Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IEEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Water Quality Parameters at the Elkhorn Slough National Estuarine Research Reserve (ESNERR)

The following dataset includes water quality and meteorological forcing data between 2003 and 2019 across four Elkhorn Slough National Estuarine Research Reserve (ESNERR) stations. The data are monthly averaged and include orthophosphate, ammonium, Nitrite, Nitrate, Nitrite + Nitrate, Chlorophyll, Temperature of water, Specific Conductance, Salinity, Dissolved Oxygen, Air Temperature and Precipitation. The data were compiled for wavelet and other statistical analyses. All data included herein are associated with the following manuscript: Venkatesh*, S., B. Arora, D. Dwivedi, S. Vezhaperambu, M. V. Ramesh (2021), Temporal Variability of Water Quality Parameters at the Elkhorn Slough Estuary using Wavelets, IEEE Proceedings on 6th International Conference for Convergence in Technology, DOI:10.1109/I2CT51068.2021.9418159.

54 ENVIRONMENTAL SCIENCES↗

An assessment of flexibility reserves in stochastic modeling at multiple timescales

Due to recent technological achievements, stochastic optimization, which inherently captures the uncertainty of intermittent resources, is being used to capture the variability and uncertainty of wind and solar resources. However, due to persistent computational limitations, it is not practical to consider all possible variable generation scenarios. As a result, a reduced number of most likely scenarios is usually considered. While this helps reduce the computational burden, it also leaves the system operator vulnerable to some risk. In order to address this issue, this paper aims at providing insight into using an explicit reserve requirement in a stochastic modeling framework in order to provide system operators with greater confidence in stochastic dispatch solutions. This is accomplished by simulating a modified version of the IEEE 118 bus system in a fully stochastic, multi-timescale framework with flexibility reserve requirements. Results show that utilizing a stochastic flexibility reserve requirement within the stochastic modeling framework offers the most reliability benefit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The allocation of a variable series reactor considering AC constraints and contingencies

The Variable Series Reactors (VSRs) can efficiently control the power flow through the adjustment of the line reactance. When they are appropriately allocated in the power network, the transmission congestion and generation cost can be reduced. Our work proposes a planning model to optimally allocate VSRs considering AC constraints and multi-scenarios including base case and contingencies. The planning model is originally a non-convex large scale mixed integer nonlinear program (MINLP), which is generally intractable. The proposed Benders approach decomposes the MINLP model into a mixed integer linear program (MILP) master problem and a number of nonlinear subproblems. Numerical case studies based on IEEE 118-bus demonstrate the high performance of the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Online Voltage Control in Distribution Network: A Two-Stage Real-Time Implementation

The increasing integration of renewable-based distributed generation (DG) brings growing challenges to distribution network (DN) voltage control. To address this issue, a two-stage distributed online voltage control framework (TDO-VC) is proposed in this paper. In the proposed method, legacy voltage control devices are controlled in the upper stage on an hourly timescale, while DGs operate autonomously online in the lower stage to remove instantaneous voltage violations. The idea of receding horizon control is applied in the upper stage to comprehensively consider the current and future renewable generation, and the generalized fast dual ascent (Gf-DA) is employed in the lower stage to effectively manage DGs through near real-time optimization. The effectiveness of the proposed TDO-VC is demonstrated by rigorous theoretical analysis and case studies on IEEE-123 bus system.

Distributed generation↗

Public Data Set: The New Pegasus-III Experiment

This public data set contains openly-documented, machine readable digital research data corresponding to figures published in A.C. Sontag et al., 'The New Pegasus-III Experiment,' IEEE Transactions on Plasma Science 50, 4009 (2022).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Consideration of HTS rapid-cycling magnet for staged muon acceleration

The HTS conductor hysteresis dominates magnet cable power loss but is independent of the magnetic field ramping rate. This makes the HTS conductor suitable to power the rapid-cycling accelerator magnet. We present a possible application of the HTS rapid-cycling magnet as outlined in [1,2] for the staged muon acceleration including the front-end Recirculating Linear Accelerator and the followed-up Rapid Cycling Synchrotrons delivering the muon beams to the Muon Collider.[1] H. Piekarz, S. Otten, A. Kario, H. ten Kate, “Rapid-cycling HTS magnet for muon acceleration”, US MC Inaugural Meeting, FERMILAB-POSTER-24-0219-AD, August 7-9, 2024[2] H. Piekarz, B. Claypool, S. Hays, M. Kufer, V. Shiltsev, “Record High Ramping Rates in HTS Based Supercond. Accelerator Magnet”, MT 27, IEEE Trans. on Applied Superccond, 32 (2022) 6, 4100404

Piekarz, Henryk [Fermilab]↗

Validation of Multiple Tools for Flat Plate Photovoltaic Modeling Against Measured Data

This report expands upon a previous work by the same authors, published in the 40th IEEE Photovoltaic Specialists conference. In this validation study, comprehensive analysis is performed on nine photovoltaic systems for which NREL could obtain detailed performance data and specifications, including three utility-scale systems and six commercial scale systems. Multiple photovoltaic performance modeling tools were used to model these nine systems, and the error of each tool was analyzed compared to quality-controlled measured performance data. This study shows that, excluding identified outliers, all tools achieve annual errors within +/-8% and hourly root mean squared errors less than 7% for all systems. It is further shown using SAM that module model and irradiance input choices can change the annual error with respect to measured data by as much as 6.6% for these nine systems, although all combinations examined still fall within an annual error range of +/-8.5%. Additionally, a seasonal variation in monthly error is shown for all tools. Finally, the effects of irradiance data uncertainty and the use of default loss assumptions on annual error are explored, and two approaches to reduce the error inherent in photovoltaic modeling are proposed.

14 SOLAR ENERGY↗

Diagnostic and Prognostic Models for Generator Step-Up Transformers

In 2014, the online monitoring (OLM) of active components project under the Light Water Reactor Sustainability program at Idaho National Laboratory (INL) focused on diagnostic and prognostic capabilities for generator step-up transformers. INL worked with subject matter experts from the Electric Power Research Institute (EPRI) to augment and revise the GSU fault signatures previously implemented in the Electric Power Research Institute’s (EPRI’s) Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. Two prognostic models were identified and implemented for GSUs in the FW-PHM Suite software. INL and EPRI demonstrated the use of prognostic capabilities for GSUs. The complete set of fault signatures developed for GSUs in the Asset Fault Signature Database of the FW-PHM Suite for GSUs is presented in this report. Two prognostic models are described for paper insulation: the Chendong model for degree of polymerization, and an IEEE model that uses a loading profile to calculates life consumption based on hot spot winding temperatures. Both models are life consumption models, which are examples of type II prognostic models. Use of the models in the FW-PHM Suite was successfully demonstrated at the 2014 August Utility Working Group Meeting, Idaho Falls, Idaho, to representatives from different utilities, EPRI, and the Halden Research Project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Aging Assessment of an Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR) Service Cable

Nuclear energy is one industry where aging of safety-related materials and components is of great concern. Many U.S. nuclear power plants are approaching, or have already exceeded, 40 years of age. Analysis comparing the cost of new plant construction versus long-term operation under extended plant licensing through 60 years strongly favors the latter option. To ensure the safe, reliable, and cost-effective long-term operation of nuclear power plants, many systems, structures, and components must be evaluated. Furthermore, as new analytical techniques and testing approaches are developed, it is imperative that we also validate, and if necessary, improve upon the previously employed Institute of Electrical and Electronic Engineers (IEEE) qualification standards originally written in 1974. Fortunately, this daunting task has global support, particularly in light of the new social and political climate surrounding nuclear energy in a post-Fukushima era.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Submerged Medium Voltage Cable Systems at Nuclear Power Plants: A Review of Research Efforts Relevant to Aging Mechanisms and Condition Monitoring

In a submerged environment, power cables may experience accelerated insulation degradation due to water-related aging mechanisms. Direct contact with water or moisture intrusion in the cable insulation system has been identified in the literature as a significant aging stressor that can affect performance and lifetime of electric cables. Progressive reduction of the dielectric strength is commonly a result of water treeing which involves the development of permanent hydrophilic structures in the insulation coinciding with the absorption of water into the cable. Water treeing is a phenomenon in which dendritic microvoids are formed in electric cable insulation due to electrochemical reactions, electromechanical forces, and diffusion of contaminants over time. These reactions are caused by the combined effects of water presence and high electrical stresses in the material. Water tree growth follows a tree-like branching pattern, increasing in volume and length over time. Although these cables can be “dried out,” water tree degradation, specifically the growth of hydrophilic regions, is believed to be permanent and typically worsens over time. Based on established research, water treeing or water induced damage can occur in a variety of electric cables including XLPE, TR-XLPE and other insulating materials, such as EPR and butyl rubber. Once water trees or water induced damage form, the dielectric strength of an insulation material will decrease gradually with time as the water trees grow in length, which could eventually result in failure of the insulating material. Under wet conditions or in submerged environments, several environmental and operational parameters can influence water tree initiation and affect water tree growth. These parameters include voltage cycling, field frequency, temperature, ion concentration and chemistry, type of insulation material, and the characteristics of its defects. In this effort, a review of academic and industrial literature was performed to identify: 1) findings regarding the degradation mechanisms of submerged cabling and 2) condition monitoring methods that may prove useful in predicting the remaining lifetime of submerged medium voltage power cables. The research was conducted by a multi-disciplinary team, and sources included official NRC reports, national laboratory reports, IEEE standards, conference and journal proceedings, magazine articles, PhD dissertations, and discussions with experts. The purpose of this work was to establish the current state-of-the-art in material degradation modeling and cable condition monitoring techniques and to identify research gaps. Subsequently, future areas of focus are recommended to address these research gaps and thus strengthen the efficacy of the NRC’s developing cable condition monitoring program. Results of this literature review and details of the testing recommendations are presented in this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Temperature-based Instanton Analysis: Identifying Vulnerability in Transmission Networks

A time-coupled instanton method for characterizing transmission network vulnerability to wind generation fluctuation is presented. To extend prior instanton work to multiple-time-step analysis, line constraints are specified in terms of temperature rather than current. An optimization formulation is developed to express the minimum wind forecast deviation such that at least one line is driven to its thermal limit. Results are shown for an IEEE RTS-96 system with several wind-farms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Toroidal Core Transformers

The original objective of this project was to design, build and test a few prototypes of single-phase dry-type distribution transformers of 25 kVA, 2.4 kV primary to 120 V transformers using cores made of a continuous steel strip shaped like a doughnut (toroid). At different points during the development of the project, the scope was enhanced to include the more practical case of a 25 kVA transformer for a 13.8 kV primary system voltage. Later, the scope was further expanded to design and build a 50 kVA unit to transformer voltage from 7.62 kV to 2x120 V. This is a common transformer used by Con Edison of New York and they are willing to test it in the field. The project officially started in September 2009 and ended in May 2014. The progress was reported periodically to DOE in eighteen quarterly reports. A Continuation Application was submitted to DOE in June 2010. In May 2011 we have requested a non-cost extension of the project. In December 2011, the Statement of Project Objectives (SOPO) was updated to reflect the real conditions and situation of the project as of 2011. A second Continuation Application was made and funding was approved in 2013 by DOE and the end date was extended to May 2014. The technical challenges that were overcome in this project include: the development of the technology to pass the impulse tests, derive a model for the thermal performance, produce a sound mechanical design, and estimate the inrush current. However, the greatest challenge that we faced during the development of the project was the complications of procuring the necessary parts and materials to build the transformers. The actual manufacturing process is relatively fast, but getting all parts together is a very lengthy process. The main products of this project are two prototypes of toroidal distribution transformers of 7.62 kV (to be used in a 13.8 kV system) to 2x120 V secondary (standard utilization voltage); one is rated at 25 kVA and the other at 50 kVA. The 25 kVA transformer passed the impulse test in KEMA high-voltage laboratories. Additional products include: nine papers published in the IEEE Transactions on Power Delivery, one patent has been filed, three PhD students were supported from beginning to graduation, five postdoctoral fellows, and three MSc students were partially supported. The electrical characteristics of our dry-type toroidal transformers are similar to those of the oil-immersed pole mounted transformers currently in use by many utilities, but toroids have higher efficiency. The no-load losses of the 50 kVA prototype are only 45 W. A standard transformer has no-load losses between 90 and 240 W. Thus, even the finest transformer built today with standard technology has double the amount of no-load losses than the prototype toroidal transformer. When the manufacturing process is prepared for mass production, the cost of a dry-type toroidal transformer would be similar to the price of an oil-filed standard design. However, because of the greatly reduced losses, the total ownership cost of a toroidal transformer could be about half of a traditional design. We got a grant from Power Bridge NY in the amount of $149,985 from June 2014 to May 2015 to continue developing the transformer with commercialization objectives. We are considering the possibility to incorporate a company to manufacture the transformers and have contacted investors. The current status of the real life testing is as follows: after several months of silence, Con Edison has re-started conversations and has shown willingness to test the transformer. Other companies, PSE&G and National Grid have recently also shown interest and we will present our product to them soon.

42 ENGINEERING↗

Application Note: Power Grid Modeling With Xyce™

This application note describes how to model steady-state power flows and transient events in electric power grids with the SPICE-compatible Xyce™ Parallel Electronic Simulator developed at Sandia National Labs. This application notes provides a brief tutorial on the basic devices (branches, bus shunts, transformers and generators) found in power grids. The focus is on the features supported and assumptions made by the Xyce models for power grid elements. It then provides a detailed explanation, including working Xyce netlists, for simulating some simple power grid examples such as the IEEE 14-bus test case.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solving the power flow equations: a monotone operator approach

The AC power flow equations underlie all operational aspects of power systems. They are solved routinely in operational practice using the Newton-Raphson method and its variants. These methods work well given a good initial “guess” for the solution, which is always available in normal system operations. However, with the increase in levels of intermittent generation, the assumption of a good initial guess always being available is no longer valid. In this paper, we solve this problem using the theory of monotone operators. We show that it is possible to compute (using an offline optimization) a “monotonicity domain” in the space of voltage phasors. Given this domain, there is a simple efficient algorithm that will either find a solution in the domain, or provably certify that no solutions exist in it. We validate the approach on several IEEE test cases and demonstrate that the offline optimization can be performed tractably and the computed “monotonicity domain” includes all practically relevant power flow solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Two Guralp Preamplifiers for GS21 Seismometer Application

Sandia National Laboratories has tested and evaluated two Guralp preamplifiers for use with a GS21 seismometer application. The two preamplifiers have a gain factor of 61.39. The purpose of the preamplifier evaluation was to determine a measured gain factor, transfer function, total harmonic distortion, self-noise, application passband, dynamic range, seismometer calibration pass-through, and to comment on any issues encountered during the evaluation. The test results included in this report were in response to static, tonal, and dynamic input signals. The Guralp GS21 preamplifiers are being evaluated for potential use in the International Monitoring System (IMS) of the Comprehensive Nuclear Test-Ban-Treaty Organization (CTBTO). Test methodologies used were based on IEEE Standards 1057 for Digitizing Waveform Recorders and 1241 for Analog to Digital Converters

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗