Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capability development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

A Computer Aided Broad Band Impedance Matching Technique Using a Comparison Reflectometer

An improved broadband impedance matching technique was developed. The technique is capable of resolving points in the waveguide which generate reflected energy. A version of the comparison reflectometer was developed and fabricated to determine the mean amplitude of the reflection coefficient excited at points in the guide as a function of distance, and the complex reflection coefficient of a specific discontinuity in the guide as a function of frequency. An impedance matching computer program was developed which is capable of impedance matching the characteristics of each disturbance independent of other reflections in the guide. The characteristics of four standard matching elements were compiled, and their associated curves of reflection coefficient and shunt susceptance as a function of frequency are presented. It is concluded that an economical, fast, and reliable impedance matching technique has been established which can provide broadband impedance matches.

Gordy, R. S.↗

Development of an emulation-simulation thermal control model for space station application

The goal of this program is to develop an improved capability for comparing various techniques for thermal management in the space station. The work involves three major tasks: Develop a Technology Options Data Base (Task 1); Complete Development of a Space Station Thermal Control Technology Assessment Program (Task 2); and Develop and Evaluate Emulation Models (Task 3).

Hartley, James G.↗

Automated rendezvous and capture development infrastructure

The facilities at Marshall Space Flight Center and JSC to be utilized to develop and test an autonomous rendezvous and capture (ARC) system are described. This includes equipment and personnel facility capabilities to devise, develop, qualify, and integrate ARC elements and subsystems into flight programs. Attention is given to the use of a LEO test facility, the current concept and unique system elements of the ARC, and the options available to develop ARC technology.

Bryan, Thomas C.↗

(abstract) Communications in Space

This paper provides an overview of the results of the JPL/NASA unmanned exploration of all of the planets of the solar system (except Pluto) as well as the telecommunications capability which was developed to enable/support those missions. The telecommunications link improvements will be described to show increases in data rate capability resulting from addition of ground antenna aperture, transmitter power, coding techniques, lower noise receivers, etc. The paper will also describe (briefly), the current and future flight missions.

coding↗

Communications in Space

This paper provides an overview of the imaging results of the JPL/NASA unmanned exploration missions to all the planets of the solar system (except Pluto) as well as the telecommunications capability which was developed to enable/support those missions. the telecommunications link improvements will be described to show increases in data rate capability resulting from the addition of ground antenna aperture, transmitter power, coding techniques, lower noise receivers, etc. This paper will also describe (briefly) the current and future flight missions. The presentation will be supported by a significant number of pictures taken during the planetary encounters as well as pictures of the Deep Space Network antennas.

imaging planets Deep Space Network telecommunicati↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

The Mars Reconnaissance Orbiter Mission: 2018 Status

The Mars Reconnaissance Orbiter (MRO) continues its dual-mode mission of scientific exploration and programmatic support. Now in its 13th year of flight (and its 12th year in its low-altitude, sun-synchronous orbit around Mars), the spacecraft continues in its normal flight mode and its science instruments continue to acquire a treasure trove of data which is being used to study the Martian environment (surface, sub-surface, and atmosphere). To date (July 2018), more than 333 TB of scientific data have been returned to Earth. Building onto the 2017 IAC paper: “The Mars Reconnaissance Orbiter Mission: Continuing a Record of Exploration from Mars Orbit,” [1] this paper provides a 2018 status update on the MRO Mission. A signature event since the 2017 writing is the onset and evolution of a planet-encircling dust event (PEDE), the first such event since 2007. Additional recent science highlights for MRO include the discovery of mid-latitude ice cliffs, polar cap characterization, daily global mapping of the 2018 PEDE dust activity and the atmospheric thermal response, further characterization of the tantalizing recurring slope lineae (RSL), and continued detection of surface changes. Programmatically, UHF relay support for the Mars Science Laboratory (MSL) rover Curiosity and the Mars Exploration Rover (MER) rover Opportunity continues at a pace that provides the engineers and scientists operating those surface vehicles timely information to support their mission planning and science analysis. Most of the landing site characterization requests for the NASA Mars 2020 rover and the ESA ExoMars Rover/Surface Platform (RSP) missions have been completed, with final acquisitions delayed due to the obscuring dust haze from the current PEDE. In parallel, the flight team has faced new engineering challenges as the spacecraft has aged. The team has developed and is implementing actions that are aimed at stretching spacecraft battery life. A new all-stellar capability using the spacecraft’s star trackers now allows for normal spacecraft operations without IMUs. In addition to its current relay duties, MRO will be synchronized to provide critical communications support for the InSight Entry, Descent, and Landing (EDL) event on November 26, 2018, and will be readied to support InSight’s critical commissioning phase with UHF relay support and environmental characterization. A new split-pass relay capability has been developed which will allow MRO to relay with two surface vehicles in “close proximity” on the same overflight, i.e. the InSight lander and the Curiosity rover. Extended for another year of operations by NASA, this paper will highlight recent scientific progress and describe actions that will extend MRO’s life well into the 2020’s as a key element of the Mars Exploration Program.

Zurek, Richard W.↗

An Orion/Ares I Launch and Ascent Simulation: One Segment of the Distributed Space Exploration Simulation (DSES)

This paper describes the architecture and implementation of a distributed launch and ascent simulation of NASA's Orion spacecraft and Ares I launch vehicle. This simulation is one segment of the Distributed Space Exploration Simulation (DSES) Project. The DSES project is a research and development collaboration between NASA centers which investigates technologies and processes for distributed simulation of complex space systems in support of NASA's Exploration Initiative. DSES is developing an integrated end-to-end simulation capability to support NASA development and deployment of new exploration spacecraft and missions. This paper describes the first in a collection of simulation capabilities that DSES will support.

Chung, Victoria I.↗

The NASA CSTI high capacity power project

The SP-100 Space Nuclear Power Program was established in 1983 by DOD, DOE, and NASA as a joint program to develop technology for military and civil applications. Starting in 1986, NASA has funded a technology program to maintain the momentum of promising aerospace technology advancement started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for a wide range of future space applications. The elements of the Civilian Space Technology Initiative (CSTI) High Capacity Power Project include Systems Analysis, Stirling Power Conversion, Thermoelectric Power Conversion, Thermal Management, Power Management, Systems Diagnostics, Environmental Interactions, and Material/Structural Development. Technology advancement in all elements is required to provide the growth capability, high reliability and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall project will develop and demonstrate the technology base required to provide a wide range of modular power systems compatible with the SP-100 reactor which facilitates operation during lunar and planetary day/night cycles as well as allowing spacecraft operation at any attitude or distance from the sun. Significant accomplishments in all of the project elements will be presented, along with revised goals and project timelines recently developed.

Winter, J.↗

Alignment of NASA’s Human System Risks with Technological Capability Gaps to Enable Integrated Research and Technology Development Strategic Planning

BACKGROUND: Radiation, reduced gravity, distance from earth, isolation and confinement, and habitation within artificially created and controlled life support environments are hazards that present risk to human space explorers. NASA’s Human System Risk Board (HSRB) maintains a set of twenty-nine different Human System Risks with subject matter experts from across the agency providing regular updates to the estimated likelihood and consequence associated with each risk. The Human Research Program (HRP) has historically used these risk classifications as a primary basis for identifying and prioritizing human research investments aimed at characterizing and/or mitigating the respective human system risks. In many cases, technology development is required to mature and validate risk mitigation strategies, however, NASA’s primary technology development programs have not typically used Human System Risks as a basis for strategic planning. A primary function of the Environmental Control and Life Support Systems (ECLSS) – Crew Health and Performance (CHP) System Capability Leadership Team (SCLT) is to continually identify, review, and update technological capability gaps and to establish and oversee multiyear strategic roadmaps aimed at guiding NASA’s technology development priorities in these areas. These roadmaps are intended to be agency-wide and independent of any program, directorate, or other organization within NASA. DESCRIPTION: The SCLT and HRP collaborated to establish a set of Human System Capability Gaps, which establish a formal linkage between the capability gaps used to prioritize investments across much of NASA, and the Human System Risks that are primarily used to inform and prioritize human research. This set of twenty-eight gaps was developed by subject matter experts, and each gap mapped to the primary associated Human System Risks. The gaps and risk mapping were then reviewed and approved via the HSRB, thereby formally aligning the research-focused Human System Risks with the technology-focused capability gaps. DISCUSSION: This effort has enabled development of integrated roadmaps and budget coordination with research and technology development activities that are formally linked to agency-recognized capability gaps and Human System Risks. Close and ongoing coordination between the SCLT, HRP, Mars Campaign Office, and the Health & Medical Technical Authority (HMTA) is essential to ensure alignment and prioritization of CHP-related research and technology development to enable NASA’s future exploration missions.

Andrew F J Abercromby↗

Integrated analysis capability for large space systems

The development of an integrated analysis computer program capable of performing the conceptual/preliminary structural system design analysis of large space systems is addressed. The integrated analysis capability (IAC) specifications include thermal/structural/controls integration, an emphasis on existing software and interactive graphics and I/O, a project size capability of 1 to 50 users (1 to 5 users concurrent), and the use of the FORTRAN '77 language. The advantages of the DISCOS and NASTRAN computer programs to the IAC are outlined and recommendations for other programs are made. Barriers to the development of the system arising from the interdisciplinary data flow are defined.

Vos, R. G.↗

Large space structures at the Marshall Space Flight Center

The Space Shuttle will provide a new capability for the construction in space of structures too large to be accommodated in the Shuttle bay. To understand and develop this new capability several construction methods and design approaches are being studied by MSFC and industry. This paper relates the general scope of these ongoing activities, the project aims and objectives, and a discussion of many design and equipment variables. Major design and construction variables, such as on-orbit or ground fabricated construction and type of materials to be used, are discussed relative to their status and applicability to various designs. Construction methods and options are reviewed and many of the support equipments under study or development are described.

Harrison, J. K.↗

An Overview of the NASA Sounding Rockets and Balloon Programs

The U.S. National Aeronautics and Space Administration (NASA) Sounding Rockets and Balloon Programs conduct a combined total of approximately fifty to sixty missions per year in support of the NASA scientific community. These missions are provided in support of investigations sponsored by NASA'S Offices of Space Science, Life and Microgravity Sciences & Applications, and Earth Science. The Goddard Space Flight Center has management and implementation responsibility for these programs. The NASA Sounding Rockets Program has continued to su,pport the science community by integrating their experiments into the sounding rocket payload and providing the rocket vehicle and launch operations necessary to provide the altitude/time required obtain the science objectives. The sounding rockets continue to provide a cost-effective way to make in situ observations from 50 to 1500 km in the near-earth environment and to uniquely cover the altitude regime between 50 km and 130 km above the Earth's surface, which is physically inaccessible to either balloons or satellites. A new architecture for providing this support has been introduced this year with the establishment of the NASA Sounding Rockets Contract. The Program has continued to introduce improvements into their operations and ground and flight systems. An overview of the NASA Sounding Rockets Program with special emphasis on the new support contract will be presented. The NASA Balloon Program continues to make advancements and developments in its capabilities for support of the scientific ballooning community. Long duration balloon (LDB) is a prominent aspect of the program with two campaigns scheduled for this calendar year. Two flights are scheduled in the Northern Hemisphere from Fairbanks, Alaska, in June and two flights are scheduled from McMurdo, Antarctica, in the Southern Hemisphere in December. The comprehensive balloon research and development (R&D) effort has continued with advances being made across the spectrum of balloon related disciplines. As a result of these technology advancements a new ultra long duration balloon project (ULDB) for the development of a 100- day duration balloon capability has been initiated. The ULDB will rely upon new balloon materials and designs to accomplish its goals. The Program has also continued to introduce new technology and improvements into flights systems, ground systems and operational techniques. An overview of the various aspects of the NASA Balloon Program will be presented.

Flowers, Bobby J.↗

Conestoga 2: A low cost commercial space transport system

Conestoga 2 is currently under development. It is capable of inserting 500 Kg satellites into 800 Km circular polar orbits. Conestoga 2 makes maximum use of existing (developed) technology and hardware. Its commercial objective is to fill a need for low cost low Earth orbital transport not efficiently served by Shuttle or larger space transport systems. Low Earth orbit markets, foreign participation, and launch site considerations are discussed along with technical and economic trade-offs.

Rasmussen, R. O.↗

Integrated System Health Management (ISHM): Systematic Capability Implementation

This paper provides a credible approach for implementation of ISHM capability in any system. The requirements and processes to implement ISHM capability are unique in that a credible capability is initially implemented at a low level, and it evolves to achieve higher levels by incremental augmentation. In contrast, typical capabilities, such as thrust of an engine, are implemented once at full Functional Capability Level (FCL), which is not designed to change during the life of the product. The approach will describe core ingredients (e.g. technologies, architectures, etc.) and when and how ISHM capabilities may be implemented. A specific architecture/taxonomy/ontology will be described, as well as a prototype software environment that supports development of ISHM capability. This paper will address implementation of system-wide ISHM as a core capability, and ISHM for specific subsystems as expansions and evolution, but always focusing on achieving an integrated capability.

Figueroa, Fernando↗

NASA Space Technology Roadmaps and Priorities: Restoring NASA's Technological Edge and Paving the Way for a New Era in Space

Success in executing future NASA space missions will depend on advanced technology developments that should already be underway. It has been years since NASA has had a vigorous, broad-based program in advanced space technology development, and NASA's technology base is largely depleted. As noted in a recent National Research Council report on the U.S. civil space program: Future U.S. leadership in space requires a foundation of sustained technology advances that can enable the development of more capable, reliable, and lower-cost spacecraft and launch vehicles to achieve space program goals. A strong advanced technology development foundation is needed also to enhance technology readiness of new missions, mitigate their technological risks, improve the quality of cost estimates, and thereby contribute to better overall mission cost management. Yet financial support for this technology base has eroded over the years. The United States is now living on the innovation funded in the past and has an obligation to replenish this foundational element. NASA has developed a draft set of technology roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist. The NRC appointed the Steering Committee for NASA Technology Roadmaps and six panels to evaluate the draft roadmaps, recommend improvements, and prioritize the technologies within each and among all of the technology areas as NASA finalizes the roadmaps. The steering committee is encouraged by the initiative NASA has taken through the Office of the Chief Technologist (OCT) to develop technology roadmaps and to seek input from the aerospace technical community with this study.

Source record↗

NASA Earth System Digital Twins (ESDT) Use Cases

NASA AIST Program is now designing and developing Digital Twins of the Earth and/or Earth systems. Organized around interconnected, multi-domain, high-scale modeling capabilities, the three major components of an Earth System Digital Twin are a continuously updated Digital Replica of the Earth System of interest, dynamic Forecasting models, and Impact Assessment capabilities. In order to define ESDT's benefits to Earth Science, as well as the AIST capabilities required to develop such systems, the AIST Program has been developed 6 science use cases corresponding to 6 of the main Earth Science domains.

J. Le Moigne↗

Earth System Digital Twins (ESDT) Definition and Science Use Cases

NASA AIST Program is now designing and developing Digital Twins of the Earth and/or Earth systems. Organized around interconnected, multi-domain, high-scale modeling capabilities, the three major components of an Earth System Digital Twin are a continuously updated Digital Replica of the Earth System of interest, dynamic Forecasting models, and Impact Assessment capabilities. In order to define ESDT's benefits to Earth Science, as well as the AIST capabilities required to develop such systems, the AIST Program has been developed 6 science use cases corresponding to 6 of the main Earth Science domains.

Earth Science Remote Sensing; Information Systems↗