The Fernald Closure Project: Lessons Learned

For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end-state determinations; - Interaction with stakeholders; - The balanced approach - on-site and off-site waste-disposal alternatives; - The contracting model; - Site safety performance; - Effectiveness of cleanup remedies; - Worker training and transition; - Client interface; - Cost and schedule performance; - Legacy management. Lessons learned can be applied: While each site and project has its own issues, the various lessons learned from the Fernald Closure Project, when taken from a global perspective, can be applied to similar efforts so that pitfalls are avoided and efficiencies realized.

54 ENVIRONMENTAL SCIENCES↗

Paths Forward: Current International and US Initiatives to Support More Sustainable Options for Uranium Production

With the nuclear renaissance, the uranium mining industry has undergone a dramatic renaissance, as well. This has been evidenced in the past 2 years with forums such as those organized by the International Atomic Energy Agency (IAEA) and in the United States (US) the National Mining Association/Nuclear Regulatory Commission (NMA/NRC) workshops drawing record attendance by established and junior uranium mining firms. In addition, IAEA meetings, as well as meetings of the NMA, industry, and agencies have begun to focus, not on only on site closure - but on the growing industry and plans for permitting new uranium recovery facilities. Finally, the International Forum on Sustainable Options for Uranium Production (IFSOUP) has emerged to carry forward many recent cooperative dialogs and concepts developed in sustainability initiatives, bringing together industry, agencies and NGOs - with the view to developing more sustainable, socially-acceptable uranium recovery practices. In this context, this paper will present current international and US initiatives which are intended to support more sustainable options for uranium production. First, we will describe a new initiative for international cooperative dialogues, to build industry, agency and NGO cooperation for enhancing global sustainability in uranium production operations, and avoid the legacy issues found in past operations: the inaugural meeting of the International Forum on Sustainable Options for Uranium Production, or IFSOUP. IFSOUP will carry forward discussions of recent and present initiatives including the Global Mining Initiative; the Mining, Minerals, and Sustainable Development Initiative (MMSD); the International Council on Mining and Metals; and the sustainable development initiatives of the US National Mining Association. Consistent with the process of ensuring development of a sustainable uranium recovery industry, while factoring in stakeholder concerns, an initiative to promote strong regulation in a risk-informed, performance based manner for an important new segment of uranium production will be described. Specifically, an overview on development of the US Nuclear Regulatory Commission's Generic Environmental Impact Statement (GEIS) for in-situ uranium recovery (ISR) will be presented. In addition to diverse stakeholder inputs, the input of significant, important elements of the industry experience to this process, which is based upon more than 25 years of ISR operating experience and some 1,400 documents provided by industry, will be described. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Savannah River Site Public and Regulatory Involvement in the Inadvertent Disposal of TRU Waste in the E-Area Low-Level Waste (LLW) Trenches

The key to successful public involvement at the Savannah River Site (SRS) has been and continues to be vigorous, up-front involvement of the public, federal and state regulators with technical experts. The SRS Waste Management Program includes all forms of radioactive waste. All of the decisions associated with the management of these wastes are of interest to the public and successful program implementation would be impossible without including the public up-front in the program formulation. Serious problems can result if program decisions are made without public involvement, and if the public is informed after key decisions are made. This paper will describe the regulatory and public involvement program and their effects on the decisions concerning the inadvertent disposal at the Savannah River Site (SRS) of TRU waste in the E-area LLW Facility Trenches. SRS engineers discovered that a small amount of TRU waste was disposed in the E-area LLW trenches in 2003. This discovery was obviously of considerable interest to the State and Federal Regulators, and to the public. In addition to notifications to all interested parties, the first order of business was to ensure that operations continued to be protective of the public and the environment. This paper will describe the interactions with the Department of Energy (DOE), the South Carolina Department of Health and Environmental Control (SCDHEC), the Environmental Protection Agency (EPA), and the public. In addition the technical details of the inadvertent disposal will be discussed along with the analysis of long term performance of the waste form in the E-Area LLW Trenches and how this information was communicated with all parties. As can be imagined, a decision to dispose of TRU waste onsite versus shipment to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal is of considerable interest to the stakeholders in South Carolina. The events that lead to the inadvertent disposal will be reviewed as well as the new systems put into place to ensure that this event will not happen again in the future. In order to determine alternatives to properly deposition this TRU waste, an evaluation of retrieval of the waste from the trench disposal was performed as well as an options risk analysis to determine the regulatory path forward should the decision be made to dispose of the TRU waste in place. An evaluation of the risks to the workers associated with retrieval was then compared to the risks of continued disposal in the E-Area Trenches. Cost and schedule for each alternative was also compared. This paper will describe the successful results of this technical, regulatory, and public involvement program, explore the challenges, how the accomplishments occurred, and describe the future challenges along with the road map for the future. A comparison with other similar events at other DOE sites will be discussed as well. In doing this, the SRS TRU and LLW programs must be described to give the readers an understanding of the technical complexities that must be communicated successfully to achieve constructive stakeholder participation and regulatory approval. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations

The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how these findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proposed Changes to Simplify Review of the Next WIPP Compliance Re-certification Application

The amended Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA) of 1996, P. L. 104-201, 110 Stat. 2422 [1], requires the U.S. Department of Energy (DOE) to prepare and submit documentation demonstrating continued compliance with the Environmental Protection Agency's (EPA's) radioactive waste disposal standard 40 CFR Part 191 [2] every five years starting after first waste receipt in accordance with the criteria of 40 CFR 194 [3]. The DOE submitted the WIPP Compliance Certification Application (CCA) [4] to EPA in 1996 and it was approved by EPA in 1998. The first shipment of waste was received for disposal at WIPP on March 26, 1999. Subsequently, the first Compliance Re-certification Application (CRA) [5] was submitted to EPA on March 26, 2004. Reflecting on lessons learned from the previous applications, the DOE is proposing a change in the format for the next CRA due on March 26, 2009. The DOE has an objective to communicate plans, schedules and re-certification methodology as early as possible to EPA and stakeholders. With that objective in mind, the DOE began communicating the proposed new application strategy to the EPA in mid- 2006. For the 2009 CRA submittal, the DOE is proposing to align the document's format to match each section to the requirements of the WIPP compliance criteria at 40 CFR Part 194 [3] and the EPA re-certification support documents. The benefits of the revised format include improved integration of all regulatory, operational, and programmatic activities; easier access to historical information and decisions; a decreased level of effort for DOE, EPA and Stakeholder review; enhancing the likelihood of a quicker re-certification decision; and potentially reducing DOE's post-submittal CRA tasks. This paper will provide insight to those wishing to understand and be kept abreast of changes in the WIPP's certification process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Integrated Waste Plan for Chalk River Laboratories - 13376

To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually for up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)

54 ENVIRONMENTAL SCIENCES↗

Status Update on the NCRP Scientific Committee SC 5-1 Report: Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents - 13450

In August 2008, the U.S. Department of Homeland Security (DHS) issued its final Protective Action Guide (PAG) for radiological dispersal device (RDD) and improvised nuclear device (IND) incidents. This document specifies protective actions for public health during the early and intermediate phases and cleanup guidance for the late phase of RDD or IND incidents, and it discusses approaches to implementing the necessary actions. However, while the PAG provides specific guidance for the early and intermediate phases, it prescribes no equivalent guidance for the late-phase cleanup actions. Instead, the PAG offers a general description of a complex process using a site-specific optimization approach. This approach does not predetermine cleanup levels but approaches the problem from the factors that would bear on the final agreed-on cleanup levels. Based on this approach, the decision-making process involves multifaceted considerations including public health, the environment, and the economy, as well as socio-political factors. In an effort to fully define the process and approach to be used in optimizing late-phase recovery and site restoration following an RDD or IND incident, DHS has tasked the NCRP with preparing a comprehensive report addressing all aspects of the optimization process. Preparation of the NCRP report is a three-year (2010-2013) project assigned to a scientific committee, the Scientific Committee (SC) 5-1; the report was initially titled, Approach to Optimizing Decision Making for Late- Phase Recovery from Nuclear or Radiological Terrorism Incidents. Members of SC 5-1 represent a broad range of expertise, including homeland security, health physics, risk and decision analysis, economics, environmental remediation and radioactive waste management, and communication. In the wake of the Fukushima nuclear accident of 2011, and guided by a recent process led by the White House through a Principal Level Exercise (PLE), the optimization approach has since been expanded to include off-site contamination from major nuclear power plant accidents as well as other nuclear or radiological incidents. The expanded application under the current guidance has thus led to a broadened scope of the report, which is reflected in its new title, Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents. The NCRP report, which is due for publication in 2013, will substantiate the current DHS guidance by clarifying and elaborating on the processes required for the development and implementation of procedures for optimizing decision making for late-phase recovery, enabling the establishment of cleanup goals on a site-specific basis. The report will contain a series of topics addressing important issues related to the long-term recovery from nuclear or radiological incidents. Special topics relevant to supporting the optimization of the decision-making process will include cost-benefit analysis, radioactive waste management, risk communication, stakeholder interaction, risk assessment, and decontamination approaches and techniques. The committee also evaluated past nuclear and radiological incidents for their relevance to the report, including the emerging issues associated with the Fukushima nuclear accident. Thus, due to the commonality of the late-phase issues (such as the potential widespread contamination following an event), the majority of the information pertaining to the response in the late-phase decision-making period, including site-specific optimization framework and approach, could be used or adapted for use in case of similar situations that are not due to terrorism, such as those that would be caused by major nuclear facility accidents or radiological incidents. To ensure that the report and the NCRP recommendations are current and relevant to the effective implementation of federal guidance, SC 5-1 has actively coordinated with the agencies of interest and other relevant stakeholders throughout the duration of the project. The resulting report will be an important resource to guide those involved in late-phase recovery efforts following a nuclear or radiological incident. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Developments in DOE FUSRAP - 13014

The DOE Office of Legacy Management assumed responsibility for the DOE FUSRAP in 2003. Since then, DOE has evaluated existing guidance and program needs to ensure that the program will remain effective in maintaining protectiveness at remediated FUSRAP sites. DOE has identified crucial elements that must be addressed to meet this goal. Knowledge of the sites and the program must be preserved and accessible to future custodians. Program processes must be defined and coordinated with other agencies. Long-term surveillance and maintenance (LTS and M) requirements for the sites must be based on human health risk and regulatory compliance, and those requirements must be well defined. Useful and accurate program information must be available to stakeholders. DOE has addressed these needs through development of a comprehensive program plan, an LTS and M plan for each completed FUSRAP site, a records finding aid, and a public information web site. These developments help ensure that the current knowledge is preserved and passed on to future custodians and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geographic Information System Tools for Management of US DOE Sites - 13489

The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

54 ENVIRONMENTAL SCIENCES↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System-2012 - 12114

The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has replaced the historic process of each DOE site gathering, organizing, and reporting their waste forecast information utilizing different databases and display technologies. In addition, WIMS meets DOE's objective to have the complex-wide waste forecast and transportation information available to all stakeholders and the public in one easy-to-navigate system. The enhancements to WIMS made since its initial deployment include the addition of new DOE sites and facilities, an updated waste and transportation information, and the ability to easily display and print customized waste forecast, the disposition maps, GIS maps and transportation information. The system also allows users to customize and generate reports over the web. These reports can be exported to various formats, such as Adobe{sup R} PDF, Microsoft Excel{sup R}, and Microsoft Word{sup R} and downloaded to the user's computer. Future enhancements will include database/application migration to the next level. A new data import interface will be developed to integrate 2012-13 forecast waste streams. In addition, the application is updated on a continuous basis based on DOE feedback. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategy for Long-Term Stewardship and Monitoring of Amchitka Island - 12190

The Long-Term Surveillance and Maintenance Plan (LTSMP) for Amchitka details how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at and around the sites on Amchitka Island. The LTSMP calls for monitoring to be performed every 5 years, at least in the initial phase of the project. The purpose of the monitoring is to develop a baseline of activity concentrations for selected radionuclides in biota, water, and soil, both on Amchitka and at the reference location on Adak Island, approximately 322 km (200 miles) northeast of Amchitka. Data compiled by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP, 2006) are being included as part of the baseline data set. The specific biological, water, and sediment samples collected during the 2011 sampling event were developed through close coordination with the primary stakeholders, including the Alaska Department of Environmental Conservation, the Aleutian Pribilof Island Association, and the U.S. Fish and Wildlife Service (USFWS). Amchitka is managed by the USFWS as part of the Alaska Maritime National Wildlife Refuge. Two plans were developed to address specific needs of the biological- and the terrestrial-monitoring programs. Results from these monitoring programs will help determine whether the environment is being impacted by radionuclide migration and uptake, and if subsistence and commercial-catch seafood is safe for human consumption. The RESRAD-BIOTA code is being used to evaluate ecological health relative to the radionuclide levels determined from this sampling event. The samples were sent to three laboratories for analysis. With the exception of the seawater samples, most of the samples were sent to the Center for Accelerator Mass Spectrometry at the Lawrence Livermore National Laboratory. A smaller subset of rock-weed samples, Star reindeer lichen samples, and soil samples collected from beneath the lichen were sent to UAF for cesium-137 analysis. Marine sediment samples were also collected and sent to UAF for testing. The seawater samples were sent to the University of Miami Tritium Laboratory for enriched tritium analysis. Results from the seawater samples for tritium were received in September 2011. Results from the 2011 sampling are expected to be available on the LM web site in 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Developments for Safe Repository Operation and staged Closure - The International MoDeRn Project - 12040

The main goal of the collaborative, European Commission 7. Framework MoDeRn project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. To achieve this goal, 18 partners representing 12 countries and including 8 Waste Management Organizations joined their efforts since 2009, and aim at developing a reference framework for repository monitoring by 2013. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). Monitoring programs should describe activities likely to verify - with the aim of confirming and possibly enhancing the prior license basis for safety and pre-closure management options - expected repository system evolutions (i.e. natural environment and engineered system evolutions) during a progressive construction, operation and closure phase that may last on the order of a century. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Global Threat Reduction Initiative's Activities Underway to Address Major Domestic Radiological Security Challenges - 12105

During their service lives, radioactive sealed sources are used for a wide variety of essential purposes. However, each year, thousands of radioactive sealed sources that pose a potential risk to national security, health, and safety become disused and unwanted in the United States. Due to their concentrated activity and portability, these sources could be used in radiological dispersal devices ('dirty bombs'). For more than a decade, the National Nuclear Security Administration and the U.S. Department of Energy, through the Global Threat Reduction Initiative Offsite Source Recovery Project (GTRI/OSRP), have facilitated the removal and disposition of thousands of disused/unwanted sources worldwide. However, the ability of GTRI/OSRP to continue its work is critically dependent on the ability to transport and appropriately dispose of these sources. On that front, GTRI/OSRP progress includes development of two prototype Type B transport containers and significant efforts toward certification, increased commercial disposal access for risk-significant sealed sources at commercial sites, and cooperation through the International Atomic Energy Agency to increase source repatriation. Disused sealed sources continue to pose a national security concern. The impact of a dirty bomb detonation could be costly both financially and to those exposed to the resulting radiation. However, significant progress has been made since 2008 on each of the challenges identified in the DHS Sealed Source Security Workshop. Not only will there be increased opportunity for commercial disposal of many sizes and types of sealed sources, but also stakeholders are studying front-end solutions to the problem of disused sealed sources, such as financial assurance and recycle. The lack of sealed source transport containers is also likely to be mitigated with the development and certification by NNSA of two new Type B models. Internationally, increased efforts at source repatriation will mitigate the threat posed by disused sealed sources abroad. Sealed sources provide irreplaceable benefits to those who use them or who benefit from their use; now stakeholders are rising to the challenge of ensuring that those benefits are safely and securely realized. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Waste-Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Vitrification Melter - 12167

The Department of Energy (DOE) has determined that the vitrification melter used in the West Valley Demonstration Project can be disposed of as low-level waste (LLW) after completion of a waste-incidental-to-reprocessing evaluation performed in accordance with the evaluation process of DOE Manual 435.1-1, Radioactive Waste Management Manual. The vitrification melter - which consists of a ceramic lined, electrically heated box structure - was operated for more than 5 years melting and fusing high-level waste (HLW) slurry and glass formers and pouring the molten glass into 275 stainless steel canisters. Prior to shutdown, the melter was decontaminated by processing low-activity decontamination flush solutions and by extracting molten glass from the melter cavity. Because it could not be completely emptied, residual radioactivity conservatively estimated at approximately 170 TBq (4,600 Ci) remained in the vitrification melter. To establish whether the melter was incidental to reprocessing, DOE prepared an evaluation to demonstrate that the vitrification melter: (1) had been processed to remove key radionuclides to the maximum extent technically and economically practical; (2) would be managed to meet safety requirements comparable to the performance objectives for LLW established by the Nuclear Regulatory Commission (NRC); and (3) would be managed by DOE in accordance with DOE's requirements for LLW after it had been incorporated in a solid physical form with radionuclide concentrations that do not exceed the NRC concentration limits for Class C LLW. DOE consulted with the NRC on the draft evaluation and gave other stakeholders an opportunity to submit comments before the determination was made. The NRC submitted a request for additional information in connection with staff review of the draft evaluation; DOE provided the additional information and made improvements to the evaluation, which was issued in January 2012. DOE considered the NRC Technical Evaluation Report as well as comments received from other stakeholders prior to making its determination that the vitrification melter is not HLW, does not require permanent isolation in a geologic repository, and can be disposed of as LLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Socio-Technical Perspective on Repository Monitoring - 12229

Monitoring geological repositories for high-activity radioactive wastes has both technical and social dimensions, which are closely interrelated. To investigate the implications of this for geological disposal, data on experts' expectations of repository monitoring and the functions that it is expected to serve were analysed. The analysis drew on strategic and technical documents on monitoring produced by national agencies and by international organisations or projects; interviews with specialists in radioactive waste management organisations on monitoring and on their perceptions of societal concerns and expectations; and observations from technical workshops on repository monitoring. Three main rationales for monitoring were found: performance confirmation; decision support in a step-wise process; and public and stakeholder confidence building. The expectation that monitoring will enhance public confidence is then examined from a social scientific perspective and the potential for and challenges to using monitoring in this way are reviewed. In conclusion, implications for stakeholder engagement in the development of monitoring objectives and strategies are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Historic Preservation Act is Not Your Problem, But How You are Addressing it for Your CERCLA Project May Be - 12344

The 1995 Environmental Protection Agency (EPA) and U.S. Department of Energy (DOE) joint 'Policy on Decommissioning of Department of Energy Facilities Under CERCLA was developed so that decommissioning could occur in a manner that ensures protection of worker and public health and the environment, that is consistent with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), that provides for stakeholder involvement, and that achieves risk reduction without unnecessary delay'. The source of the 'unnecessary delays' the joint policy intended to avert could be attributed to numerous factors such as obtaining permits, conducting administrative activities, or implementing regulatory processes that could yield, among other things, differing preferred alternatives. Why, you might ask, more than fifteen years later, does DOE continue to struggle through CERCLA projects with unnecessary delays? From problem identification, to determination of nature and extent, to alternative analysis and ultimately remedy selection and implementation, reaching a compliant and effective clean-up end-point can be a process that seems to mimic geologic timescales. The source of these delays is often the failure to use all of the tools the CERCLA process offers. As one example, renewed commitment to follow the CERCLA process to address the regulatory reviews pursuant to the National Historic Preservation Act (NHPA) is called for. Project managers implementing CERCLA actions in any agency, not only DOE, do not need to be apprehensive about using the CERCLA process for NHPA review but should welcome it. It is critical that methods are used that address substantive NHPA requirements clearly and consistently, and that they are shared and communicated as frequently as needed to interested and questioning stakeholders. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe, efficient cleanup, and (3) an implementation section which describes how the partnering process will be conducted, as well as how disputes will be managed. The signed Partnering Framework and Partnering Agreement provide the needed foundation of the safe and cost-effective cleanup and re-industrialization of the ETTP Site. The benefits of partnering have already been observed as the Partnering Teams effectively addressed a number of early contract and project challenges such as funding reductions and progress in resolving Material Differences. Based, in part of the successes achieved as a result of the partnering between UCOR and DOE-ORO, UCOR and DOE-ORO are extending this partnering approach to a number of the ETTP Site stakeholders. For example, DOE-ORO, UCOR and CROET signed a Partnering Agreement on November 3, 2011. This Partnering Agreement affirms the parties' commitment to work collaboratively to re-industrialize the ETTP Site. Both DOE-ORO and UCOR are looking to extend this partnering approach with other Site stakeholders such as its employees, its subcontractors, the Oak Ridge National Laboratory and the Y-12 Security Complex in the future. (authors)