Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Analysis of remote operating systems for space-based servicing operations, volume 1

A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

Source record↗

Computing and information services at the Jet Propulsion Laboratory - A management approach to a diversity of needs

The Jet Propulsion Laboratory, a research and development organization with about 5,000 employees, presents a complicated set of requirements for an institutional system of computing and informational services. The approach taken by JPL in meeting this challenge is one of controlled flexibility. A central communications network is provided, together with selected computing facilities for common use. At the same time, staff members are given considerable discretion in choosing the mini- and microcomputers that they believe will best serve their needs. Consultation services, computer education, and other support functions are also provided.

Felberg, F. H.↗

Experimental results supporting the determination of service quality objectives for DBS systems

A summary of the results of a joint United States and Canadian program on subjective measurements of the picture degradation caused by noise and interference on an NTSC encoded color television signal is given in this paper. The effects of system noise, cochannel and adjacent channel interference, and both single entry and aggregate as well as a combination of these types of interference were subjectively evaluated by expert and nonexpert viewers under reference conditions. These results were used to develop the rationale used at RARC '83 to establish the service quality objective for planning the DBS service for the American continents.

Chouinard, G.↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

Flight service evaluation of composite inboard ailerons on the L-1011 under Contract NAS 1-15069 for a period of five years is discussed. The period from July 1984, when the second yearly inspections were completed, through June 1985 is covered. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons were installed in 1980 on Lockheed's flight test L-1011. This aircraft is now inactive and inspections were therefore not performed this year. No visible damage was observed on any of the composite ailerons, and no maintenance action has occurred on any of the composite parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 8787 to 10,804 hours, after approximately 3 years of service.

Stone, R. H.↗

The 737 graphite composite flight spoiler flight service evaluation

The flight service experience of 111 graphite-epoxy spoilers on 737 transport aircraft and related ground based environmental exposure of graphite-epoxy material specimens is covered. Spoilers have been installed on 28 aircraft representing seven major airlines operating throughout the world. An extended flight service evaluation program of 15 years is presently underway. As of December 1984, a total of 2,092, 155 spoiler flight hours and 2,954,814 spoiler landings had been accumulated by this fleet.

Coggeshall, R. L.↗

Flight service evaluation of composite components on the Bell helicopter model 206L

This is the second annual report on the flight service components for the Bell Model 206L JetRanger helicopter. The components have been placed in service in the Continental United States, Canada, and Alaska. The report covers the period from 1 August 1983 to 1 January 1986. The status of 34 sets of components is discussed in this report. Approximately 73,000 flight hours were accumulated on the components as of 1 January 1986. Three years of coupon tests on the components are presented with test results. A vertical fin had been struck by lightning and the results of its examination and tests are included.

Wilson, H. E., II↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

This report covers flight service evaluation of composite inboard ailerons on the L-1011 under contract NAS1-15069 for a period of five years. This is the fifth and final annual report of the maintenance evaluation program, and covers the period from July 1986 when the fourth yearly inspections were completed, through May 1987. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta and two TWA aircraft. A fifth shipset of composite ailerons was installed in 1980 on Lockheed's flight test L-1011. The previous four annual inspections had been visual exterior inspections only. For this final inspection, the lower covers were removed for access and both interior and exterior surfaces, spars and ribs, and fastener holes were inspected. No damage or defects were observed on any of the composite ailerons, and no maintenance actions had occurred except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 14,597 to 17,180 hours, after approximately 5 years of service.

Stone, R. H.↗

Contamination control concepts for space station customer servicing

The customer servicing operations envisioned for the space station, which include instrument repair, orbital replacement unit (ORU) changeout, and fluid replenishment for free-flying and attached payloads, are expected to create requirements for a unique contamination control subsystem for the customer servicing facility (CSF). Both the core space station and the CSF users present unique requirements/sensitivities, not all of which are currently defined with common criteria. Preliminary results from an assessment of the effects of the CSF-induced contamination environment are reported. Strategies for a comprehensive contamination control approach and a description of specific hardware devices and their applicability are discussed.

Maruya, K. A.↗

Advanced Information Processing System (AIPS) proof-of-concept system functional design I/O network system services

The function design of the Input/Output (I/O) services for the Advanced Information Processing System (AIPS) proof of concept system is described. The data flow diagrams, which show the functional processes in I/O services and the data that flows among them, are contained. A complete list of the data identified on the data flow diagrams and in the process descriptions are provided.

Source record↗

Mobile satellite services: International co-ordination, co-operation and competition

In the context of a discussion of international cooperation, coordination and competition regarding mobile satellite services, it is asserted that: there will be more than one civil mobile satellite service in the 1990's; competition between these separate mobile satellite systems is inevitable; no system should enjoy monopoly protection or subsidies; and coordination and cooperation are desirable and necessary, since the available L-band spectrum is in short supply.

Lundberg, Olof↗

The space station assembly phase: System design trade-offs for the flight telerobotic servicer

The effects of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems often involves a substitution of automation capabilities for human EVA or IVA activities. A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effects of operational constaints. Changes in the region of cost-effectiveness are examined under a variety of system design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: as a research-oriented test bed to learn more about space usage of telerobotics; as a research based test bed having an experimental demonstration orientation with limited assembly and servicing applications; or as an operational system to augment EVA and to aid construction of the Space Station and to reduce the program (schedule) risk by increasing the flexibility of mission operations.

Smith, Jeffrey H.↗

OMV servicing missions from Space Station

The Orbital Maneuvering Vehicle (OMV) will provide a means of bringing large observatories to the Space Station for servicing and redeployment to their operating altitudes. However, there are many constraints which must be met in mission planning. The missions must be designed so that propellant consumption is within the usable allowance, but contingency operations can still be accomplished. The vehicle was designed specifically to accommodate such missions, with emphasis upon servicing the Hubble Space Telescope. The OMV has been designed for operations from the Shuttle Orbiter and the Space Station. It will readily accommodate basing at the Space Station and executing observatory retrieval and redeployment missions. Mission profiles have been designed which allow retrieval with contingency hold before descent, and which allow contingency return of the observatory if it fails to reactivate properly. This capability will be a major addition to the Space Transportation System and will increase the utility of the Space Station.

Jennings, Jerry L.↗

Space Station services and design features for users

The operational design features and services planned for the NASA Space Station will furnish, in addition to novel opportunities and facilities, lower costs through interface standardization and automation and faster access by means of computer-aided integration and control processes. By furnishing a basis for large-scale space exploitation, the Space Station will possess industrial production and operational services capabilities that may be used by the private sector for commercial ventures; it could also ultimately support lunar and planetary exploration spacecraft assembly and launch facilities.

Kurzhals, Peter R.↗

Cost-effective intersatellite link applications to the fixed satellite services

Potential cost-effective applications of intersatellite links (ISLs) to domestic, regional, and global fixed satellite services are presented, addressing traffic forecast and service demands for the year 2001. To determine the cost advantages and other systems benefits of ISLs, selected satellite network architectures were derived for ISL and corresponding non-ISL systems. The cost analysis was performed using payload sizing based on state-of-the-art ISL technology, both optical and microwave.

Lee, Y. S.↗

High time service evaluation of thermal barrier coatings on the Rolls-Royce RB211 engine

One of the main concerns of airline operators for the use of thermal barrier coatings (TBC) in the turbine is that the coating will spall and cause a premature engine removal. Even though much cyclic data is available on TBCs, high time data is much harder and expensive to come by. The typical 150 h type test used to qualify hardware, or modifications, falls far short of the 5 to 10,000 hour experience desired. One way to obtain data demonstrating the longevity of TBCs is through a service evaluation program on a commercial engine. For a meaningful evaluation of the TBC system it must be applied to a component which operates in a typical hot end environment. In addition the component performance should not suffer if the coating is lost. For these reasons Rolls-Royce chose to coat the IP turbine nozzle guide vanes, and run these in an RB211 engine. Two ceramic top coats and several different bond coats were tested in a rainbow fashion on several engines. Three layer magnesium zirconate was used as a base line. Various yttria stabilized zirconia ceramics were used. Top MCrAlY bond coats were applied by various techniques. Some of the coated vanes have now accumulated ofer 5000 hours. The results are presented from the first sets with 2500 and 4200 hours of service respectively.

Toriz, F. Chris↗

A methodology for automation and robotics evaluation applied to the space station telerobotic servicer

The efforts of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems would involve a substitution of automation capabilities for human extravehicular or intravehicular activities (EVA, IVA). A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effect of operational constraints (space transportation system (STS), attached payload, and proximity operations). Changes in the region of cost-effectiveness are examined under a variety of systems design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: (1) as a research-oriented testbed to learn more about space usage of telerobotics; (2) as a research based testbed having an experimental demonstration orientation with limited assembly and servicing applications; or (3) as an operational system to augment EVA and to aid the construction of the Space Station and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations.

Smith, Jeffrey H.↗

Space Station flight telerobotic servicer functional requirements development

The Space Station flight telerobotic servicer (FTS), a flight robotic system for use on the first Space Station launch, is described. The objectives of the FTS program include: (1) the provision of an alternative crew EVA by supporting the crew in assembly, maintenance, and servicing activities, and (2) the improvement of crew safety by performing hazardous tasks such as spacecraft refueling or thermal and power system maintenance. The NASA/NBS Standard Reference Model provides the generic, hierarchical, structured functional control definition for the system. It is capable of accommodating additional degrees of machine intelligence in the future.

Oberright, John↗

The Flight Telerobotic Servicer Project and systems overview

As part of the Flight Telerobotic Servicer (FTS) project an advanced telerobotic system is being developed to assist in and reduce crew extravehicular activity (EVA) for the U.S. Space Station. The FTS will be used for assembly, maintenance, servicing, and inspection throughout the lifetime of the Space Station. A brief overview of the FTS program is given, and some of the technical and system engineering issues associated with the development of the FTS are explored. A key to the evolutionary capability of the FTS design is the NASREM (NASA Standard Reference Model for telerobot control system) architecture. This architecture provides the framework for future growth and permits a logical blend of teleoperation and autonomous operations as required.

Mccain, Harry G.↗