Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Feasibility of Achieving a Zero-Net-Energy, Zero-Net-Cost Homes

A green building competition, to be known as the Energy Free Home Challenge (EFHC), is scheduled to be opened to teams around the world in 2010. This competition will encourage both design innovation and cost reduction, by requiring design entries to meet 'zero net energy' and 'zero net cost' criteria. For the purposes of this competition, a 'zero net energy' home produces at least as much energy as it purchases over the course of a year, regardless of the time and form of the energy (e.g., electricity, heat, or fuel) consumed or produced. A 'zero net cost' home is no more expensive than a traditional home of comparable size and comfort, when evaluated over the course of a 30-year mortgage. In other words, the 'green premium' must have a payback period less than 30 years, based on the value of energy saved. The overarching goal of the competition is to develop affordable, high-performance homes that can be mass-produced at a large scale, and are able to meet occupant needs in harsh climates (as can be found where the competition will be held in Illinois). This report outlines the goals of the competition, and gauges their feasibility using both modeling results and published data. To ensure that the established rules are challenging, yet reasonable, this report seeks to refine the competition goals after exploring their feasibility through case studies, cost projections, and energy modeling. The authors of this report conducted a survey of the most progressive home energy-efficiency practices expected to appear in competition design submittals. In Appendix A, a summary can be found of recent projects throughout the United States, Canada, Germany, Switzerland, Sweden and Japan, where some of the most progressive technologies have been implemented. As with past energy efficient home projects, EFHC competitors will incorporate a multitude of energy efficiency measures into their home designs. The authors believe that the cost of electricity generated by home generation technologies will continue to exceed the price of US grid electricity in almost all locations. Strategies to minimize whole-house energy demand generally involve some combination of the following measures: optimization of surface (area) to volume ratio; optimization of solar orientation; reduction of envelope loads; systems-based engineering of high efficiency HVAC components, and on-site power generation. A 'Base Case' home energy model was constructed, to enable the team to quantitatively evaluate the merits of various home energy efficiency measures. This Base Case home was designed to have an energy use profile typical of most newly constructed homes in the Champaign-Urbana, Illinois area, where the competition is scheduled to be held. The model was created with the EnergyGauge USA software package, a front-end for the DOE-2 building energy simulation tool; the home is a 2,000 square foot, two-story building with an unconditioned basement, gas heating, a gas hot-water heater, and a family of four. The model specifies the most significant details of a home that can impact its energy use, including location, insulation values, air leakage, heating/cooling systems, lighting, major appliances, hot water use, and other plug loads. EFHC contestants and judges should pay special attention to the Base Case model's defined 'service characteristics' of home amenities such as lighting and appliances. For example, a typical home refrigerator is assumed to have a built-in freezer, automatic (not manual) defrost, and an interior volume of 26 cubic feet. The Base Case home model is described in more detail in Section IV and Appendix B.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Impacts of Reduced Noise Operations of Wind Turbines on Neighbor Annoyance: A Preliminary Analysis in Vinalhaven, Maine

Neighbors living near the 3 turbine, 4.5 MW Vinalhaven, Maine wind power facility, which began operations in late 2009, have complained that the noise from the turbines is unwelcome and annoying. Fox Islands Wind, the owner of the facility, hypothesized that implementing a Noise Reduced Operation (NRO) for the turbines, which effectively limits the turbines maximum rpm and power output, would reduce the sound levels produced by the turbines, and therefore might also reduce the degree to which the neighbors report being annoyed by those sounds. To test this hypothesis in a preliminary fashion, a pilot study was conducted in early 2010, the results of which are the subject of this brief report. The study included asking near-by residents - those within roughly 3000 feet - to rate the sounds and the degree to which they were annoyed by them using logs which they filled out at multiple times during the day on as many days as were possible in the 35 day study period in February and March, 2010. Meanwhile, FIW adjusted the NRO settings of the turbines in a random fashion in the evenings during the same period, but in a pattern that the respondents were not made aware of. Ultimately, nine individuals turned in roughly 200 log entries (i.e., responses), each of which was time coded to allow testing if the response was correlated with the wind facility operating conditions at that time. The analysis of these data found small, non-statistically-significant differences in self-reported turbine loudness and annoyance ratings between the periods when the NRO was enacted and when it was not, after controlling for many of the relationships that could independently influence perceived loudness and annoyance (e.g., wind direction, time of day). Possible explanations for these small differences in self-reported turbine loudness and annoyance ratings include: the relative difference in sound output from the turbines when NRO was engaged and when it was not was small; and/or that differences in turbine sound outputs that did exist might have been masked by higher (non-turbine) wind sound levels that were coincident with NRO periods. Because this preliminary test only included a small portion of the population surrounding the turbines, the sample of self-reported ratings was itself very small. In addition, the conditions varied greatly over the study period, as described in the report that follows. Consequently, the results presented here should be considered preliminary, and further data collection and analysis are warranted. The main findings of this preliminary study are: (1) As planned, periods in which the NRO was engaged were found to have noticeably lower turbine rotational speeds (rpm), based on turbine operational data. (2) 11% of responses overall indicated that the turbines were perceived as either 'very' or 'extremely' loud at the time they were logged, and roughly two thirds of those (7% overall) indicated the sounds to be 'very' or 'extremely' annoying. (3) Self-reported turbine loudness and annoyance ratings were higher during the night and when the wind was from the North (participants in the study were located to the east and south of the turbines). (4) Self-reported turbine loudness and annoyance ratings were generally found to be lower during the NRO periods, but these observed differences are relatively small in magnitude, and are not statistically significant. (5) There is some limited evidence that high-speed surface winds mask self-reported turbine loudness and annoyance ratings. Therefore, because NRO settings are only engaged during periods of high winds, the true effects of the NRO adjustments might be diluted to some degree. (6) The results of this preliminary assessment should not be applied to the full population of homeowners near the turbines in Vinalhaven, Maine because the potentially most-sensitive individuals (those most vocal of their dislike of the turbine sounds) opted not to participate in the study, and because the study did not include the relatively large number of individuals who primarily visit the island during the summer months.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee

This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.

54 ENVIRONMENTAL SCIENCES↗

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which data are available revealed over 10,000 energy-related problems, resulting in 16% median whole-building energy savings in existing buildings and 13% in new construction, with payback time of 1.1 years and 4.2 years, respectively. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and 1.1, and cash-on-cash returns of 91% and 23% were attained for existing and new buildings, respectively. High-tech buildings were particularly cost-effective, and saved higher amounts of energy due to their energy-intensiveness. Projects with a comprehensive approach to commissioning attained nearly twice the overall median level of savings and five-times the savings of the least-thorough projects. It is noteworthy that virtually all existing building projects were cost-effective by each metric (0.4 years for the upper quartile and 2.4 years for the lower quartile), as were the majority of new-construction projects (1.5 years and 10.8 years, respectively). We also found high cost-effectiveness for each specific measure for which we have data. Contrary to a common perception, cost-effectiveness is often achieved even in smaller buildings. Thanks to energy savings valued more than the cost of the commissioning process, associated reductions in greenhouse gas emissions come at 'negative' cost. In fact, the median cost of conserved carbon is negative - -$110 per tonne for existing buildings and -$25/tonne for new construction - as compared with market prices for carbon trading and offsets in the +$10 to +$30/tonne range. Further enhancing the value of commissioning, its non-energy benefits surpass those of most other energy-management practices. Significant first-cost savings (e.g., through right-sizing of heating and cooling equipment) routinely offset at least a portion of commissioning costs - fully in some cases. When accounting for these benefits, the net median commissioning project cost was reduced by 49% on average, while in many cases they exceeded the direct value of the energy savings. Commissioning also improves worker comfort, mitigates indoor air quality problems, increases the competence of in-house staff, plus a host of other non-energy benefits. These findings demonstrate that commissioning is arguably the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today. Energy savings tend to persist well over at least a 3- to 5-year timeframe, but data over longer time horizons are not available. It is thus important to 'Trust but Verify,' and indeed the field is moving towards a monitoring-based paradigm in which instrumentation is used not only to confirm savings, but to identify opportunities that would otherwise go undetected. On balance, we view the findings here as conservative, in the sense that they underestimate the actual performance of projects when all costs and benefits are considered. They underestimate the technical potential for a scenario in which best practices are applied.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Aerial Radiological Survey of Selected Areas of Area 18 - Nevada Test Site

As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey of selected areas of Area 18 of the Nevada Test Site (NTS) for the purpose of mapping man-made radiation deposited as a result of the Johnnie Boy and Little Feller I tests. The survey area centered over the Johnnie Boy ground zero but also included the ground zero and deposition area of the Little Feller I test, approximately 7,000 feet (2133 meters) southeast of the Johnnie Boy site. The survey was conducted in one flight. The completed survey covered a total of 4.0 square miles. The flight lines (with the turns) over the surveyed areas are presented in Figure 1. One 2.5-hour-long flight was performed at an altitude of 100 ft above ground level (AGL) with 200 foot flight-line spacing. A test-line flight was conducted near the Desert Rock Airstrip to ensure quality control of the data. The test line is not shown in Figure 1. However, Figure 1 does include the flight lines for a ''perimeter'' flight. The path traced by the helicopter flying over distinct roads within the survey area can be used to overlay the survey data on a base map or image. The flight survey lines were flown in an east-west orientation perpendicular to the deposition patterns for both sites. This technique provides better spatial resolution when contouring the data. The data were collected by the AMS data acquisition system (REDAR V) using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data, in the form of gamma energy spectra, were collected every second over the course of the survey and were geo-referenced using a differential Global Positioning System. Spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man-made radioisotopes. Spectral data can also identify specific radioactive isotopes. Based on the results of the RSL NTS 1994 surveys, this area was chosen for a resurvey to improve the spatial resolution of the reported depositions for the Johnnie Boy and Little Feller I events. In addition, the survey was expected to confirm the absence of detectable concentrations of Americium-241 (Am-241) at the Johnnie Boy site and attempt to confirm the presence of Uranium-235 (U-235).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Potential for Induced Seismicity Related to the Northern California CO2 Reduction Project Pilot Test, Solano County, California

The objective of this technical report is to analyze the potential for induced seismicity due to a proposed small-scale CO{sub 2} injection project in the Montezuma Hills. We reviewed currently available public information, including 32 years of recorded seismic events, locations of mapped faults, and estimates of the stress state of the region. We also reviewed proprietary geological information acquired by Shell, including seismic reflection imaging in the area, and found that the data and interpretations used by Shell are appropriate and satisfactory for the purpose of this report. The closest known fault to the proposed injection site is the Kirby Hills Fault. It appears to be active, and microearthquakes as large as magnitude 3.7 have been associated with the fault near the site over the past 32 years. Most of these small events occurred 9-17 miles (15-28 km) below the surface, which is deep for this part of California. However, the geographic locations of the many events in the standard seismicity catalog for the area are subject to considerable uncertainty because of the lack of nearby seismic stations; so attributing the recorded earthquakes to motion along any specific fault is also uncertain. Nonetheless, the Kirby Hills Fault is the closest to the proposed injection site and is therefore our primary consideration for evaluating the potential seismic impacts, if any, from injection. Our planned installation of seismic monitoring stations near the site will greatly improve earthquake location accuracy. Shell seismic data also indicate two unnamed faults more than 3 miles east of the project site. These faults do not reach the surface as they are truncated by an unconformity at a depth of about 2,000 feet (610 m). The unconformity is identified as occurring during the Oligocene Epoch, 33.9-23.03 million years ago, which indicates that these faults are not currently active. Farther east are the Rio Vista Fault and Midland Fault at distances of about 6 miles (10 km) and 10 miles (16 km), respectively. These faults have been identified as active during the Quaternary (last 1.6 million years), but without evidence of displacement during the Holocene (the last 11,700 years). The stress state (both magnitude and direction) in the region is an important parameter in assessing earthquake potential. Although the available information regarding the stress state is limited in the area surrounding the injection well, the azimuth of the mean maximum horizontal stress is estimated at 41{sup o} and it is consistent with strike-slip faulting on the Kirby Hills Fault, unnamed fault segments to the south, and the Rio Vista Fault. However, there are large variations (uncertainty) in stress estimates, leading to low confidence in these conclusions regarding which fault segments are optimally oriented for potential slip induced by pressure changes. Uncertainty in the stress state can be substantially reduced by measurements planned when wells are drilled at the site. Injection of CO{sub 2} at about two miles depth will result in a reservoir fluid pressure increase, which is greatest at the well and decreases with distance from the well. After the injection stops, reservoir fluid pressures will decrease rapidly. Pressure changes have been predicted quantitatively by numerical simulation models of the injection. Based on these models, the pressure increase on the Kirby Hills Fault at its closest approach to the well due to the injection of 6,000 metric tons of CO{sub 2} would be a few pounds per square inch (psi), which is a tiny fraction of the natural pressure of approximately 5,000 psi at that depth. The likelihood of such a small pressure increase triggering a slip event is very small. It is even more unlikely that events would be induced at the significantly greater depths where most of the recorded earthquakes are concentrated, because it is unlikely that such a small pressure pulse would propagate downwards any appreciable distance. Therefore, in response to the specific question of the likelihood of the CO{sub 2} injection causing a magnitude 3.0 (or larger) event, this preliminary analysis suggests that no such induced or triggered events would be expected. However, it is possible that a fault, too small to be detected by the existing seismic data, yet sufficiently large to cause a magnitude 3 event, could exist in close proximity to the injection point where the pressure increase could cause slippage. However, the existence of such a fault would be detectable in the data planned for collection from the well prior to injection. We do note that natural earthquake events of up to 3.7 in magnitude have occurred in this area and would be expected to occur again regardless of the proposed CO{sub 2} injection.

54 ENVIRONMENTAL SCIENCES↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 6)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 9)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 10)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 11)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations for High-Wattage Waste (Rev. 12)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Drillhole SNL-18 (C-3233)

SNL -18 (permitted by the New Mexico (NM) State Engineer as C.3233) was drilled and completed during June 2006 to provide geological data and hydrological testing of the Culebra Dolomite Member of the Permian Rustler Formation along the margin of the northeastern arm of Nash Draw, north of the Waste Isolation Pilot Plant (WIPP) site. SNL -18 is in the area where upper Salado Formation halite has been dissolved and is in the mudflat facies tract of Rustler mudstone -halite units. Culebra transmissivity is expected to be relatively high. SNL -18 is located near the southeast corner of section 20, T21S, R31E, in eastern Eddy County, NM. SNL.18 was drilled to a total depth (TD) of 566 feet (ft) below ground level (bgl), based on driller’s measurements. Below the caliche pad, SNL.18 encountered poorly consolidated sands, the Mescalero caliche, and the Gatuña, Dewey Lake, and Rustler Formations. The Santa Rosa and upper Dewey Lake have been eroded at SNL -18. The Rustler was cored from the lower Forty-niner Member into the upper Culebra Dolomite Member, with generally poor recovery. Geophysical logs were acquired from the open hole to a depth near TD. Water was encountered in the interval including lower Dewey Lake to Forty -niner Member. SNL -18 was drilled to 307 ft (Dewey Lake) using air. Air and mist were used to drill and core from 307–496 ft. From 496 ft to TD, mud was used for drilling and coring with poor to no returns circulating to the surface. Coring was abandoned in the upper Culebra Dolomite due to hole conditions. Core recovery was variable, and cuttings are limited to lacking below 496 ft. Cement was pumped into the drillhole to control loss of circulation and fill during drilling. The Los Medaños was drilled through mudstone 2 (M -2) and into the top of anhydrite 1 (A -1) based on geophysical logs and drilling rates. The thickness of M -2 is normal. No cuttings were obtained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Monitor Well AEC-7 (C-2742) Reconfiguration Activities

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under the Hazardous Waste Facility Permit (Permit NM4890139088-TSDF, as amended) issued by the New Mexico Environment Department (NMED). WIPP is located approximately 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1-1). Disposal panels are being excavated in the Permian Salado Formation at a depth of approximately 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells used for this purpose were constructed of carbon steel casing that has deteriorated to varying degrees due to corrosion. For some wells, the deterioration has led to failure of the well integrity. In such cases, the well must either be reconfigured or completely plugged, according to regulatory requirements, to prevent commingling of groundwater from different formations. Other wells are nearing the end of their useful life and/or are duplicative of other wells that serve the same purpose. Because of these integrity issues, WIPP has begun a program to plug and abandon wells that are no longer useful for the monitoring program or are redundant, and to reconfigure other wells for future monitoring. One such well is known as AEC-7, which was reconfigured to monitor only the Culebra Member of the Rustler Formation. The New Mexico Office of the State Engineer (OSE) permitted well AEC-7 as C-2742. This well has been part of the far-field monitoring network since 1974. The well was used to obtain water level levations and hydraulic parameters from both the Bell Canyon Formation and the Culebra Member of the Rustler Formation. This basic data report provides a historical account of the well from the original installation to the current configuration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment and Reconfiguration Activities for Fiscal Year 2005 (Rev. 1)

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under a permit issued by the New Mexico Environment Department (NMED). WIPP is located 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of about 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells in the fiscal year (FY) 2005 program were selected for plugging and abandonment (P&A) due to redundancy. In other words, the well pads have multiple wells that monitor the Culebra ("Culebra") Member of the Rustler Formation when only one is necessary. These multi-well locations are a relic of various aquifer testing programs associated with the site characterization of WIPP. Additionally, the multi-well locations had wells that were completed in both the Culebra and the Magenta ("Magenta") Members of the Rustler Formation for dual monitoring of these intervals. The intervals were separated by inflatable packers used as bridge plugs, and over the years these packers have aged and their integrity compromised. For these wells, the packers were removed and the wells were converted to Magenta-only monitor wells. The FY 2005 program was initiated on March 31, 2005, and concluded on July 16, 2005. The FY 2005 program initially included 25 wells requiring workover (P&A, Magenta reconfiguration, cleaning and keeping). During the process, the U.S. Bureau of Land Management (BLM) requested transfer of two wells (H-7c and H-8c) to their ownership for future livestock watering. These wells were transferred to the BLM through execution of Form wr-03, Declaration of Owner of Underground Water Rights, between the New Mexico Office of the State Engineer (NMOSE), the BLM, and the DOE Carlsbad Field Office (CBFO). One well (H-2b2) was cleaned and retained as a Culebra monitor well for continued use. One well (H-3d) was converted to a shallow well to monitor the formational contact between the Dewey Lake Redbeds Formation and the Santa Rosa Formation in support of the DP-831 discharge permit monitoring program. Nine dual-completion wells were reconfigured as Magenta-only monitor wells, and 12 wells were plugged and abandoned permanently. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment Activities for Fiscal Year 2006

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic mixed waste under a permit issued by the New Mexico Environment Department. WIPP is located 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). The fiscal year 2006 (FY 2006) program was initiated on July 24, 2006, and concluded on October 12, 2006. The FY 2006 program included lugging and abandonment (P&A) of four wells, which permanently removed them from the monitoring network. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗