Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Dynamic RPS Path to Flight

NASA Glenn Research Center has been pursuing the development of dynamic power conversion for several decades. Candidate NASA missions involve mutli-year travel to far away destinations, or to extreme environments where sunlight does not exist. Human-base mission studies also show that power needs would be beyond the capabilities of solar energy conversion, and instead would require nuclear reactor energy sources, for which the thermal energy must be converted to electricity. Dynamic power conversion technology has developed sufficiently to make a sound engineering argument that it is suitable for these NASA missions. Dynamic conversion power sources have yet to be flown in space, and thus suffer a disadvantage owing to their lack of heritage data on flight missions. One of the largest obstacles for adoption is the uncertainty in reliability of a device with moving parts. However, significant progress has been made toward demonstrating the technology capable in all relevant environments, with the necessary long life. Another hurdle for adoption is the lack of mission, which would drive specific requirements, and provide a solid timeline for technology development endpoint. Until a mission is identified, an alternative approach is necessary to advance a dynamic power conversion system towards flight.

Oriti, Sal↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

Time Domain Astronomy with the Fermi Gamma-Ray Burst Monitor in the Multimessenger Era

Outline -Introduction: Fermi Gamma-Ray Burst Monitor (GBM); Gamma-Ray Bursts (GRBs). -GRB 170817A: GBM’s most famous GRB; Gamma-ray and Gravitational Wave (GW) Observations; Science from Joint GW/GRB observations; Timeline of follow-up observations. -Similar GRBs in GBM data: GRB 150101B; Other similar GRBs. -What comes next?: Joint GBM and LIGO (Laser Interferometer Gravitational-Wave Observatory) / Virgo (Michelson interferometer operated by a European consortium) observations; Science from new GW/GRB observations; New types of coincident events. -Other types of transient and variable sources observed with Fermi GBM.

Wilson-Hodge, Colleen A.↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

Ion Propulsion for Solar System Exploration

NASA's Evolutionary Xenon Thruster (NEXT) is ready for transition-to-flight. The thruster has completed all qualification-level environmental testing, and has demonstrated a xenon propellant throughput, total impulse, and total operating hours greatly in excess of anticipated planetary science mission requirements, and exceeding that achieved by any other thruster technology in the history of electric propulsion. NEXT is the next generation system, a natural progression in technology from that implemented successfully on the Deep-Space one and Dawn missions, developed at NASA's Glenn Research Center in Cleveland, Ohio. The first implementation of NEXT will be on NASA 's Double Asteroid Redirection Test (DART). DART will be the first demonstration of the kinetic impact technique to change the motion of an asteroid in space. The DART mission is in Phase C, led by Johns Hopkins University Applied Physics Laboratory. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster solar electric propulsion system as its primary in-space propulsion system. By utilizing NEXT, DART is able to gain significant flexibility to the mission timeline and launch window, as well as decrease in launch vehicle cost. This presentation will review NASA's investment strategy in electric propulsion _ in particular gridded ion thruster technology _ as it applies to solar system exploration. Results obtained from implementing this technology on Deep-Space one and Dawn will be reviewed. Mission studies which highlight the impacts of the NEXT technology will be discussed, and near-term proposed and scheduled missions including DART and CAESAR (Comet Astrobiology Exploration Sample Return) will be reviewed.

Electric Propulsion↗

Dynamic RPS Path to Flight - Nuclear and Emerging Technologies for Space

NASA Glenn Research Center has been pursuing the development of dynamic power conversion for several decades. Candidate NASA missions involve mutli-year travel to far away destinations, or to extreme environments where sunlight does not exist. Human-base mission studies also show that power needs would be beyond the capabilities of solar energy conversion, and instead would require nuclear reactor energy sources, for which the thermal energy must be converted to electricity. Dynamic power conversion technology has developed sufficiently to make a sound engineering argument that it is suitable for these NASA missions. Dynamic conversion power sources have yet to be flown in space, and thus suffer a disadvantage owing to their lack of heritage data on flight missions. One of the largest obstacles for adoption is the uncertainty in reliability of a device with moving parts. However, significant progress has been made toward demonstrating the technology capable in all relevant environments, with the necessary long life. Another hurdle for adoption is the lack of mission, which would drive specific requirements, and provide a solid timeline for technology development endpoint. Until a mission is identified, an alternative approach is necessary to advance a dynamic power conversion system towards flight.

Oriti, Salvatore↗

Program Management for Concurrent University Satellite Programs, Including Propellant Feed System Design Elements

Propulsion options for CubeSats are limited but are necessary for the CubeSat industry to continue future growth. Challenges to CubeSat propulsion include volume/mass constraints, availability of sufficiently small and certified hardware, secondary payload status, safe storage of high energy, and power requirements. A multi-mode (chemical and electric) thruster was developed by at the Missouri University of Science and Technology (Missouri S&T) to enable CubeSat propulsion missions. Two satellite buses, a 3U and 6U, are being developed by the M-SAT satellite research team at Missouri S&T to demonstrate the multi-mode thruster's capabilities. Two key challenges related to these missions are the development of the feed system to support the thruster and management of the two programs' personnel, resources, timelines, and budgets. The feed system was designed to support the unique needs of the thruster including material compatibility with the custom ionic liquid, variable flow rate, high pressurization, and high voltage within the constraints and budget of a student-designed propulsion system. The feed system was also designed to minimize risk as a secondary payload. This resulted in the development of a unique method to pressurize propellant stored in the feed system tubing. Within the expected operating pressure range, the method was experimentally shown to provide sufficient pressure and propellant volume to the thruster to meet mission success criteria. The 3U and 6U CubeSat buses were designed concurrently with complimentary payloads, hardware, objectives, and team structures. Resources such as personnel, lab space, and time had to be carefully balanced between the two teams. With proper management, the two programs have been able to support one another, providing valuable insight and collaboration between the two teams. Lessons learned include experience with design, testing, and assembly of hardware, team training/mentoring and motivation, improved documentation practices, and risk management.

Withrow, Shannah Nichole↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

Lessons Learned from International Space Station Crew Autonomous Scheduling Test

In 2017, our team investigated and evaluated the novel concept of operations of astronaut self-scheduling (rescheduling their own timeline without creating violations) onboard International Space Station (ISS). Five test sessions were completed for this technology demonstration called Crew Autonomous Scheduling Test (CAST). For the first time in a spaceflight operational environment, an ISS crewmember planned, rescheduled, and executed their activities in real-time on a mobile device while abiding by flight and scheduling constraints. This paper discusses the lessons learned from deployment to execution.

planning and scheduling↗

Internal Electrostatic Discharge Testing of Inert Solid Rocket Motor Materials

Jupiter’s moon Europa is believed to have a global liquid-water ocean beneath its icy surface. As such, it is a highly interesting destination for explorers seeking signs of life outside of Earth. This interest has given rise to the Europa Lander Mission [Hand, et al., 2017]. The central goal of the Europa Lander Mission is to place a stationary lander on Europa and make surface and sub-surface measurements, dramatically improving understanding of this Jovian moon, and potentially detecting signs of life.Placing a lander on Europa will require multiple spacecraft elements deployed across a multi-year mission timeline. Some of the key elements include: a large payload capacity rocket, such as the Space Launch System (SLS), capable of providing direct Jupiter orbit insertion; a solar-powered carrier; a de-orbit system; a sky crane landing system; and, of course, the surface lander. A noteworthy fact is that the current design requires a large solid rocket motor to provide the necessary braking thrust for the de-orbit stage. While solid rocket motors have been used extensively by NASA during launch, in-space use has been limited. In addition to the normal challenges associated with a long-distance planetary mission, the Europa Lander Mission must also contend with the high-radiation environment associated with the Jovian system. The size of Jupiter, combined with its magnetic field strength, and rotation speed, result in a harsh radiation environment composed of high energy charged particles (ions and electrons) as well as high-temperature plasmas [de Soria-Santacruz Pich, 2016]. Due to this high-radiation environment, each component of the Europa Lander spacecraft must be evaluated to determine its radiation dose tolerance and its likelihood for experiencing electrostatic charging (and discharging). In general, metal components in a Jovian environment do not pose a concern for radiation degradation; in fact, metal structures and closeouts can act as radiation shielding for the more sensitive components. Charging of a metal component is only an issue if the component is not properly grounded to the spacecraft chassis. However, electrically insulating materials, such as polymers, are subject to radiation degradation as well as surface and internal charging, and therefore require extra scrutiny. The focus of this paper will be on the insulating materials that are commonly used inside solid rocket motors. The special application of a solid rocket motor used in space after a relatively long duration flight, combined with the high energy electron environment in the Jovian system, raises concerns about the possibility of significant charging and discharging leading to reduced performance.

Schneider, Todd A.↗

Zero Trust Network Security

A poster for the Pathways Student Showcase that includes a description of what Zero Trust Network Security is, the rough timeline for the initial stages of implementation here at KSC, who I am, and what I'm working on.

Coulter, Lawrence W.↗

Testing of the NASA Exploration Extravehicular Mobility Unit Demonstration (xEMU Demo) Architecture at the Neutral Buoyancy Laboratory (NBL)

Following Z-2 space suit testing that occurred from 2016-2017, the Exploration Extravehicular Mobility Unit (xEMU) Project was tasked with building a demonstration unit of the xEMU space suit to test on the International Space Station (ISS) in 2023. This suit is called xEMU Demonstration Suit (xEMU Demo). Based on feedback from astronauts during the Z-2 NBL test series, design changes were made, resulting in a new prototype suit called the Z-2.5 space suit. The design of the Z-2.5 space suit with an exploration Portable Life Support Systems (xPLSS) mock-up represents the architecture of xEMU Demo. The team is testing Z-2.5 in the NBL to evaluate this architecture and validate changes made from Z-2. The results will inform the xEMU Demo design going forward to its Preliminary Design Review (PDR) in the summer of 2019. This Z-2.5 NBL test series focuses on evaluating the microgravity performance of the suit and the ability to complete ISS-related tasks. The series is comprised of 10 manned runs and an unmanned corn-man run. Six test subjects, including four astronauts, will participate. The test objective is to evaluate ability xEMU Demo architecture to perform ISS microgravity tasks. Each crew members will complete both a familiarization run and a nominal EMU EVA timeline run. Qualitative and quantitative data will be collected to aid the assessment of the suit. Preliminary feedback from astronauts who have completed the test series evaluate the xEMU Demo architecture as acceptable to complete a demonstration mission on the ISS.

Davis, Kristine↗

Autonomy @NASA

NASA's work in deploying autonomy technologies to improve aeronautics and space missions over the last 25 years. Widely disseminated examples are highlighted, mostly in a few timeline charts, but with a few specific examples.

Van Dalsem, William R.↗

Mid-Course Correction Contingency Analysis for the James Webb Space Telescope

This investigation details two analyses performed as part of an early orbit contingency operations study related to the James Webb Space Telescope’s limited ability to maneuver in a sunward direction. First, contingency planning developed by the Flight Dynamics Team and shared with the Science and Operations Center to quickly assess the available timeline in the event of a delayed mid-course correction maneuver is presented. Second, the methods for recovering from a maneuver over-burn using observatory geometry to exploit the solar radiation pressure perturbation contributions from the large sunshield as well as adjusting the maneuver campaign to recover the observatory are examined.

JWST↗

Large-Scale Boundary Layer Ingesting Propulsor Research

NASA’s Advanced Air Transport Technology (AATT) project is investigating boundary layer ingesting (BLI) propulsors for advanced subsonic commercial vehicle concepts to enable the reduction of fuel burn. A multidisciplinary team of researchers from NASA, United Technologies Research Center (UTRC), Virginia Polytechnic University, and the Air Force Arnold Engineering Development Complex developed and tested an embedded BLI inlet and distortion-tolerant fan (BLI2DTF) system in the NASA Glenn Research Center (GRC) 8- foot by 6-foot (8x6) transonic wind tunnel. The test demonstrated the component performance goals necessary for an overall fuel burn reduction of 3 to 5 percent on a large hybrid wing body (HWB) aircraft. Special test equipment, including a raised floor with flow effectors and a bleed system, was developed for use in the 8x6 to produce the appropriate incoming boundary layer representative of an HWB application. Detailed measurements were made to determine the inlet total pressure loss and distortion, fan stage efficiency, and aeromechanic performance including blade vibration stress and displacement response. Results from this test were used as input to a vehicle-level system study performed by the AATT project to assess the impact of BLI on an alternative advanced concept aircraft referred to as the NASA D8 (ND8), which is somewhat similar to the HWB in its integration of the propulsor. This paper will provide an overview of the project timeline, special test equipment needed in the wind tunnel to develop the appropriate incoming boundary layer, and the difficulties in designing a propulsor for the test. The paper will conclude with some representative aerodynamic and aeromechanic data from the test itself and conclude with how this data was used in the ND8 system study.

Aerodynamic performance↗

Large-Scale Boundary Layer Ingesting Propulsor Research

_NASA's Advanced Air Transport Technology (AATT) project is investigating boundary layer ingesting (BLI) propulsors for advanced subsonic commercial vehicle concepts to enable the reduction of fuel burn. A multidisciplinary team of researchers from NASA, United Technologies Research Center (UTRC), Virginia Polytechnic University, and the Air Force Arnold Engineering Development Complex developed and tested an embedded BLI inlet and distortion-tolerant fan (BLI2DTF) system in the NASA Glenn Research Center (GRC) 8-foot by 6-foot (8x6) transonic wind tunnel. The test demonstrated the component performance goals necessary for an overall fuel burn reduction of 3 to 5 percent on a large hybrid wing body (HWB) aircraft. Special test equipment, including a raised floor with flow effectors and a bleed system, was developed for use in the 8x6 to produce the appropriate incoming boundary layer representative of an HWB application. Detailed measurements were made to determine the inlet total pressure loss and distortion, fan stage efficiency, and aeromechanic performance including blade vibration stress and displacement response. Results from this test were used as input to a vehicle-level system study performed by the AATT project to assess the impact of BLI on an alternative advanced concept aircraft referred to as the NASA D8 (ND8), which is somewhat similar to the HWB in its integration of the propulsor. This paper will provide an overview of the project timeline, special test equipment needed in the wind tunnel to develop the appropriate incoming boundary layer, and the difficulties in designing a propulsor for the test. The paper will conclude with some representative aerodynamic and aeromechanic data from the test itself and conclude with how this data was used in the ND8 system study.

Celestina, Mark L.↗

Innovative Approaches to Using the International Space Station as a Mars Transit Analog

Human research on the International Space Station (ISS) crew has made significant advances in understanding of the effects of physiology on human health in space missions. However, ISS has not been as suitable for research on other hazards of human spaceflight such as isolation and communications delay. NASA recently completed a special assessment of whether modifications could be made to operations or facilities so that ISS could be used more effectively as an analog to simulate long-duration crew missions beyond low earth orbit. A cross-disciplinary team met to identify concept of operations, trade spaces, challenges, and opportunities to making ISS more operationally relevant as a Mars transit mission analog, and the results and implementation plans are summarized in this manuscript. In addition to the use case of 12-month missions (already in planning by the NASA ISS Program to bound expected Mars transit durations), three new use cases where ISS could provide valuable high-fidelity experience were identified. (1) Testing of operations procedures and medical care could be enhanced by demonstrating crew handling a simulated medical event in microgravity, autonomously, and with significant communications delay. (2) Isolation and confinement effects of deep space transit could be studied on ISS to validate current habitable volume requirements for Mars transit as well as provide context for evaluating the results of the extensive ground-based simulations in HERA and NEK. A trade study of possible operational and hardware changes that would make ISS applicable to these use cases was completed. (3) Surface operations after the physiological deconditioning of a long transit could be conducted to validate crew ability to perform critical ground tasks after 6-month Mars transit and aid in conceptual design of Mars surface element architectures. Each of the case studies includes a trade space between operational impacts on nominal ISS activities and degree of fidelity. A phased approach to implementation means that several "quick start" activities can be done in 2019-2020 at the same time as planning continues for more complex exploration analog options beginning as early as 2022. The team determined that many of these quick-start tasks could be done with available assets, entirely independent of other exploration system development timelines (such as Orion, Space Launch System). The consideration of the full suite of human spaceflight capabilities in the lunar vicinity can also be included as each step in human exploration serves as a simulation opportunity for some aspect of subsequent missions. Further discussions of options with the international community are critical for considering the benefits as well as impacts of simulation activities on ISS, as well as to better formulate future mission architectures.

Robinson, Julie A.↗