Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ventilation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Evaluation of Savings in Energy-Efficient Public Housing in the Pacific Northwest

This report presents the results of an energy performance and cost-effectiveness analysis. The Salishan phase 7 and demonstration homes were compared to Salishan phase 6 homes built to 2006 Washington State Energy Code specifications 2. Predicted annual energy savings (over Salishan phase 6) was 19% for Salishan phase 7, and between 19-24% for the demonstration homes (depending on ventilation strategy). Approximately two-thirds of the savings are attributable to the DHP. Working with the electric utility provider, Tacoma Public Utilities, researchers conducted a billing analysis for Salishan phase 7. Median energy use for the development is 11,000 kWh; annual energy costs are $780, with a fair amount of variation dependent on size of home. Preliminary analysis of savings between Salishan 7 and previous phases (4 through 6) suggest savings of between 20 and 30 percent. A more comprehensive comparison between Salishan 7 and previous phases will take place in year two of this project.

affordable housing↗

New Whole-House Solutions Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania

In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania, to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. The team evaluated a market-available through-wall air transfer fan system that provides air to the bedrooms.The relative ability of this system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability.

50% Building America Benchmark↗

DOE Zero Energy Ready Home Case Study: Near Zero Maine Home II - Vassalboro, Maine

This case study describes a DOE Zero Energy Ready home in Vassalboro, Maine, that scored HERS 35 without PV and HERS 11 with PV. This 1,200 ft2 home has 10.5-inch-thick double-walls with 3 layers of mineral wool batt insulation, an R-20 insulated slab, R-70 cellulose in the attic, extensive air sealing, a mini-split heat pump, an heat recovery ventilator, solar water heating, LED lighting, 3.9 kWh PV, and triple-pane windows.

builder↗

New Whole-House Solutions Case Study: Winchester Homes and Camberly Homes

The Partnership for Home Innovation team worked with the builder to develop a new set of high performance home designs—including advanced wall and HVAC systems—that could be applicable on a production scale. The new home designs are to be constructed in the mixed humid climate zone and could eventually apply to all of the builder's home designs to meet or exceed future energy codes or performance-based programs. However, the builder recognized that the combination of new wall framing designs and materials, higher levels of insulation in the wall cavity, and more detailed air sealing to achieve lower infiltration rates changes the moisture characteristics of the wall system. In order to ensure long term durability and repeatable successful implementation with few call-backs, this report demonstrates through measured data that the wall system functions as a dynamic system, responding to changing interior and outdoor environmental conditions within recognized limits of the materials that make up the wall system. A similar investigation was made with respect to the complete redesign of the heating, cooling, air distribution, and ventilation systems intended to optimize the equipment size and configuration to significantly improve efficiency while maintaining indoor comfort. Recognizing the need to demonstrate the benefits of these efficiency features, the builder offered a new house model to serve as a test case to develop framing designs, evaluate material selections and installation requirements, changes to work scopes and contractor learning curves, as well as to compare theoretical performance characteristics with measured results.

2x6 walls↗

Existing Whole-House Solutions Case Study: Build San Antonio Green, San Antonio, Texas

PNNL, FSEC, and CalcsPlus provided technical assistance to Build San Antonio Green on three deep energy retrofits. For this gut rehab they replaced the old roof with a steeper roof and replaced drywall while adding insulation, new HVAC, sealed ducts, transfer grilles, outside air run-time ventilation, new lighting and water heater.

Building America↗

Design and Performance of an Image Processing Occupancy Sensor

The design and performance of a novel image-processing occupancy sensor (IPOS) based on production-grade embedded hardware are described. The IPOS overcomes several issues related to traditional passive infrared (PIR) and ultrasonic-based motion sensors. It also provides a rich set of feedback signals that more sophisticated applications can use for occupant-optimized lighting, daylighting,temperature,and ventilation control, as well as with building security systems. The IPOS was tested as part of an integrated system consisting of a building energy management system (EMS) alongside a pair of PIR sensors produced by different manufacturers. IPOS output was fed to the EMS via the building automation and controls network (BACnet) and logged alongside the PIR outputs in an officeenvironment over several days. Tests suggest the IPOS device identifies occupancy events better than two commercial PIR sensors (94.1% accuracy compared to 73.1% on average). Also, IPOS could correctly identify stationary occupants whereas the PIR sensors could not.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Brilliant Execution of Smart Labs: Employing Best Practices to Improve Safety and Reduce Energy for Sustainable Labs: Preprint

Laboratory buildings often dominate the energy use on research campuses, consuming three to four times the energy of a typical office building. In most cases, these facilities are defined as “mission critical,” with excessive energy use as simply an unfortunate truth that cannot be avoided without compromising safety. However, case studies indicate cost savings opportunities of up to 40% in laboratories (compared to standard practices) by employing energy efficient design strategies that also improve the safety of lab spaces (Better Buildings 2018). To help stakeholders implement improvement measures, the Smart Labs Toolkit describes a proven approach to optimizing performance of laboratories and critical control environments in new or existing facilities. The Toolkit outlines distinct phases for building a successful Smart Labs program that include: Plan, Assess, Optimize, and Manage. Each phase has specific tasks, training videos, and resources to educate users, support the efforts of key stakeholders, and maximize benefits for the organization in implementing high-performance labs. The Toolkit also includes case studies from the 17 Better Buildings Smart Labs Accelerator partners, sharing lessons learned and supporting the Smart Labs approach to safe, efficient world class science. This paper reviews the technology choices for implementing Smart Labs ventilation strategies, controls, and other efficiency measures. Better Building Smart Lab Accelerator partners provide case study examples of safety and energy-savings results of using Smart Labs approaches.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

HVAC End-of-Life: Options and Best Practices

When heating, ventilating, and air-conditioning (HVAC) systems reach end-of-life status, building owners typically seek the quickest, most cost-effective replacement. Although there are several rooftop unit (RTU) replacement tool kits and programs to guide clients through this process, there is limited information on how to handle end-of-life HVAC systems. This fact sheet provides relevant information to help building owners manage proper disposal of HVAC systems, how to navigate regulations, and how to recover economic value from old systems.

30 DIRECT ENERGY CONVERSION↗

Energy Savings of Occupancy-Based Controls in Office Buildings

Variable-air-volume (VAV) systems are used in many office buildings. The terminal’s minimum air flowrate set point is an important parameter that has significant impact on energy consumption and indoor air quality. Conventional controls usually have the terminal’s minimum air flowrate at a constant, irrespective of the occupancy status. Such practice may cause energy waste, ventilation and thermal comfort problems. This paper examines the potential of energy savings by occupancy-based controls (OBCs). The sensed occupancy information, either presence or the people count, is used to determine the air flowrate of terminal boxes, the thermostat set points, and the lighting as well. Using EnergyPlus, energy savings of OBC strategies are evaluated for representative existing medium office buildings in the U.S. Simulation results show that for the location of Baltimore, MD, the use of air-side economizer or not does indeed have significant impact on the comparison between the two OBC strategies. The OBC based on the occupant presence has about 13% whole-building energy savings no matter whether the air-side economizer is used in the AHU operation. However, for the OBC based on the people count, the percentage of energy savings increases from 13% for the case of not using air-side economizer to 23% for the case of using air-side economizer.

Occupancy based control, building simulation, adva↗

ComStock/COVID-19: U.S. Commercial Building Stock Analysis of COVID-19 Mitigation Strategies

ComStock is a DOE platform, with NREL as the lead developer, that models the U.S. commercial building stock using OpenStudio/EnergyPlus to perform physics-based building energy modeling simulations. The ASHRAE Epidemic Taskforce (ASHRAE-ETF) has released several COVID-19 mitigation strategies for commercial buildings. ComStock was used to analyze the impact of four strategies on the existing commercial building stock. These strategies are upgrading to MERV-13 filters, disabling demand control ventilation (DCV), increasing minimum outdoor air to 100%, and HVAC flushing mode operation. Results show the impact of each measure on energy consumption, electric consumption, gas consumption and peak electric.

30 DIRECT ENERGY CONVERSION↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

A jewel in the desert: BHP Billiton's San Juan underground mine

The Navajo Nation is America's largest native American tribe by population and acreage, and is blessed with large tracks of good coal deposits. BHP Billiton's New Mexico Coal Co. is the largest in the Navajo regeneration area. The holdings comprise the San Juan underground mine, the La Plata surface mine, now in reclamation, and the expanding Navajo surface mine. The article recounts the recent history of the mines. It stresses the emphasis on sensitivity to and helping to sustain tribal culture, and also on safety. San Juan's longwall system is unique to the nation. It started up as an automated system from the outset. Problems caused by hydrogen sulfide are being tackled. San Juan has a bleederless ventilation system to minimise the risk of spontaneous combustion of methane and the atmospheric conditions in the mine are heavily monitored, especially within the gob areas. 3 photos.

01 COAL, LIGNITE, AND PEAT↗

Extracting value from coal mine methane

Emerging US policy to regulate greenhouse gas (GHG) emissions through a cap-and-trade program presents mine managers with a new opportunity to explore and develop methane utilization or abatement projects that generate value from the anodization of carbon offset credits. In addition, the rising focus on US energy security and domestic energy supply is promoting mine managers and engineers to give further consideration to the importance of their methane gas by-products. The market through which coal mine methane offset projects can be developed and carbon offset credits monetized is quickly maturing. While many methane utilization projects have previously been uneconomical, the carbon offset credit market provides a new set of financing tools for mine engineers to capitalize these projects today. Currently , there are two certification programs that have approved project protocols for CMM projects. The Voluntary Carbon Standard (VCS) offers a methodology approved under the Clean Development Mechanism, the international compliance based offset market under the Kyoto Protocol. The VCS protocol is applicable to projects that combust ventilation air methane (VAM) and methane extracted from pre-and post-mine drainage systems. The Chicago Climate Exchange (CCX), which operates a voluntary yet binding cap-and-trade market, also has an approved protocol for CMM projects. CCX's protocol can be applied to projects combusting VAM, and methane extracted from pre-and-post-mine drainage systems, as well as abandoned mines. The article describes two case studies - Developing a gob gas utilization project financed by carbon offset credits and First VAM oxidation system to be commissioned at an operating mine in the US. 1 tab., 4 photos.

01 COAL, LIGNITE, AND PEAT↗

Refurbishment of the tritium laboratories at SCK-CEN

The SCK-CEN tritium laboratories were commissioned in 1975 for a maximum tritium inventory of 37 TBq. With an aim to improve the infrastructure, the capabilities and safety, SCK-CEN's general management decided to refurbish the laboratories. A new ventilation system, including a stack and gloveboxes equipped with a detritiation installation, will allow a higher tritium inventory limit of 0.37 PBq. This paper discusses the ongoing refurbishment of the two neighboring tritium laboratories. Currently one laboratory has been de-nuclearized whilst the other is still in operation. Nevertheless a number of conclusions can already be drawn. We succeeded in de-nuclearizing most of the equipment and infrastructure without personnel receiving measurable tritium doses. If the free released metals had been disposed off at a nuclear melting facility, 22% of the costs could have been saved, however free release is more socially acceptable. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Considerations for recovery of large areas of a nuclear facility for re-use - 15147

This paper highlights a number of factors an organization might consider for recovery of a facility, using a successful example from the UK. In 2013 a power failure led to the shutdown of the ventilation system that caused loose contamination to be deposited over large sections of man-accessible areas of plant after the evacuation of personnel. The successful initiation of emergency Command and Control arrangements during the Response phase, saw several key responders brought together to offer technical direction across many disciplines. The actions of the Command and Control unit prevented any further spread contamination to other areas of the facility and any external release. This enabled the return of the plant to an operational status which forms an important mission enabler for the site hazard reduction programme. Intervention at an early stage during the Response phase of the incident saw the cessation of traditional dilute chemical wet decontamination approach that would otherwise leave a legacy of slow leaching contamination; to that of containment and ultimate removal of loose contamination using strippable coatings. Doing so established a more rapid and reliably 'clean' access or pathway into the plant to establish the full extent of the situation. The scale and scope of the decontamination requirement was steadily revealed through a number of controlled re-entries to the plant. A number of other techniques were considered and employed to address the different areas making use of available plant resources to deliver the successful 'self-help' recovery of the plant using multi-disciplinary teams. As Response switched to Recovery, it was important to set out and agree which strategic option should be adopted to return the facility to normal operation. Equally, it was necessary to verify which equipment had been affected by the power outage and repair as required. Furthermore, equipment with designated safety functions had to be maintained alongside the Recovery activities. A careful balance of priorities demanded an unparalleled depth of plant knowledge to address this, whilst still keeping site and external stakeholders informed. The engagement by the plant workforce to take on the decontamination challenge to enable recovery of their plant supported by other teams formed a critical step in the speed of recovery. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP - February 2014 operational events and the compliance re-certification application (CRA) 2014 - 15293

On Wednesday, February 5, 2014, an underground mine fire involving a salt haul truck occurred at the Waste Isolation Pilot Plant (WIPP). There were 86 workers in the mine when the fire occurred. All workers were evacuated. Nine days later, on Friday, February 14, 2014, there was an incident in the underground repository at WIPP which resulted in the release of americium and plutonium from one or more transuranic (TRU) waste containers into the environment. The release was detected by an underground continuous air monitor and then directed through high-efficiency particulate air (HEPA) filter banks located in the surface exhaust building. However, a measurable portion bypassed the HEPA filters via leakage through two ventilation system dampers and was discharged directly to the environment from an exhaust duct. No personnel were determined to have received external contamination; however, some individuals that were on site were identified through bioassay to have initially tested positive for low level amounts of internal contamination. Trace amounts of americium and plutonium were detected off-site.While significant to day-to-day operations, these events have no impact to the long-term performance of the repository. Because WIPP's re-certification is based solely on the post-closure performance of the repository (40 CFR 191, Subparts B and C), these recent events do not affect the long-term performance predictions or its technical and scientific basis. In this paper we will further explore the requirements for WIPP's re-certification, and the basis for our contention that the recent WIPP operational events do not impact long-term repository performance or have any implications on salt as a geologic disposal media, and that re-certification efforts should continue uninterrupted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Higher harmonic ultrasonic guided waves for structural integrity assessment of dry storage canisters - 15381

Dry storage of used fuel from nuclear power plants has gone from an interim storage solution to a longer-term solution, which necessitates monitoring the integrity of the stainless steel canister that confines the used fuel. Since the storage facilities are located around the country in a variety of different environments there is a wide range of degradation mechanisms that could occur over time in the cylindrical canister. One potential degradation mode that has created significant concern is stress corrosion cracking. We propose using higher harmonic ultrasonic guided waves as a tool to nondestructively inspect used fuel canisters. Higher harmonics are generated when a wave propagates through a nonlinear elastic media. These higher harmonics have been shown to be quite sensitive to microstructural features such as dislocation substructures, persistent slip bands, precipitates, etc. The use of ultrasonic guided waves to inspect the canister is attractive due to the size of the canister and the ability of guided waves to inspect a reasonably large domain relative to traditional bulk wave ultrasonics. We will highlight our recent progress on theory, numerical simulations, and laboratory experiments to develop higher harmonic guided waves as a tool to detect microstructural changes that precede macro-scale damage. Analyzed structures include plates and hollow cylinders, and we focus on localized damage initiation, as is the case for stress corrosion cracking. Recent experiments focus on using magnetostrictive transducers in activating the fundamental shear horizontal mode (SH0) and the third harmonic that is generated due to the material nonlinearity. The magnetostrictive transducer comprises a thin iron-cobalt foil, a meandering electric coil, and a permanent magnet. These transducers are inexpensive, easy to use, and are very efficient at generating shear waves. In applications where the wavelength is larger than the plate thickness, the waves are guided by the traction free boundary conditions and propagate in the plane of the plate. For this canister application, the shear horizontal waves energize the entire thickness of the canister and propagate along the shell in the direction dictated by the meander coil. Experiments indicate that magnetostrictive transducers can generate waves that propagate in plate thicknesses of 1 mm to at least 16 mm. The SH0 mode is nondispersive and generates a third harmonic of the same mode that is shown to be sensitive to localized plastic strain and unseen fatigue damage. It has a strong potential to detect the very early stages of stress corrosion cracking. Due to the geometric configuration of dry storage casks, the transducers will need to be delivered to the inspection points by a robotic system that navigates through the cask ventilation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗