Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway: Enhanced SPRA-based Margins Assessment

Recently there has been development in the field of risk-informed performance-based (RIPB) design and licensing approaches, which leverage detailed risk assessments and performance-based metrics to allow flexibility and innovation. These RIPB approaches include the probabilistic treatment of external hazards, including low frequency events that are beyond the design basis. However, there are certain challenges that have been identified to the probabilistic treatment of low frequency external events, primarily due to uncertainty in the hazard curve and the associated plant response to rare, severe events. The NRC is currently developing 10 CFR Part 53 that would establish a technology-inclusive regulatory framework for use by applicants for new commercial advanced nuclear reactors. By examining the regulatory safety criteria contained within draft 10 CFR Part 53 and associated draft RIPB seismic design guidance, potential challenges were identified in demonstrating satisfaction of the safety criteria for low frequency external events, with specific difficulties associated with demonstrating compliance with the quantitative health objectives (QHOs). Non-LWRs are expected to utilize the direct calculation of offsite consequence, rather than use surrogates, for comparison to the QHOs, which can be particularly challenging as the previously identified uncertainties are compounded by uncertainties in the response of the neighboring population. The central recommendation from this effort is that it is necessary to develop an approach for demonstrating compliance with the safety criteria in draft Part 53 that addresses the key challenges while providing flexibility to applicants. This paper summarizes key findings, establishes a series of high-level goals, and reviews a newly developed approach to address the major challenges associated with assessing compliance with QHOs, with avenues to demonstrate compliance based on either the estimated consequence or the available margin to event occurrence, while also building on existing experience of seismic margins assessments. The paper also provides examples to demonstrate the application of the approach, as well as recommendations and potential future work.

external hazards↗

Deep Sigma Point Processes-Assisted Chance-Constrained Power System Transient Stability Preventive Control

Here this paper proposes a deep sigma point processes (DSPP)-assisted chance-constrained power system transient stability preventive control method to deal with uncertain renewable energy and loads-induced stability risk. The traditional transient stability-constrained preventive control is reformulated as a chance-constrained optimization problem. To deal with the computational bottleneck of the time-domain simulation-based probabilistic transient stability assessment, the DSPP is developed. DSPP is a parametric Bayesian approach that allows us to predict system transient stability with high computational efficiency while accurately quantifying the confidence intervals of the predictions that can be used to inform system instability risk. To this end, with a given preset confidence probability, we embed DSPP into the primal dual interior point method to help solve the chance-constrained preventive control problem, where the corresponding Jacobian and Hessian matrices are derived. Comparison results with other existing methods show that the proposed method can significantly speed up preventive control while maintaining high accuracy and convergence

97 MATHEMATICS AND COMPUTING↗

An Ensemble Optimization Framework for Coupled Design of Hydropower Contracts and Real-Time Reservoir Operating Rules

Often, revenues from hydropower generation depend on the operator's ability to provide firm power in the presence of uncertain inflows. The primary options available for optimizing revenue are negotiation of a firm power contract before operations begin and adjustment of the reservoir release during operations. Contract and release strategy optimization are closely coupled and most appropriately analyzed with stochastic real-time control methods. Here we use an ensemble-based approach to stochastic optimization that provides a convenient way to construct nonparametric revenue probability distributions to explore the implications of uncertainty. The firm power contract is a simplified bilateral fixed price agreement that partially insulates operator and buyer from price fluctuations. The release control laws and firm energy target are jointly optimized to maximize the operator's expected revenue. Revenue probability distributions and related spill performance statistics indicate that predictive operating strategies such as stochastic dynamic programming and model predictive control can give significantly better performance than standard deterministic operating rules. The performance obtained from batch optimization with perfect inflow information establishes a convenient upper bound on potential revenue and provides a baseline for assessing the significance of differences between real-time operating strategies. Sensitivity analysis indicates that the benefits of predictive operational strategies are greatest for reservoirs with medium nondimensional residence times and less important for reservoirs with large residence times. Overall, probabilistic analysis of the coupled hydropower contract-operations problem provides a realistic way to assess revenue and risk for reservoirs that must provide firm power when inflows are uncertain.

13 HYDRO ENERGY↗

Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report

The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solar PV, Wind Generation, and Load Forecasting Dataset for ERCOT 2018: Performance-Based Energy Resource Feedback, Optimization, and Risk Management (P.E.R.F.O.R.M.)

This report describes the Advanced Research Projects Agency-Energy Performance-Based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) Electric Reliability Council of Texas (ERCOT) dataset consisting of load, solar, and wind deterministic and probabilistic forecasts at three timescales. This dataset consists of 1 year of time-coincident load, wind, and solar actuals and probabilistic forecasts for a region similar to ERCOT. All the data are stored in Hierarchical Data Format 5 (HDF5) files and have been uploaded to an Amazon Web Services repository. The ERCOT data set has 2 years (2017, 2018) of actuals and 1 year (2018) of probabilistic forecasts. These data are provided at various spatial (i.e., site-level, zone-level, and system-level) and temporal scales (i.e., day-ahead, intraday, and intra-hour). Specifically, data are provided for 125 existing wind sites, 22 existing solar sites, 139 proposed wind sites, and 204 proposed solar sites.

14 SOLAR ENERGY↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2023

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2023. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2023 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Record of Decision↗

NESC-VII: Fracture Mechanics Analyses of WPS Experiments on Large-scale Cruciform Specimen

This paper describes numerical analyses performed to simulate warm pre-stress (WPS) experiments conducted with large-scale cruciform specimens within the Network for Evaluation of Structural Components (NESC-VII) project. NESC-VII is a European cooperative action in support of WPS application in reactor pressure vessel (RPV) integrity assessment. The project aims in evaluation of the influence of WPS when assessing the structural integrity of RPVs. Advanced fracture mechanics models will be developed and performed to validate experiments concerning the effect of different WPS scenarios on RPV components. The Oak Ridge National Laboratory (ORNL), USA contributes to the Work Package-2 (Analyses of WPS experiments) within the NESCVII network. A series of WPS type experiments on large-scale cruciform specimens have been conducted at CEA Saclay, France, within the framework of NESC VII project. This paper first describes NESC-VII feasibility test analyses conducted at ORNL. Very good agreement was achieved between AREVA NP SAS and ORNL. Further analyses were conducted to evaluate the NESC-VII WPS tests conducted under Load-Cool-Transient- Fracture (LCTF) and Load-Cool-Fracture (LCF) conditions. This objective of this work is to provide a definitive quantification of WPS effects when assessing the structural integrity of reactor pressure vessels. This information will be utilized to further validate, refine, and improve the WPS models that are being used in probabilistic fracture mechanics computer codes now in use by the NRC staff in their effort to develop risk-informed updates to Title 10 of the U.S. Code of Federal Regulations (CFR), Part 50, Appendix G.

99 GENERAL AND MISCELLANEOUS↗

Station Blackout: A case study in the interaction of mechanistic and probabilistic safety analysis

The ability to better characterize and quantify safety margins is important to improved decision making about nuclear power plant design, operation, and plant life extension. As research and development (R&D) in the light-water reactor (LWR) Sustainability (LWRS) Program and other collaborative efforts yield new data, sensors, and improved scientific understanding of physical processes that govern the aging and degradation of plant SSCs needs and opportunities to better optimize plant safety and performance will become known. The purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway R&D is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic and probabilistic approaches are combined in order to estimate a safety margin. We use the scenario of a “station blackout” wherein offsite power and onsite power is lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and contrast this with traditional risk analysis modeling for this type of accident scenario.

97 MATHEMATICS AND COMPUTING↗

Cost-Effectiveness Analysis of Preoperative Versus Postoperative Radiation Therapy in Extremity Soft Tissue Sarcoma

Purpose: Surgery combined with radiation therapy (RT) is the cornerstone of multidisciplinary management of extremity soft tissue sarcoma (STS). Although RT can be given in either the preoperative or the postoperative setting with similar local recurrence and survival outcomes, the side effect profiles, costs, and long-term functional outcomes are different. The aim of this study was to use decision analysis to determine optimal sequencing of RT with surgery in patients with extremity STS. Methods and Materials: A cost-effectiveness analysis was conducted using a state transition Markov model, with quality-adjusted life years (QALYs) as the primary outcome. A time horizon of 5 years, a cycle length of 3 months, and a willingness-to-pay threshold of $50,000/QALY was used. One-way deterministic sensitivity analyses were performed to determine the thresholds at which each strategy would be preferred. The robustness of the model was assessed by probabilistic sensitivity analysis. Results: Preoperative RT is a more cost-effective strategy ($26,633/3.00 QALYs) than postoperative RT ($28,028/2.86 QALYs) in our base case scenario. Preoperative RT is the superior strategy with either 3-dimensional conformal RT or intensity-modulated RT. One-way sensitivity analyses identified the relative risk of chronic adverse events as having the greatest influence on the preferred timing of RT. The likelihood of preoperative RT being the preferred strategy was 82% on probabilistic sensitivity analysis. Conclusions: Preoperative RT is more cost effective than postoperative RT in the management of resectable extremity STS, primarily because of the higher incidence of chronic adverse events with RT in the postoperative setting.

61 RADIATION PROTECTION AND DOSIMETRY↗

Predicting Biological Cleanliness: An Empirical Bayes Approach for Spacecraft Bioburden Accounting

To comply with the international planetary protection policy set forth by the Committee on Space Research and NASA Agency level requirements, spacecraft destined to biologically sensitive planetary bodies have to minimize terrestrial biological contamination. Analysis, testing and inspection are the standard forward verification activities that are used to demonstrate compliance with the biological contamination requirements. For testing of spacecraft surface areas, a swab or wipe sample is collected from surfaces prior to last access and subsequently processed in the lab using NASA Approved Planetary Protection Methods for Culture Based Assays. Raw data resulting from this assay is then statistically treated employing a mathematical paradigm stemming from the 1970’s Viking Lander Project to generate the bioburden density and total microbial bioburden present. This standard approach arbitrarily accounts for error and provides an upper conservative bound as it reports the maximum number of spores estimated to be present on flight hardware surfaces. A bioburden density estimate factors in the following variables: the observed bioburden count, representative volume processed, sampling efficiencies. Notably, to account for error in the approach, a 0 observed count is arbitrarily changed to a count of 1 for each hardware grouping. The data generated by spacecraft bioburden verification campaigns in the past have resulted in <80% of wipes and <90% of swabs containing a bioburden count of 0. As such, having a robust and well documented statistical approach for dealing with the probability of low incident rates is necessary to be able to estimate spacecraft bioburden. Being able to statistically describe the bioburden distribution and associated confidence level is a gamechanger for the development of bioburden allocations during mission design and will allow for tighter management of risk throughout spacecraft build. Thus, Empirical Bayes statistical approach was evaluated to estimate the microbial bioburden on spacecraft to mitigate the aforementioned mathematical concerns and provide a probabilistic bioburden distribution of the flight hardware surface. For application of this approach to performing bioburden calculations, a range of non-informative prior assumptions on hardware surfaces are explored for Bayesian analyses while informative priors using posterior distributions from prior assays are utilized for Empirical Bayes analyses. Several non-informative priors are currently under investigation to assess fitness including use of these priors to serve as a foundation to build off of NASA specification values or a basis of risk to account for unknowns during the integration and testing process. Informative priors under consideration are generated using sampled bioburden values from hardware originating within like processing environments (e.g. vendor cleaning process or similar assembly process), temporal spacecraft status events as a prediction for hardware cleanliness of future samples, and heritage system bioburden actuals to predict allocation for subsequent missions. Informative priors and probabilistic bioburden distributions are then validated using data sets from the Mars Exploration Rover, Mars Science Laboratory, and InSight missions. Using Empirical Bayes approach to generate a probabilistic bioburden distribution as demonstrated through mission use cases provides a valid approach for use in the end-to-end requirements verification process.

97 MATHEMATICS AND COMPUTING↗

Bayesian Framework for Bioburden Density Estimation in Planetary Protection

To comply with the international planetary protection policy set forth by the Committee on Space Research and NASA Agency level requirements, spacecraft destined to biologically sensitive planetary bodies have to minimize terrestrial biological contamination. Analysis, testing and inspection are the standard forward verification activities that are used to demonstrate compliance with the biological contamination requirements. For testing of spacecraft surface areas, a swab or wipe sample is collected from surfaces prior to last access and subsequently processed in the lab using NASA Approved Planetary Protection Methods for Culture Based Assays. Raw data resulting from this assay is then statistically treated employing a mathematical paradigm stemming from the 1970’s Viking Lander Project to generate the bioburden density and total microbial bioburden present. This standard approach arbitrarily accounts for error and provides an upper conservative bound as it reports the maximum number of spores estimated to be present on flight hardware surfaces. A bioburden density estimate factors in the following variables: the observed bioburden count, representative volume processed, sampling efficiencies. Notably, to account for error in the approach, a 0 observed count is arbitrarily changed to a count of 1 for each hardware grouping. The data generated by spacecraft bioburden verification campaigns in the past have resulted in <80% of wipes and <90% of swabs containing a bioburden count of 0. As such, having a robust and well documented statistical approach for dealing with the probability of low incident rates is necessary to be able to estimate spacecraft bioburden. Being able to statistically describe the bioburden distribution and associated confidence level is a gamechanger for the development of bioburden allocations during mission design and will allow for tighter management of risk throughout spacecraft build. Thus, Empirical Bayes statistical approach was evaluated to estimate the microbial bioburden on spacecraft to mitigate the aforementioned mathematical concerns and provide a probabilistic bioburden distribution of the flight hardware surface. For application of this approach to performing bioburden calculations, a range of non-informative prior assumptions on hardware surfaces are explored for Bayesian analyses while informative priors using posterior distributions from prior assays are utilized for Empirical Bayes analyses. Several non-informative priors are currently under investigation to assess fitness including use of these priors to serve as a foundation to build off of NASA specification values or a basis of risk to account for unknowns during the integration and testing process. Informative priors under consideration are generated using sampled bioburden values from hardware originating within like processing environments (e.g. vendor cleaning process or similar assembly process), temporal spacecraft status events as a prediction for hardware cleanliness of future samples, and heritage system bioburden actuals to predict allocation for subsequent missions. Informative priors and probabilistic bioburden distributions are then validated using data sets from the Mars Exploration Rover, Mars Science Laboratory, and InSight missions. Using Empirical Bayes approach to generate a probabilistic bioburden distribution as demonstrated through mission use cases provides a valid approach for use in the end-to-end requirements verification process.

97 - MATHEMATICS AND COMPUTING↗

Development of robust pressure management strategies for geologic CO 2 sequestration

Injecting CO 2 into deep geologic formations for permanent storage can potentially lead to leakage or induced seismicity if the overpressures exceed the fracture gradient or fault re-activation pressure. Strategies that remove reservoir fluids before or after injection may reduce these risks. But, even extensively characterized reservoirs can have substantial gaps in characterization necessary for developing optimal deterministic or even probabilistic pressure management strategies. The characterization data may not provide well-defined bounds or distributions of reservoir parameters or conditions (permeability, fault locations, fracture gradient, fault reactivation pressure). To assess the impact of these uncertainties, we present an approach for evaluating alternative pressure management strategies based on their robustness of meeting project performance criteria. We quantify the robustness of alternative strategies against several criteria: (1) exceeding fault re-activation pressure, (2) failing to inject a desired quantity of CO 2 , (3) exceeding a maximum quantity of extracted brine, and (4) failing to reach a desired extraction efficiency. Our approach allows nuances of competing and complimentary criteria to be quantitatively evaluated in a manner and in a level of detail not possible with optimization approaches. We illustrate the fundamentals of the approach on a simple one-dimensional analytical example using the Thiem equation. Here, we demonstrate the approach using a numerical flow and transport model with uncertain heterogeneous permeabilities using data and site characteristics from the Rock Springs Uplift Carbon Storage Site in southwestern Wyoming.

58 GEOSCIENCES↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway: Safety Criteria Evaluation

There has been recent progress in the development of risk-informed performance-based (RIPB) design and licensing approaches, which leverage the insights gained from detailed risk assessments and utilize performance-based metrics to permit flexibility and innovation. The RIPB approaches have included the probabilistic treatment of external hazards, including low frequency events that are beyond the design basis. A preceding study conducted in FY21 noted that there are certain challenges to the probabilistic treatment of low frequency external events, which are primarily the result of uncertainty in the hazard curve and the associated plant response to rare, severe events. The current work expands on the previous study by examining the regulatory safety criteria contained within draft 10 CFR Part 53 and associated draft RIPB seismic design guidance. The evaluation identified potential challenges in demonstrating satisfaction of the safety criteria for low frequency external events, with specific difficulties associated with demonstrating compliance with cumulative safety criteria metrics, such as the quantitative health objectives (QHOs). Non-LWRs are expected to utilize the direct calculation of offsite consequence, rather than use surrogates, for comparison to the QHOs, which can be particularly challenging as the previously identified uncertainties are compounded by uncertainties in the response of the neighboring population. The current work details this evaluation and key findings. The central recommendation from this effort is that it is necessary to develop an approach for demonstrating compliance with the safety criteria in draft Part 53 that addresses the key challenges while providing flexibility to applicants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability/Risk Methods and Design Tools for Application in Space Programs

Since 1984 NASA has funded several major programs to develop Reliability/Risk Methods and tools for engineers to apply in the design and assessment of aerospace hardware. Two probabilistic software tools that show great promise for practical application are the finite element code NESSUS and the system risk analysis code QRAS. This paper examines NASA's past, present, and future directions in reliability and risk engineering applications, Both the NESSUS and QRAS software tools are detailed.

Townsend, John S.↗

Transition from Consultation to Monitoring-NRC's Increasingly Focused Review of Factors Important to F-Area Tank Farm Facility Performance - 13153

In consultation with the NRC, DOE issued a waste determination for the F-Area Tank Farm (FTF) facility in March 2012. The FTF consists of 22 underground tanks, each 2.8 to 4.9 million liters in capacity, used to store liquid high-level waste generated as a result of spent fuel reprocessing. The waste determination concluded stabilized waste residuals and associated tanks and auxiliary components at the time of closure are not high-level and can be disposed of as LLW. Prior to issuance of the final waste determination, during the consultation phase, NRC staff reviewed and provided comments on DOE's revision 0 and revision 1 FTF PAs that supported the waste determination and produced a technical evaluation report documenting the results of its multi-year review in October 2011. Following issuance of the waste determination, NRC began to monitor DOE disposal actions to assess compliance with the performance objectives in 10 CFR Part 61, Subpart C. To facilitate its monitoring responsibilities, NRC developed a plan to monitor DOE disposal actions. NRC staff was challenged in developing a focused monitoring plan to ensure limited resources are spent in the most cost-effective manner practical. To address this challenge, NRC prioritized monitoring areas and factors in terms of risk significance and timing. This prioritization was informed by NRC staff's review of DOE's PA documentation, independent probabilistic modeling conducted by NRC staff, and NRC-sponsored research conducted by the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Fukushima Safety Enhancement Activities in Canada

In the immediate aftermath of the common-cause seismic and tsunami events that triggered the Fukushima Daiichi nuclear accident on March 11, 2011, the nuclear regulator, the Canadian Nuclear Safety Commission (CNSC), requested that all Cass I nuclear facilities re-examine the safety cases for their nuclear facilities. Lessons-learned task forces were established by the CNSC, and the nuclear utilities, Ontario Power Generation (OPG), Bruce Power (BP), and New Brunswick Power (NBP). The purposes of these independent task forces was to develop relevant lessons learned issues for the Candu nuclear power plants operating in Canada and to identify actions that could enhance safety. Subsequently, a CNSC Integrated Action Plan was developed to address the recommendations arising from the CNSC Task Force Report, and the licensees aligned their actions with this plan. The actions were grouped into four categories, as follows. 1. Strengthening defence in depth; Actions included re-assessment of a site-specific external hazards using PSA; physical plant changes to add further cooling water make-up capability to heat sinks; development of new Canadian standards and updated regulatory documents that address requirements for Beyond Design Basis Accidents (BDBA), Probabilistic Safety Assessment (PSA) and Period Safety Review (PSR); development of a new and novel methodology for assessing multi-unit risk that is consistent with the IAEA construct of defence-in-depth (including a safety goal hierarchy and complementary risk analysis methods that address 'Black Swan' events); enhanced management of hydrogen combustion challenges; and enhanced Severe Accident Management Guidelines (SAMG). 2. Enhancing emergency response; Actions included provision of Emergency Mitigation Equipment (EME) such as transportable diesel-driven pumps or fire engines, transportable diesel generators for AC and instrument power; pre-installed connections to in-plant equipment via easily accessible and protected quick-connect points for water and electrical power; upgraded emergency response centres; enhanced communication systems and protocols; and enhanced emergency response programs, training and exercises. 3. Improving the regulatory framework and processes; 4. Enhancing international collaboration. Actions assigned under categories 3 and 4 were placed upon the regulator. This presentation will focus on the assigned actions in categories 1 and 2. The underlying motivation, objectives, and safety benefits associated with the actions will be described within the context of broader aspects of severe accident mitigation in water-cooled reactors. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probabilistic Multi-Hazard Performance Assessment of Concrete Structures in Nuclear Installations

Concrete structures in nuclear installations are subject to time-dependent degradation mechanisms that can deteriorate their physical and mechanical properties, potentially exacerbating the risk of structural failure under external forces such as a seismic event. Previous research has extensively investigated the seismic response of nuclear concrete structures and the associated risk, as well as their effect on structural components safety margins. However, substantial work is still necessary to incorporate concrete aging effects into such evaluations. In fact, most models in the literature assume pristine concrete conditions and do not account for the impact of aging on the structural components’ fragility curves. This work identifies relevant time-dependent degradation mechanisms and provides simplified models to predict the the evolution of key material properties based on data from the literature. Namely, this work focuses on the aging effects of corrosion, alkali–silica reaction (ASR), and irradiation on reinforced concrete within US Department of Energy (DOE) nuclear facilities and nuclear power plants (NPP) structures. Furthermore, degradation models based on literature data are presented that define the relationship between probabilistic material properties and the concrete’s age. In this work, sampled material properties served as input for a simplified finite element model (FEM) of a critical nuclear structural system, with the output of the FEM being the seismic response for a given ground motion. The results of the FEM were then used within a probabilistic performance assessment with a statistically significant number of samples. The research presented herein addresses the detrimental effects of hazards caused by natural phenomena on deteriorated concrete elements of nuclear installations. This work directly benefits the safety analysis performed on US DOE/ National Nuclear Security Administration (NNSA) nuclear facilities located in areas prone to seismic activity. The results presented herein could aid in the improvement of DOE-STD-1020, the DOE Standard that addresses seismic risk analysis and capacity evaluation in DOE facilities. DOE-STD-1020 refers to the requirements in American Society of Civil Engineers (ASCE) 4-98, now superseded by ASCE 4-16, that shall be met in performing dynamic response analyses and generating in-structure response spectra, provided that such requirements are consistent with the requirements of ASCE/Structural Engineering Institute (SEI) 43-05. Moreover, the results presented herein could also aid in the updating of section C3.1.1. of ASCE 4-16 to account for the effects of aging on the stiffness of reinforced elements and American Concrete Institute (ACI) 349.3R-18, “Report on Evaluation and Repair of Existing Nuclear Safety-Related Concrete Structures.” Ultimately, this work can assist the risk assessment of potential lifetime extension of the existing US commercial nuclear fleet (light water reactors) and the safety analysis of the emerging advanced nuclear reactors. The proposed proof-of-concept methodology employs open-source DOE computational tools and is transferable to commercial software commonly used by engineering firms.

42 ENGINEERING↗