Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Considerations for Implementation of MARSSIM/MARSAME Surface Radioactivity Surveys within FUSRAP - 12330

Surveys for residual surface radioactivity support the release of buildings under MARSSIM and the release of materials and equipment under MARSAME consensus guidance. There are a multitude of factors and conditions that must be assessed and addressed when developing a defensible survey design. ISO-7503 addresses the most basic survey considerations with consistent terminology and defensible calculation methodologies recommended for program-wide implementation by the authors. A key point of interest is the ISO-7503 approach to determining the total efficiency of the measurement system that is promoted by the authors for adoption throughout FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactor Design and Decommissioning - An Overview of International Activities in Post Fukushima Era1 - 12396

Accidents at the Fukushima Dai-ichi reactors as a result of the devastating earthquake and tsunami of March 11, 2011 have not only dampened the nuclear renaissance but have also initiated a re-examination of the design and safety features for the existing and planned nuclear reactors. Even though failures of some of the key site features at Fukushima can be attributed to events that in the past would have been considered as beyond the design basis, the industry as well as the regulatory authorities are analyzing what features, especially passive features, should be designed into the new reactor designs to minimize the potential for catastrophic failures. It is also recognized that since the design of the Fukushima BWR reactors which were commissioned in 1971, many advanced safety features are now a part of the newer reactor designs. As the recovery efforts at the Fukushima site are still underway, decisions with respect to the dismantlement and decommissioning of the damaged reactors and structures have not yet been finalized. As it was with Three Mile Island, it could take several decades for dismantlement, decommissioning and clean up, and the project poses especially tough challenges. Near-term assessments have been issued by several organizations, including the IAEA, the USNRC and others. Results of such investigations will lead to additional improvements in system and site design measures including strengthening of the anti-tsunami defenses, more defense-in-depth features in reactor design, and better response planning and preparation involving reactor sites. The question also arises what would the effect be on the decommissioning scene worldwide, and what would the effect be on the new reactors when they are eventually retired and dismantled. This paper provides an overview of the US and international activities related to recovery and decommissioning including the decommissioning features in the reactor design process and examines these from a new perspective in the post Fukushima -accident era. Accidents at the Fukushima Daiichi reactors in the aftermath of the devastating earthquake and tsunami of March 11, 2011 have slowed down the nuclear renaissance world-wide and may have accelerated decommissioning either because some countries have decided to halt or reduce nuclear, or because the new safety requirements may reduce life-time extensions. Even in countries such as the UK and France that favor nuclear energy production existing nuclear sites are more likely to be chosen as sites for future NPPs. Even as the site recovery efforts continue at Fukushima and any decommissioning decisions are farther into the future, the accidents have focused attention on the reactor designs in general and specifically on the Fukushima type BWRs. The regulatory authorities in many countries have initiated a re-examination of the design of the systems, structures and components and considerations of the capability of the station to cope with beyond-design basis events. Enhancements to SSCs and site features for the existing reactors and the reactors that will be built will also impact the decommissioning phase activities. The newer reactor designs of today not only have enhanced safety features but also take into consideration the features that will facilitate future decommissioning. Lessons learned from past management and operation of reactors as well as the lessons from decommissioning are incorporated into the new designs. However, in the post-Fukushima era, the emphasis on beyond-design-basis capability may lead to significant changes in SSCs, which eventually will also have impact on the decommissioning phase. Additionally, where some countries decide to phase out the nuclear power, many reactors may enter the decommissioning phase in the coming decade. While the formal updating and expanding of existing guidance documents for accident cleanup and decommissioning would benefit by waiting until the Fukushima project has progressed sufficiently for that experience to be reliably interpreted, the development of structured on-line sharing of information and especially the creation of an on-line compendium of methods, tools, and techniques by which damaged fuel and other unique situations have been addressed can be addressed sooner and maintained as new problems and solutions arise and are resolved. The IAEA's new 'WEB 2.0 tool' CONNECT is expected to play a significant role in this and related information-sharing activities. The trend in some countries such as the United States has been to re-license the existing reactors for additional twenty years, beyond the original design life. Given the advances in technology over the past four decades, and considering that the newer designs incorporate significant improvements in safety systems, it may not be economical or technically feasible to retrofit enhancements into some of the older reactors. In such cases, the reactors may be retired from service and decommissioned. Overall, the energy demand in the world continues to rise, with sharp increases in the Asian countries, and nuclear power's role in the world's energy supply is expected to continue. Events at Fukushima have led to a re-examination on many fronts, including reactor design and regulatory requirements. Further changes may occur in these areas in the post-Fukushima era. These changes in turn will also impact the world-wide decommissioning scene and the decommissioning phase of the future reactors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prospective implementation of a software application for pre-disposal L/ILW waste management activities in Romania

Romania is actively engaged to update the Medium and Long Term National Strategy for Safe Management of Radioactive Waste and to approve the Road Map for Geological Repository Development. Considering relevant documents to be further updated, about 122,000 m{sup 3} SL-LILW are to be disposed in a near surface facility that will have room, also, for quantities of VLLW. Planned date for commissioning is under revision. Taking into account that in this moment there are initiated several actions for the improvement of the technical capability for LILW treatment and conditioning, several steps for the possible use of SAFRAN software were considered. In view of specific data for Romanian radioactive waste inventory, authors are trying to highlight the expected limitations and unknown data related with the implementation of SAFRAN software for the foreseen pre-disposal waste management activities. There are challenges that have to be faced in the near future related with clear definition of the properties of each room, area and waste management activity. This work has the aim to address several LILW management issues in accordance with national and international regulatory framework for the assurance of nuclear safety. Also, authors intend to develop their institutional capability for the safety demonstration of the existent and future radioactive waste management facilities and activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge Management in the Field of Nuclear Energy - How to Bridge the Gap between Retiring Workforce and Next Generations - 17101

The current phase-out decision of the German Federal Government and the 'Energiewende' - resulting from the Fukushima Daiichi Accident in 2011 - changed the nuclear market significantly. Together with the change in political and social attitude towards nuclear energy since 2002 it has contributed to a decline in technical expertise. This as well as the generation change in the nuclear technology lead to the risk of losing accumulated knowledge and experience which still are essential for the future - not only in Germany but in other countries - even though the focus in Germany will shift from operating to decommissioning, dismantling and radioactive waste management. A long-term strategy in order to preserve technical expertise to solve the forthcoming tasks in Germany was required. This strategy should include e.g. the implementation of technical programs not only for internal training of the staff but also for authorities. Together with authorities TUV NORD developed individual training concepts for a broad range of customers to preserve a transfer of know-how with the state-of-the-art in science and technology and even support international projects, especially in countries with less experience in the nuclear fields. Additionally, special data bases were developed in order to ensure the accessibility of long-term nuclear data storage. Furthermore technical conferences in different fields like decommissioning and radioactive waste disposal were established as an opportunity for knowledge exchange. Based on given examples it is being demonstrated how technical expertise can be preserved even though the field of nuclear energy in Germany has changed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Proposed Path Forward for Standardization - 17131

Incorporation of a standardized canister system into the commercial waste management system represents an opportunity to develop an integrated approach to storage, transportation, and disposal issues. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. The current inventory of commercial spent nuclear fuel dry storage systems is diverse and increasing. In addition, the currently loaded systems are large-capacity systems (up to 37 pressurized water reactor assemblies or 89 boiling water reactor assemblies) that are now able to accommodate large (greater than 45 kilowatts) amounts of heat during storage, with the potential to accommodate fairly high heat loads (∼32 kilowatts) for transportation as well. A standardized canister system designed with disposition in mind would likely be significantly smaller than the current systems and have dramatically lower heat limit maximums. Over the past few years, the Department of Energy (DOE) Office of Nuclear Energy Fuel Cycle Technologies Nuclear Fuels Storage and Transportation Planning Project (NFST) has performed a number of system analyses using logistic simulations to evaluate the impacts of incorporating these smaller canisters into the commercial waste management system. These simulations predict the amount of resources (e.g., staff, canisters/casks, rail-cars, facilities), the size of facilities, and the timing of operations, as well as provide rough order-of-magnitude cost estimates. In addition to system analyses, DOE funded efforts by EnergySolutions to develop a generic design of a small-capacity standardized canister system and investigate innovative operational approaches to minimize the at-reactor operational impacts of loading such smaller canisters. A result of EnergySolutions' work was the development of a 'canister-in-carrier' concept that would allow for loading, storing, transporting, and potentially disposing of groups of small canisters at the same time. With the inclusion of this new concept, the most recent system analyses show that incorporating standardized canister systems into the commercial waste management system has the potential for some system-wide cost reductions in addition to the flexibility that smaller canisters would provide to the system. Based on these analyses, the authors of this paper recommend that DOE fund (1) a demonstration of the ability to weld up to four small canisters at the same time to confirm the feasibility and practicality of the canister-in-carrier concept and (2) the development of a more detailed conceptual design for future applications for Certificates of Compliance, if standardized canisters were incorporated into the commercial waste management system. This paper documents both the results of the latest assessment of standardized canister concepts including the canister-in-carrier concept and the authors' recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Problems and Solutions for the Long-term Storage of LLW in Germany - 17512

The primary aim of the Lower Saxony regulating authority is that all radioactive waste in long-term interim storage is made safe and their contents precisely documented. The requirements for regulating authority include: documentation, recovery, inspection, reconditioning, longer-term interim storage with full accessibility for inspection and transfer to the national disposal facility. The waste acceptance requirements of the disposal site Konrad as well as requirements for the interim storage facilities have to be met for all stored waste packages. Beside this, some challenges came up in the last few years, e.g. waste products with restrictions concerning the stability because of corrosion, fouling or fermentation processes. Some of these examples are shown. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of U.S. Special Permit/Exemption/Authorization Processes for Licensing Type B Radioactive Material Packages - 17513

In the United States, there are three regulators (agencies) associated with licensing Type B radioactive material packages for shipping. They are the U.S. Department of Energy (DOE), the United States Nuclear Regulatory Commission (NRC), and the United States Department of Transportation (DOT). Each regulator has requirements and guidance which implement United States Code of Federal Regulations 10 CFR 71 - Packaging and Transportation of Radioactive Material and 49 CFR 171 through 180 - Hazardous Materials Regulations. Periodically, select packages may not clearly fit within the requirements or guidance. In such cases, the planned shipper can petition the applicable agency for a special permit/exemption/authorization approving the shipment with the specified deviations from the requirements or guidance. If equivalent safety is successfully demonstrated to the applicable regulator, such authorization may be obtained. This paper compares the: 1) DOE exemption process; 2) the NRC special package authorization process; and, 3) the DOT special permit process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Formerly Utilized Sites Remedial Action Program - Program Update - 17530

The legacy of the United States' early atomic energy program is an important piece of our Nation's history. That legacy however, left low-level radiological contamination at properties now owned and operated by commercial, private and/or local government entities. Although many of these contaminated sites were identified by the Government in the past, additional properties continue to be identified. The United States Government, thru the US Department of Energy (USDOE) and the US Army Corps of Engineers (USACE), is addressing these sites with the Formerly Utilized Sites Remedial Action Program (FUSRAP) and has been doing so since the 1970's. The USDOE and the USACE both have roles in the Program. The USACE FUSRAP Program has an important task but faces many challenges to achieve a success conclusion. Since the implementation of 'sequestration cap' budgeting by Congress in 2012, the annual budget for the Program has decreased significantly compared to the funding levels in prior years. The Program complies with USACE Civil Works budgetary reprogramming rules that requires close coordination between the project and program teams to appropriately and efficiently obligate and expend Program funding. The very nature of environmental remediation work results in consistently finding additional unknowns during each phase of a project. The Program is required to follow Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) guidance and conduct cost recovery activities but does not have authorities such as those held by the US Environmental Protection Agency (USEPA). In order to pursue cost recovery actions, conclude a settlement agreement or file an administrative order, USACE must engage the US Department of Justice or USEPA to act on their behalf as USACE does not have the authority to do so themselves. Twenty years later, USACE continues to carry out the FUSRAP mission and work in coordination with the USDOE Office of Legacy Management (DOE-LM) to ensure that the Government's responsibilities are addressed. Success is measured by finishing each site cleanup so they can be turned back to their property owner and stakeholders for safe use. USACE continues to seek new technologies and methods of approach to improve and expedite site investigations and clean ups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radium/Barium waste project - 15043

The treatment, shipping, and disposal of a highly radioactive radium/barium waste stream have presented a complex set of challenges requiring several years of effort. The project illustrates the difficulty and high cost of managing even small quantities of highly radioactive Resource Conservation and Recovery Act (RCRA)-regulated waste. Pacific Northwest National Laboratory (PNNL) research activities produced a Type B quantity of radium chloride low-level mixed waste (LLMW) in a number of small vials in a facility hot cell. The resulting waste management project involved a mock-up RCRA stabilization treatment, a failed in-cell treatment, a second, alternative RCRA treatment approach, coordinated regulatory variances and authorizations, alternative transportation authorizations, additional disposal facility approvals, and a final radiological stabilization process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stop managing people, start managing agreements - 15081

One definition of management in business and organizations is: 'the function that coordinates the efforts of people to accomplish goals and objectives using available resources efficiently and effectively'. Unfortunately, what it takes to coordinate (literally, to create order together) is beyond the scope of today's management tools. The top five management tools in the world, according to a Bain 2013 survey, are: Strategic Planning; Customer Relationship Management; Employee Engagement Surveys; Benchmarking; and Balanced Scorecard. These are useful tools in business and organizations, but do not help managers coordinate the complex performance networks of agreements with resource providers, team members, and internal and external user-customers and authorities required to accomplish group or organizational goals. How do we manage such a network? While coordination is increasingly necessary in today's world of work, it is also a much neglected area of serious study because it is, almost literally, an invisible phenomenon. We can observe people inside groups, as well as their activities and results, but coordination is a product of managing what is going on between groups, not inside them. The challenge is making that in-between visible and actionable, not just 'white space'. A solution: define a Team's performance as agreements - and deliveries on the agreements - for products, services, and communications - the things moving between a Team and its immediate circle of resource providers, customers, and authorities relevant to a goal. This approach has been shown to reduce operational costs while also increasing team members' recognition of their interdependent responsibilities. Managers and Team leaders can then turn any Team goal into an opportunity for accomplishment in three steps: 1. Define 'performance' in terms of deliverable products, services, and communications for every goal; 2. Keep performance status current and visible to all team members; and 3. Debrief and update performance status routinely. Teamwork and engagement in goal accomplishment require a focus on Sender-Receiver agreements, productive communication, and timely and accurate status-tracking and feedback. Sustaining the context for accomplishment is not about managing people - it requires supporting coordination for the network of agreements in which people operate. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The container database? life-cycle management of container inventories at the Hanford site - 15131

Since 2011 the Department of Energy (DOE) Richland Operations Office (DOE-RL) and their contractor CH2M HILL Plateau Remediation Company (CH2M HILL) have worked together to develop a database that provides life-cycle management and control of all CH2M HILL-managed Department of Transportation (DOT) Type A and Industrial Packaging (IP) container assets at the Hanford Site. This powerful tool provides CH2M HILL with the capability to centrally manage container procurement specifications; maintenance requirements; certificates of conformance; certification and test reports; as-built drawings; and information on container status, location, and ownership; and any special characteristics of container assets. The database was originally developed to provide ready access to Type A and IP container supplier and manufacturer Certificates of Conformance (CoCs) and related certification documentation to support onsite shipments in compliance with the Hanford Site Wide Transportation Safety Document (TSD), DOE/RL-2001-0036, as well as regulatory or other requirements. The information is accessed through active links to these documents within the database itself. The database has grown to include links to external supplementary information to support onsite shipments, such as links to authorized tie downs for each package type, approved packaging and transportation commodities, and approved shipping authorizations, and packaging management procedures and checklists. The database is a living databank that is easily tailored to meet user- and site-specific needs as they are identified. It is currently being expanded to include the inventories of all Hanford contractors, as well as other packaging assets, such as specialty drums and packaging commodities. Each upgrade brings efficiencies and cost savings, not only in container inventory management, but also in the areas of work control, waste packaging, waste transportation, and regulatory compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and testing of a combined neutron and gamma assay system for measuring fissile material in fuel and waste items - 15340

A combined neutron and gamma ray assay system for the measurement of fissile material in both fuel and waste items has been designed, modelled, developed and tested. The purpose of the system is to measure and characterize a wide range of fissile materials including uranium, plutonium, americium and mixed oxide fuel arising from a variety of processes and facilities across the United Kingdom. Dounreay Site Restoration Limited at Dounreay currently stores these items form the United Kingdom Nuclear Decommissioning Authority's un-irradiated fuel inventory. This inventory comprises historic materials from ex-United Kingdom Atomic Energy Authority nuclear fuel projects and experiments together with fast reactor fuel materials and some commercial fuel items as delivered to Dounreay for recovery. The combined assay system has been designed and constructed to support the operation of a fuel processing facility, which will be operated at Dounreay to treat these historic legacy fuel materials, making them suitable for long term storage. Appropriate characterization of the fissile material is required for safety, criticality control and nuclear materials safeguards purposes prior to final disposition. The system consists of both gamma ray and neutron measurement components. The results of a neutron measurement are combined with the gamma ray isotopic ratio measurement results to generate the assay result for the fissile material being characterized. The gamma ray component of the system employs a safeguards quality high purity Germanium detector with electro-mechanical cooling and the measurements of fissile material containers are made in a shielded chamber with a tin and copper graded lining. Containers of fissile material are rotated during the gamma ray measurement and a variable automatic steel collimator aperture mechanism is employed to adjust the measured count rate to control detector dead time. Gamma ray spectra are analysed using the plutonium and uranium isotopic ratio code PC/FRAM. The gamma ray system can also be configured to perform a direct assay of small quantities of uranium bearing material. For this assay measurement a series of cadmium filters can be positioned in front of the detector to reduce the contribution from 59 keV gamma rays from Am-241. In addition to gamma ray isotopic measurements, both active and passive neutron assay is performed by the system. The neutron-measuring component consists of a thick walled cylindrical polyethylene chamber, which provides neutron moderation for 30 one-inch diameter He-3 detector tubes located in re-entrant channels in the polyethylene moderator. Two removable polyethylene-inserts incorporating lower plug assemblies are provided, one with and one without a cadmium lining. Also two top plug units are provided, again one with cadmium and one without a cadmium liner. The Neutron Subsystem can be operated both as a passive and as an active neutron coincidence counter. In both fast and thermal active neutron mode, the neutron component employs two americium-beryllium (Am-Be) alpha-n neutron sources, one positioned in the top and the other in the bottom plug unit. The neutron sources are removed when the counter is operated in passive mode. Passive neutron detection efficiency and active neutron performance has been modelled using the MCNP Monte Carlo computer simulation code as part of the design process. In the absence of fissile samples, operation of the gamma ray component of the system has been tested initially using calibrated Eu-152 and Ba-133 gamma ray sources and the use of archived spectra from fissile material measurements. Initial testing of the neutron system has employed a calibrated Cf-252 spontaneous fission neutron source. Neutron testing has been confirmed using further MCNP simulations. The results of test measurements with the system are presented and compared with the results of MCNP measurement simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of mine remediation programmes in developing countries - a life cycle perspective - 15371

This paper analyses some challenges of environmental rehabilitation (ER) projects in developing countries that the authors have encountered over the past two decades in many parts of the world, discusses the reasons and proposes ways to mitigate them. In the life cycle of an ER project, some stages that are particularly decisive for the lasting rehabilitation success are considered here: (1) site characterisation/baseline studies, (2) justification and development of remediation objectives, site end states and a remediation strategy, and (3) the after-care phase. This paper argues that the time available in many ER projects in developing countries using international funding is very often insufficient, and discusses the reasons for some of the most important bottlenecks: (1) time realistically required to produce thorough baseline data and obtain historic site information that are indispensable to develop a robust remediation design, (2) lack of an adequate legal and regulatory framework, overlapping and/or conflicting provisions of national standards and discrepancies with international best practice, (3) unmanaged stakeholder expectations regarding the actual health and environmental risks, justification and prioritisation of remedial actions, and the achievable remediation end state. Insufficient resources for after-care, monitoring and, if required, corrective action is another major issue that, in the experience of the authors, jeopardises the sustainability of remediation success. Consequently by applying the lessons learnt from previous ER projects in developing (and developed) countries and taking them on board during the programming phase of new ER projects, international funding agencies could greatly help to avoid these obstacles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of performance assessments and 3116 basis documents within the Savannah River Site liquid waste facilities - 15375

The end of the Cold War has left a legacy of over 136 million liters (36 million gallons) of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate it into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site. This process allows the US Department of Energy (DOE) to move forward with closure of the cleaned waste tanks and associated ancillary structures. To support performance-based, risk decision making for closure and disposal activities, three individual performance assessments (PAs) have been developed - salt-stone Disposal Facility, F-Tank Farm and H-Tank Farm. In addition, three Waste Determinations (WDs) have been made by the Secretary of Energy, in consultation with the Nuclear Regulatory Commission (NRC), under the authority of Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA Section 3116). To support these waste determination decisions, individual '3116 Basis Documents' were developed that describe the assumptions and conditions under which the criteria outlined in NDAA Section 3116 are met. The development of each of the PAs represented a long and arduous effort that involved the development of both deterministic and probabilistic conceptual models of the facilities, the development of assumptions and associated ranges, uncertainty and sensitivity analyses, model data collection and analyses, writing of the actual performance assessment, internal and external peer reviews, and ultimately approval by DOE. Similarly, the development of the 3116 Basis Documents represents similar time and financial commitments. At the end of these efforts, after years of preparation and millions of dollars in investment, we have thousands of pages of highly technical text, tables of data and hundreds of graphs and charts all contained in a series of thick binders that fit neatly on the shelf of a bookcase. We were done - right? Actually, we were just getting started. Performance Assessments and 3116 Basis Documents are living documents that shape day-to-day and long-term decision making in the operation of a low-level waste disposal facility (e.g., salt-stone Disposal Facility) or in area closure activities (e.g., F-Tank Farm or H-Tank Farm). Although these documents do not contain specifically described requirements per se, they do utilize specific assumptions that, if changed significantly, could result in no longer being able to demonstrate that there is reasonable assurance that the required performance objectives or the criteria from NDAA Section 3116 can be met. Savannah River Remediation LLC (SRR), the contractor responsible for Liquid Waste operations at SRS, has not only developed the PAs and 3116 Basis Documents to support this work and shepherded these documents through the DOE approval process, but has also developed the processes and procedures to ensure the successful implementation and integration of these documents into day-to-day decision making within the associated facilities. This paper describes these processes, including the Un-reviewed Waste Management Question process and the PA Maintenance process, and provides specific examples of their successful implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Needs for integrated risk assessment to support optimal environmental management decisions - 15455

Cleaning up legacy waste from 50 years of nuclear weapons production and energy research still remains a challenge for the U.S. Department of Energy (DOE). The DOE environmental management program is currently forecasted to run through at least late 2060's with an estimated liability of $204 billion. Risks to human health of workers and the public, the ecological system, and nuclear safety of cleanup activities continue to drive the cost of DOE's cleanup programs. Currently, these risks are generally assessed and managed independently of each other. Except for DOE self-regulated on-site disposal activities of low-level radioactive waste, risks to human health and the environment are generally under the purview of U.S. Environmental Protection Agency and State regulatory agencies, while nuclear safety risks are regulated by DOE with oversight from the U.S. Nuclear Regulatory Commission and the Defense Nuclear Facilities Safety Board where appropriate. When managing health and environmental risks, the individual regulatory authorities often use an area-by-area (or unit-by-unit), contaminant-by-contaminant (chemical-by-chemical or radionuclide-by-radionuclide) approach, focusing on a single medium (soil, water, or air), a single source (e.g., a burial ground or a processing facility), and a single receptor (e.g, a groundwater well or a creek). This level of segregation in risk evaluations by risk category, geographical location, and operational unit, as well as the corresponding separation of regulatory authorities poses a significant challenge to reaching an optimal decision in prioritizing and managing cleanup activities. This management challenge adds another layer of complexity to large-scale cleanup effort at complex sites such as the Hanford site in eastern Washington. Therefore, to support a scientifically sound, operationally robust decision making process, there is a need for an integrated, holistic approach to risk assessment that addresses the combined effects of all major contributing factors. Previous studies have pointed out the need for integrated risk assessments that address multi-contaminant, multimedia, multi-pathway exposures, for the purposes of evaluating risks to human health and the environment. We believe that a comprehensive risk assessment should also take into nuclear safety risks that are associated with handling of nuclear material either retrieved from burial sites or to be decommissioned from nuclear facilities. Recent efforts, such as the Consortium for Risk Evaluation with Stakeholder Participation (CRESP)-led Hanford site-wide independent risk review that will categorize all types of risks at the Hanford site and the DOE complex-wide risk review mandated by the Fiscal Year 2014 Consolidated Appropriations Act ('Omnibus bill'), are beginning to more comprehensively address this need. This paper provides a categorization of various types of risks present at typical DOE sites, reviews the current risk assessment and management practices, and discusses the needs for integrating nuclear safety into performance and risk assessments for optimal cleanup decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗