1,176 records · Page 66

Evaluation of Zero-Net-Rate Pumping Tests

Accurately estimating the distribution of aquifer properties is key to understanding contaminant movement in the subsurface. The distribution of aquifer properties is typically addressed using slug or constant-rate well tests, and the pros and cons of these tests are well known. Slug tests are appealing because they avoid removing contaminated water, but their results are affected by well skin and the small volume of displaced water limits the volume of aquifer that can be evaluated. Constant-rate well tests have the disadvantage of requiring disposal of potentially contaminated water, but they can generate properties that are more representative than slug tests, and they can be used to estimate well efficiency and storativity, which are difficult to characterize using slug tests. Periodic pumping tests are appealing because they have many of the advantages and few of the disadvantages of slug and constant-rate well tests. Periodic pumping tests involve cycling the pumping rate with a regular period and measuring the resulting response in monitoring wells. Some of these tests involve imposing a periodic rate on a constant mean rate. However, other tests involve moving water out and back into the well at rates that are balanced so the net rate after each period is zero. Some zero-net-rate (ZNR) well tests use rates that follow a sinusoidal pattern, whereas others use a square wave pattern that switches between a constant rate of pumping and a constant rate of injection to achieve a zero-net rate. ZNR well tests appear to be a useful compromise between slug and constant rate tests, but methods for conducting and analyzing the results from these tests have received limited evaluation. Periodic pumping tests are typically evaluated through recorded pressure responses to a disturbance source. Recent work has demonstrated that the strain field in the vadose zone shows a response to disturbances in the underlying aquifer. Various instrument designs are available that can record vertical and horizontal strain to very precise resolutions (10-9 ε). Measuring the strain in the vadose zone can present lower costs than measuring pressure in a monitoring well, so using strain could improve the resolution of ZNR tests, as well as make these tests potentially cheaper. A ZNR periodic pumping system was constructed and used to perform tests in the Clemson, South Carolina area. The system was designed to pump and inject with a periodic square-wave, so pumping occurs at a constant rate for half the period and is followed by injection at the same rate for half the period resulting in no net gain or loss of water from the aquifer. The system is designed to generate flow rates from 1 to 3.5 gallons per minute (gpm) with a capacity of 875-gallon per half period. Pressure and strain monitoring points are located in the vicinity of the pumping well. A series of 10 ZNR periodic pumping tests were conducted at the field site, with periods ranging from 2 to 540 minutes. Pressure data were collected and recorded in four monitoring wells in various locations around the pumping well. In addition, vertical and horizontal strain and tilt data were recorded in various locations around the pumping well. Traditional aquifer tests, including slug tests and constant-rate pumping tests were conducted at the field site to provide a baseline of aquifer parameter estimates that are compared the results of ZNR tests. Pressure data measured at monitoring wells during ZNR tests were analyzed utilizing an analytical solution (Streltsova, 1988) that assumes a confined aquifer and estimates hydraulic diffusivity and transmissivity using the time lag and amplitude of the pressure signal. The storativity can be separated out from the hydraulic diffusivity using the transmissivity estimate. The time-lag and amplitude of the pressure signals were estimated using a Fourier transform. The time-lag of the primary period of the pressure increases as a linear function of distance from the pumping well, and it increases as the square root of the period of the ZNR test over a range of periods spanning two orders of magnitudes. The first few harmonics follow similar trends, but the higher frequency harmonics diverge from this trend. Strain and tilt data from various instruments in the vadose and saturated zones are periodic during ZNR tests. The time lags of the strain components increase roughly linearly with distance from the well. Many of the time lags of the strain data from the vadose zone are similar to the time lags observed in the pressure data from a similar distance and pumping period. Theoretical experiments were performed to understand how pressure and strain responds to ZNR periodic pumping. The time-lags of the simulated pressure responses match the field data trends. The results were used to validate the Streltsova (1988) solution for periodic pumping to estimate hydraulic diffusivity. Hydraulic diffusivity was estimated to be 1.8 x 10-2 m2s-1 < Dh < 9.0 x 10-2 m2s-1 using pressure data from all the wells during ZNR tests. Transmissivity was estimated to be 0.8 x 10-4 m2s-1 < T < 4.3 x 10-4 m2s-1. Assuming Storativity = T/Dh gives 1.1 x 10-3 < S < 19 x10-3. Transmissivity is used to estimate the hydraulic conductivity, K, by dividing by the assumed aquifer thickness. Two constant-rate pumping tests were conducted and analyzed using two conceptual models: The Hantush (1961) solution was used to analyze data assuming confined conditions and the Neuman (1974) solution was used to analyze data assuming unconfined conditions. The Hantush (1961) solution estimated transmissivity to be 1.6 x 10-4 m2s-1 < T < 1.8 x 10-4 m2s-1 when using data from all the wells. Storativity was estimated to be 4.4 x 10-3 < S < 8.2 x 10-3. Assuming Dh = T/S gives 0.22 x 10-2 m2s-1 < Dh < 3.6 x 10-2 m2s-1. The Neuman (1974) solution estimated transmissivity to be 0.80 x 10-4 m2s-1 < T < 0.84 x 10-4 m2s-1. Total storativity (S + Sy) was estimated to be 22 x 10-3 < S < 110 x 10-3. Storativity excluding the Sy term was estimated to be 2.2 x 10-3 < S < 2.5 x 10-3. Assuming Dh = T/S gives 0.073 x 10-2 m2s-1 < S < 0.36 x 10-2 m2s-1. Two slug tests were performed on the pumping well, PW-2. The Bouwer and Rice (1976) solution for slug tests was used to analyze the data. This solution works for both confined and unconfined conditions, so both conceptual models were covered through the analysis. Hydraulic conductivity was estimated to be 1.95 x 10-6 ms-1 < K < 2.49 x 10-6 ms-1. Statistical comparison show generally no significant difference in the estimates of Dh, K, or S made using ZNR and conventional pumping tests.. However, the total storage estimated by the Neuman (1974) solution for unconfined settings is larger than that estimate using the Streltsove analysis applied to the ZNR tests. This is likely because the Neuman solution considers delayed yield from storage that the water table, whereas the Streltsova (1988) solution assumes confined conditions. The analysis also indicates that there is a statistically significant difference between parameters estimated with conventional slug tests and those measured with either constant-rate pumping tests or ZNR tests. Hydraulic diffusivity is estimated from the time-lag and the distance from the well. The time-lags of the strain data from the vadose zone are similar to the lags of the pressure data from a similar distance. This indicates that hydraulic diffusivities estimated from the strain data measured in the vadose zone would be similar to the estimates from the pressure data measured in the aquifer. There appear to be sign reversals in some of the strain data that were corrected to estimate the time lag. The dissolved oxygen (CO) concentration was measured during several ZNR tests to evaluate the feasibility of using the procedure to increase contaminant degradation kinetics that are related to DO. The results indicate that DO can be increased during the cycling of ZNR tests in some cases.

Smith-Jones, Austin↗

A semi–automatic analytical methodology for characterizing the energy consumption of MRI systems using load duration curves

Background and purpose: Magnetic resonance imaging (MRI) scanners are a major contributor to greenhouse gas emissions from the healthcare sector, and efforts to improve energy efficiency and reduce energy consumption rely on quantification of the characteristics of energy consumption. The purpose of this work was to develop a semi-automatic analytical methodology for the characterization of the energy consumption of MRI systems using only the load duration curve (LDC). LDCs are a fundamental tool used across various fields to analyze and understand the behavior of loads over time. Methods: An electric current transformer sensor and data logger were installed on two 3T MRI scanners from two vendors, termed M1 (outpatient scanner) and M2 (inpatient/emergency scanner). Data was collected for 1 month (7/11/2023 to 8/11/2023). Active power was calculated, assuming a balanced three-phase system, using the average current measured across all three phases, a 480 V reference voltage for both machines, and vendor-provided power factors. An LDC was constructed for each system by sorting the active power values in descending order and computing the cumulative time (in units of percentage) for each data point. The first derivative of the LDC was then computed (LDC’), smoothed by convolution with a window function (sLDC’), and used to detect transitions between different system modes including (in descending power levels): scan, prepared-to-scan, idle, low-power, and off. The final, segmented LDC was used to measure time (% total time), total energy (kWh), and mean power (kW) for each system mode on both scanners. The method was validated by comparing mean power values, computed using the segmented 1-month LDC, for each nonproductive system mode (i.e., prepared-to-scan, idle, lower-power, and off) against power levels measured after a deliberate system shutdown was performed for each scanner (1 day worth of data). Results: The validation revealed differences in mean power values <1.4% for all nonproductive modes and both scanners. In the scan system mode, the mean power values ranged from 29.8 to 37.2 kW and the total energy consumed for 1 month ranged from 11 106 to 14 466 kWh depending on the scanner. Over the course of 1 month, the portion of time the scanners were in nonproductive modes ranged from 76% to 80% across scanners and the nonproductive energy consumption ranged from 8010 to 6722 kWh depending on the scanner. The M1 (outpatient) scanner consumed 99.9 and 183.9 kWh/day in idle mode for weekdays and weekends, respectively, because the scanner spent 23% more time proportionally in idle mode on the weekends. Conclusions: A semi-automatic method for quantifying energy consumption characteristics of MRI scanners was introduced and validated. This method is relatively simple to implement as it requires only power data from the scanners and avoids the technical challenges associated with extracting and processing scanner log files. Finally, the methodology enables quantitative evaluation of the power, time, and energy characteristics of MRI scanners in scan and nonproductive system modes, providing baseline data and the capability of identifying potential opportunities for enhancing the energy efficiency of MRI scanners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Validation Assessment for the Soil Moisture Active Passive (SMAP) Level 4 Carbon (L4_C) Data Product Version 5

The post-launch Cal/Val phase of the SMAP mission is guided by two primary objectives for each science product team: 1) to calibrate, verify, and improve the performance of the science algorithms, and 2) validate accuracies of the science data products as specified in the SMAP Level-1 mission science requirements. Algorithm science and product maintenance activities during the SMAP extended mission phase have also involved periodic algorithm calibration and product refinements to maintain or enhance product consistency and performance as well as science utility. This report provides an assessment of the latest (Version 5) SMAP Level 4 Carbon (L4_C) product. The L4_C Version 5 (v5) global record now spans more than six years (March 2015 – present) of SMAP operations and has benefited from five major reprocessing updates to the operational product. These reprocessing events and L4_C product release updates have incorporated various algorithm refinements and calibration adjustments to account for similar refinements to the upstream GEOS land model assimilation system, SMAP brightness temperatures, and MODIS vegetation inputs used for L4_C processing. The SMAP L4_C algorithms utilize a terrestrial carbon flux model informed by daily surface and root zone soil moisture information contributed from the SMAP Level 4 Soil Moisture (L4_SM) product along with optical remote sensing-based (e.g. MODIS-based) land cover and canopy fractional photosynthetic active radiation (fPAR), and other ancillary biophysical data. The carbon flux model estimates global daily net ecosystem CO2 exchange (NEE) and the component carbon fluxes, namely, vegetation gross primary production (GPP) and soil heterotrophic respiration (Rh). Other L4_C product elements include surface (~0-5 cm depth) soil organic carbon (SOC) stocks and associated environmental constraints to these processes, including soil moisture-related controls on GPP and ecosystem respiration (Kimball et al. 2014, Jones et al. 2017). The L4_C product addresses SMAP carbon cycle science objectives by: 1) providing a direct link between terrestrial carbon fluxes and underlying freeze/thaw and soil moisture-related constraints to these processes, 2) documenting primary connections between terrestrial water, energy and carbon cycles, and 3) improving understanding of terrestrial carbon sink activity. The SMAP L4_C algorithms and operational product are mature and at a CEOS Validation Stage 4 level (Jackson et al. 2012) based on extensive validation of the multi-year record against a diverse array of independent benchmarks, well characterized global performance, and systematic refinements gained from five major reprocessing events. There are no Level-1 mission science requirements for the L4_C product; however, self-imposed requirements have been established focusing on NEE as the primary product field for validation, and on demonstrating L4_C accuracy and success in meeting product science requirements (Jackson et al. 2012). The other L4_C product fields also have strong utility for carbon science applications (e.g., Liu et al. 2019, Endsley et al. 2020); however, analysis of these other fields is considered secondary relative to primary validation activities focusing on NEE. The L4_C targeted accuracy requirements are to meet or exceed a mean unbiased root-mean-square error (ubRMSE, or standard deviation of the error) for NEE of 1.6 g C m-2 d-1 and 30 g C m-2 yr-1, emphasizing northern (≥45°N) boreal and arctic ecosystems; this accuracy is similar to that of tower eddy covariance measurement-based observations (Baldocchi 2008). Methods used for the latest v5 L4_C product performance and validation assessment have been established from the SMAP Cal/Val plan and previous studies (Jackson et al. 2012, Jones et al. 2017) and include: 1) consistency evaluations of the product fields against earlier product releases (version 4 or earlier); 2) comparisons of daily carbon flux estimates with independent tower eddy 4covariance measurement-based daily carbon (CO2) flux observations from core tower validation sites (CVS); and 3) consistency checks against other global carbon products, including soil carbon inventory records, global GPP records derived from tower observation upscaling methods, and satellite-based observations of canopy solar induced chlorophyll fluorescence (SIF) as a surrogate for GPP. Metrics used to evaluate relative agreement between L4_C product fields and observational benchmarks include correlation (r-value), RMSE differences, bias and model sensitivity diagnostics. Following these validation criteria, the present report provides a validation assessment of the latest L4_C product release (v5). Detailed descriptions of the L4_C algorithm and additional global product accuracy and performance results are given elsewhere (Jones et al. 2017, Endsley et al. 2020). The v5 L4_C product replaces earlier product versions and continues to show: (i) accuracy and performance levels meeting or exceeding SMAP L4_C science requirements; (ii) improvement over the previous product version (version 4); and (iii) suitability for a diversity of science applications. Example L4_C applications from the recent literature include clarifying environmental trends and controls on the northern terrestrial carbon sink (Liu et al. 2019), diagnosing drought-related impacts on ecosystem productivity (Li et al. 2020), and regional monitoring of cropland conditions for projecting annual yields (Wurster et al. 2020). 2EXPECTED L4_C ALGORITHM AND PRODUCTPERFORMANCE The L4_C algorithm performance, including variance and uncertainty estimates of model outputs, was determined during the mission pre-launch phase through spatially explicit model sensitivity studies using available model inputs similar to those currently being used for operational production and evaluating the resulting model simulations over the observed range of northern (≥45 °N) and global conditions (Kimball et al. 2012, Entekhabi et al. 2014). The L4_C algorithm options were also evaluated during the mission prelaunch phase, including deriving canopy fPAR from lower order NDVI (Normalized Difference Vegetation Index) inputs in lieu of using MODIS (MOD15) fPAR; and including an explicit model representation of boreal fire disturbance recovery impacts. These results indicated that the L4_C accuracy requirements (i.e., NEE ubRMSE ≤ 30 g C m-2 yr-1or ≤ 1.6 g C m-2 d-1) could be met from the baseline algorithms over more than 82% and 89% of global and northern vegetated land areas, respectively (Yi et al. 2013, Kimball et al. 2014). The global L4_C algorithm error budget for NEE derived during the mission prelaunch phase indicated that the estimated NEE ubRMSE uncertainty is proportional to GPP and is therefore larger in higher biomass productivity areas, including forests and croplands (Kimball et al. 2014). Likewise, NEE ubRMSE uncertainty is expected to be lower in less-productive areas, including grasslands and shrublands. Expected model NEE ubRMSE levels were also generally within targeted accuracy levels for characteristically less-productive boreal and Arctic biomes, even though relative model error as a proportion of total productivity (NEE RMSE / GPP) may be large in these areas. The estimated NEE uncertainty was lower than expected in some warmer tropical high biomass productivity areas (e.g. Amazon rainforest) because of reduced low temperature and moisture constraints to the L4_C respiration calculations so that the bulk of model uncertainty is contributed by GPP in these areas. Model NEE uncertainty in the African Congo was estimated to

SMAP↗

Quantifying Properties for a Mechanistic, Predictive Understanding of Aqueous Impact on Aging of Medium and Low Voltage AC and DC Cabling in Nuclear Power Plants

To address the gap in knowledge in understanding degradation in relevant service conditions, this project aimed to develop a mechanistic, predictive model of medium and low voltage cable failure based on the primary environmental degradation parameters of aqueous immersion time, temperature, and the oxidation extent. To do so, we took a two-fold approach toward evaluating degradation as related to the aqueous condition. First, we evaluated the chemical, mechanical, and electrical properties of polymers that comprise the cabling insulation under varied aqueous conditions at different temperatures. Secondly, we evaluated the performance of insulation materials under similar accelerated aging conditions in addition to the dielectric breakdown of the cabling under submersion conditions. Thermal oxidation and immersion of LDPE thin films were done using a Parr vessel and the extent of oxidation was monitored using the carbonyl index from ATR-FTIR spectrum, a ratio quantifying the carbonyl functionality produced on the LDPE film surface. Increasing the temperature, oxidation time, and oxygen pressure increased the water-vapor permeability and the carbonyl content. Thermogravimetric analysis of the films confirmed that there is indeed an initial weight loss of the smaller molecular weight molecules and volatiles. At higher temperatures, there is a secondary mass loss. Up to 70°C, the mass loss curves were similar until 80°C, when the aged films decreased at a much greater rate with respect to increasing temperature. This was seen in the 10, 50, 90% weight loss temperatures. The mechanical properties of sheet PP and HDPE as well as injection molded LDPE, HDPE, HDPP dog bones were plotted with respect to the time spent in the Parr vessel during thermal oxidation. For the sheet PP and HDPE, the UTS and the modulus of elasticity decreased while the elongation increased. The injection-molded LDPE, HDPE, and HDPP dog bones experienced a similar trend where the changes in the properties were within experimental uncertainty. This analysis of LDPE in dry and immersive oxygen-rich environments is an important baseline for future experiments looking at other degradation mechanisms. A predictive aging model for low-density polyethylene insulative cable housings was developed. This model revealed a combination of physical and chemical processes which lead to an increase in permeability and a decrease in strength of the insulator. In creating this predictive model, a gap of knowledge in the literature was revealed in two areas: understanding how the crystallinity of a polymer changes with time and visualizing the predicted pores formed through the insulator which leads to failure. Developing and using an adapted ATR-FTIR method, crystallinity was monitored and compared to bulk crystallinity found via DSC. Inhomogeneity in crystallinity changes were observed but the FTIR method but was found to be less reliable. Pore visualization was found utilizing electrical impedance spectroscopy saturated aged polyethylene films with synthesized citrate-capped gold nanoparticles, and chloroauric acid precursor. results indicate a decreasing impedance of the polyethylene films caused by the transport of ions through the film. SEM imaging was then performed for elemental analysis of the films and counter electrodes for the presence of ions. Chloride and gold ions were detected; however, no nanoparticles were found. This gives an estimated pore size of at least 0.3 nm through the aged film. Cyclic submergence of polyethylene and polypropylene in aqueous solutions of copper sulfate and Harrison’s solution were examined. It was discovered that aging in these mixed conditions and at 90°C did cause a small, yet significant increase to tensile strength for both unaged polyethylene and polypropylene. The PE and PP in cycled and submerged conditions did not have tensile strengths significantly different from dry-aged after 16 weeks. For both solutions, it was determined that capacitance increases with both water tree depth and cable temperature and is relatively independent of changing water tree AR. As for resistance, there is no apparent change between depth percentages of 10 and 80 for both solutions. This is because the water tree has not yet entered the conductor and thus there is no shorting current flowing through the tree yet. Between 80 and 100% water tree depth, it is observed that for both solutions there is a rapid decrease in resistance because the tree is now impacting the conductor shield and allowing shorting current to flow through it. The relationship between resistance and temperature was found to be inversed. As temperature increases, resistance decreases for both water tree solutions with distilled water having the most apparent difference across the range of temperatures simulated. With regards to water tree AR, resistance was found to be relatively independent at depth percentages of 10, 50, and 70, but there was some relationship at 100% depth for both solutions. At this depth, as water tree AR increased, resistance was found to also increase. Through the examination of voltage and electric field distribution plots, it was confirmed for EPR cables that increasing water tree depth leads to increasing distortion. The increase in shorting current at 100% depth for aqueous copper sulfate compared to distilled water was also visualized. Lastly, the relationship between shorting current and temperature for narrow water trees was visualized and validated using the distribution plots. This study has led to a better understanding of the effect of cable temperature, water tree solution, and geometry of the tree region on cable degradation. Furthermore, this study has documented simulation results of water tree degradation in EPR MV cables, which had been previously lacking in information. Future work in this area will add frequency into the mix and examine what effect it has on the rate of cable degradation as a result of water treeing. To compliment the work being carried by UMD on different polymer chemistries, harvested medium voltage (MV) cables were selected for accelerated aging study at ORNL. These medium voltage cables are representative of the vintages and materials that are currently in use at existing nuclear power plants (NPPs). These cables were immersed in water at 90°C and energized for a period of two years at elevated voltage. Partial discharge was measured during this period of time to track potential degradation. Unfortunately, due to the absence of failure, the extent of integration between the UMD techniques and the harvested MV insulation was limited. However, based on the findings and from the UMD research in the previous sections on polyethylene and polypropylene, follow-on characterization for harvested MV cable insulation should focus on sample preparation to take advantage of the UMD techniques to better understand mechanistic degradation in MV cable insulations. This would include: 1.) Utilization of solutions and impedance measurement insulation to track permeability in harvested and accelerated aging insulation samples, 2.) Adaptation of gold nanoparticle synthesis for electrical impedance spectroscopy with supporting SEM characterization to study pore formation in harvested and accelerated aged insulation samples, & 3.) ATR-FTIR crystallinity with multiple temperature dependent harvested MV cable insulation under different air and submerged accelerated aging. In addition, low voltage dielectric spectroscopy and high voltage dissipation factor, tan δ, could be implemented as a condition monitoring tool for harvested MV cable insulation in submerged environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗