Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Multijunction Solar Cell Technology for Mars Surface Applications

Solar cells used for Mars surface applications have been commercial space qualified AM0 optimized devices. Due to the Martian atmosphere, these cells are not optimized for the Mars surface and as a result operate at a reduced efficiency. A multi-year program, MOST (Mars Optimized Solar Cell Technology), managed by JPL and funded by NASA Code S, was initiated in 2004, to develop tools to modify commercial AM0 cells for the Mars surface solar spectrum and to fabricate Mars optimized devices for verification. This effort required defining the surface incident spectrum, developing an appropriate laboratory solar simulator measurement capability, and to develop and test commercial cells modified for the Mars surface spectrum. This paper discusses the program, including results for the initial modified cells. Simulated Mars surface measurements of MER cells and Phoenix Lander cells (2007 launch) are provided to characterize the performance loss for those missions. In addition, the performance of the MER rover solar arrays is updated to reflect their more than two (2) year operation.

Mars solar cell↗

MO-AB-BRA-07: Prompt Gamma-Ray Spectroscopy for Range Verification of Clinical Proton Beams

Purpose: We developed a pre-clinical prototype system for range verification of proton pencil-beam scanning fields. The system was evaluated using phantom treatment plans delivered with a clinical dose rate. Methods: The absolute range of proton pencil-beams was verified through an optimization procedure, which matches energy- and time-resolved prompt gamma-ray measurements with models, based on cross sections for discrete prompt gamma-ray line excitations. Phantom experiments were performed with a pre-clinical prototype detector, using treatment plans delivered with a clinical pencil-beam scanning system. The detector consisted of an actively shielded lanthanum(III) bromide scintillator. Tungsten was used to collimate the gamma-rays. To support high event rates, the detector readout featured custom amplifiers and an active voltage divider for the photomultiplier. The detector signals were acquired by fast analog-to-digital converters and processed using digital algorithms. The data acquisition was also synchronized with the pencil-beam scanning and dosimetry systems. Results: We successfully acquired prompt gamma-ray spectra during the delivery of proton pencil-beams with a clinical beam current of 2 nA at the exit of the treatment head. The number of events in the primary detector ranged from 1 x 10{sup 6} to 2 x 10{sup 6} per second. In phantom experiments, non-uniform range errors were introduced by placing strips of plastic in the beam path. The magnitudes and positions of these range errors were correctly detected in two-dimensional range maps that were generated from the measurements. With our small scale prototype, a 1.0 mm standard deviation on the absolute range required about 5 x 10{sup 8} protons per delivered pencil-beam. Conclusions: Prompt gamma-ray spectroscopy to verify the absolute range of proton beams was demonstrated under clinical pencil-beam delivery conditions. A 1 mm to 2 mm range verification accuracy for a field delivering 1 Gy, appears feasible with a full scale system. This work was supported by the Federal Share of program income earned on C06-CA059267, Proton Therapy Research and Treatment Center.

60 APPLIED LIFE SCIENCES↗

Shuttle Avionics Integration Laboratory

The SAIL (Shuttle Avionics Integration Laboratory) has been established to provide direct in-line support to the space shuttle program. The SAIL provides a central facility where the avionics and related flight hardware, flight software, and flight procedures will be brought together for integration and verification testing. The basic approach is to utilize qualifiable avionics flight hardware to the greatest extent possible. Where this is not feasible, flight hardware simulators are developed that provide the electrical/electronic termination, stimulation, and signal interface to the flight hardware that it would actually encounter in the shuttle vehicle. This paper discusses the existing laboratory configuration supporting the approach and landing test phase of the shuttle program, the operational experience gained to date, and the design of the laboratory elements to support the orbital flight test phase.

Chambers, T. V.↗

The General Atomics Center for Magnetohydrodynamic Modeling (CEMM) Final Report

The Center for Extended Magnetohydrodynamic Modeling (CEMM) is built around the further development, verification, validation, and other application of two major extended magnetohydrodynamics (MHD) codes NIMROD and M3D-C1. The General Atomics (GA) CEMM Program focuses on three main research areas: extension of the M3D-C1 MHD code plasma response calculations to new regimes, coupling of the DK4D drift kinetic equation solver to a temperature evolution equation, and simulations of disruption mitigation for unstable plasmas with pre-existing magnetic islands using massive gas injection (MGI) with the NIMROD MHD code. A systematic scan of the zero-crossing of the rotation profile in a DIII-D ITER-similar shape equilibrium using linear, time-independent modeling with M3D-C1 was performed. A new Python utility, autoC1, has been developed to automate the running of M3D-C1 for linear simulations. A number of ELM suppression experiments were analyzed including a validation and cross-code verification with the MARS-F MHD code of magnetic signal phase shifts across ELM-suppression bifurcations. A linearized, time-dependent temperature equation was tightly coupled to the electron and ion drift-kinetic equations (DKEs) in the DK4D drift-kinetic equation solver. Various explicit and implicit implementations were attempted, but all methods proved numerically unstable, even with the addition of numerical dissipation. Several simulations were completed investigating the effects of pre-existing islands on disruption mitigation by MGI in DIII-D using NIMROD.

3D MHD Simulation↗

Recent SCALE Activities Within the Nuclear Criticality Safety Program

The role of SCALE in the Department of Energy’s Nuclear Criticality Safety Program (NCSP) is defined according to the Five-Year Plan, and summarized as follows. 1. Sustain/improve SCALE NCS features through user driven enhancements, software quality assurance (SQA) and validation and verification (V&V). 2. Assure adaptability to various computing platforms and compilers. 3. Improve user interfaces/documentation consistent with modern engineering software. 4. Support responsive communication to SCALE criticality safety users through SCALE Newsletters, email notices, and updates on the SCALE website. 5. Modernize software infrastructure and capabilities to improve quality and reliability and to ensure long term sustainability of the NCS capabilities. This paper describes the specific activities which have been performed within each area above for the NCSP in the fiscal year (FY) 2018, from October 1, 2017, to September 30, 2018.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Hubble Space Telescope: Cycle 1 calibration plan. Version 1.0

The framework for quantitative scientific analysis with the Hubble Space Telescope (HST) will be established from a detailed calibration program, and a major responsibility of staff in the Telescope & Instruments Branch (TIB) is the development and maintenance of this calibration for the instruments and the telescope. The first in-orbit calibration will be performed by the SI Investigation Definition Teams (IDTs) during the Science Verification (SV) period in Cycle 0 (expected to start 3 months after launch and last for 5 months). Subsequently, instrument scientists in the TIB become responsible for all aspects of the calibration program. Because of the long lead times involved, TIB scientists have already formulated a calibration plan for the next observing period, Cycle 1 (expected to last a year after the end of SV), which has been reviewed and approved by the STScI Director. The purpose here is to describe the contents of this plan. Our primary aim has been to maintain through Cycle 1 the level of calibration that is anticipated by the end of SV. Anticipated accuracies are given here in tabular form - of course, these accuracies can only be best guesses because we do not know how each instrument will actually perform on-orbit. The calibration accuracies are expected to satisfy the normal needs of both the General Observers (GOs) and the Guaranteed Time Observers (GTOs).

Stanley, Peggy↗

Baseline Characterization Database Verification Report – PCEA Billet 02S8 7

The purpose of this Engineering Calculations and Analysis Report is to present the data being collected in the Baseline Graphite Characterization program, which is directly tasked with supporting the Idaho National Laboratory’s (INL’s) research and development efforts on the Advanced Reactor Technologies (ART) Program. This program is populating a comprehensive database that will reflect the baseline properties of nuclear grade graphite with regard to individual grade, billet, and position within individual billets. The physical and mechanical property information being collected will be transferred to the Nuclear Data Management and Analysis System (NDMAS), and that database will help populate the handbook of property data available to member nations of the Generation IV International Forum. Transfer of these data from the applicable technical lead to the dissemination databases available to other end users requires a full review of the test procedures and data collection efforts through an analysis of the multiple summary spreadsheets and values being collected. This report represents the analysis for PCEA billet 02S8 7 and facilitates release of associated data to the NDMAS custodians.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Baseline Characterization Database Verification Report – PCEA Billet XPC01D3-36

The purpose of this Engineering Calculations and Analysis Report is to present the data being collected in the Baseline Graphite Characterization program, which is directly tasked with supporting the Idaho National Laboratory’s (INL’s) research and development efforts on the Advanced Reactor Technologies (ART) program. This program is populating a comprehensive database that will reflect the baseline properties of nuclear-grade graphite with regard to individual grade, billet, and position within individual billets. The physical and mechanical property information being collected will be transferred to the NGNP Data Management and Analysis System (NDMAS), and from that database will help populate the handbook of property data available to member nations of the Generation IV International Forum (GIF). The transfer of this data from the applicable technical lead to the dissemination databases available to other end users requires a full review of the test procedures and data collection efforts through an analysis of the multiple summary spreadsheets and values being collected. This report represents that analysis for PCEA billet XPC01D3-36 and facilitates the release of the associated data to the NDMAS custodians.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Diode step stress program, JANTX1N5614

The reliability of switching diode JANTX1N5614 was tested. The effect of power/temperature step stress on the diode was determined. Control sample units were maintained for verification of the electrical parametric testing. Results are reported.

Source record↗

Space shuttle propulsion estimation development verification

The application of extended Kalman filtering to estimating the Space Shuttle Propulsion performance, i.e., specific impulse, from flight data in a post-flight processing computer program is detailed. The flight data used include inertial platform acceleration, SRB head pressure, SSME chamber pressure and flow rates, and ground based radar tracking data. The key feature in this application is the model used for the SRB's, which is a nominal or reference quasi-static internal ballistics model normalized to the propellant burn depth. Dynamic states of mass overboard and propellant burn depth are included in the filter model to account for real-time deviations from the reference model used. Aerodynamic, plume, wind and main engine uncertainties are also included for an integrated system model. Assuming uncertainty within the propulsion system model and attempts to estimate its deviations represent a new application of parameter estimation for rocket powered vehicles. Illustrations from the results of applying this estimation approach to several missions show good quality propulsion estimates.

Rogers, Robert M.↗

Advanced orbiting systems test-bedding and protocol verification

The Consultative Committee for Space Data Systems (CCSDS) has begun the development of a set of protocol recommendations for Advanced Orbiting Systems (SOS). The AOS validation program and formal definition of AOS protocols are reviewed, and the configuration control of the AOS formal specifications is summarized. Independent implementations of the AOS protocols by NASA and ESA are discussed, and cross-support/interoperability tests which will allow the space agencies of various countries to share AOS communication facilities are addressed.

Noles, James↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Requirements Description of GAMSOR and GAMSRC

This report presents the modeling and simulation capabilities of Argonne National Laboratory’s GAMSOR and GAMSRC code that is used in present reactor analysis activities. These capabilities will then be used to establish the set of verification tasks necessary to verify GAMSOR for use on commercial projects. A similar approach was taken for the PERSENT, REBUS and DIF3D software packages. The GAMSOR program is a modified version of DIF3D used to obtain the coupled neutron gamma flux distributions for a given reactor system. GAMSOR was first developed in the 1980s and its work has progressed in parallel with DIF3D throughout its various development phases. While GAMSOR is compatible with DIF3D-FD and DIF3D-Nodal, DIF3D-VARIANT is most commonly used today and will be the focus of the present verification effort. As covered in [1], GAMSOR was built to provide more accurate heating distributions by explicitly solving for both the gamma and neutron heating distributions. Without this consideration, gamma heat is normally assumed to be deposited locally at the site of gamma production. This is acceptable for modeling some phenomena because the total energy production is preserved, but it can lead to inaccurate approximations of fluence-dependent behaviors such as fuel performance, swelling, cladding embrittlement, radiation induced creep, and power peaking. The outputs from GAMSOR are contained in multiple intermediate and final output files: FIXSRC, VARSRC, GTFLUX, GHFLUX, PWDINT, NPDINT, and GPDINT. DIF3D normally produces a PWDINT file containing power density results, with the assumption that gamma rays are absorbed where they are emitted (i.e., energy deposition is local with no modeled transport). With GAMSOR, neutron power density (NPDINT) and gamma power density (GPDINT) are both produced, with their summed power densities replacing the results in PWDINT for total heating (i.e., recoverable) power density.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The eROSITA Final Equatorial-Depth Survey (eFEDS): Identification and characterization of the counterparts to point-like sources

In November 2019, eROSITA on board of the Spektrum-Roentgen-Gamma (SRG) observatory started to map the entire sky in X-rays. After the four-year survey program, it will reach a flux limit that is about 25 times deeper than ROSAT. During the SRG performance verification phase, eROSITA observed a contiguous 140 deg 2 area of the sky down to the final depth of the eROSITA all-sky survey (eROSITA Final Equatorial-Depth Survey; eFEDS), with the goal of obtaining a census of the X-ray emitting populations (stars, compact objects, galaxies, clusters of galaxies, and active galactic nuclei) that will be discovered over the entire sky. This paper presents the identification of the counterparts to the point sources detected in eFEDS in the main and hard samples and their multi-wavelength properties, including redshift. To identify the counterparts, we combined the results from two independent methods (NWAY and ASTROMATCH), trained on the multi-wavelength properties of a sample of 23k XMM-Newton sources detected in the DESI Legacy Imaging Survey DR8. Then spectroscopic redshifts and photometry from ancillary surveys were collated to compute photometric redshifts. Of the eFEDS sources, 24 774 of 27 369 have reliable counterparts (90.5%) in the main sample and 231 of 246 sources (93.9%) have counterparts in the hard sample, including 2514 (3) sources for which a second counterpart is equally likely. By means of reliable spectra, Gaia parallaxes, and/or multi-wavelength properties, we have classified the reliable counterparts in both samples into Galactic (2695) and extragalactic sources (22 079). For about 340 of the extragalactic sources, we cannot rule out the possibility that they are unresolved clusters or belong to clusters. Inspection of the distributions of the X-ray sources in various optical/IR colour-magnitude spaces reveal a rich variety of diverse classes of objects. The photometric redshifts are most reliable within the KiDS/VIKING area, where deep near-infrared data are also available. This paper accompanies the eROSITA early data release of all the observations performed during the performance and verification phase. Together with the catalogues of primary and secondary counterparts to the main and hard samples of the eFEDS survey, this paper releases their multi-wavelength properties and redshifts.

79 ASTRONOMY AND ASTROPHYSICS↗

Verification Problems for Parameterized Load Curves in DYNA3D

Two verification problems are presented which test a set of newly implemented load curve features in the explicit finite element program DYNA3D. Each test consists of a single element, with the velocity of each node specified via a different load curve type. The first test covers initialization and run-time execution of these new features, while the second test covers redefinition of load curves upon restart. The proposed problems may be easily extended to test additional load curve features.

42 ENGINEERING↗

Annual Performance Assessment and Composite Analysis Review for the ICDF Landfill FY 2008

This report addresses low-level waste disposal operations at the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility (ICDF) landfill from the start of operations in Fiscal Year 2003 through Fiscal Year 2008. The ICDF was authorized in the Operable Unit 3-13 Record of Decision for disposal of waste from the Idaho National Laboratory Site CERCLA environmental restoration activities. The ICDF has been operating since 2003 in compliance with the CERCLA requirements and the waste acceptance criteria developed in the CERCLA process. In developing the Operable Unit 3-13 Record of Decision, U.S. Department of Energy Order (DOE) 435.1, 'Radioactive Waste Management', was identified as a 'to be considered' requirement for the ICDF. The annual review requirement under DOE Order 435.1 was determined to be an administrative requirement and, therefore, annual reviews were not prepared on an annual basis. However, the landfill has been operating for 5 years and, since the waste forms and inventories disposed of have changed from what was originally envisioned for the ICDF landfill, the ICDF project team has decided that this annual review is necessary to document the changes and provide a basis for any updates in analyses that may be necessary to continue to meet the substantive requirements of DOE Order 435.1. For facilities regulated under DOE Order 435.1-1, U.S. DOE Manual 435.1-1, 'Radioactive Waste Management', IV.P.(4)(c) stipulates that annual summaries of low-level waste disposal operations shall be prepared with respect to the conclusions and recommendations of the performance assessment and composite analysis. Important factors considered in this review include facility operations, waste receipts, and results from monitoring and research and development programs. There have been no significant changes in operations at the landfill in respect to the disposal geometry, the verification of waste characteristics, and the tracking of inventories against total limits that would affect the results and conclusions of the performance assessment. Waste receipts to date and projected waste receipts through Fiscal Year 2012 are both greater than the inventory assessed in the performance assessment and composite analysis. The waste forms disposed of to the landfill are different from the waste form (compacted soil) assessed in the performance assessment. The leak detection system and groundwater monitoring results indicate the landfill has not leaked. The results of the performance assessment/composite analysis are valid (i.e., there is still a reasonable expectation of meeting performance objectives) but the new information indicates less conservatism in the results than previously believed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Orbit Modelling for Satellites Using the NASA Prediction Bulletins

For some satellites the NASA Prediction Bulletins are the only means available to the general user for obtaining orbital information. A computational interface between the information given in the NASA Prediction Bulletins and standard orbit determination programs is provided. Such an interface is necessary to obtain accurate orbit predictions. The theoretical considerations and their computational verification in this interface modelling are presented. This analysis was performed in conjunction with satellite aided search and rescue position location experiments where accurate orbits of the Amateur Satellite Corporation (AMSAT) OSCAR-6 and OSCAR-7 spacecraft are a prerequisite.

Bonavito, N. L.↗