Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Power System Planning: Advancements in Capacity Expansion Modeling

This fact sheet focuses specifically on one element of the long-term planning process, the capacity expansion model. It highlights the key advances in these models to enable planning for systems with growing shared of renewable energy and storage.

capacity expansion model↗

FY 2022 Site Sustainability Plan

The United States Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) is a recognized leader in sustainability, as evidenced by its ongoing optimization of resources in campus operations, including water, energy, waste, and purchasing, as well as continued commitment to meeting federal mandates and goals. NREL's dedication to sustainability supports the laboratory's success by applying what is learned through research and development to campus facilities and infrastructure systems. The Site Sustainability Plan provides a road map for all site planning and development. NREL drives the adoption of these initiatives to a global audience by conducting business operations that demonstrate the incorporation of clean energy practices. NREL will continue to develop a sustainable and resilient campus while growing greater technological capabilities to advance the national renewable energy marketplace.

climate change↗

Transmission Planning with Renewable Energy Zones (REZ): Overview, Select Case Studies, and Key Enablers

The renewable energy zone (REZ) transmission planning process is a proactive method to plan, approve, and build transmission infrastructure that connects high-quality and large-scale renewable resources to the power system. This presentation was developed for a technical side event focused on transmission systems to facilitate the rapid decarbonization of power systems at the Clean Energy Ministerial Senior Officials Meeting in March 2023. This document contains a synthesis of key REZ case studies throughout the world and is intended as a resource for policymakers and energy planners.

Australia↗

Strategies and Good Practices to Support Robust Stakeholder Engagement in Multi-Sector Energy Transition Planning

This document discusses strategies and good practices to facilitate diverse stakeholder engagement and inclusive decision-making within the context of complex energy system modernization studies and multi-sector energy transition planning, drawing upon the knowledge and expertise of numerous USAID, NREL, and other DOE laboratory practitioners with international and domestic energy planning experience. Examples of multi-sector energy transition analyses from the United States are included in this document to draw out relevant lessons learned and experience for the USAID-NREL Partnership - strategies and good practices will be updated over time as new insights emerge through collaboration with international partners and stakeholders. Considerations included within this document can also be used to support stakeholder engagement at the sector level (e.g., for power, transport, buildings), in addition to integrated approaches.

ENERGY PLANNING, POLICY, AND ECONOMY↗

TSDC: Transportation Secure Data Center: Real-World Data for Planning, Modeling, and Analysis

The Transportation Secure Data Center is a centralized repository for high-resolution transportation data from hundreds of travel and transit surveys and studies. It makes vital transportation data broadly available to users while preserving the privacy of survey participants. It houses surveys and studies conducted by state departments of transportation, metropolitan planning organizations, transit agencies, cities, and other public agencies. Meanwhile, the Livewire Data Platform empowers research, industry, and academic partners to easily and securely preserve, maintain, share, discover, and gain access to transportation and mobility data. Livewire accommodates a range of datasets, including behavioral, experimental, model, analytical, and raw data at the vehicle, traveler, and system levels. Datasets support mobility research and planning spanning urban science, connected and automated vehicles, fueling and charging infrastructure, mobility decision science, multimodal transportation, vehicle efficiency, and more.

33 ADVANCED PROPULSION SYSTEMS↗

The impact of development priorities on power system expansion planning in sub-Saharan Africa

Sub-Saharan Africa faces unique barriers to electricity development due to the large proportion of the population that is un-electrified and the prevalence of rural populations. Typically, power system expansion planning models assume all potential consumers can be immediately electrified. This assumption is unrealistic in sub-Saharan Africa, where electrification will likely be a gradual process over a number of years. Furthermore, since a large proportion of the population in sub-Saharan Africa is located in rural regions, the prioritization of these regions may impact how the grid develops. In this research, we develop a multi-period optimization model for power generation and transmission system expansion planning in sub-Saharan Africa. In contrast to existing models, which assume full electrification, we consider a variety of electrification policies and analyze the impact of varying the electrification rate and policy on the cost and resources selected for power system expansion. We test our model on a case study of Rwanda. We find that varying the year in which full electrification is reached has a larger impact on cost and generation capacity than varying the electrification policy does, although, when urban and rural regions are considered equitably, more rooftop solar is built. Varying the electrification policies has a larger impact on transmission expansion than on generation expansion and this impact is amplified when starting from zero initial system capacity rather than the original Rwanda system. Additionally, a sensitivity analysis shows that tightening the bounds on CO 2eq emissions has a large impact on the generation portfolio and cost.

97 MATHEMATICS AND COMPUTING↗

Potential Impacts of Transportation and Building Electrification on the Grid: A Review of Electrification Projections and their Effects on Grid Infrastructure, Operation, and Planning

This paper highlights the main impacts of transportation and building electrification on electricity grid infrastructure, operations, and planning. We focus on which electric technologies are expected to grow, how electrification will impact electricity demand and grid activities, and which solutions might improve the integration of these technologies. Recent industry reports show increasing projections of electrification technologies in the coming decades. Studies show that increased demand from electrification will likely require grid capacity expansion and make grid operations and planning more challenging; however, multiple non-wires solutions exist to ensure integration is efficient and cost-effective. Electrification of space heating and especially transportation is expected to have the largest impact on electricity demand in the near future. Uncontrolled electric vehicle charging poses a significant challenge to grid operations, but control strategies create an opportunity for improved efficiency. Other insights include a high level of uncertainty in electrification adoption and potential benefits of combining electrification technologies with renewable generation and energy storage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data-Driven Simulation-Based Planning for Electric Airport Shuttle Systems: A Real-World Case Study

Many airports are adopting battery electric buses in their shuttle fleets due to concerns over air quality and regulations. This study proposes a simulation-based optimization modeling framework to help airport shuttle operators effectively deploy electric buses. We evaluated a planned airport electric shuttle system with an event-driven simulator. Empirical data collected from existing systems were used to drive the simulations. We then proposed a simulation-based optimization model to determine the battery capacity, charging power, and number of chargers so that predefined objective(s) (e.g., minimizing total capital cost, minimizing emissions) are optimized. Compared to existing studies, the primary contribution of the proposed method is that it can model the real-world stochastic nature of operations in an electric bus system with much higher fidelity. To demonstrate the proposed modeling framework, we study a real-world shuttle system at the Dallas-Fort Worth International Airport, and present extensive numerical studies. When considering partial fleet electrification, the model can provide a set of Pareto optimal solutions. When considering full fleet electrification, the optimal solution requires a 50-kWh battery capacity and four 210-kW chargers, resulting in a total capital cost of $26,744,000. The results demonstrate that the proposed modeling framework can effectively optimize the planning of electric airport shuttle systems with partial or full fleet electrification.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗

Developing energy flexibility in clusters of buildings: A critical analysis of barriers from planning to operation

This paper examines building energy flexibility at an aggregated level and addresses the main barriers and research gaps for the development of this resource across three design and development phases: market and policy, early planning and design, and operation. We review methodologies and tools and discuss barriers, challenges, and opportunities, incorporating policy, economic, technical, professional, and social perspectives. Although various legal and regulatory frameworks exist to foster the development of energy flexibility for small buildings, financing mechanisms are limited with a significant number of perceived risks undermining private investment. For the early planning and design phase, planners and designers lack appropriate tools and face interoperability challenges, which often results in insufficient consideration of demand response programs. The review of the operational phase highlighted the socio-technical challenges related to both the complexity of deployment and communication, as well as privacy and acceptability issues. Finally, the paper proposes a number of targeted research directions to address challenges and promote greater energy flexibility deployments, including capturing building demand side dynamics, improving baseline estimations and developing seamless connectivity between buildings and districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A scalable planning framework of energy storage systems under frequency dynamics constraints

As the penetration of renewables increases in power systems, the declining system inertia can cause frequency stability issues. Battery energy storage systems (BESSs) respond fast and therefore can relieve the low inertia difficulty but need to be appropriately sized considering the associated cost. This paper presents a novel stochastic optimization model for economically planning BESS capacity while considering the spatial–temporal correlation of wind generation and generator outages under frequency stability constraints, which include the rate-of-change of frequency (RoCoF), frequency nadir (FN), and quasi-steady-state (QSS) frequency. A set of new FN constraints that can be easily linearized is developed. To account for renewable uncertainties, a realistic uncertainty modeling approach, Random Field, is adopted to generate wind generation scenarios by considering both spatial and temporal evolutions of wind speed profiles. The ESS sizing is formulated as a mixed-integer linear programming problem and solved by using a scalable decomposition-and-coordination approach, Surrogate Absolute Value Lagrangian Relaxation (SAVLR). To further improve the scalability and reduce computational burdens, a rolling-horizon-based update is developed and incorporated into SAVLR for providing a practical solution to the long-term planning of very large-scale power systems. Finally, a modified IEEE 118-bus system and the Polish system are used to validate the effectiveness and scalability of the model and solution methodology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AI-Based Quantification of Planned Radiation Therapy Dose to Cardiac Structures and Coronary Arteries in Patients With Breast Cancer

The purpose of this work is to develop and evaluate an automatic deep learning method for segmentation of cardiac chambers and large arteries, and localization of the 3 main coronary arteries in radiation therapy planning on computed tomography (CT). In addition, a second purpose is to determine the planned radiation therapy dose to cardiac structures for breast cancer therapy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Informing the planning of rotating power outages in heat waves through data analytics of connected smart thermostats for residential buildings

Abstract With climate change, heat waves have become more frequent and intense. Rotating power outages happen when the power supply is unable to meet the cooling demand increase resulting from extreme high temperatures. Power outages during heat waves expose residents to high risks of overheating. In this study, we propose a novel data-driven inverse modelling approach to inform decision makers and grid operators on planning rotating power outages. We first infer the building thermal characteristics using the connected smart thermostat data, and used the estimated thermal dynamics to simulate the thermal resilience during a heat wave event. Our proposed method was tested for the California power outage in August 2020 by using the open source Ecobee Donate Your Data dataset. We found in California the power outage should not last more than two hours during heat waves to avoid overheating risks. Informing the residents in advance so they can prepare for it through pre-cooling is a simple but effective strategy to expand the acceptable power outage duration. In addition to assisting power outage planning, the proposed method can be used for other applications, such as to evaluate a building energy efficiency policy, to examine fuel poverty, and to estimate the load shifting potential of building stocks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Energy Equity Considerations in Distribution Systems Planning

Current distribution system planning (DSP) processes do not explicitly account for energy equity considerations, such as who is most affected by power system burdens, where those burdens are concentrated, and what investments can be made to improve baseline conditions. This paper proposes an iterative framework for advancing energy equity as an objective of the DSP process, showing how measurement strategies, or metrics (informed by conceptual foundations of energy justice), can be applied to benchmark equity performance at various stages. This methodology is applied for equity-aware distributed energy resource (DER) hosting capacity analysis and outage analysis to provide critical insights on infrastructure upgrade decisions compared to a business-as-usual (BAU) case. The analysis is performed on a taxonomy feeder representing the West Coast urban/semi-urban system with augmentation of electric vehicles (EVs) and rooftop solar photovoltaic (PV) generators. The study considers disadvantaged community (DAC) and non-disadvantaged community (NDAC) load regions to enable equity-aware simulations. The results demonstrate how equity-aware planning could reveal the limitations of the traditional DSP process as DAC regions are found to have lower DER hosting capacity and higher outage vulnerability. Overall, this work provides insights on the need to incorporate energy equity as an integral part of the DSP process.

Energy Equity, Distribution System Planning, DER a↗

Multi-Period Active Distribution Network Planning Using Multi-Stage Stochastic Programming and Nested Decomposition by SDDIP

This paper presents a multi-period active distribution network planning (ADNP) with distributed generation (DG). The objective of the proposed ADNP is to minimize the total planning cost, subject to both investment and operation constraints. The paper proposes a multi-stage stochastic optimization model to address DG uncertainties over several periods, in which the decisions are made sequentially by only using the present-stage information. A nested decomposition method is proposed which applies the stochastic dual dynamic integer programming (SDDIP) method to address computational intractabilities of the proposed ADNP approach. The presented numerical results and discussions on a 33-bus distribution system and a large-scale 906-bus system verify the effectiveness of the proposed ADNP method and its solution method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Fast Flexibility-Driven Generation Portfolio Planning Method for Sustainable Power Systems

We are witnessing an acceleration in the uptake of renewable energy in power systems. Because of the associated variability and uncertainty of renewables, power systems need to have an adequate supply of flexibility to allow for suitable management of short-term operations. So far most of the work in this area has neglected how flexibility needs associated with renewables are fulfilled as part of dispatchable generation capital investments decisions. To address this challenge, we propose an approach to plan the dispatchable generation mix of a power system as needed to counteract variability and uncertainty associated with significant shares of variable renewable generation. The approach exploits the linear time-invariant feature of variable generation variability using historical phase planes of capacity (in MW) and ramp (in MW/min) to bridge the gap between long-term capacity planning and short-term intra-hour flexibility needs. This approach is much more computationally tractable than other proposals, while also being able to capture adequately short-term operational features like ramping and net load variability. Numerical tests are performed on realistic datasets to substantiate the effectiveness of the approach.

bulk power system planning↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

The requirements of the Hazardous Waste Facility Permit are fulfilled through execution of LANL's fourth strategic goal: “Enabling mission delivery through next-generation facility, infrastructure, and operational excellence.” With input from our stakeholders, we will continue to fulfill those requirements and to improve our waste operations. In 2015, the Laboratory purpose statement focused waste management efforts by directing delivery of mission success through operational effectiveness and scientific excellence. This Plan advances that purpose through community involvement. In the process of achieving our national security mission, Los Alamos National Laboratory generates some hazardous and mixed waste. Hazardous waste is solid waste that is dangerous or potentially harmful to human health or the environment. Hazardous wastes can be liquids, solids, gases, or sludges. They can be discarded as commercial products, such as cleaning fluids or pesticides, or as the byproducts of operations. Specific substances are listed in 40 Code of Federal Regulations (CFR), Part 261: 40 CFR Part 261. Hazardous waste management activities are regulated by the U. S. Environmental Protection Agency and the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515-1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure, post closure care, and cleanup as necessary, of permitted waste management units. On November 30, 2010, NMED renewed the Hazardous Waste Facility Permit (the Permit). In June 2020 the Permittees submitted a permit renewal application to the NMED for their review and approval. The Hazardous Waste Facility Permit Community Relations Plan (CRP) describes the scope of public involvement in the activities of the Permit. The CRP is specifically designed to facilitate the community outreach, engagement, and relations activities concerning the Laboratory’s Hazardous Waste Facility Permit and coordinates with but does not include public involvement for other Laboratory programs, initiatives, or environmental activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗