Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MITIGATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Recharge Demand Mitigation for Latent Heat Thermal Energy Storage at Off-peak Hours

The utilization of integrated heat pump thermal energy storage (HP-TES) systems for space conditioning applications can reduce electrical power demand and achieve utility savings resulting from peak shaving and load shifting. However, issues arise when the energy required to recharge the TES exceeds the shifted energy demand, especially in extreme climates where high-temperature lifts between the outdoor air conditions and phase-change materials (PCMs) during recharging may occur. In this work, a single room-temperature (22°C) PCM-TES is integrated into a single-speed heat pump system using a secondary hydronic loop where the TES is recharged using the outdoor unit during off-peak hours. Three recharge strategies were investigated as potential pathways to reduce recharging power demand: (i) considering different heat source/sink temperatures, (ii) using a variable-speed compressor, and (iii) using a variable-speed pump. Simulations were conducted using Modelica for HP-TES recharging at different heat source/sink temperatures from -30 – 20℃ in heating mode and 0 – 30℃ in cooling mode. Results show that the most effective recharge demand reduction strategy is an HP-TES system using a single-speed compressor with a variable-speed pump for the hydronic loop run at preferable heat source/sink temperatures when the temperature lifts were reduced. Utilizing a variable-speed compressor for the HP-TES system reduced recharge time in extreme cases at the cost of additional compressor power input. The findings motivate potential control strategies that minimize recharge energy and maximize peak energy savings, hence reducing overall operating costs and annual energy consumption for HP-TES systems for space conditioning applications.

25 ENERGY STORAGE↗

Mitigating the Effect of Wind Gusts on Local Run-of-River Hydropower Plants Using Cooperative Control

This paper focuses on the challenges and solutions associated with the integration of wind farms in a hydro- dominated power system. Due to sudden increases in wind power, the system frequency can increase, causing excessive reduction in the run-of-river (ROR) system’s power. Considering their small pondage, this can result in damage to the physical structure due to water level violations which are also penalized by stakeholders. To prevent excessive ROR power deviations, ROR governor wear and tear, and to prevent tie-line deviations, a centralized, distributed, and hybrid scheme for coordinating the response from a cluster of ROR plants is examined. Both centralized and distributed control as well as their hybrids can reduce frequency peaks. However, the inclusion of decentralized cooperative controls leads to reduced governor actions from fast- acting plants while enhancing net response from the hydro unit cluster.

13 HYDRO ENERGY↗

Preignition mitigation strategy for gaseous fuel engine

Operating a gaseous fuel engine system includes detecting preignition in one or more of a plurality of cylinders based on a monitored cylinder pressure during combustion of a gaseous fuel such as a gaseous hydrogen fuel. Operating a gaseous fuel engine system also includes reducing a fuel injection amount for the one or more of the plurality of cylinders to a derated fuel injection amount that is based on a timing of the detected preignition. Fuel injection amount may be reduced to a greater relative extent if detected preignition is early, and to a lesser relative extent if detected preignition is later, in an engine cycle. Related apparatus and control logic is also disclosed.

Graziano, Jr., Michael T.↗

Determining Drying Conditions to Mitigate Hanford Transfer Line Corrosion

Radioactive waste is stored in underground, carbon-steel double-shell tanks at the Department of Energy Hanford site.1,2,3 The underground transfer lines are used to transfer the waste between the tanks and other assets at the Hanford tank farm facilities. The transfer lines constructed before 1990 are pipe-in-pipe design with most of the lines having carbon steel carrier pipe and carbon steel encasements. The lines constructed after 1990 have a stainless-steel carrier with a carbon steel encasement. The carrier lines, which are in contact with the waste, provide a critical confinement function, while the encasements provide secondary containment to reduce the risk of a release and contamination to the environment. In 2022, a visual inspection of the annulus between the encasement and the carrier for one of the pre-1990 transfer lines revealed standing liquid in contact with the carrier pipe. Additionally, a significant build-up of corrosion products on the exterior of the carrier pipe and the interior of the encasement pipe was observed. To assess the extent of condition, borescope inspections were performed in the encasement space of additional transfer lines in the facility to provide a baseline. The inspection revealed that of the lines inspected, 29 had either moisture present or evidence that moisture had been present in the past (e.g., waterline corrosion where the pipe had been exposed to standing water). Additional inspections indicated several instances of pitting corrosion on the interior of the encasement and exterior the carrier transfer lines. An image of the carrier pipe with several pits is presented in Figure 1(a) and the profiled image of the transfer line section along with the pit depths are presented Figure 1(b). As seen in the figure, the deepest pit was 73 mils on the pipe section. These lines were designated as “do-not-use” until further compensatory actions are implemented to return the lines to service.

Shukla, Pavan K. [Savannah River National Laborato↗

Wellbore Stability and Mud Loss Management in Geothermal Drilling: Optimizing Mud Weight to Mitigate Tensile Wellbore Fracturing at The Geysers, California

As part of a U.S. Department of Energy (DOE) Geothermal Technologies Office-funded initiative, Geysers Power Company, LLC, a subsidiary of Calpine Corporation, has been working to enhance drilling performance at the world’s largest geothermal field, The Geysers, in northern California. In a recent drilling operation of the GDC-36 well, excessive mud losses were encountered, initially addressed through repeated but largely ineffective cement plugging. Ultimately, the most effective strategy was to drill blind through the loss zones, made feasible by the high rate of penetration (ROP) achieved with PDC bits, allowing significant progress before the mud tanks were depleted and water-sensitive argillic formation layers could collapse. In response to these challenges, the project team explored alternative methods to minimize downtime and risks associated with cement plugging and continuous mud loss and to contemplate the driving mechanisms for the losses. Wellbore imaging using Formation MicroImager (FMI) and Ultrasonic Borehole Imager (UBI) tools revealed longitudinal tensile fractures, which were attributed to mud weights exceeding the minimum circumferential stress resulting from the native stress field and formation pressure. This study examines the mud losses encountered and leverages wellbore imaging data to understand the mechanisms behind mud induced tensile fracturing in specific rock facies. Understanding fracture behavior across different lithologies is crucial, as fractures within the reservoir can enhance steam migration throughout the system. The reservoir at The Geysers lies within the Mesozoic Franciscan Assemblage, a tectonic mélange formed by subduction. It consists of metamorphosed turbidite sandstone (greywacke) and mudstone (argillite), oceanic upper crust (including greenstone and chert), and serpentinized ultramafic rocks - each exhibiting distinct geomechanical fracturing properties. The structural fabric of the Franciscan Assemblage was shaped by low-angle Mesozoic thrust faulting and later overprinted by sub-vertical strike-slip structures related to the Pacific-North American plate boundary. A wellbore stability model was developed using core measurements and logs to simulate fracturing scenarios during drilling under varying stress conditions. These simulations guided the development of an optimized mud weight management strategy that should enable adaptive adjustments during drilling, reducing the likelihood of tensile fracturing and mud losses, ultimately improving operational efficiency.

15 GEOTHERMAL ENERGY↗

Techno-economic assessment of emissions mitigation technologies for post-combustion CO2 capture using AMP/PZ

Minimizing the environmental impacts of amine-based post-combustion carbon capture technologies is essential for meeting environmental permitting regulations and ensuring public acceptance. Experimental test campaigns at the CO₂ capture pilot plant in Niederaussem using CESAR1 demonstrated that integrating available emission abatement technologies can significantly reduce the concentration of amines and degradation products in CO₂-depleted flue gas to below the detection limit of an infrared spectrometer. The study confirmed that proprietary dry bed technology (OEASE Aerozone™) or a second water wash can lower AMP and PZ emissions to below 1 mg/Nm³. However, to achieve very low NH₃ emissions below 2 mg/Nm³, an acid or other chemically active wash downstream of the water wash is required. A configuration with a dry bed or a double water wash results in a carbon capture cost (CCC) of 44 €/tCO₂, and a CO₂ avoided cost (CAC) of 86 €/tCO₂. A configuration with an acid wash increases the CCC to 47 €/tCO₂ and the CAC to 90 €/tCO₂ due to the amine losses in the acid waste and its treatment.

CO2 capture↗