Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Connection space reduction mechanism

A connector assembly comprised of two halves, each respectively including a shell type connector subassembly, one being an active half and the other being a passive half is described. The active half includes an alignment cusp that causes a coupling motion in response to coming in contact with the outer portion of the other half, which causes the respective connectors within the two subassemblies to move toward each other into coupling relationship at twice the rate at which the two subassemblies come together. Both halves are adapted to rotate about and translate along respective mutually orthogonal axes to facilitate an interconnection.

Milam, Malcolm Bruce↗

ISS General Resource Reel

This video is a collection of computer animations and live footage showing the construction and assembly of the International Space Station (ISS). Computer animations show the following: (1) ISS fly around; (2) ISS over a sunrise seen from space; (3) the launch of the Zarya Control Module; (4) a Proton rocket launch; (5) the Space Shuttle docking with Zarya and attaching Zarya to the Unity Node; (6) the docking of the Service Module, Zarya, and Unity to Soyuz; (7) the Space Shuttle docking to ISS and installing the Z1 Truss segment and the Pressurized Mating Adapter (PMA); (8) Soyuz docking to the ISS; (9) the Transhab components; and (10) a complete ISS assembly. Live footage shows the construction of Zarya, the Proton rocket, Unity Node, PMA, Service Module, US Laboratory, Italian Multipurpose Logistics Module, US Airlock, and the US Habitation Module. STS-88 Mission Specialists Jerry Ross and James Newman are seen training in the Neutral Buoyancy Laboratory (NBL). The Expedition 1 crewmembers, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, are shown training in the Black Sea and at Johnson Space Flight Center for water survival.

Source record↗

The Optical Fiber Array Bundle Assemblies for the NASA Lunar Reconnaissance Orbiter

The United States, National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC), Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware assemblies for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufactured at NASA GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and lidar. These assemblies were developed in coordination with Diamond Switzerland, and the NASA GSFC Mechanical Systems Division. The assemblies represent a strategic enhancement for NASA's Laser Ranging and Laser Radar (LIDAR) instrument hardware by allowing light to be moved to alternative locations that were not feasible in past space flight implementations. An account will be described of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO. The LRO is scheduled to launch end of 2008.

Ott, Melanie N.↗

Integration by parts

This paper describes the unique integration and verification challenges associated with the Space Station Freedom and an approach to solve these problems using Data Management Systems (DMS) Kits. These DMS Kits will help alleviate the complex integration problems inherent in building, assembling and testing the Space Station. Particular emphasis has been placed on utilizing the capabilities and services of the on-board DMS to provide the integration and verification tools, not only for the DMS but for the other on-board distributed systems as well. DMS Kits are provided to system/software developers across the program. These DMS Kits provide a common set of integration and verification tools and hardware. Each system developer can then utilize, through the kits, a simulation of the complete data processing environment which will be available on orbit. The paper describes the evolution of the integration process from the system level to the final integration of multiple launch packages. DMS Kits are used throughout this process, which addresses both the ground and on-orbit aspects of the problem.

Barry, Thomas↗

Manufacturing and Integration Status of the JWST OSIM Optical Simulator

OSIM is a full field, cryogenic, optical simulator of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE). It provides simulated point source/star images for optical performance testing of the JWST Integrated Science Instrument Module (ISIM). OSIM is currently being assembled at the Goddard Space Flight Center (GSFC). In this paper, we describe the capabilities, design, manufacturing and integration status, and uses of the OSIM during the optical test program of ISIM and the Science Instruments. Where applicable, the ISIM tests are also described.

Sullivan, Joe↗

Investigation of Bolt Preload Relaxation for JWST Thermal Heat Strap Assembly Joints with Aluminum-1100 and Indium Gaskets

Accurately predicting fastener preload relaxation in the James Webb Space Telescope (JWST) heat strap assemblies is essential to insure adequate thermal performance during its mission lifecycle. The mechanisms for preload relaxation in the strap joints include Al-1100 material creep, indium gasket flow-out, and embedment of the joint faying surfaces. This report documents the results from a bolted joint relaxation test, including analysis and curve fitting of the test data for predicting preloads five years after initial torque application. The report also includes the derivation of a preload uncertainty factor enveloping both torque/preload application scatter and expected preload relaxation at the end of mission life.

Joint↗

Investigation of Bolt Preload Relaxation for JWST Thermal Heat Strap Assembly Joints with Aluminum-1100 and Indium Gaskets

Accurately predicting fastener preload relaxation in the James Webb Space Telescope (JWST) heat strap assemblies is essential to insure adequate thermal performance during its mission lifecycle. The mechanisms for preload relaxation in the strap joints include Al-1100 material creep, indium gasket flow-out, and embedment of the joint faying surfaces. This report documents the results from a bolted joint relaxation test, including analysis and curve fitting of the test data for predicting preloads five years after initial torque application. The report also includes the derivation of a preload uncertainty factor enveloping both torque/preload application scatter and expected preload relaxation at the end of mission life.

Preload↗

Qualification and Performance of a High-Efficiency Laser Transmitter for Deep-Space Optical Communications

A high-power Laser Transmitter Assembly (LTA) was developed to support the Deep Space Optical Communications (DSOC) technology demonstration being developed by the Jet Propulsion Laboratory. NASA’s Psyche Mission plans to host the DSOC flight subsystem for testing space-to-ground high-bandwidth laser communications en route to the 16 Psyche asteroid. We review the design, performance, and qualification of the LTA Engineering Model and Flight Model (EM and FM) delivered to JPL. The LTA uses a master-oscillator power amplifier (MOPA) design and delivers up to 4.5 W at 1550 nm, with a highly efficient, cladding-pumped, polarization-maintaining erbium-ytterbium fiber amplifier. The master oscillator generates a range of pulse widths and repetition rates to support modulation formats from 16- to 128-PPM for optical data transmission at >100 Mbps. The LTA was designed for high reliability and radiation hardness, and includes redundant signal and pumping paths to reduce single points of failure, hardware interlocks to ensure safe operation and protection against damage, closed-loop control of optical power, and detailed health and status via telemetry. The LTA EM and FM were subjected to unit-appropriate space qualification testing. We describe the performance testing of the EM and FM, for the characterization of key metrics such as wavelength stability, signal linewidth, optical pulse width, jitter, and extinction ratio, and polarization extinction ratio. The management of optical nonlinearities (self-phase modulation, Brillouin scattering, or pulse-to-pulse energy variation), which could result in an optical link penalty or damage to the LTA, is also detailed, and factors affecting the power efficiency are discussed.

Jaques, J.↗

Simulation of the human-telerobot interface

A part of NASA's Space Station will be a Flight Telerobotic Servicer (FTS) used to help assemble, service, and maintain the Space Station. Since the human operator will be required to control the FTS, the design of the human-telerobot interface must be optimized from a human factors perspective. Simulation has been used as an aid in the development of complex systems. Simulation has been especially useful when it has been applied to the development of complex systems. Simulation should ensure that the hardware and software components of the human-telerobot interface have been designed and selected so that the operator's capabilities and limitations have been accommodated for since this is a complex system where few direct comparisons to existent systems can be made. Three broad areas of the human-telerobot interface where simulation can be of assistance are described. The use of simulation not only can result in a well-designed human-telerobot interface, but also can be used to ensure that components have been selected to best meet system's goals, and for operator training.

Stuart, Mark A.↗

Space Construction Automated Fabrication Experiment Definition Study (SCAFEDS). Volume 1: Executive summary

The techniques, processes, and equipment required for automatic fabrication and assembly of structural elements in space using the space shuttle as a launch vehicle and construction base were investigated. Additional construction/systems/operational techniques, processes, and equipment which can be developed/demonstrated in the same program to provide further risk reduction benefits to future large space systems were included. Results in the areas of structure/materials, fabrication systems (beam builder, assembly jig, and avionics/controls), mission integration, and programmatics are summarized. Conclusions and recommendations are given.

Source record↗

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress through FY 2024

The National Aeronautics and Space Administration (NASA) Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center (GSFC) has been developing technology to robotically refuel both heritage and recently developed satellites on-orbit funded through NASA’s Space Technology Mission Directorate (STMD). The On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) mission, formerly known as Restore-L, developed a system to refuel a satellite in space and assemble a communications antenna. By demonstrating these capabilities, the mission would advance never-before tested technologies for use in future missions (by NASA, other government organizations, and private industries). The purpose of this paper is to capture the lessons learned from the hardware development of the OSAM-1 Propellant Transfer System (PTS) that are highly relevant for the ISAM community. This paper covers a review of in-space servicing extensibility and critical technologies that were being developed within NExIS, focusing on the fluid transfer refueling technology within the framework of the OSAM-1 PTS. An overview of the technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 2018, 2019 and 2020. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Final assembly, qualification, and functional tests along with installation and acceptance testing of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. Technology development, challenges, lessons learned, along with installation and testing results are discussed, with particular focus on the OSAM-1 assemblies including the PTA and HMA. In addition, testing utilizing the integrated flight simulator test setups will be summarized. The OSAM-1 PTS made great strides in advancing in-space refueling technology; however, there are unfinished development efforts remaining. This paper concludes with a brief summary of the technology shortfalls (gaps) that remain in the key areas of in-space fluid transfer.

ISAM↗

Assessment of Commercial-Off-The-Shelf Electronics for use in a Short-Term Geostationary Satellite

Commercial-Off-The-Shelf (COTS) electronics offer cutting-edge capability at lower prices compared to their space-grade counterparts. However, their use in space missions has been limited due to concerns around survivability in a space environment; COTS devices are not designed to survive the harsh radiation environment of space. Nonetheless, for space missions with short durations it may be possible to use COTS electronics. This study evaluates the use of several families of COTS electronics for a specific short-term mission. An assembled database including selected space grade and COTS components is discussed. High confidence FPGAs, microprocessors, and optocouplers COTS are identified. Medium confidence Memory, ADCs, DACs, power electronics, and RFMMICs COTS are also included, as well as testing to improve confidence in medium confidence parts. An experimental approach for evaluating tin whisker susceptibility for tin-leaded COTS components is described. Using COTS electronics in Short-Term Geostationary Satellites is feasible; this report includes enabling tools.

42 ENGINEERING↗

Analysis of Direct Solar Illumination on the Backside of Space Station Solar Cells

The International Space Station (ISS) is a complex spacecraft that will take several years to assemble in orbit. During many of the assembly and maintenance procedures, the space station's large solar arrays must he locked, which can significantly reduce power generation. To date, power generation analyses have not included power generation from the backside of the solar cells in a desire to produce a conservative analysis. This paper describes the testing of ISS solar cell backside power generation, analytical modeling and analysis results on an ISS assembly mission.

Delleur, Ann M.↗

STS-84 Day 04 Highlights

On this fourth day of the STS-84 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Eileen M. Collins, Payload Cmdr, Jean-Francois Clervoy (ESA), Mission Specialists Edward T. Lu, Carlos I. Noriega, Elena V. Kondakova, Jerry M. Linenger (download), and C. Michael Foale (upload) spend their first full day of work together conducting science investigations and transferring equipment from one spacecraft to the other. The Spacehab double module at the rear of Atlantis' payload bay was the focus of activity today as crew members conducted science experiments in the Biorack facility and transferred items to and from the Mir Space Station. In an interview with CBS News, Precourt and Tsibliev praise the sixth joint docking mission between the U.S. and Russia, indicating it is serving as a worthwhile exercise to prepare for the assembly of the International Space Station. Precourt also said the Mir appears to be in good condition despite recent systems problems, and said Mir will be a perfectly safe home for Foale for his stay on orbit.

Source record↗

Manufacturing Cost Analysis of Advanced Parabolic Trough Collector

The research team performed a detailed bottom-up manufacturing cost estimate for an advanced parabolic trough design - the Solar Dynamics Sunbeam-MT (Sunbeam Mid-Term). This includes all components for manufacturing and assembly in a manufacturing facility (e.g. space frame and arms), and the purchased parts (e.g. mirrors and receiver tubes). Estimates of the construction and assembly activities have been made to then determine an estimated installed cost. Prior analysis has already undertaken detailed bottom-up manufacturing, assembly, and construction analysis for the Ultimate Trough from schlaich bergermann partner (sbp), and this work updates the solar field cost estimates based on a similar aperture area as the SunBeam-MT. For this analysis, the Ultimate Trough is considered the commercial parabolic trough and the Sunbeam-MT as the advanced parabolic trough. For similarity, both the Sunbeam-MT and the Ultimate Trough have been modelled with a solar field with approximately 800,000 square meters (m2) in aperture area - the equivalent of a large CSP plant. The analysis has found a potential installed cost estimate of the Sunbeam-MT could be $120/m2 but must be built at scale to confirm this estimate. Compared to prior analysis, the commercial Ultimate Trough using U.S. conditions, has reduced in installed cost from $178/m2 to $152/m2. Both designs could be even cheaper with Chinese steel.

cost analysis↗

Growth of mercuric iodide (HgI2) for nuclear radiation detectors

Mercuric iodide is a material used for the fabrication of the sensing element in solid state X-ray and gamma ray detecting instruments. The operation of the devices is determined to a large degree by the density of structural defects in the single crystalline material used in the sensing element. Since there were strong indications that the quality of the material was degraded by the effects of gravity during the growth process, a research and engineering program was initiated to grow one or more crystals of mercuric iodide in the reduced gravity environment of space. A special furnace assembly was designed which could be accommodated in a Spacelab rack, and at the same time made it possible to use the same growth procedures and controls used when growing a crystal on the ground. The space crystal, after the flight, was subjected to the same evaluation methods used for earth-grown crystals, so that comparisons could be made.

Vandenberg, L.↗