Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Scenario development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Development of the maypole (hoop/column) deployable reflector concept for large space systems application

A review of the NASA supplied mission scenarios for the communications, radiometry and radio astronomy missions. Led to specific hoop/column antenna configurations for each mission. The mission configurations were then evaluated to identify specific technology items requiring further development. The compilation of these technology drivers resulted in a specification of an artificial or point design, the design element around which all design and performance estimates for the rest of the program were made. Mechanisms for deployment and stowing are examined including the cable driven mast and the latch pulley roller. Methods for determining the thermal expansion of candidate materials, the development of the cables, cords, and hinged joints, and surface adjustment are considered.

Montgomery, D. C.↗

Pax permanent Martian base: Space architecture for the first human habitation on Mars, volume 5

America at the Threshold: Report of the Synthesis Group on America's Space Exploration Initiative (the 'Synthesis Report,' sometimes called the Stafford Report after its astronaut chair, published in 1991) recommended that NASA explore what it called four 'architectures,' i.e., four different scenarios for habitation on Mars. The Advanced Design Program in Space Architecture at the University of Wisconsin-Milwaukee supported this report and two of its scenarios--'Architecture 1' and 'Architecture 4'--during the spring of 1992. This report investigates the implications of different mission scenarios, the Martian environment, supporting technologies, and especially human factors and environment-behavior considerations for the design of the first permanent Martian base. The report is comprised of sections on mission analysis, implications of the Martian atmosphere and geologic environment, development of habitability design requirements based on environment-behavior and human factors research, and a full design proposed (concept design and design development) for the first permanent Martian base and habitat. The design is presented in terms of a base site plan, master plan based on a Mars direct scenario phased through IOC, and design development details of a complete Martian habitat for 18 crew members including all laboratory, mission control, and crew support spaces.

Huebner-Moths, Janis↗

Mars base buildup scenarios

Two Mars surface based build-up scenarios are presented in order to help visualize the mission and to serve as a basis for trade studies. In the first scenario, direct manned landings on the Martian surface occur early in the missions and scientific investigation is the main driver and rationale. In the second senario, Earth development of an infrastructure to exploit the volatile resources of the Martian moons for economic purposes is emphasized. Scientific exploration of the surface is delayed at first in this scenario relative to the first, but once begun develops rapidly, aided by the presence of a permanently manned orbital station.

J D Blacic↗

Mission Activity Planning for Humans and Robots on the Moon

A series of studies is conducted to develop a systematic approach to optimizing, both in terms of the distribution and scheduling of tasks, scenarios in which astronauts and robots accomplish a group of activities on the Moon, given an objective function (OF) and specific resources and constraints. An automated planning tool is developed as a key element of this optimization system.

task allocation↗

Large Deployable Reflector (LDR) system concept and technology definition study. Analysis of space station requirements for LDR

A study was conducted to determine how the Large Deployable Reflector (LDR) might benefit from the use of the space station for assembly, checkout, deployment, servicing, refurbishment, and technology development. Requirements that must be met by the space station to supply benefits for a selected scenario are summarized. Quantitative and qualitative data are supplied. Space station requirements for LDR which may be utilized by other missions are identified. A technology development mission for LDR is outlined and requirements summarized. A preliminary experiment plan is included. Space Station Data Base SAA 0020 and TDM 2411 are updated.

Agnew, Donald L.↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team (A-Team). The A-Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an ATeam study. In these studies, Concept Maturity Levels (CML) are used to group methods. These levels include idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for exploring the science objectives, feasibility, and scope will be described including use of a new technique for understanding the most compelling science, called a Science Return Diagram (SRD). In the process of developing the SRD, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid towards developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions and reveal the mission concept’s most compelling science. This paper will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.In June of 2011 a new collaborative engineering approach forearly concept formulation began in the JPL InnovationFoundry [1], six months later becoming the “A-Team” [2].Responding to a need for exploring mission architecturelevel trades [3], the A-Team precedes Team X [4,5] in asequence of concurrent engineering teams at JPL that can beused to mature a concept from a “cocktail napkin” level ideato a complete mission point design. The A-Team efficientlyexplores the science, implementation, and programmatictrade space in early concept formulation. Small, facilitatedgroups of experts generate innovative ideas, quantitativelyassess feasibility, and discover key sensitivities in the tradespace through collaborative analysis and use of advancedmethods and tools. The A-Team process builds off theexperience within JPL and other recent approaches to earlyconcept formulation [6] including best practices of the JPLInnovation Foundry, Project Systems Engineering &Formulation Section, Team Eureka and the Rapid MissionArchitecture Team[7].The A-Team is a focal point for innovative formulationapproaches and people within JPL. It relies on a largebackground of study resources, creative thinkers and “greybeard” scrutinizers, advanced tools, and subject matterexperts with both breadth and depth in experience andexpertise that are all available at JPL. The A-Team isdesigned to be a rapid and efficient process takingapproximately 6 weeks (the entire process can be as short asjust a few days or as long as up to three months) and costingthe equivalent of a work-month of a full-time employee orless. Studies begin with detailed planning and client reviewfollowed by study sessions, analysis work, and reporting.The staffing on each study is customized to the study goalsand objectives, and it is addressed early in the A-Teamprocess. Sessions are generally half-day or whole-day eventsand conducted over a series of days with focused agendas thatare moderated by a trained facilitator. Preliminary results andknowledge capture are available within hours of each session,and a final report is generally available two weeks later.One of the biggest challenges facing early conceptdevelopment is understanding the gradient in science returnversus various available mission scenarios and payload options. Often times, major areas of scientific inquiry havealready been prioritized by science groups, including throughthe National Research Council’s Decadal Studies inAstronomy, Planetary, and Earth Science. Yet science teamscontinue to struggle, especially in competitive missionsolicitations, to capture the right amount of scope that’sachievable within the cost constraints of the opportunity.Often the desire to completely and comprehensively study ascience area in just one mission (after all, true missionopportunities are rare) drives teams to take on too much,providing requirements that are unachievable within theresources of the opportunity without inducing unacceptableimplementation risk. Alternatively, science teams can seekto reduce risk by using an established instrument, but havenot thought through the traceability and key aspects of thescience question to justify its use. Both scenarios lead to badassumptions at the beginning of the concept development thatcan then ripple through implementation option choices,potentially preventing what would have been a good scienceinvestigation from being selected.The purpose of this paper is first to provide some additionalbackground and summary of the A-Team process, tools,people, and facilities. We then focus on the A-Teammethodology for overcoming the barriers of defining thescience scope well at the early concept development stage.This includes understanding the science story andtraceability, and then examining the gradient in science returnversus key characteristics of observables, developing theright payload and mission requirement specification throughexamining the science and implementation trade space.

Ziemer, John K.↗

Plume Diagnostics of the RSRM Static Firings for the Pressure Perturbation Studies

During the STS-54 launch (RSRM-29), the right hand solid rocket motor experienced a 13.9 psi chamber pressure perturbation at 67 seconds into the motor operation. This pressure augmentation equated to a thrust change of 51 klb. Concerns were raised regarding the adverse effects of this thrust imbalance on the shuttle system and the overall thrust into the external tank structural elements. Pressure perturbations have been observed in solid rocket motors due to expulsion of igniter or insulation materials; the motor thrust during such events drop abruptly before rising. However, the RSRM motors do not exhibit such behavior during the large chamber pressure perturbation events. Several scenarios were investigated to explain these pressure perturbations in the RSRM motors based on a fault tree developed after STS-54. Of these, the expulsion of the slag accumulated in the submerged nozzle region appeared to be the most plausible scenario to explain the observations. Slag is a natural combustion product of aluminized solid rocket motors. The RSRM propellant contains 16% by weight of aluminum. Any ejection of this slag mass during nozzle vectoring or other side loads on the motor will result in the chamber pressure perturbation. Two RSRM static firings were instrumented extensively to further understand the slag expulsion phenomenon in the RSRM and the associated pressure perturbations.

Mathias, Edward C.↗

The space station integrated refuse management system

The design and development of an Integrated Refuse Management System for the proposed International Space Station was performed. The primary goal was to make use of any existing potential energy or material properties that refuse may possess. The secondary goal was based on the complete removal or disposal of those products that could not, in any way, benefit astronauts' needs aboard the Space Station. The design of a continuous living and experimental habitat in space has spawned the need for a highly efficient and effective refuse management system capable of managing nearly forty-thousand pounds of refuse annually. To satisfy this need, the following four integrable systems were researched and developed: collection and transfer; recycle and reuse; advance disposal; and propulsion assist in disposal. The design of a Space Station subsystem capable of collecting and transporting refuse from its generation site to its disposal and/or recycling site was accomplished. Several methods of recycling or reusing refuse in the space environment were researched. The optimal solution was determined to be the method of pyrolysis. The objective of removing refuse from the Space Station environment, subsequent to recycling, was fulfilled with the design of a jettison vehicle. A number of jettison vehicle launch scenarios were analyzed. Selection of a proper disposal site and the development of a system to propel the vehicle to that site were completed. Reentry into the earth atmosphere for the purpose of refuse incineration was determined to be the most attractive solution.

Anderson, Loren A.↗

Toward fusion plasma scenario planning for NSTX-U using machine-learning-accelerated models

One of the most promising devices for realizing power production through nuclear fusion is the tokamak. To maximize performance, it is preferable that tokamak reactors achieve advanced operating scenarios characterized by good plasma confinement, improved magnetohydrodynamic (MHD) stability, and a largely non-inductively driven plasma current. Such scenarios could enable steady-state reactor operation with high \emph{fusion gain} --- the ratio of produced fusion power to the external power provided through the plasma boundary. Precise and robust control of the evolution of the plasma boundary shape as well as the spatial distribution of the plasma current, density, temperature, and rotation will be essential to achieving and maintaining such scenarios. The complexity of the evolution of tokamak plasmas, arising due to nonlinearities and coupling between various parameters, motivates the use of model-based control algorithms that can account for the system dynamics. In this work, a learning-based accelerated model trained on data from the National Spherical Torus Experiment Upgrade (NSTX-U) is employed to develop planning and control strategies for regulating the density and temperature profile evolution around desired trajectories. The proposed model combines empirical scaling laws developed across multiple devices with neural networks trained on empirical data from NSTX-U and a database of first-principles-based computationally intensive simulations. The reduced execution time of the accelerated model will enable practical application of optimization algorithms and reinforcement learning approaches for scenario planning and control development. An initial demonstration of applying optimization approaches to the learning-based model is presented, including a strategy for mitigating the effect of leaving the finite validity range of the accelerated model. The approach shows promise for actuator planning between experiments and in real-time.

machine learning↗

Reusability Studies for Ares I and Ares V Propulsion

With a mission to continue to support the goals of the International Space Station (ISS) and explore beyond Earth orbit, the United States National Aeronautics and Space Administration (NASA) is in the process of launching an entirely new space exploration initiative, the Constellation Program. Even as the Space Shuttle moves toward its final voyage, Constellation is building from nearly half a century of NASA spaceflight experience, and technological advances, including the legacy of Shuttle and earlier programs such as Apollo and the Saturn V rocket. Out of Constellation will come two new launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. With the initial goal to seamlessly continue where the Space Shuttle leaves off, Ares will firstly service the Space Station. Ultimately, however, the intent is to push further: to establish an outpost on the Moon, and then to explore other destinations. With significant experience and a strong foundation in aerospace, NASA is now progressing toward the final design of the First Stage propulsion system for the Ares I. The new launch vehicle design will considerably increase safety and reliability, reduce the cost of accessing space, and provide a viable growth path for human space exploration. To achieve these goals, NASA is taking advantage of Space Shuttle hardware, safety, reliability, and experience. With efforts to minimize technical risk and life-cycle costs, the First Stage office is again pulling from NASA's strong legacy in aerospace exploration and development, most specifically the Space Shuttle Program. Trade studies have been conducted to evaluate lifecycle costs, expendability, and risk reduction. While many first stage features have already been determined, these trade studies are helping to resolve the operational requisites and configuration of the first stage element. This paper first presents an overview of the Ares missions and the genesis of the Ares vehicle design. It then looks at one of the most important trade studies to date, the "Ares I First Stage Expendability Trade Study." The purpose of this study was to determine the utility of flying the first stage as an expendable booster rather than making it reusable. To lower the study complexity, four operational scenarios (or cases) were defined. This assessment then included an evaluation of the development, reliability, performance, and transition impacts associated with an expendable solution. The paper looks at these scenarios from the perspectives of cost, reliability, and performance. The presentation provides an overview of the paper.

Williams, Thomas J.↗

Reusability Studies for Ares I and Ares V Propulsion

With a mission to continue to support the goals of the International Space Station (ISS) and explore beyond Earth orbit, the United States National Aeronautics and Space Administration (NASA) is in the process of launching an entirely new space exploration initiative, the Constellation Program. Even as the Space Shuttle moves toward its final voyage, Constellation is building from nearly half a century of NASA spaceflight experience, and technological advances, including the legacy of Shuttle and earlier programs such as Apollo and the Saturn V rocket. Out of Constellation will come two new launch vehicles: the Ares I crew launch vehicle and the Ares V cargo launch vehicle. With the initial goal to seamlessly continue where the Space Shuttle leaves off, Ares will firstly service the Space Station. Ultimately, however, the intent is to push further: to establish an outpost on the Moon, and then to explore other destinations. With significant experience and a strong foundation in aerospace, NASA is now progressing toward the final design of the First Stage propulsion system for the Ares I. The new launch vehicle design will considerably increase safety and reliability, reduce the cost of accessing space, and provide a viable growth path for human space exploration. To achieve these goals, NASA is taking advantage of Space Shuttle hardware, safety, reliability, and experience. With efforts to minimize technical risk and life-cycle costs, the First Stage office is again pulling from NASA s strong legacy in aerospace exploration and development, most specifically the Space Shuttle Program. Trade studies have been conducted to evaluate life-cycle costs, expendability, and risk reduction. While many first stage features have already been determined, these trade studies are helping to resolve the operational requisites and configuration of the first stage element. This paper first presents an overview of the Ares missions and the genesis of the Ares vehicle design. It then looks at one of the most important trade studies to date, the "Ares I First Stage Expendability Trade Study." The purpose of this study was to determine the utility of flying the first stage as an expendable booster rather than making it reusable. To lower the study complexity, four operational scenarios (or cases) were defined. This assessment then included an evaluation of the development, reliability, performance, and transition impacts associated with an expendable solution. This paper looks at these scenarios from the perspectives of cost, reliability, and performance.

Williams, Thomas J.↗

Space Transportation and Destination Facilities

The Space Transportation and Destination Facilities section focused on space transportation vehicles-from use of existing vehicles to development of specialized transports-and on space stations, space business parks, space hotels, and other facilities in space of the kind that eventually would provide services for general public space travel (PST) and tourism. For both transportation and destination facilities, the emphasis was on the identification of various strategies to enable a realistic incremental progression in the development and acquisition of such facilities, and the identification of issues that need resolution to enable formation of viable businesses. The approach was to determine the best: (1) Strategies for general PST and tourism development through the description and analysis of a wide range of possible future scenarios. With these scenarios in mind the section then identified. (2) Key issues to be explored. (3) opportunities to eliminate barriers. (4) Recommendations for future actions. (5) Top-level requirements and characteristics for general PST and tourism systems and services that would guide the development of transportation and destination facilities.

Smitherman, David↗

Innovations in dynamic test restraint systems

Recent launch system development programs have led to a new generation of large scale dynamic tests. The variety of test scenarios share one common requirement: restrain and capture massive high velocity flight hardware with no structural damage. The Space Systems Lab of McDonnell Douglas developed a remarkably simple and cost effective approach to such testing using ripstitch energy absorbers adapted from the sport of technical rockclimbing. The proven system reliability of the capture system concept has led to a wide variety of applications in test system design and in aerospace hardware design.

Fuld, Christopher J.↗

An assessment of technology alternatives for telecommunications and information management for the space exploration initiative

On the 20th anniversary of the Apollo 11 lunar landing, President Bush set forth ambitious goals for expanding human presence in the solar system. The Space Exploration Initiative (SEI) addresses these goals beginning with Space Station Freedom, followed by a permanent return to the Moon, and a manned mission to Mars. A well designed, adaptive Telecommunications, Navigation, and Information Management (TNIM) infrastructure is vital to the success of these missions. Utilizing initial projections of user requirements, a team under the direction of NASA's Office of Space Operations developed overall architectures and point designs to implement the TNIM functions for the Lunar and Mars mission scenarios. Based on these designs, an assessment of technology alternatives for the telecommunications and information management functions was performed. This technology assessment identifies technology developments necessary to meet the telecommunications and information management system requirements for SEI. Technology requirements, technology needs and alternatives, the present level of technology readiness in each area, and a schedule for development are presented.

Ponchak, Denise S.↗

AI Ethics Appendix: A Novel Approach to AI Ethics Workforce Development

The "AI Ethics Appendix" is a game-based design fiction for the deliberation of uncertain artificial intelligence (AI) ethical scenarios. The game is intended to be used as a tool for AI practitioners and industry professionals to grow responsible and ethical AI knowledge as they integrate this technology into their development. As AI/ML ethical considerations and governmental compliance develop, it is important to encourage teams to encourage teams to incorporate diverse thinking early in the development cycle and consider how different stakeholders may be affected by the technology. This game accomplishes these goals through storytelling and meaningful game interaction based on methods from game design as well as speculative and design fiction in the field of Human-Centered Design. The game mechanics were informed by the NASA Framework for the Ethical Use of Artificial Intelligence, Executive Order 13960, examples of AI use cases, and colleagues' work experiences with AI/ML.

trustworthy↗

Uncommon Behavior of Li Doping Suppresses Oxygen Redox in P2-Type Manganese-Rich Sodium Cathodes

Utilizing both cationic and anionic oxygen redox reactions is regarded as an important approach to exploit high-capacity layered cathode materials with earth abundant elements. It has been popular strategies to effectively elevate the oxygen redox activities by Li-doping to introduce unhybridized O 2p orbitals in Na x MnO 2 -based chemistries or enabling high covalency transition metals in P2-Na 0.66 Mn x TM 1-x O 2 (TM = Fe, Cu, Ni) materials. Here, we investigated the effect of Li doping on regulating the oxygen redox activities P2-structured Na 0.66 Ni 0.25 Mn 0.75 O 2 materials. Systematic X-ray characterizations and ab initio simulations have shown that the doped Li has uncommon behavior in modulating the density of states of the neighboring Ni, Mn and O, leading to the suppression of the existing oxygen and Mn redox reactivities and the promotion of the Ni redox. Furthermore, the findings provide a complementary scenario to current oxygen redox mechanisms and shed lights on developing new routes for high-performance cathodes.

25 ENERGY STORAGE↗

Estimation of the time for steam generator trip due to cyber intrusions

The time required to trip a pressurized water reactor (PWR) by inserting malicious signals into its steam generator (SG) control system has been studied using the Generic PWR (GPWR) Simulator. A semi-analytical model is developed to approximately reproduce the simulator response and understand the dynamics of the control unit. A series of two proportional-integral controllers determines control action according to preset constants, the readings from the feedwater level sensor, and those from feedwater and steam flowrate transmitters. It is observed that the most important factor that determines whether a trip will occur is how much additional water is added to or withheld from the SG over time compared to normal operating conditions. In order to determine the effects of control action on the SG, changes in mass inventory are considered. This approach models the SG water level as a function of mass inventory and has a backward temporal memory. A Python interface is developed for the GPWR framework to automatically simulate different spoofing scenarios and post-process the related data. We observe that the trip times predominantly depend on flow mismatch and/or level errors. Controller parameters, including the integral time and gain constants, either speed up or slow down the rate of progression to a trip setpoint but do not cause a trip by themselves. The reactor can trip on a high-level signal when the reading crosses above 78%, increased from its reference level of 57%, or a low-level reading when it is below 25%. The present results show roughly how long the operators would have to respond to an attack, given a specific set of spoofing signals within the issue space analyzed. Furthermore, we have generated a simple surface by fitting a combination of exponential functions to the data obtained from the GPWR Simulator. In general, trips on a low level have been observed to occur faster than those on a high level.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Model to inform the expansion of hydrogen distribution infrastructure

A growing hydrogen economy requires new hydrogen distribution infrastructure to link geographically distributed hubs of supply and demand. The Hydrogen Optimization with Deployment of Infrastructure (HOwDI) Model helps meet this requirement. The model is a spatially resolved optimization framework that determines location-specific hydrogen production and distribution infrastructure to cost-optimally meet a specified location-based demand. While these results are useful in understanding hydrogen infrastructure development, there is uncertainty in some costs that the model uses for inputs. Thus, the project team took the modeling effort a step further and developed a Monte Carlo methodology to help manage uncertainties. Seven scenarios were run using existing infrastructure and new demand in Texas exploring different policy and tax approaches. The inclusion of tax credits increased the percentage of runs that could deliver hydrogen at <$\$4$ /kg from 31% to 77% and decreased the average dispensed cost from $\$4.35$ /kg to $\$3.55$ /kg. However, even with tax credits there are still some runs where unabated SMR is deployed to meet new demand as the low-carbon production options are not competitive. Every scenario, except for the zero-carbon scenario (without tax credits), resulted in at least 20% of the runs meeting the $\$4$ /kg dispensed fuel cost target. This indicates that multiple pathways exist to deliver $\$4$ /kg hydrogen.

08 HYDROGEN↗