Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Digital I and C system upgrade integration technique

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m{sup 2} of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m{sup 2} for a total active area of 1200 m{sup 2}. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS end-cap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2 x 0.5 m{sup 2} have been built with the same structure as foreseen for the NSW upgrade. It represents the first example of a Micromegas quadruplet ever built, realized using the resistive-strip technology and decoupling the amplification mesh from the readout structure. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 deg. and provide a measurement of the second coordinate. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be given on the methods developed to achieve the challenging mechanical precision. Measurements of deformation on chamber prototypes as a function of thermal gradients, gas over-pressure and internal stress (mesh tension and module fixation on supports) will be also shown in comparison to simulation. These tests were essential in the development of the final design in order to minimize the effects of deformations. During installation and operation all deformations and relative misalignments will be monitored through an optical alignment system and compensated in the tracking software. The optical alignment concept will also be outlined. 2 (authors)

43 PARTICLE ACCELERATORS↗

Construction and Design of a full size sTGC prototype for the ATLAS New Small Wheel upgrade

For the forthcoming Phase-I upgrade to the LHC (2018/19), the first station of the ATLAS muon end-cap system, Small Wheel, will need to be replaced. The New Small Wheel (NSW) will have to operate in a high background radiation region while reconstructing muon tracks with high precision as well as furnishing information for the Level-1 trigger. In particular, the precision reconstruction of tracks requires a spatial resolution of about 100 μm, and the Level-1 trigger track segments have to be reconstructed with an angular resolution of approximately 1 mrad. The NSW will have two chamber technologies, one primarily devoted to the Level-1 trigger function the small-strip Thin Gap Chambers (sTGC) and one dedicated to precision tracking, Micromegas detectors, (MM). The single sTGC planes of a quadruplet consists of an anode layer of 50 μm gold plated tungsten wire sandwiched between two resistive cathode layers. Behind one of the resistive cathode layers, a PCB with precise machined strips (thus the name sTGC's) spaced every 3.2 mm allows to achieve the position resolution that ranges from 70 to 150 μm, depending on the incident particle angle. Behind the second cathode, a PCB that contains an arrangement of pads, allows for a fast coincidence between successive sTGC layers to tag the passage of a track and reads only the corresponding strips for triggering. To be able to profit from the high accuracy of each of the sTGC planes for trigger purposes, their relative geometrical position between planes has to be controlled to within a precision of about 40 μm in their parallelism, as well (due to the various incident angles), to within a precision of 80 μm in the relative distance between the planes to achieve the overall angular resolution of 1 mrad. The needed accuracy in the position and parallelism of the strips is achieved by machining brass inserts together when machining the strip patterns into the cathode boards in a single step. The inserts can then be used as external references on a granite table. Precision methods are used to maintain high accuracy when combining four single detector gaps first into two doublets and then into a quadruplet. We will present results on the ongoing construction of full size (∼1 x 1 m) sTGC quadruplet prototypes before full construction starts in 2015. (authors)

43 PARTICLE ACCELERATORS↗

Upgrade of High-Energy X-Ray real-time radioscopy for KROTOS experiment

As part of its R and D programs on severe accidents, in particular on understanding of corium-water interaction, CEA is commissioning an update of the KROTOS experiment at Cadarache. The Xray imaging setup (high energy real-time radioscopy) is upgraded to provide the best performances for the new experimental program. In order to fit the performance needs (faster acquisition, smaller detection limit and higher field of view), two radioscopy setups, with two linear accelerators (linacs 9 MV and 6 MV), are placed in the irradiation cell. Having discussed the expected performances in terms of frequency, detection limit and field-of-view, this article details each stage of both radioscopy chains: principles and technical characteristics. Then, linacs and cameras synchronization (at few hundred Hertz), data flows and storage setups are detailed. Finally, experimental characterizations and performance validations on phantom are presented. (authors)

43 PARTICLE ACCELERATORS↗

Upgrade Your Work Plans for Better Performance - 16103

Most work plans involve at least two basic pieces: a list of things to do and a timeline for doing them. These 'tasks-and-times' plans can be used for managing a project, an organizational change, or the implementation of a strategic objective. But given the high rate of plan failures - often cited as ranging from 35% to over 80% - something must be missing. Three ideas for upgrading work plans have demonstrated higher success rates than the time-and-task method alone. First, maintain a 'GPS Scorecard' of the Goals, Performance metrics, and Schedules for accomplishment. Second, maintain a Performance Circle Register of all key players, and the key deliverables to and from each of them, that will ensure success. Third, implement all three parts of an accountability management system, collectively referred to as 'T3': Tracking, Team assignments, and Talk-times to update status and progress against the plan. Why bother to take the extra steps to strengthen work plans? There are three reasons: (a) Because traveling without a map is risky in times of high change in infrastructure, staffing, and technology; (b) Because 'expectations' do not guarantee delivery as reliably as well-defined agreements; and (c) Because 'accountability' is a management practice, not a personality trait. Together, implementing these three ideas can provide for clarity of purpose, guidance in establishing the productive relationships necessary for success, and a system of supporting accountability for all participants, both on the team and with others inside and outside of the organization. (authors)

99 GENERAL AND MISCELLANEOUS↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AVANTech's Liquid Radwaste (LRW) Processing System Upgrade at the Farley Nuclear Plant - 20328

This paper looks at the Liquid Radioactive Waste (LRW) processing system configuration at Joseph M. Farley Nuclear Plant (Plant Farley). A combination of factors led the staff at Plant Farley to seek a better way to manage and process liquid waste. These factors were: - Reduce effluent activity; - Reduce waste volume; - Improve cost efficiency. The LRW processing system changes made at Plant Farley are identified and discussed. The information and technologies cited in this paper are directly applicable to other nuclear power plants who might contemplate an upgrade of LRW processing systems or of individual system components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations and Recent Upgrades to a Tritium Recycling Facility - 20375

Nuclear Sources and Services Inc. (NSSI) is a waste handling treatment company that has been operating since 1971. In 2000, NSSI began building a 1,000 m{sup 2} (∼10,000 sqft) tritium recycling facility on the Houston, Texas premises to address a growing need in the waste disposal market. Over the years, the capability of the facility grew to address many different waste streams with the goal of recycling > 99.9% of all tritium activity back into the fusion community. This is achieved by maintaining an effluent stack release well below the 150 GBq/year (C Ci/year) operating limit and maintaining all liquid and solid waste disposal below the low-level radioactive release limit of 0.C MBq/kg (10 μCi/kg). The unique processing systems in the facility attracts many challenging contracts. Within the past two years, NSSI has engaged with customers to treat; organic mixed wastes that simultaneously contain tritium and carbon-14, safely extract tritium from large quantities of exit sign lights, and remove tritium from uncharacterised legacy depleted uranium beds from a superfund site. This paper will outline the initial testing, the system upgrades to treat these varied streams, and the progress in processing the feedstocks provided by these projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMONSTRATION OF A MULTI-STAGE TESTING AND EVALUATION APPROACH FOR A SAFETY-RELATED DIGITAL UPGRADE AT A NUCLEAR POWER PLANT

There is an imminent need for existing United States nuclear power plants to reduce their operating and maintenance costs to remain economically viable. Digital technology provides significant opportunity for the existing nuclear power plant fleet to transform that way in which work is accomplished to reduce costs and allow the fleet to remain economically competitive. However, a careful understanding of the human-technology integration is needed to ensure the continued safe and reliable operation of these existing plants with new digital capabilities. This work presents interim findings in applying human factors engineering to a safety-significant digital upgrade for a United States nuclear power plant, following the new Alternative Review Process in the recently revised Digital Instrumentation and Control Interim Staff Guidance Licensing Process, Revision 2. The interim results described in this work provides an industry perspective, based on ongoing work, to recent work published from Vazquez, Green, and Desaulniers (2022).

99 GENERAL AND MISCELLANEOUS↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Electrospinner Upgrades for Nanofiber Production

Electrospinning is an inexpensive and flexible method for producing nanofibers. Nanofibers are highly adaptable with potential applications in accelerator target systems, air and water filtration, and biomedicine. This project aims to upgrade and test an existing roll-to-roll electrospinner that is more economical for industrial nanofiber production. Varying the diameter of nanofiber can change its functional properties. The current unit cannot adjust spinneret-collector separation, which determines nanofiber diameter. The electro-spinneret channel also does not have lateral adjustment capabilities for precise alignment. Lastly, the viscosities of our polymer solutions have not been quantified. Solution injection into the channel is presently inconsistent because of imperfect nozzle sizing, resulting in waste and decreased efficiency. Modeling was done with Siemens NX CAD software, and viscosity was measured using a Brookfield DVE-LV viscometer. A dual scissor lift design for channel displacement, powered by a dual-shaft DC motor coupled to precision lead screws, was approved and construction was started. Preliminary channel modifications also were initiated. Going forward, the scissor lift system will be integrated and evaluated with our electrospinner, along with further channel modifications. Viscosity measurements of polyvinyldimethylformamide (PVDF) were recorded with inconsistent results due to inadequate testing conditions. Future viscosity trials must be completed in accordance with testing requirements. The optimization and commercialization of roll-to-roll electrospinner units can make nanofiber production more feasible for many new industries and consumer products.

Black, Niko↗

Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source

A programmable signal processor-based credited safety control that calculates pulsed beam power based on beam kinetic energy and charge was designed as part of the Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS). The system must reliably shut off the beam if the average power exceeds 2.145 MW averaging over 60 seconds. System calibration requires pedigree in measurements, calibration setup, and calculations. This paper discusses the calibration of the analog beam signal components up to and including the Analog Digital Convertors (ADCs) for implementation into the Safety Programmable Logic Controllers (PLCs) and Field Programmable Gate Arrays (FPGAs).

Bobrek, Miljko↗

Limerick Safety-Related Instrumentation and Control Upgrade Human Factors Engineering Preliminary Validation Report

This document is a results summary report for the human factors engineering (HFE) preliminary validation (PV) performed for the Limerick Generating Station (LGS) Safety-Related (SR) Instrumentation and Control (I&C) Upgrade Project at the Idaho National Laboratory (INL) Human Systems Simulation Laboratory (HSSL). This occurred during the week of February 20, 2023.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Functional Verification for Endcap Concentrator ASICs in the High-Granularity Calorimeter Upgrade of CMS

The High-Granularity Calorimeter (HGCAL) of CMS will undergo a major upgrade during Long-Shutdown 3. The Endcap Concentrator (ECON) ASICs represent key elements in the readout chain, processing trigger (ECON-T) and data (ECON-D) streams from the HGCROC to the lpGBT. The ECONs will operate in a radiation environment with a High-Energy Hadron (HEH) flux of $3\cdot10^{6} cm^{-2}s^{-1}$. This contribution describes the Universal Verification Methodology (UVM)-based functional verification of the ECON ASICs focusing on the re-use of existing components to manage the complexity of the verification environment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Control System Upgrade for Battery State-of-Charge Indications

The Advanced Test Reactor (ATR) Complex at Idaho National Laboratory (INL) relies on Battery Backed Power (BBP) systems and Uninterruptible Power Supplies (UPS) to ensure continuous power supply to critical components. This project aims to enhance the reliability and functionality of the battery monitoring and control systems by updating the State-of-Charge (SOC) system, Programmable Logic Controller (PLC), and Human-Machine Interface (HMI) for the nuclear safety-related battery banks. The current system, while functional, has areas for improvement, particularly in recharging calculations and alarm functions. The project objectives include developing flow charts, programming the new PLC and HMI, conducting bench tests, and updating design documentation. Additionally, the project ensures compliance with safety standards, develops training materials, creates comprehensive documentation, and integrates seamlessly with existing ATR infrastructure. The new SOC system is designed to be scalable for future upgrades, improve efficiency, enhance data accuracy, implement redundancy features, and achieve project goals within budget constraints while considering environmental impact. The methodology involved familiarizing with BBP and UPS systems, collecting current readings, rescaling signals, learning ladder logic, and updating the HMI. The transition from SLC 5/03 PLC using RS Logix 500 to CompactLogix 5380 using Studio 5000 was a key step. Despite challenges in transferring outdated PLC ladder logic and HMI code, starting from scratch led to a more accurate and efficient monitoring system, contributing to improved safety and operational efficiency. The project is currently awaiting approval of the Engineering Calculation and Analysis Report (ECAR) before implementation.

42 - ENGINEERING↗