Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design guidelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Converting Clinical Pathways to BPM+ Standards: A Case Study in Stable Ischemic Heart Disease

Clinical pathways (CPs) are structured healthcare plans designed to implement evidence-based clinical guidelines, medical algorithms, and protocols. In recent years, a community called BPM+ Health has worked to establish a shareable and computer-consumable representation of CP, leveraging standard notations. These notations, collectively referred to as BPM+, include the Business Process Management and Notation (BPMN), Case Management Model and Notation (CMMN), and Decision Model and Notation (DMN), which aim to support clinical management and standardized communication between different stakeholders. However, the adaptation of these notations for the existing guidelines has largely been left unexplored. This paper introduces procedural steps and criteria considerations to apply components of BPM+ notations to reconstruct a guideline for Stable Ischemic Heart Disease. This paper describes how each of the three different notations is mapped to a medical guideline and discusses the advantages and limitations of representing CPs with BPM+ as compared with paper-based medical guidelines.

Chae, Junghoon↗

Tracking the dynamic seroma cavity using fiducial markers in patients treated with accelerated partial breast irradiation using 3D conformal radiotherapy

Purpose: The purpose of the present study was to perform an analysis of the changes in the dynamic seroma cavity based on fiducial markers in early stage breast cancer patients treated with accelerated partial breast irradiation (APBI) using three-dimensional conformal external beam radiotherapy (3D-CRT). Methods: A prospective, single arm trial was designed to investigate the utility of gold fiducial markers in image guided APBI using 3D-CRT. At the time of lumpectomy, four to six suture-type gold fiducial markers were sutured to the walls of the cavity. Patients were treated with a fractionation scheme consisting of 15 fractions with a fractional dose of 333 cGy. Treatment design and planning followed NSABP/RTOG B-39 guidelines. During radiation treatment, daily kV imaging was performed and the markers were localized and tracked. The change in distance between fiducial markers was analyzed based on the planning CT and daily kV images. Results: Thirty-four patients were simulated at an average of 28 days after surgery, and started the treatment on an average of 39 days after surgery. The average intermarker distance (AiMD) between fiducial markers was strongly correlated to seroma volume. The average reduction in AiMD was 19.1% (range 0.0%-41.4%) and 10.8% (range 0.0%-35.6%) for all the patients between simulation and completion of radiotherapy, and between simulation and beginning of radiotherapy, respectively. The change of AiMD fits an exponential function with a half-life of seroma shrinkage. The average half-life for seroma shrinkage was 15 days. After accounting for the reduction which started to occur after surgery through CT simulation and treatment, radiation was found to have minimal impact on the distance change over the treatment course. Conclusions: Using the marker distance change as a surrogate for seroma volume, it appears that the seroma cavity experiences an exponential reduction in size. The change in seroma size has implications in the size of the CTV, PTV, and percent of normal breast tissue irradiated when using 3D-CRT.

60 APPLIED LIFE SCIENCES↗

Manufactured Home Equipment Sizing and Selection Tool

This tool is for use for manufactured homes built to the HUD Code (thermal provisions of the Manufactured Housing Construction and Safety Standards, Subpart F, Section §3280), including manufactured homes certified as ENERGY STAR® and DOE Efficient New Homes. It provides a simple look-up procedure to assist equipment specifiers, HVAC contractors, home installers, retailers, manufacturers, and electric utility staff. For new manufactured homes, it guides in selection of single speed heat pumps and air conditioners. For existing homes, it determines design conditions and nominal equipment size. The guidelines provide a simple but accurate procedure that reduces oversizing and its associated problems.

Source record↗

Improvised Nuclear Device Response Training Materials

Nuclear terrorism is a very real threat to the American people. The best way to prepare for, and respond to, terrorist events is to plan for them ahead of time. Research done at Lawrence Livermore National Laboratory (LLNL) has already been conducted on what will happen following the detonation of a low-yield, ground-level nuclear device. Even though this knowledge exists, many cities have not begun to prepare for nuclear terrorism events. This project took the scientific research presentations and publications developed at LLNL and turned them into training materials that use clear language without scientific terminology, and can be easily understood by response personnel. These materials model and analyze the detonation of an Improvised Nuclear Device (IND) in a major metropolitan area. The information contained in these materials explains that survival after the detonation of an IND is possible, and seeks to inform readers on various topics related to the detonation of an IND. Creation of these materials required an understanding of the research behind IND response planning, including building protection factors, radiological fallout, weather patterns and understanding how emergency response happens in an urban environment. The result is a suite of training modules for instructors and students: Fallout, Prompt Effects, Response and Shelter-Evacuation Strategies. These modules are designed so that they may be taught as a combined, full course, or taken as individual modules. Upon completion of an individual module, or the entire set, a person will have a greater understanding, and increased background knowledge, on topics related to a small-scale nuclear attack. These training modules are intended to give an overview of topics necessary to understand what will happen after detonation of an IND and provide suggestions and strategies for response and evacuation. They are not intended to provide a substitute to local, regional, state and national response planning for a nuclear attack. These guides were designed with the intent to act as guidelines and starting points for further extensive planning by all levels of government. By gaining an overview of IND related topics, there is a hope that response planning officials will realize the importance of planning as well as the survivability of such an event with proper planning.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Measure Guideline: Three High Performance Mineral Fiber Insulation Board Retrofit Solutions

This Measure Guideline describes a high performance enclosure retrofit package that uses mineral fiber insulation board. The Measure Guideline describes retrofit assembly and details for wood frame roof and walls and for cast concrete foundations. This Measure Guideline is intended to serve contractors and designers seeking guidance for non-foam exterior insulation retrofit.

&#8203↗

Measure Guideline. Passive Vents

This guideline is intended to be useful to designers, decision makers, and contractors who implement passive ventilation strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ECAR-5067 Computational Evaluation on Effect of Edge-rounding in Circular to Annular Flow Transitions within a Hexagonal Duct

In this ECAR, the computational fluid dynamics (CFD) simulation of the duct with a cross-section varying from circle to annulus was performed to evaluate the effect of edge-rounding of the internal edges. The edge of circular channel and the edge of inner annular channel were rounded with the radius of curvature ranged from 0 mm to 20 mm. The CFD results show that the pressure loss of the duct can be reduced by increasing the radius of the rounded edge. Case-A results showed that the pressure drop can be significantly reduced by the edge-rounding, e.g., the pressure drop was reduced approximately 56% by the radius of curvature of 5.0mm, and reduced 70% by the radius of curvature of 20.0 mm although its effectiveness would be attenuated as the radius of curvature of edge increases. Results from Case-B showed the impact of rounding the inlet edge was practically negligible compared to the outlet edge. This ECAR could provide a guideline to determine the optimum inlet module design of the VTR fuel rod bundle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flight experiments to determine visibility requirements for approaches and landings.

Some of the effects of horizontal visual restriction on the front cockpit of a T-33 aircraft were studied. These studies are pertinent to the establishment of guidelines that will be used in canopy design for limited visibility situations. Results of the study revealed that runway extension lines are helpful for restricted visibility situations. The superiority of a 300-foot runway over a 200-foot runway was greater than expected from geometric considerations. It was also shown that practice learning has a noticeable effect on performance. Finally, visibility restrictions that force a pilot into shallow glides should be avoided, and the available visibility should be sufficient to provide adequate information so that the pilot can solve the lateral-directional and pitch tasks simultaneously.

Carpenter, R.↗

A methodology for producing small scale rural land use maps in semi-arid developing countries using orbital imagery

The author has identified the following significant results. Results have shown that it is feasible to design a methodology that can provide suitable guidelines for operational production of small scale rural land use maps of semiarid developing regions from LANDSAT MSS imagery, using inexpensive and unsophisticated visual techniques. The suggested methodology provides immediate practical benefits to map makers attempting to produce land use maps in countries with limited budgets and equipment. Many preprocessing and interpretation techniques were considered, but rejected on the grounds that they were inappropriate mainly due to the high cost of imagery and/or equipment, or due to their inadequacy for use in operational projects in the developing countries. Suggested imagery and interpretation techniques, consisting of color composites and monocular magnification proved to be the simplest, fastest, and most versatile methods.

Vangenderen, J. L.↗

A survey of the status of and philosophies relating to cockpit warning systems

A survey was taken to study current cockpit caution and warning (c/w) systems, and to examine industry philosophies regarding c/w system design including current efforts to improve them. Guidelines currently in use were outlined and those which appear to have general acceptance, those which are considered ineffective or erroneous, and those with which there is broad disagreement as to validity, were delineated. Major airplane manufacturerd were surveyed and a manufacturer dealing specifically with aircraft instrumentation was consulted.

Cooper, G. E.↗

Satellite services - An added benefit of the space transportation system

It is argued that the greatest economic benefit can be achieved by the Space Shuttle Orbiter's use as a satellite servicing platform if the following conditions are fulfilled: (1) the international user community must build serviceability features into its satellite and orbital platform designs, based on a common set of guidelines; (2) the various tools required for satellite servicing must be developed in a timely manner; and (3) servicing costs must be kept as low as possible, in order to appeal to the greatest number and variety of satellite operators. A three-part program development schedule is proposed, beginning with near-Orbiter servicing in low earth orbit, continuing with servicing at orbital heights between the low and geosynchronous at greater distances from the Orbiter, and culminating in the early 1990's with the use of the Space Operations Center (SOC) platform for servicing at all orbital heights.

Herardian, M. M.↗

Guidelines on ergonomic aspects of control rooms

The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.

Mitchell, C. M.↗

An experimental evaluation of slots versus porous strips for laminar-flow applications

Detailed mean velocity and disturbance amplitude measurements were conducted in a Blasius boundary-layer flow with wall suction applied at three downstream locations. The main emphasis was a direct comparison of the growth rate of the instability wave with discrete spanwise slots versus wide porous strips. The results demonstrate that the local effects of suction through slots or very narrow porous strips have a greater beneficial effect on the stability of the boundary-layer flow relative to the suction influence of a wide porous strip. Codes which use continuous suction for the growth rates of the instability waves to determine the suction quantities for a multiple series of slots will be quite conservative in the estimation of the suction quantity. Guidelines were provided for suction-chamber design and flow rates to minimize internal oscillations which propagate into the boundary-layer flow.

Cornelius, Kenneth C.↗

Semi-Automated Diagnosis, Repair, and Rework of Spacecraft Electronics

NASA's Constellation Program for Exploration of the Moon and Mars places human crews in extreme isolation in resource scarce environments. Near Earth, the discontinuation of Space Shuttle flights after 2010 will alter the up- and down-mass capacity for the International Space Station (ISS). NASA is considering new options for logistics support strategies for future missions. Aerospace systems are often composed of replaceable modular blocks that minimize the need for complex service operations in the field. Such a strategy however, implies a robust and responsive logistics infrastructure with relatively low transportation costs. The modular Orbital Replacement Units (ORU) used for ISS requires relatively large blocks of replacement hardware even though the actual failed component may really be three orders of magnitude smaller. The ability to perform in-situ repair of electronics circuits at the component level can dramatically reduce the scale of spares and related logistics cost. This ability also reduces mission risk, increases crew independence and improves the overall supportability of the program. The Component-Level Electronics Assembly Repair (CLEAR) task under the NASA Supportability program was established to demonstrate the practicality of repair by first investigating widely used soldering materials and processes (M&P) performed by modest manual means. The work will result in program guidelines for performing manual repairs along with design guidance for circuit reparability. The next phase of CLEAR recognizes that manual repair has its limitations and some highly integrated devices are extremely difficult to handle and demand semi-automated equipment. Further, electronics repairs require a broad range of diagnostic capability to isolate the faulty components. Finally repairs must pass functional tests to determine that the repairs are successful and the circuit can be returned to service. To prevent equipment demands from exceeding spacecraft volume capacity and skill demands from exceeding crew time and training limits, the CLEAR project is examining options provided by non-real time tele-operations, robotics, and a new generation of diagnostic equipment. This paper outlines a strategy to create an effective repair environment where, with the support of ground based engineers, crewmembers can diagnose, repair and test flight electronics in-situ. This paper also discusses the implications of successful tele-robotic repairs when expanded to rework and reconfiguration of used flight assets for building Constellation infrastructure elements.

Struk, Peter M.↗

Characterizing the Benefits of Seismic Isolation of Nuclear Structures in Terms of Reduced Risk and Cost

Seismic isolation is a mature technology that has been implemented in many civil structures, including buildings, bridges, liquid natural gas tanks, and off shore oil platforms, both in the United States and other countries, to mitigate the damaging effects of earthquakes. Seismic isolation has also been used in nuclear structures in France and South Africa, but not yet in the United States: neither in the Department of Energy facilities nor in commercial nuclear power plants (NPPs). This is primarily due to a lack of guidelines, codes and standards for the analysis, design and construction specific to seismically isolated nuclear structures. However, seismic isolation of nuclear structures has seen increased research interest in the recent years and the recently published national consensus standard, America Society of Civil Engineers (ASCE) Standard 4-16 'Seismic analysis of safety related nuclear structures', now incorporates language and commentary (Chapter 12) for seismically isolating surface or near-surface-mounted nuclear facilities, including NPPs. Seismic isolation substantially reduces horizontal seismic loads (demands) on structures, systems, and components. Reduction in demand results in four potential benefits: (1) economic: reduction in capital cost, (2) increased safety: reduction in the mean annual frequency of unacceptable performance, (3) insurance: protection against increases in the known seismic hazard after construction by minimizing the effort to re-qualify and re-certify structures, systems and components, and (4) recertification: the opportunity to certify an existing NPP design for a region of higher seismic hazard. Item (2) above, an increase in safety (reduction of seismic risk), was explored in Huang et al., wherein it was demonstrated that the implementation of seismic isolation reduced seismic risk in nuclear power plant structures. Studies that assess item (1) have not been performed although the use of isolation may lead to large reductions in the capital cost of safety-related nuclear facilities. Funding provided by Nuclear Safety Research and Development in the Department of Energy (DOE) allowed the authors to develop a framework for assessing the economic benefits and reductions in seismic risk afforded by the use of seismic (base) isolation. The framework includes probabilistic risk assessment and estimation of overnight capital costs (OCC's) of a sample generic DOE nuclear facility (GDNF). The project is documented in detail in Bolisetti et al. and Yu et al., and key results are presented here. The GDNF considered in this study is based on a facility constructed at the Idaho National Laboratory. The GDNF is a two-story reinforced concrete building with an embedded basemat and is founded on soft rock at the boundary of Site Class B and Site Class C (B/C boundary) as characterized by ASCE/SEI Standard 7. The GDNF is assumed to handle radiological materials, and its structure, systems and components (SSC's) are designed to effectively confine these materials in the event of an internal failure. The GDNF is populated with components that are generic to safety-related nuclear structures. A single system, which is intended to confine a loss of materials-at-risk (MAR) to the interior of the structure, is chosen for this study. Accordingly, a hypothetical event tree and fault tree are assumed for risk assessment. The isolation system for the GDNF is designed per Chapter 12 of ASCE/SEI 4-16 but is not optimized. The isolation system consists of 38 lead rubber bearings installed in one horizontal plane below the basemat. Details of the GDNF, including the SSC's, event tree and fault tree, and isolation system, are presented in the project report and Yu et al.. This study includes seismic risk assessment and cost estimation for four cases: (1) the GDNF is located at a site of low to moderate seismic hazard and is constructed on a conventional (non-isolated) foundation; (2) the GDNF is located at the same site as case 1, but is seismically isolated; (3) the GDNF is located at a site of high seismic hazard and is constructed on a conventional foundation; and (4) the GDNF is located at the same site of high seismic hazard as case 3, but is seismically isolated. In this study, the DOE site at Idaho National Laboratory (INL) is chosen as the low to moderate seismic hazard site for cases 1 and 2, and the Los Alamos National Laboratory (LANL) is chosen as the high seismic hazard site for cases 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and Performance Evaluation of a Resistive Control Using a Hydraulic PTO System for the TALOS Wave Energy Converter

This study is focused on developing a numerical model to evaluate the performance of a hydraulic PTO system for the TALOS Wave Energy Converter. The WEC device is described and the architecture of the hydraulic PTO system is presented with detail. The WEC is modeled using WEC-Sim, and the PTO is modeled using the Simscape Fluids library from Simulink. The hydraulic PTO is based on a constant pressure configuration that is suitable for WEC passive control. The hydraulic system is composed by a set of rectifying valves and two hydraulic accumulators that reduce the stiffness of the system and also serve as energy storage devices. One of the advantages of this hydraulic PTO architecture is the possibility of controlling the electric generator to operate around the optimal efficiency operating point. The main components of the hydraulic PTO are off-the-shelf devices that are commercially available, which will facility a future deployment of the designed system. The design variables used for this study are the accumulator size, the maximum pressure in the accumulators, the hydraulic motor maximum displacement, and the shaft speed in the electric generator. The performance of the system is evaluated individually, using sinusoidal inputs that replicates regular wave conditions. In addition to this, the numerical model of the PTO is coupled to a WEC-Sim simulation of the TALOS Wave Energy Converter with six PTOs to generate a wave-to-wire model. The main objective of this work is to present a comprehensive design methodology that could serve as a guideline for future research efforts focused on implementing control algorithms on multi degree of freedom WECs.

hydraulic systems↗

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dam’s Second Powerhouse, Columbia River

A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dam’s Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites – “Range D” 122 m directly downstream from the existing sluice chute outfall and “Range F” 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

13 HYDRO ENERGY↗

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Fish at Bonneville Dam’s Second Powerhouse, Columbia River

A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dam’s Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites – “Range D” 121.9 m straight downstream from the existing outfall and “Range F” 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.

13 HYDRO ENERGY↗