Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Selection of Global Climate Model Data for Downscaling With Generative Machine Learning and Use in the Power Planning for Alignment of Climate and Energy Systems Project

The range of results from climate models and scenarios is important to the understanding of uncertainty in power planning analysis. A U.S. Department of Energy-funded analytic project called Power Planning for Alignment of Climate and Energy Systems is developing data and analytic methods to reflect the effects of climate change on key variables for power system planning, as part of the Grid Modernization Lab Consortium. This project will select and prepare global climate model results for use in power system planning models. A related report (Evaluation of Global Climate Models for Use in Energy Analysis) assesses the performance of various global climate models from the Coupled Model Intercomparison Project Phase 6 data archive for their historical skill with respect to energy system performance and for their future projections under multiple climate change scenarios. Building from that report, we describe the selection of a climate scenario (Shared Socioeconomic Pathway [SSP] 2-4.5) and five climate models: TaiESM1, EC-Earth3-CC, GFDL-CM4, EC-Earth3-Veg, and MPI-ESM1-2-HR. We describe the model selection criteria, which were based on the quality of the match between model results under historical conditions and on the representation of the range of future values for several variables. These results will be downscaled via an open-source generative machine learning method called Super-Resolution for Renewable Energy Resource Data with Climate Change Impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

43 PARTICLE ACCELERATORS↗

First Wave of Incentive-Driven CCS Projects in North Dakota

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, March 28–30, 2022. While the central interior of North America offers a tremendous storage resource, optimization will be key to meaningfully reducing the more than 2.6 billion tons of CO 2 emitted annually from large point sources in the United States. These initial projects tend to have the most favorable economics and are often able to take advantage of the best geology, with little to no competition for resource. This initial wave of projects is informing investment in and creating the opportunity for innovation that will enable the next wave of incentive-based CCS projects. Such innovation is critical for reducing costs, enhancing the design and operability of the next wave of CCS projects, and realizing more of the 250 billion tons of storage resource in North Dakota.

01 COAL, LIGNITE, AND PEAT↗

Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project

The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.

13 HYDRO ENERGY↗

STILGAR End-of-Project Report

The Subsurface Tunnel Imaging LeveraGed by Analysis of Rayleigh wave ellipticity (STILGAR) project demonstrated an integrated geophysical approach for detecting, locating, and characterizing underground structural changes using dense seismic arrays and advanced inversion techniques. Field campaigns were conducted at two operational mines—the Redmond salt mine (Utah) and Graymont Pleasant Gap limestone mine (Pennsylvania)—providing real-world testbeds for monitoring anthropogenic subsurface activity. At the Redmond salt mine, seismic interferometry combined with back-projection inversion successfully identified continuous, low-amplitude signals from mining operations. The approach differentiated stationary from migrating anthropogenic sources, captured daily operational cycles, and validated the potential of passive seismic monitoring for remote detection of underground activity. At the Graymont Pleasant Gap mine, two dense seismic deployments in the spring and fall of 2023 generated over 4 TB of high-resolution data. Key outcomes included the relocation of 199 underground and 8 surface explosions with accuracies within tens of meters and the development of a 3D P-wave velocity model using the triple-difference tomography algorithm (tomoTD) that resolved major structural features such as the mine entrance, low-velocity tunnels, and roof-collapse areas. Ambient noise cross-correlation and back-projection analyses revealed persistent sources linked to ongoing mining activity, whereas horizontal-to-vertical spectral ratio (HVSR) and ellipticity studies confirmed stable site responses across seasons and identified soil thickness trends consistent with regional erosional and depositional processes. Checkerboard and sensitivity tests further validated the robustness of the tomographic results. Overall, the findings emphasize that although significant progress has been made in subsurface imaging, further work is needed to enhance the detection and localization of underground structures. Accurate imaging requires higher frequencies, yet anthropogenic sources tend to dominate the seismic record at those frequencies, and high-frequency surface waves are affected by higher modes that complicate interpretation. The improved detection and localization of human-induced signals enabled detailed temporal and spatial mapping of daily mine operations, demonstrating the feasibility of continuous anthropogenic source monitoring. Sensitivity to signals from nontraditional sources, such as fan operations, highlights the broader applicability of this approach to other industrial environments in which continuous and impulsive signals are present. The field campaigns produced a substantial volume of high-quality seismic data, supporting the development and testing of new methods for seismic source characterization and subsurface imaging. Future deployments should include sensors capable of recording lower frequencies to probe deeper structures, increase bandwidth to enhance resolution and sensitivity to both shallow and deep targets, and collect additional large-scale datasets to refine imaging and source characterization techniques. Moreover, conducting 3D modeling studies of seismic wavefields at higher frequencies will provide a better understanding of wave scattering and cavity–wavefield interactions in complex underground environments. In conclusion, the STILGAR project demonstrated that integrated seismic monitoring can effectively characterize underground operations, capturing both natural and anthropogenic signals. The approaches developed provide a foundation for improved detection, localization, and imaging of subsurface structures and are directly transferable to broader industrial monitoring applications.

58 GEOSCIENCES↗

Meadowview Neighborhood Electrification Project

Awarded a Congressionally Directed Spend (CDS) in 2023, Sacramento Municipal Utility District (SMUD) has successfully executed the Meadowview Neighborhood Electrification Project designed to demonstrate the efficacy of residential energy efficiency and weatherization upgrades for under-resourced communities positively impacting energy use reductions, financial metrics, and indoor air quality. Initially, the project sought to electrify and upgrade 300 homes in Sacramento’s Meadowview neighborhood. However, as interest and momentum grew, the project team proved increasingly efficient and was able to retrofit 374 homes. The project built on SMUD’s years of effort increasing energy efficiency, weatherization, and electrification for low-income residential customers—moving beyond incremental improvements toward full home electrification where it was both feasible and cost-effective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Barriers to Solar and Storage Hybrids: Modeled vs. empirical wholesale market value and net-value for co-located solar + storage projects [Slides]

Large-scale (1MW+) co-located solar and battery storage projects are expanding rapidly in the United States, but their realized contribution to the bulk power system remains poorly understood because public project-level operating data are limited. The Lawrence Berkeley National Laboratory estimates the wholesale market value of 280 operational photovoltaic-plus-storage (PV+S) projects across the seven ISOs/RTOs and 19 additional balancing authorities, representing roughly 95% of the U.S. PV+S fleet in 2024. We model optimized hourly dispatch under energy, capacity, and ancillary-service market opportunities and compare the resulting value with standalone PV value, project-specific levelized cost estimates, and empirical operating or revenue data where available.

14 SOLAR ENERGY↗

Aniak Energy Efficiency Retrofit Project

The Native Village of Aniak (NVA) is a remote Yup’ik community in western Alaska. NVA is proposing to install energy efficiency measures in the Tribal Office, Community Center, Association of Village Council Presidents (AVCP) Office, and Duplex. The goal of the project is to reduce the overall energy use of the NVA by implementing energy efficiency measures in four high-use tribal buildings. This project expects to have the following outcomes: projected annual energy savings of approximately $24,238; projected annual reduction in fuel oil of roughly 1,802 gallons and electricity of around 24,537 kWh; and annual reduction in carbon dioxide emissions of approximately 84,594 pounds/year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Technical Report - Kotzebue Wind Power Project - Volume II

The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

17 WIND ENERGY↗

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energy’s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 “Quality Assurance Program” under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as “not applicable” to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Title: Nuclear Astrophysics Data from Radioactive Beam Facilities

The scientific aims of this project have been the evaluation and dissemination of key nuclear reactions in nuclear astrophysics, with a focus on ones to be studied at new radioactive beam facilities worldwide. These aims were maintained during the entire funding period from 2003 - 2006. In the following, a summary of the reactions evaluated during this period is provided. Year 1 (2003-04): {sup 21}Na(p,{gamma}){sup 22}Mg and {sup 18}Ne({alpha},p){sup 21}Na - The importance of the {sup 21}Na(p,{gamma}){sup 22}Mg and the {sup 18}Ne({alpha},p){sup 21}Na reactions in models of exploding stars has been well documented: the first is connected to the production of the radioisotope {sup 22}Na in nova nucleosynthesis, while the second is a key bridge between the Hot-CNO cycles and the rp-process in X-ray bursts. By the end of Summer 2004, our group had updated these reaction rates to include all published data up to September 2004, and cast the reaction rates into standard analytical and tabular formats with the assistance of Oak Ridge National Laboratory's computational infrastructure for reaction rates. Since September 2004, ongoing experiments on these two reactions have been completed, with our group's participation in both: {sup 21}Na(p,{gamma}){sup 22}Mg at the TRIUMF-ISAC laboratory (DRAGON collaboration), and 18Ne({alpha},p){sup 21}Na at Argonne National Laboratory (collaboration with Ernst Rehm, Argonne). The data from the former was subsequently published and included in our evaluation. Publication from the latter still awaits independent confirmation of the experimental results. Year 2 (2004-05): The 25Al(p,{gamma}){sup 26}Si and {sup 13}N(p,{gamma})14O reactions - For Year 2, we worked on evaluations of the {sup 25}Al(p,{gamma}){sup 26}Si and {sup 13}N(p,{gamma}){sup 14}O reactions, in accordance with our proposed deliverables and following similar standard procedures to those used in Year 1. The {sup 25}Al(p,{gamma}){sup 26}Si reaction is a key uncertainty in the understanding the origin of galactic {sup 26}Al, a target radioisotope for gamma ray astronomy; the {sup 13}N(p,{gamma}){sup 14}O reaction in turn is the trigger reaction for the transition into the Hot-CNO cycles in novae and X-ray bursts. A graduate student of mine, who has been supported part-time by this grant, completed the evaluation of the {sup 25}Al(p,{gamma}){sup 26}Si reaction as part of his plans to measure this reaction at TRIUMF for his Ph.D. thesis project. I also hired a part-time undergraduate student for the 2004-05 academic year to assist with the evaluations, including that of the {sup 13}N(p,{gamma}){sup 14}O reaction. Year 3 (2005-06): The {sup 40}Ca({alpha},{gamma}){sup 44}Ti and {sup 26}Al(p,{gamma}){sup 27}Si reactions - This year's progress was closely coupled to new results coming from our collaboration on the DRAGON spectrometer team at TRIUMF. The {sup 40}Ca({alpha},{gamma}){sup 44}Ti and {sup 26}Al(p,{gamma}){sup 27}Si reactions were both measured, and significant modifications to their respective reaction rates were required. Both are required input toward predicting the respective amounts of Titanium-44 and Aluminum-26 produced in our galaxy, in supernovae, massive stars, and nova explosions. The {sup 26}Al(p,{gamma}){sup 27}Si reaction rate was successfully completed. The {sup 40}Ca({alpha},{gamma}){sup 44}Ti reaction in particular served as the Ph.D. thesis for Christian Ouellet, and therefore the evaluation of this rate fell naturally within his thesis project. Christian successfully defended his thesis in 2007 and is now working for me on the McMaster DOE-funded Nuclear Data Project. In light of the recent data from his thesis, Christian is now putting the final touches on this evaluation, and will disseminate it through the Oak Ridge National Laboratory reaction rate database.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Final Technical Report on STTR Project DE-FG02-04ER86191 Hydrogen Cryostat for Muon Beam Cooling

The project was to develop cryostat designs that could be used for muon beam cooling channels where hydrogen would circulate through refrigerators and the beam-cooling channel to simultaneously refrigerate 1) high-temperature-superconductor (HTS) magnet coils, 2) cold copper RF cavities, and 3) the hydrogen that is heated by the muon beam. In an application where a large amount of hydrogen is naturally present because it is the optimum ionization cooling material, it was reasonable to explore its use with HTS magnets and cold, but not superconducting, RF cavities. In this project we developed computer programs for simulations and analysis and conducted experimental programs to examine the parameters and technological limitations of the materials and designs of Helical Cooling Channel (HCC) components (magnet conductor, RF cavities, absorber windows, heat transport, energy absorber, and refrigerant).The project showed that although a hydrogen cryostat is not the optimum solution for muon ionization cooling channels, the studies of the cooling channel components that define the cryostat requirements led to fundamental advances. In particular, two new lines of promising development were opened up, regarding very high field HTS magnets and the HS concept, that have led to new proposals and funded projects.

43 PARTICLE ACCELERATORS↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site characterization phase was completed, laying the groundwork for moving the project towards a potential injection phase. Feasibility and design assessment activities included an assessment of the CO{sub 2} source options (a slip-stream capture system or transported CO{sub 2}); development of the injection and monitoring system design; preparation of regulatory permits; and continued stakeholder outreach.

01 COAL, LIGNITE, AND PEAT↗

Geologic Sequestration of CO2 in Deep, Unmineable Coalbeds: An Integrated Researdh and Commercial-Scale Field Demonstration Project

The Coal-Seq consortium is a government-industry collaborative consortium with the objective of advancing industry's understanding of complex coalbed methane and gas shale reservoir behavior in the presence of multi-component gases via laboratory experiments, theoretical model development and field validation studies. This will allow primary recovery, enhanced recovery and CO{sub 2} sequestration operations to be commercially enhanced and/or economically deployed. The project was initially launched in 2000 as a U.S. Department of Energy sponsored investigation into CO{sub 2} sequestration in deep, unmineable coalseams. The initial project accomplished a number of important objectives, which mainly revolved around performing baseline experimental studies, documenting and analyzing existing field projects, and establishing a global network for technology exchange. The results from that Phase have been documented in a series of reports which are publicly available. An important outcome of the initial phase was that serious limitations were uncovered in our knowledge of reservoir behavior when CO{sub 2} is injected into coal. To address these limitations, the project was extended in 2005 as a government-industry collaborative consortium. Selected accomplishments from this phase have included the identification and/or development of new models for multi-component sorption and diffusion, laboratory studies of coal geomechanical and permeability behavior with CO{sub 2} injection, additional field validation studies, and continued global technology exchange. Further continuation of the consortium is currently being considered. Some of the topics that have been identified for investigation include further model development/refinement related to multicomponent equations-of-state, sorption and diffusion behavior, geomechanical and permeability studies, technical and economic feasibility studies for major international coal basins, the extension of the work to gas shale reservoirs, and continued global technology exchange.

01 COAL, LIGNITE, AND PEAT↗