimized ELM suppression through the advanced application of 3D RMPs. From real-time $D_α$ data, the controller is achievable robust ELM suppression while simultaneously minimizing the applied RMP in order to enhance plasma performance. In real time, the instantaneous ELM-frequency is analyzed with an adaptive feedback algorithm to determine amplitudes and phases of RMP coil currents that will maximize plasma performance while maintaining ELM suppression. When applied through the KSTAR plasma control system in several experiments using $textiti{n}$ = 1 RMPs, robust ELM suppression is achieved and sustained in feedback while reducing the RMP strength to ~65% of its initial value. Minimization of the RMP strength in this manner not only allows for operation of longer discharges due to a decrease in flux consumption but also allows for a strong recovery of up to ~60% of $β_N$ throughout the ELM-free period.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measured Performance of Residential Dehumidifiers Under Cyclic Operation

Residential construction practices are progressing toward higher levels of energy efficiency. A proven strategy to save energy is to simultaneously increase building insulation levels and reduce outdoor air infiltration. Tight homes require intentional mechanical ventilation to ensure healthy indoor air. Overall, this strategy results in a shift in the mix of latent and sensible space conditioning loads, requiring proportionally more moisture to be removed compared to standard homes. There is currently not sufficient information available at a wide enough range of operating points to design dehumidification systems for high performance homes in hot-humid climates. The only industry information available on dehumidifier moisture removal and energy consumption are performance ratings conducted at a single test condition, which does not provide a full representation of dehumidifier operation under real-world conditions. Winkler et al. (2011) developed steady state performance maps to predict dehumidifier performance at a variety of indoor conditions. However, installed heating, ventilating, and air-conditioning (HVAC) equipment rarely operates at steady state. Part load performance testing of residential dehumidifiers is not mandated by current test standards. Therefore, we tested the part load performance of four residential dehumidifiers in the National Renewable Energy Laboratory's (NREL) Advanced HVAC Systems Laboratory . The part load efficiency of each dehumidifier was measured under 13 cycling scenarios, and combined with NREL field data to develop part load fraction (PLF) performance curves under realistic cycling scenarios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

High-sensitivity plasma density retrieval in a common-path second-harmonic interferometer through simultaneous group and phase velocity measurement

Precise measurements of the plasma density in ionized gas cells and discharged capillaries are critical to the design and operation of plasma-based accelerators, active plasma lenses, and plasma-based radiation sources. In this manuscript, a spectral-domain common-path second-harmonic interferometer is upgraded with the simultaneous measurement of the group and phase velocity, allowing for high-sensitivity density characterization (from the phase velocity advance) without the need for phase tracking from zero-density (enabled by the group velocity delay). The technique is applied to 1.5-cm-long plasma structures, without density ambiguity in parameter scans with >2π phase jumps. Finally, the single-shot sensitivity in phase retrieval is demonstrated at 63 mrad, equivalent to a density-length product of 1.8·10 15 cm -2 . This is an improvement of ×45 compared to group velocity analysis alone.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Prediction of SOFC Performance with or without Experiments: A Study on Minimum Requirements for Experimental Data

In the present paper, a physics-based procedure combining experiments and multi-physics numerical simulations is developed for overall analysis of SOFCs operational diagnostics and performance predictions. In this procedure, essential information for the fuel cell is extracted first by utilizing empirical polarization analysis in conjunction with experiments and refined by multi-physics numerical simulations via simultaneous analysis and calibration of polarization curve and impedance behavior. The performance at different utilization cases and operating currents is also predicted to confirm the accuracy of the proposed model. It is demonstrated that, with the present electrochemical model, three air/fuel flow conditions are needed to produce a set of complete data for better understanding of the processes occurring within SOFCs. After calibration against button cell experiments, the methodology can be used to assess performance of planar cell without further calibration. The proposed methodology would accelerate the calibration process and improve the efficiency of design and diagnostics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing

High-energy cryogenic propellant is an essential element in future space exploration programs. Therefore, NASA and its industrial partners are committed to an advanced development/technology program that will broaden the experience base for the entire cryogenic fluid management community. Furthermore, the high cost of microgravity experiments has motivated NASA to establish government/aerospace industry teams to aggressively explore combinations of ground testing and analytical modeling to the greatest extent possible, thereby benefitting both industry and government entities. One such team consisting of ManTech SRS, Inc., Edwards Air Force Base, and Marshall Space Flight Center (MSFC) was formed to pursue a technology project designed to demonstrate technology readiness for an SRS liquid hydrogen (LH2) in-space propellant management concept. The subject testing was cooperatively performed June 21-30, 2000, through a partially reimbursable Space Act Agreement between SRS, MSFC, and the Air Force Research Laboratory. The joint statement of work used to guide the technical activity is presented in appendix A. The key elements of the SRS concept consisted of an LH2 storage and supply system that used all of the vented H2 for solar engine thrusting, accommodated pressure control without a thermodynamic vent system (TVS), and minimized or eliminated the need for a capillary liquid acquisition device (LAD). The strategy was to balance the LH2 storage tank pressure control requirements with the engine thrusting requirements to selectively provide either liquid or vapor H2 at a controlled rate to a solar thermal engine in the low-gravity environment of space operations. The overall test objective was to verify that the proposed concept could enable simultaneous control of LH2 tank pressure and feed system flow to the thruster without necessitating a TVS and a capillary LAD. The primary program objectives were designed to demonstrate technology readiness of the SRS concept at a system level as a first step toward actual flight vehicle demonstrations. More specific objectives included testing the pressure and feed control system concept hardware for functionality, operability, and performance. Valuable LH2 thermodynamic and fluid dynamics data were obtained for application to both the SRS concept and to future missions requiring space-based cryogen propellant management.

Moore, J. D.↗