Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INSTALLATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Space shuttle auxiliary propulsion system design study. Phase C and E report: Storable propellants, RCS/OMS/APU integration study

Auxiliary propulsion concepts for application to the space shuttle are compared. Both monopropellant and bipropellant earth storable reaction control systems were evaluated. The fundamental concepts evaluated were: (1) monopropellant and bipropellant systems installed integrally within the vehicle, (2) fuel systems installed modularly in nose and wing tip pods, and (3) fuel systems installed modularly in nose and fuselage pods. Numerous design variations within these three concepts were evaluated. The system design analysis and methods for implementing each of the concepts are reported.

Anglim, D. D.↗

Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

Source record↗

Near real time water resources data for river basin management

The author has identified the following significant results. Twenty Data Collection Platforms (DCP) are being field installed on USGS water resources stations in the Delaware River Basin. DCP's have been successfully installed and are operating well on five stream gaging stations, three observation wells, and one water quality monitor in the basin. DCP's have been installed at nine additional water quality monitors, and work is progressing on interfacing the platforms to the monitors. ERTS-related water resources data from the platforms are being provided in near real time, by the Goddard Space Flight Center to the Pennsylvania district, Water Resources Division, U.S. Geological Survey. On a daily basis, the data are computer processed by the Survey and provided to the Delaware River Basin Commission. Each daily summary contains data that were relayed during 4 or 5 of the 15 orbits made by ERTS-1 during the previous day. Water resources parameters relays by the platforms include dissolved oxygen concentrations, temperature, pH, specific conductance, well level, and stream gage height, which is used to compute stream flow for the daily summary.

Paulson, R. W.↗

Establishment, test and evaluation of a prototype volcano surveillance system

A volcano-surveillance system utilizing 23 multilevel earthquake counters and 6 biaxial borehole tiltmeters is being installed and tested on 15 volcanoes in 4 States and 4 foreign countries. The purpose of this system is to give early warning when apparently dormant volcanoes are becoming active. The data are relayed through the ERTS-Data Collection System to Menlo Park for analysis. Installation was completed in 1972 on the volcanoes St. Augustine and Iliamna in Alaska, Kilauea in Hawaii, Baker, Rainier and St. Helens in Washington, Lassen in California, and at a site near Reykjavik, Iceland. Installation continues and should be completed in April 1973 on the volcanoes Santiaguito, Fuego, Agua and Pacaya in Guatemala, Izalco in El Salvador and San Cristobal, Telica and Cerro Negro in Nicaragua.

Ward, P. L.↗

Interference between exhaust system and afterbody of twin-engine fuselage configurations

Some of the mutual aircraft afterbody and engine nozzle interferences that can exist on aircraft complex aft-ends and on simplified twin-jet afterbodies are reviewed. Emphasis is placed on studies of twin-engine fuselage configurations with nozzles installed near the terminus of the afterbody where the interactions of the nozzle exhausts and external stream produce a complex flow-field environment. The magnitude of the aft-end problem for real aircraft configurations is illustrated, and some theoretical and empirical considerations of afterbody drag on simple bodies are treated. Many of the factors regarding airframe-installation effects on nozzle performance are discussed, as well as nozzle-installation effects on aircraft performance.

Runckel, J. F.↗

A summary of ERTS-1 data collection system applications

Geographically, applications were made over nearly the entire area where direct readout could be accomplished using the data acquisition stations in the ERTS-1 system. The extreme areas included Iceland, the Canadian Arctic, Alaska, Hawaii and Central America. In the discipline sense the majority of applications were in the water resources area with other applications being formally and informally reported in meteorology, oceanography, volcano surveillance and forestry. Installation and maintenance of the data collection platforms, as is true with nearly all new systems, was not accomplished without difficulty. On the whole, however, it has gone well enough so that it is agreed that it is a system which is amenable to installation in a variety of physical situations and the installation is accomplished with an ease commensurate with eventual use in an operational system.

Salomonson, V. V.↗

Skylab program. Earth resources experiment package. Sensor performance report. Volume 7 (S190B): SL2, SL3 and SL4 evaluations

The S190B Earth Terrain Camera (ETC) operated acceptably for all of its scheduled EREP passes throughout the SL2 mission. The crew reported no problems in unstowing the camera, changing filters, installing the ETC window in the SAL, or installing the camera onto the window. The ETC was operated for a total of seven times with no failures. The clock on the ETC was checked on DOY 170 (June 19, 1973) and was found to be 30 min. and 58 sec. slower than GMT. The change in time was expected since a similar circumstance was experienced during ETC qualification testing for launch vibration. A leak existed in the seal of the spare magazine to the camera vacuum interface. For EREP passes 08 and 10, black-and-white film EK 3414 (roll no. 82) was installed in this spare magazine. Since there was an audible hiss, the vacuum hose was not connected to the camera. This caused the vacuum platen to be inoperable, resulting in some degradation in resolution for this roll of film. The vegetation of the South American jungle areas proved to be much darker than vegetation found in the United States, and was consequently about 1/2 stop underexposed in all cases.

Kenney, G. P.↗

An inexpensive economical solar heating system for homes

A low-cost solar home heating system to supplement existing warm-air heating systems is described. The report is written in three parts: (1) a brief background on solar heating, (2) experience with a demonstration system, and (3) information for the homeowner who wishes to construct such a system. Instructions are given for a solar heating installation in which the homeowner supplies all labor necessary to install off-the-shelf components estimated to cost $2,000. These components, which include solar collector, heat exchanger, water pump, storage tank, piping, and controls to make the system completely automatic, are available at local lumber yards, hardware stores, and plumbing supply stores, and are relatively simple to install. Manufacturers and prices of each component used and a rough cost analysis based on these prices are included. This report also gives performance data obtained from a demonstration system which was built and tested at the Langley Research Center.

Allred, J. W.↗

ATS-3 ranging support

The purpose of this effort was to provide NASA-Goddard Space Flight Center with ATS-3 ranging data from ground stations of the VHF network and from an additional ground station installed at the NASA-Goddard Space Flight Center. Ranging measurements to the NASA transponder enabled calculation of the transponder's line-of-position. Installation of an S-band transponder at the same site and the conduct of ranging experiments to this transponder and others via ATS-6 provided a second line-of-position. The NASA S-band transponder was specifically designed for installation aboard spacecraft. Consequently, this program provided NASA an opportunity to compare two different techniques using geostationary satellites in the tracking low orbit satellites.

Brisken, A. F.↗

Residential solar-heating system-design package

Design package for modular solar heating system includes performance specifications, design data, installation guidelines, and other information that should be valuable to those interested in system (or similar systems) for projected installation. When installed in insulated "energy saver" home, system can supply large percentage of total energy needs of building.

Source record↗

DSS 13 antenna subsystem automation

Unattended station operation was implemented that permitted full operational control from the network operations center (NOCC). Sensors were installed in the mechanical subsystem to monitor critical functions and to permit automated premission checkout of the subsystem, automated reaction to component failure, and identification of failed components under control of the antenna pointing computer. This monitoring installation is a prototype for monitoring equipment to be installed throughout the DSN.

Phillips, H.↗

Learning to build large structures in space

The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.

Hagler, T.↗

Precision temperature gradient measurements on window glass

Surface temperature gradients were measured with miniature thermocouples installed in a 58.5 cm (23-inch) square window. Test measurements at 25 locations were made under vacuum and with the window operating in radiant heat transfer mode. The analysis of thermocouple design and installation is presented along with a lead wire routing scheme to allow for both differential and absolute temperature measurements while using a minimum number of signal feedthru paths through the test chamber wall. Typical test data and operational precautions are presented along with the accuracy analysis for installation effects and measurement effects to support differential temperature measurement precision values of + or - 0.06 C RMS + or - 0.1 F RMS).

Mikk, G.↗

YF-17/ADEN system study

The YF-17 aircraft was evaluated as a candidate nonaxisymmetric nozzle flight demonstrator. Configuration design modifications, control system design, flight performance assessment, and program plan and cost we are summarized. Two aircraft configurations were studied. The first was modified as required to install only the augmented deflector exhaust nozzle (ADEN). The second one added a canard installation to take advantage of the full (up to 20 deg) nozzle vectoring capability. Results indicate that: (1) the program is feasible and can be accomplished at reasonable cost and low risk; (2) installation of ADEN increases the aircraft weight by 600 kg (1325 lb); (3) the control system can be modified to accomplish direct lift, pointing capability, variable static margin and deceleration modes of operation; (4) unvectored thrust-minus-drag is similar to the baseline YF-17; and (5) vectoring does not improve maneuvering performance. However, some potential benefits in direct lift, aircraft pointing, handling at low dynamic pressure and takeoff/landing ground roll are available. A 27 month program with 12 months of flight test is envisioned, with the cost estimated to be $15.9 million for the canard equipped aircraft and $13.2 million for the version without canard. The feasiblity of adding a thrust reverser to the YF-17/ADEN was investigated.

Gowadia, N. S.↗

Solar energy retrofit for Clarksville Middle School, Clarksville, Indiana

The solar energy retrofit heating system installed to provide heating for two gymnasiums at the Clarksville Middle School located in Clarksville, Indiana is described in detail. The system type is hot water using existing chilled water piping and chilled water coils in an air handler system. Flat plate, single-glazed selectively coated solar collectors were installed on the roof of each gymnasium. Total collector area covers 6,520 square feet. The liquid is stored in a 10,000 gallon steel tank installed below grade.

Source record↗

Eliminating gaps in split rings

Simple installation method allows thinner, lighter tether rings than conventional procedures, saving expensive materials. Installer inverts ring with pliers before it is slid over cable, then returns it to its original position after installation. Ring is in correct orientation, and coils are tightly compressed for high reliability fastening.

Gould, R. W.↗

Residential photovoltaic module and array requirements study

Design requirements for photovoltaic modules and arrays used in residential applications were identified. Building codes and referenced standards were reviewed for their applicability to residential photovoltaic array installations. Four installation types were identified - integral (replaces roofing), direct (mounted on top of roofing), stand-off (mounted away from roofing), and rack (for flat or low slope roofs, or ground mounted). Installation costs were developed for these mounting types as a function of panel/module size. Studies were performed to identify optimum module shapes and sizes and operating voltage cost drivers. It is concluded that there are no perceived major obstacles to the use of photovoltaic modules in residential arrays. However, there is no applicable building code category for residential photovoltaic modules and arrays and additional work with standards writing organizations is needed to develop residential module and array requirements.

Nearhoof, S. L.↗