Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Instrumentation utilisation for risk control in safety operations

Ways in which instrumentation is utilized for risk control for inherently safe (no control or guidance) and flight programmed launch vehicles is presented. Instrumentation and how it is utilized in the launching and recovery of balloons and payloads is also presented. Wind sensing, computer systems, tracking, and telemetry are discussed.

Swayer, F. R.↗

The Middeck Active Control Experiment (MACE)

The Middeck Active Control Experiment (MACE) is a NASA In-Step and Control Structure Interaction (CSI) Office funded Shuttle middeck experiment. The objective is to investigate the extent to which closed-loop behavior of flexible spacecraft in zero-gravity (0-g) can be predicted. This prediction becomes particularly difficult when dynamic behavior during ground testing exhibits extensive suspension and direct gravity coupling. On-orbit system identification and control reconfiguration is investigated to improve performance which would otherwise be limited due to errors in prediction. The program is presently in its preliminary design phase with launch expected in the summer of 1994. The MACE test article consists of three attitude control torque wheels, a two axis gimballing payload, inertial sensors and a flexible support structure. With the acquisition of a second payload, this will represent a multiple payload platform with significant structural flexibility. This paper presents on-going work in the areas of modelling and control of the MACE test article in the zero and one-gravity environments. Finite element models, which include suspension and gravity effects, and measurement models, derived from experimental data, are used as the basis for Linear Quadratic Gaussian controller designs. Finite element based controllers are analytically used to study the differences in closed-loop performance as the test article transitions between the 0-g and 1-g environments. Measurement based controllers are experimentally applied to the MACE test article in the 1-g environment and achieve over an order of magnitude improvement in payload pointing accuracy when disturbed by a broadband torque disturbance. The various aspects of the flight portion of the experiment are also discussed.

Miller, David W.↗

Test Results for an Off-the-Shelf GPS/INS During Approach and Landing Testing of the X-40A

The X-37 is an unpiloted, reusable space vehicle that will be launched into space, orbit the Earth, reenter the atmosphere, and land autonomously. At the heart of the Guidance, Navigation and Control (GN&C) will be the Space Integrated GPS/INS (SIGI) system, an off the shelf navigation grade GPS/INS that has been enhanced for space and reentry environments. SIGI will provide both navigation and flight control data to the X-37's GN&C. The X-40A is an unpiloted experimental vehicle whose shape and performance are similar to the X-37's and was flown earlier this year to develop and test the approach and landing phase of X-37. On board the X-40A is the X-37's SIGI, which is riding along as an experiment. The X-40A SIGI experiment provided early characterization of SIGI operation and performance with differential GPS (Global Positioning System) during real world approach and landing. Characterization testing was geared toward assessment of reliability and performance of the system. The objectives were to demonstrate performance levels sufficient to meet the X-37 requirements for automatic, autonomous approach and landing, demonstrate reliability over repeated ground and flight tests, and reduce risk for integration of SIGI into the vehicle and support environment. This paper presents a summary of this testing and the results to date.

Childers, Dave↗

NASA Dryden Status

This slide presentation reviews the status of several NASA Dryden projects. These include: the Lift And Nozzle Change Effects on Tail Shock (LANCETS), Integrated Resilient Aircraft Control (IRAC) F-18 #853 Testbed X-48B, Blended Wing Body flights, Stratospheric Observatory for Infrared Astronomy (SOFIA), Ikhana Project, and the Orion Crew Exploration Vehicle (CEV) Launch Abort Systems Tests

Bosworth, John T.↗

Cryogenic Propellant Management Device: Conceptual Design Study

Concepts of Propellant Management Devices (PMDs) were designed for lunar descent stage reaction control system (RCS) and lunar ascent stage (main and RCS propulsion) missions using liquid oxygen (LO2) and liquid methane (LCH4). Study ground rules set a maximum of 19 days from launch to lunar touchdown, and an additional 210 days on the lunar surface before liftoff. Two PMDs were conceptually designed for each of the descent stage RCS propellant tanks, and two designs for each of the ascent stage main propellant tanks. One of the two PMD types is a traditional partial four-screen channel device. The other type is a novel, expanding volume device which uses a stretched, flexing screen. It was found that several unique design features simplified the PMD designs. These features are (1) high propellant tank operating pressures, (2) aluminum tanks for propellant storage, and (3) stringent insulation requirements. Consequently, it was possible to treat LO2 and LCH4 as if they were equivalent to Earth-storable propellants because they would remain substantially subcooled during the lunar mission. In fact, prelaunch procedures are simplified with cryogens, because any trapped vapor will condense once the propellant tanks are pressurized in space.

Wollen, Mark↗

Development and Qualification of the Primary Structure of the Orion European Service Module

This paper presents an overview of the development and qualification test campaign for the primary structure of the European Service Module of ORION, the NASA spacecraft which will serve the future human exploration missions to the Moon, Mars and beyond. Under an agreement between NASA and ESA, the ORION will be powered by a European Service Module (ESM), providing also water and oxygen for astronauts' life sustainability. The development and qualification of the European Service Module (ESM) is under ESA responsibility with Airbus Defense and Space as the prime contractor. Thales Alenia Space Italia is responsible for design development, manufacturing, assembly and qualification of the Structure subsystem. The European Service Module, installed onto the launch adapter, shall support the crew module with its adapter and a launch abort system. It shall sustain: - A combination of global and local launch loads during lift off and ascent phases, - On orbit loads induced by engine firing for orbital transfers and attitude control. The ESM structure is based on a core made of Composite Fiber Reinforced Polymer (CFRP) sandwich panels complemented by aluminum alloy platforms, longerons and secondary structures. A development campaign has been implemented in order to define and validate composite parts' strength allowable values for design: coupon tests at material level, test at component level up to breadboards tests performed on main structural components (composite to metallic joints, and at panels' discontinuities). An incremental approach as defined in [1] has been followed. A qualification static test campaign at primary structure assembly level has been implemented in order to validate the design against static stiffness and ultimate strength as well as to correlate the structural Finite Element Model (FEM) used for sizing and confirm the margins of safety. The tests have been performed successfully by Thales Alenia Space Italia (TAS-I) on two flight representative structural models (STA1, STA2), in Turin facilities (Italy) between August 2015 and March 2017, with engineering support of technical representatives from Airbus, ESA, NASA and LMCO. The main development and qualification test activities and associated results are presented and discussed in the paper

Structural Testing↗

Spectrometer Scan Mechanism for Encountering Jovian Orbit Trojan Asteroids

This paper describes the design, testing, and lessons learned during the development of the Lucy Ralph (L'Ralph) Scan Mirror System (SMS), composed of the Scan Mirror Mechanism (SMM), Differential Position Sensor System (DPSS) and Mechanism Control Electronics (MCE). The L'Ralph SMS evolved from the Advanced Topographic Laser Altimeter System (ATLAS) Beam Steering Mechanism (BSM), so design comparisons will be made. Lucy is scheduled to launch in October 2021, embarking upon a 12-year mission to make close range encounters in 2025 and 2033 with seven Trojan asteroids and one main belt asteroid that are within the Jovian orbit. The L'Ralph instrument is based upon the New Horizons Ralph instrument, which is a panchromatic and color visible imager and infrared spectroscopic mapper that slewed the spacecraft for imaging. The L'Ralph SMM is to provide scanning for imaging to eliminate the need to slew the spacecraft. One purpose of this paper is to gain understanding of the reasoning behind some of the design features as compared with the ATLAS BSM. We will identify similarities and differences between the ATLAS BSM and the L'Ralph SMM that resulted from the latter's unique requirements. Another purpose of this paper is to focus upon "Lessons Learned" that came about during the development of the L'Ralph SMM and its MCE, both mechanism engineering issues and solutions as well as Ground Support Equipment (GSE) issues and solutions that came about during the validation of requirements process. At the time of this writing, the L'Ralph SMM has been flight qualified and delivered to the project.

Blumenstock, Kenneth A.↗

TPSAS-NF1676L-11132-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful, and, in most cases, results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

TPSAS-NF1676L-11021-DND

The Orion Pad Abort 1 Flight Test occurred on May 6th, 2010 at White Sands Missile Range in New Mexico. The test was the first for the Orion vehicle and was primarily a test of the Orion Launch Abort System’s ability to execute an abort from the launch pad. The test was successful and in most cases results were well within predicted outcomes. For this test, the thermal control subsystem was an inherent part of the flight operations team. The thermal team provided pre-launch predictions of component temperatures, set component temperature limits, and monitored those limits during the flight operations process as part of the primary flight operations team. The thermal team was also responsible for day-of-flight predictions of the main abort motor’s propellant mean bulk temperature, a key launch constraint for the test. After the test, thermal data was collected, reviewed, and compared against pre-launch predictions showing very good agreement in most areas. Based on the pre-test and flight operations experience, a detailed list of lessons learned has been developed and will be reviewed prior to potential future Orion or other such flight tests.

Joseph F Gasbarre↗

InSight attitude control system thruster characterization and calibration for successful navigation to Mars

In order for the InSight spacecraft to execute a safe Mars landing, it was crucial that the navigation team accurately predict the trajectory and deliver the spacecraft to the targeted atmospheric entry point. One of the primary challenges faced by the Navigation Team was the accurate reconstruction and prediction of small but frequent velocity changes imparted by the spacecraft’s Attitude Control System thrusters. This paper discusses the in-flight thruster calibration campaign, the reconstruction and prediction of accelerations throughout various phases of cruise (including compensating for significant outgassing after launch and attitude transition), and the subsequent impact on atmospheric entry point delivery

McCandless, Sarah Elizabeth↗

Novel concept for detection of a fluid flow fault in a pumped fluid heat rejection system

A pumped fluid heat rejection system (HRS) requires continuous flow of the working fluid to ensure that the components controlled by the HRS stay within their allowable temperature limits. An interruption of flow could result in violations of hardware qualification limits and mission failure. Some of these violations can happen within a few hours. Hence, quick detection of a flow fault to invoke mitigation measures is very critical. In typical pumped fluid HRS, dual or triple pumps are employed to switch the backup units in case the primary unit were to fail. The key metric for the selection of a fault detection system is that it should detect the fault much before the fault’s impact on the thermal health of the HRS controlled components is realized. A trade study was conducted to select such a system for the Europa Clipper Mission to Europa, a moon of Jupiter that is planned for a launch in 2023. Out of the several concepts studied, the most attractive one was a novel and simple concept that uses a low power film heater attached to a section of the HRS tubing. While the fluid flows at its nominal rate, the high thermal coupling of the flowing fluid leads to the tube being close to the fluid’s temperature. However, when the flow stops, the heater warms the small thermal mass of the tubing to a high temperature in a short span of time (~15 minutes). This large temperature rise would then imply that the flow must have stopped. This paper will describe the various concepts considered, the chosen concept, its implementation, and the results of developments tests to validate its performance.

Schmidt, Tyler↗

NASA Gateway Refueling Architecture and Concept of Operation

The Lunar Gateway is a deep space orbiting outpost being developed by NASA in partnership with ESA and other domestic and international partners. It is a critical component of NASA’s Artemis program supporting long-term human exploration of the moon and is designed to be refueled, requiring the on-orbit transfer of propellants. The first two modules of Gateway to be launched will be the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO). The PPE contains the bipropellant chemical and electrical propulsion systems that will provide attitude control and orbit raising capability for Gateway. The reaction control system (RCS) utilizes monomethylhydrazine (MMH) and mixed oxides of nitrogen-3 (MON-3) as the fuel and oxidizer, respectively. Helium is used as a pressurant. The Advanced Electric Propulsion Systems (AEPS) and Busek hall thrusters that comprise the solar electric propulsion (SEP) system use xenon as the propellent. The ESPRIT Refueling Module, provided by ESA, will supply the propellant refueling function to Gateway’s propulsion systems. On-orbit refueling is a complex, technically challenging operation that is key to enabling sustainable crewed Lunar and Martian exploration. Numerous systems may be involved in the refueling operation. Also numerous systems are required to enable the successful ability for Gateway to refuel such as, SEP, RCS, Structure & Mechanisms (S&M), Guidance, Navigation and Control (GNC), Thermal, Software, Vehicle System Manager (VSM), Flight Ops, Extra Vehicular Robotics (EVR), Communication and Tracking (C&T), Avionics, and more. This paper will detail the design architecture, concept of operations, and challenges associated with the Gateway refueling system. The methodologies used in Gateway will be compared to those implemented in OSAM-1 and the best practices documented by AIAA and CONFERS (Consortium For Execution Of Rendezvous And Servicing Operations).

Brandie L. Rhodes↗

Looking to the Future: A Call to Action for Advanced GNC Algorithm Verification and Validation

Future space systems will rely on autonomous Guidance, Navigation, and Control (GNC) functions to efficiently manage safe and precise self-directed operations in uncertain complex environments. Fundamentally, the GNC system plays a key role in mission performance and safety because it computes the ideal trajectory (Guidance), determines the actual trajectory (Navigation), and executes the ideal trajectory (Control) of a vehicle’s position and attitude. Our current GNC systems are highly automated and already have a high degree of complexity. As missions become more ambitious, GNC systems for launch vehicles and space platforms (e.g., spacecraft, probes, and landers) will require higher levels of performance and autonomous operation than previously encountered, for example, this includes GNC for optimizing aerodynamic and/or propulsion performance during planetary entry. This GNC Verification and Validation (V&V) paper highlights concerns with what undoubtedly will be a trend towards increased complexity as fully autonomous GNC systems are developed for future space missions. Clearly, complex GNC systems pose challenges in the prelaunch V&V phase, which is a relatively expensive part of a mission’s life cycle. Essentially the V&V phase is focused on checking that the system effectively meets all the design and operational requirements for the mission. The authors of this paper (i.e., the Inter-Agency Working Group of GNC subject matter experts) focused on this fundamental question over the past few years: Will the GNC engineering community of practice be sufficiently prepared to perform the necessary V&V on evolving GNC architectures that are driven by very demanding requirements for autonomy, resiliency, reconfigurability, adaptability, and mission cost-benefit balance? It is the viewpoint of our Inter-Agency team that the GNC V&V approaches and processes needed to address the next generation of complex GNC systems, which likely will employ various forms of modern GNC technology, are not currently established to the level the community will need in the future. While researchers and practitioners have made some progress in developing new GNC V&V methods for modern GNC systems, a good deal of work remains to be done to codify such methods in a comprehensive and systematic manner. Thus, the Inter-Agency team’s partner organizations [the National Aeronautics and Space Administration (NASA), the European Space Agency (ESA), the National Centre for Space Studies (CNES), the German Aerospace Center (DLR), the French Aerospace Lab (ONERA), and ISAE-SUPAERO] have conducted preliminary investigations into advancing GNC V&V techniques, which resulted in the identification of the need for education, new V&V tools, and benchmark problems for the GNC community. The necessary proactive steps to be taken to meet the challenges and fill the gaps in GNC V&V are summarized in this paper. The first steps include identifying advanced analysis tools, developing a GNC V&V roadmap, and expanding education and training programs for GNC practitioners. This paper is a call to action and proposes a comprehensive set of recommended actions for all our stakeholders: space agencies, researchers, and industry.

Samir Bennani↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Impurities removal by laser blow-off from in-vacuum optical surfaces on RFX-mod experiment

An in situ window cleaning system by laser blow-off through optical fiber has been developed on the basis of a feasibility study previously presented. The beam generated by a Q-switched Nd:YAG laser is launched in a vacuum box into a high damage threshold optical fiber through a lens. The fiber output is focused on the impurities-coated surface of a vacuum window exposed to the plasma of the RFX-mod experiment, and it is remotely controlled with an xy motion system to scan the entire surface. We first investigate the energy density threshold necessary to ablate the deposited impurity substrate on removed dirty windows: above threshold, a single laser pulse recovers {approx}95% of the window transmission before its exposure to the plasma, while below it the efficiency of the cleaning process is too poor. The system so conceived was then used to clean the three collection windows of the Main Thomson scattering diagnostic on RFX-mod. We also present results obtained applying the same technique to the SiO-protected Al mirror used for the Z{sub eff} diagnostic: an energy threshold for efficient impurity removal without mirror damage is first identified, then ablation tests are executed and analyzed in terms of recovered reflectivity. The SIMS technique is used both with windows and mirror to study the composition of surfaces before and after the ablation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Contamination Control and Assessment Strategy for Martian Moons Exploration (MMX)

Martian Moons eXploration (MMX) is a sample return mission from the Martian moon Phobos. The MMX spacecraft is scheduled for launch in 2026 and return to Earth in 2031. The primary science objective of MMX is to reveal the origin of the Martian moons, thereby advancing the understanding of planetary system formation and material transport in the solar system, as well as to observe processes affecting the circumplanetary and surface environments of Mars. The returned sample will be transported to the curation facility at ISAS/JAXA, and the subsequent curation and sample analysis activity will be conducted. As a sample return mission, MMX requires strict contamination control to prevent the intrusion of terrestrial materials.

H Sugahara↗

Gamma ray satellite to be launched from Africa

The announcement is presented of the launch of NASA's Small Astronomy Satellite B (SAS-B) on 2 Nov. 1972, to study gamma rays. The launch is to be from the Italian-operated San Marco Equatorial Range in the Indian Ocean for ease in acquiring an equatorial orbit. The spacecraft systems described include: stabilization and control, communication, and spark chamber gamma ray telescope. The results of Uhuru (Explorer 42) are also presented.

Allaway, H. G.↗

Space Shuttle Orbiter Approach and Landing Test Program

The approach and landing tests of the orbiter vehicle, planned for early 1977, will be the first actual flight activity in the NASA Space Shuttle Program. The tests are to include air-launched unpowered glide, approach, and landing tests. A review is presented of the basic Shuttle program and a description of the orbiter design is given, taking into account the flight control systems. Details of the actual test program will be partly based on the results to be obtained with an orbiter aeroflight simulator.

Fullerton, C. G.↗