Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Technical and management information system: The tool for professional productivity on the space station program

The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

Montoya, G.↗

Management experience of an international venture in space The Ulysses mission

The management of the Ulysses project, a probe which will fly a solar polar orbit, is described. The 5-yr mission will feature a flyby of Jupiter to deflect the spacecraft into a high-inclination orbit. Data on the solar corona, solar wind, the sun-wind interface, the heliospheric magnetic field, solar and nonsolar cosmic rays, etc., will be gathered as a function of the solar latitude. NASA will track and control the probe with the Deep Space Network. JPL provides project management for NASA while the Directorate of Scientific Programs performs ESA management functions. The DOE will provide a radioisotope thermoelectric generator while NASA and ESA each supply half the scientific payload. A NASA-ESA Joint Working Group meets about twice per year to monitor the project and discuss the technical and scientific requirements. Safety issues and measures which are being addressed due to the presence of the Pu-238 heat source for the RTG are discussed.

Yoshida, Ronald Y.↗

Operations Analysis of Space Shuttle System

The space science program at NASA since 1950's has gone through stages of development and implementation in rocketry and scientific advancement. It has become the nation's largest scientific institution of research and innovation for space exploration and military research, and overall a pride of the nation at an exorbitant cost. After placing man on moon, space shuttle program at NASA is an on-going project with a high success rate at an average cost of about $450m per flight. A future endeavor from both government and private sectors needs to be undertaken for commercialization of this expensive mission. In order to attract private enterprises, it needs to boost up its operations with better technology at lower cost to cope with rapid changes in scientific advancement and economic competition. Thus, a second-generation reusable launch vehicle (2GRLV) will play a major role in future operation of NASA centers. Envisioning this potential way of saving the program by reducing the cost, NASA is currently managing an innovative program called the Space Launch Initiative (SLI) to develop key technologies that will support the development of second-generation reusable launch vehicles (RLV) which will be more economical and safer and reliable than the existing space shuttle system. The selection of which technologies to fund for further development is being based on their likelihood to contribute to providing cost reduction or safety improvements. It is envisioned that in the 2006 timeframe, NASA will make a decision as to whether or not to commit to the replacement of the current space shuttle system with a new RLV. The decision to proceed with a new RLV will be partly based on the likelihood that the new system will be better than the existing space shuttle. Government and private entrepreneurs are currently considering four different types of RLV projects: commercial programs, government programs, international concepts, and X Prize competitors. NASA has already commissioned a series of X-programs to study the future RLV program. Today, NASA decision makers need analytical tools to help determine which technologies to fund the development of this technology. In the 2006 timeframe, these same decision makers will need analytical tools to evaluate and compare various RLV architectures, including the existing space shuttle so as to make the best decision for whether or not to proceed with the development of a new RLV, and if so, then which one. A study is conducted here to establish ground level knowledge from the historical data and expertise experiences of the field personnel. Such information is compiled in the form of mission statement, goals, space shuttle operations, payloads and cargo constraints, resource constraints, and bottlenecks to the enhancement vector.

Bhaba R. Sarker↗

Integrated Hybrid System Architecture for Risk Analysis

A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.

Moynihan, Gary P.↗

The repository-based software engineering program: Redefining AdaNET as a mainstream NASA source

The Repository-based Software Engineering Program (RBSE) is described to inform and update senior NASA managers about the program. Background and historical perspective on software reuse and RBSE for NASA managers who may not be familiar with these topics are provided. The paper draws upon and updates information from the RBSE Concept Document, baselined by NASA Headquarters, Johnson Space Center, and the University of Houston - Clear Lake in April 1992. Several of NASA's software problems and what RBSE is now doing to address those problems are described. Also, next steps to be taken to derive greater benefit from this Congressionally-mandated program are provided. The section on next steps describes the need to work closely with other NASA software quality, technology transfer, and reuse activities and focuses on goals and objectives relative to this need. RBSE's role within NASA is addressed; however, there is also the potential for systematic transfer of technology outside of NASA in later stages of the RBSE program. This technology transfer is discussed briefly.

Source record↗

Ultra-Efficient Engine Technology (UEET) Program

The Ultra-Efficient Engine Technology (UEET) Program includes seven key projects that work with industry to develop and hand off revolutionary propulsion technologies that will enable future-generation vehicles over a wide range of flight speeds. A new program office, the Ultra-Efficient Engine Technology (UEET) Program Office, was formed at the NASA Glenn Research Center to manage an important National propulsion program for NASA. The Glenn-managed UEET Program, which began on October 1, 1999, includes participation from three other NASA centers (Ames, Goddard, and Langley), as well as five engine companies (GE Aircraft Engines, Pratt & Whitney, Honeywell, Allison/Rolls Royce, and Williams International) and two airplane manufacturers (the Boeing Company and Lockheed Martin Corporation). This 6-year, nearly $300 million program will address local air-quality concerns by developing technologies to significantly reduce nitrogen oxide (NOx) emissions. In addition, it will provide critical propulsion technologies to dramatically increase performance as measured in fuel burn reduction that will enable reductions of carbon dioxide (CO2) emissions. This is necessary to address the potential climate impact of long-term aviation growth.

Manthey, Lori A.↗

An Agent-Based Cockpit Task Management System

An agent-based program to facilitate Cockpit Task Management (CTM) in commercial transport aircraft is developed and evaluated. The agent-based program called the AgendaManager (AMgr) is described and evaluated in a part-task simulator study using airline pilots.

Funk, Ken↗

Program documentation standards

A style manual is presented to serve as a reference and guide for system and program documentation. It is intended to set standards for documentation, prescribing the procedures to be followed, format to be used, and information to be produced. The standards for program documentation specify the extent to which the programmer should support his efforts in writing. The first three sections of the manual (system, program, and operation descriptions) contain information of particular interest to management, operators, and program users, respectively. Each section was designed as a self-sufficient description from the management, operator, or user point of view.

Parker, D. A.↗

Space Station thermal test bed status and plans

The accomplishments, current status, and future plans of the thermal test bed program for Space Station thermal management are discussed. This program is intended to support the design and development of the thermal control systems for the Space Station. The topics discussed include heat pipe radiator evaluation, modular panel tests, two-phase heat transport, and testing of thermal buses using ammonia as the working fluid.

Brady, Timothy K.↗

ACTS propagation program

The Advanced Communications Technology Satellite (ACTS) Propagation Program is organized to fulfill certain needs and requirements of the ACTS community. It is hoped that issues related to propagation effects in the context of ACTS experiments can be addressed and resolved by this program. The objectives of the ACTS Propagation Program are included in but not limited to planning for propagation measurements and studies using ACTS; organizing propagation experimenters who want to use ACTS into one group; developing observation stations for ACTS propagation measurements; supervising data collection, analysis, and ensure uniformity of data recording among various experimenters; and assisting the ACTS Program Office to carry out its objectives. This program is organized and managed by the NASA Propagation Program at the Jet Propulsion Laboratory. Financial support for this program is provided by NASA.

Davarian, Faramaz↗

Lunar Prospector Technical Design Review

Topics considered include: Ames Mission Management Office Rolls and Responsibilities; Program Overview/Requirements/Description; Project Status; Management; Science Goals and Objectives; Science Instruments; and Systems Requirements.

Source record↗

STS-114: Discovery Day 6 Post MMT Meeting

Wane Hill, Deputy Manager of the Space Shuttle Program, and Steve Poulos, Manager, Orbiter Project Office discussed damage assessments caused during ascent. Steve further detailed the damage analysis and assessments with chart presentation of composite tile damage and gap filler sites evaluation, protruding ceramic shim, left wing tile damage, comparisons of ground test results versus FD5 focused inspection, and the window 1 blanket. Gap fillers, the STS-73, thermal protection, temperature range, heating and heating range, aerodynamics, aerothermodynamics, risk, foam damage, tile adhesions, and extravehicular activities are topics covered with the News media.

Source record↗

NASA GSFC Opportunities for STEM Professionals Using the Vantage Point of Space

NASA has a variety of learning opportunities for STEM professionals. Three opportunities at GSFC are examined in this chapter: 1) standard summer research and development internship for undergraduates, 2) senior internship for undergraduate and graduate students and 3) a workshop series for informal learning center professionals. We describe these programs, examine their evolution with respect to most effective education practices and their assessment and evaluation, and identify the similarities and differences between them. The internship programs highlight authentic project-based research and development experiences with the senior internship providing a richer, deeper, and more demanding experience that has greater professional value. The workshops for informal learning center professionals on-the-other hand, focus on building knowledge of GSFC s science and engineering strengths among these professionals, and on building enduring partnerships between individuals (participants and GSFC scientist, engineers and educators) and between organizations (GSFC and the informal learning center). Finally, we examine the characteristics of these programs from a design and management perspective. Through this examination we identify a general structure that provides insight into more effective design and management of similar education programs.

Meeson, Blanche W.↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

Translational Cell & Animal Research in Space 1965-2011

Translational Cell and Animal Research (TCAR). For nearly 50 years, the NASA Space Biology Program has funded, and Ames Research Center (ARC) has managed, a robust program of fundamental research including studies using a wide range of animal cells, tissues and organisms. Much of this research was conducted on spacecraft in microgravity environments including diverse platforms such as: Gemini Spacecraft, US Biosatellites, Apollo Command Modules, Skylabs, Russian Biosatellites, NASA Space Shuttles, NASA/Mir, and most recently, the International Space Station (ISS). During the Space Shuttle Era (1981–2011), the science of space biology took an enormous step forward with 45 missions that afforded researchers with new opportunities to conduct systematic and complex experiments aimed at a deeper understanding of how life adapts to the space environment. Beginning in the 1990s, the products of these experiments, comprised of research summaries and rare, unused biospecimens, were collected and catalogued within the ARC Life Sciences Data Archiving Office, a branch of NASA’s Life Sciences Data Archive (LSDA) managed from the NASA Johnson Spaceflight Center.

Ronca, April E.↗

Agricultural applications of remote sensing: A true life adventure

A study of agricultural applications of remote sensing with a major US agricultural firm was undertaken in mid-1973. The study continued for eighteen months, and covered the areas of crop monitoring and management as well as large scale crop inventories. Pilot programs in the application of aircraft remote sensing and LANDSAT data were conducted. An operational aircraft survey program for ranch management has subsequently been implemented by the agricultural firm. LANDSAT data was successfully used to produce a ninety-seven percent accurate inventory of cotton over 4.8 million acres of California's San Joaquin Valley.

Schaller, E. S.↗

STS-31: Hubble HST Science

The primary objective of STS-31 was to deploy the Hubble Space Telescope(HST). This videotape presents a press briefing about the scientific goals of the HST program. The panel members were Dr. Weiler, HST program scientist; Dr. Boggess from NASA Goddard, the Center managing the HST Program; and Dr. Bahcall, President Elect of the American Astronomical Union. Dr. Weiler opened the panel discussion by introducing other HST scientists who were in the audience. Dr. Bahcall explained the four major areas that astronomers hope to better understand using the HST data: (1) The size and age of the universe; (2) quasars as flashlights to understanding other features of the universe; (3) planets around other stars; and (4) weather on the other planets of our Solar System. Other areas in which he hopes to have some understanding are galaxies under quasars, black holes, and missing matter. After his remarks, Dr. Bahcall presented a plaque to Charles Pellerin, who helped initiate the series of astrophysics telescopes. The HST is the first of these "Great Observatories". After the presentation, questions from the press were answered.

Source record↗