Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Treadmill Exercise Within LBNP as an Integrated Coutermeasure to Microgravity

An integrated exercise countermeasure for microgravity is needed to protect multiple physiologic systems and save crew time. Such a countermeasure should protect orthostatic tolerance, upright ambulatory capability (including sprinting), aerobic capacity, muscle strength/endurance, and other physiologic parameters relevant to human performance. We developed a novel physiologic countermeasure, treadmill exercise within LBNP, for preventing cardiovascular and musculoskeletal deconditioning associated with prolonged bed rest and spaceflight. We evaluated 40 min of daily LBNP treadmill exercise by a battery of physiologic parameters relevant to maintaining exercise performance and health of both women and men during bed-rest (simulated microgravity) studies lasting from 5 to 60 days. For 30 day studies, we employed identical twins with one twin as the control and the other twin as the exerciser to improve comparative power. During the WISE 60-day HDT study, the treadmill exercise within LBNP was performed 3-4 days each week and resistive exercise was performed 2-3 days each week. Our treadmill within LBNP protocol maintained plasma volume and sprint speed (30 day HDT bed-rest studies of identical twins), orthostatic tolerance to a degree, upright exercise capacity, muscle strength and endurance, and some bone parameters during 30 day (twin studies) and 60 day (WISE-2005) bed-rest simulations of microgravity. When combining treadmill exercise within LBNP and resistive exercise (WISE), cardiac mass increased significantly in the exercise (EX) group during bed rest relative to controls (CON). Upright peak VO2, and knee extensor strength and endurance decreased significantly in CON subjects; but these parameters were preserved in the EX group. In the 60 day WISE study, each LBNP exercise session was followed immediately by 10 minutes of static LBNP, and the last such session occurred three days before the end of bed rest. Still, orthostatic tolerance was better maintained in the EX group than in the CON group. Therefore, these collective peer-reviewed results document that our treadmill exercise within LBNP countermeasure safely and efficiently protects multiple physiologic systems in women and men during bed-rest studies of up to 60 days. Supported by NASA grants NNJ04HF71G and NAG 9-1425, NIH grant GCRC M01 RR00827 and by WISE support from ESA, NASA, CSA, and CNES.

Lee, Stuart↗

Gateway Architecture: A Major "Flexible Path" Step to the Moon and Mars After the International Space Station?

With NASA's commitment to the International Space Station (ISS) now all but certain for at least through the coming decade, serious consideration may be given to extended US in-space operations in the 2020s, when presumably the ISS will exceed its sell by date. Indeed, both ESA and Roscosmos, in addition to their unambiguous current commitment to ISS, have published early concept studies for extended post-ISS habitation (e.g., http://www.esa.int/esaHS/index.html, http://www.russianspaceweb.com/opsek.html and references therein). In the US, engineers and scientists have for a decade been working both within and outside NASA to assess one consistent candidate for long-term post-ISS habitation and operations, although interrupted by changing priorities for human space flight, Congressional direction, and constrained budgets. The evolving work of these groups is described here, which may have renewed relevance with the recent completion of a major review of the nation s human space flight program.

Thronson, Harley↗

Science with the James Webb Space Telescope

The scientific capabilities of the James Webb Space Telescope (JWST) fall into four themes. The End of the Dark Ages: First Light and Reionization theme seeks to identify the first luminous sources to form and to determine the ionization history of the universe. The Assembly of Galaxies theme seeks to determine how galaxies and the dark matter, gas, stars, metals, morphological structures, and active nuclei within them evolved from the epoch of reionization to the present. The Birth of Stars and Protoplanetary Systems theme seeks to unravel the birth and early evolution of stars, from infall onto dust-enshrouded protostars, to the genesis of planetary systems. The Planetary Systems and the Origins of Life theme seeks to determine the physical and chemical properties of planetary systems around nearby stars and of our own, and investigate the potential for life in those systems. To enable these for science themes, JWST will be a large (6.6m) cold (50K) telescope launched to the second Earth-Sun Lagrange point in 2014. It is the successor to the Hubble Space Telescope, and is a partnership of NASA, ESA and CSA.

Gardner, Jonathan P.↗

Testing for the J-2X Upper Stage Engine

NASA selected the J-2X Upper Stage Engine in 2006 to power the upper stages of the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Based on the proven Saturn J-2 engine, this new engine will provide 294,000 pounds of thrust and a specific impulse of 448 seconds, making it the most efficient gas generator cycle engine in history. The engine's guiding philosophy emerged from the Exploration Systems Architecture Study (ESAS) in 2005. Goals established then called for vehicles and components based, where feasible, on proven hardware from the Space Shuttle, commercial, and other programs, to perform the mission and provide an order of magnitude greater safety. Since that time, the team has made unprecedented progress. Ahead of the other elements of the Constellation Program architecture, the team has progressed through System Requirements Review (SRR), System Design Review (SDR), Preliminary Design Review (PDR), and Critical Design Review (CDR). As of February 2010, more than 100,000 development engine parts have been ordered and more than 18,000 delivered. Approximately 1,300 of more than 1,600 engine drawings were released for manufacturing. A major factor in the J-2X development approach to this point is testing operations of heritage J-2 engine hardware and new J-2X components to understand heritage performance, validate computer modeling of development components, mitigate risk early in development, and inform design trades. This testing has been performed both by NASA and its J-2X prime contractor, Pratt & Whitney Rocketdyne (PWR). This body of work increases the likelihood of success as the team prepares for testing the J-2X powerpack and first development engine in calendar 2011. This paper will provide highlights of J-2X testing operations, engine test facilities, development hardware, and plans.

Buzzell, James C.↗

Plasma IMS Composition Measurements for Europa and the Other Galilean Moons

NASA and ESA are planning the joint Europa Jupiter System Mission (EJSM) to the Jupiter system with specific emphasis to Europa and Ganymede, respectively. The Japanese Space Agency is also planning an orbiter mission to explore Jupiter's magnetosphere and the Galilean satellites. For NASA's Jupiter Europa Orbiter (JEO) we are developing the 3D Ion Mass Spectrometer (IMS) with two main goals which can also be applied to the other Galilean moons, 1) measure the plasma interaction between Europa and Jupiter's magnetosphere and 2) infer the 4 pi surface composition to trace elemental and significant isotopic levels. The first goal supports the magnetometer (MAG) measurements, primarily directed at detection of Europa's sub-surface ocean, while the second gives information about transfer of material between the Galilean moons, and between the moon surfaces and subsurface layers putatively including oceans. The measurement of the interactions for all the Galilean moons can be used to trace the in situ ion measurements of pickup ions back to either Europa's or Ganymede's surface from the respectively orbiting spacecraft. The IMS instrument, being developed under NASA's Astrobiology Instrument Development Program, would maximally achieve plasma measurement requirements for JEO and EJSM while moving forward our knowledge of Jupiter system composition and source processes to far higher levels than previously envisaged. The composition of the global surfaces of Europa and Ganymede can be inferred from the measurement of ejected neutrals and pick-up ions using at minimum an in situ payload including MAG and IMS also fully capable of meeting Level 1 mission requirements for ocean detection and survey. Elemental and isotopic analysis of potentially extruded oceanic materials at the moon surfaces would further support the ocean objectives. These measurements should be made from a polar orbiting spacecraft about Europa or Ganymede at height 100 km. The ejecta produced by sputtering of the surfaces of Europa and Ganymede has been shown to be representative of the surface composition. Level 2 science on surface geology and composition can then be further enhanced by addition of the following: 3D Ion Neutral Mass Spectrometer (INNS), 3D plasma electron spectrometer (ELS), and hot plasma energetic particle instrument. The measurement approach is to alternate between times measuring pickup ions and times measuring plasma and magnetic field parameters along the spacecraft trajectory. By measuring the pickup ion energy, arrival direction and mass-per-charge, the ion can be traced back along the ejection trajectory to the approximate area of origin if the 3-D electric field and magnetic field are known. In situ observations of plasma flow velocities and vector magnetic fields can be used to determine the local convective electric field (E = -VXB) along the spacecraft trajectory. By combining this information with models of the magnetospheric interaction with Europa, one can generate 3D maps of the electric and magnetic field and compute the trajectories of the pickup ions back to the surface or exospheric points of origin. In the case of Ganymede there is the additional complexity of its own internal dipole magnetic field, while Io's volcanic activity introduces the complexity of a highly structured denser atmosphere. Callisto with its less globally extended exosphere will have a simpler interaction than for Europa (i.e., more like our moon). We will discuss these differences in light of the above proposed technique. Finally, the INNS observations and neutral exosphere models are needed to estimate production rates of pickup ions. The hot plasma measurements are needed to correct for sputtering rates which can be time dependent and electron plasma observations for electron impact ionization rates. Instrument characteristics, field-of-view requirements, modes of operation and effects of radiation on instrument functionality will be discussed.

Sittler, Edward↗

Global Trends in Space Access and Utilization

In the not-so-distant past, space access and air/space technology superiority were within the purview of the U.S. and former Soviet Union's respective space agencies, both vying for global leadership in space exploitation. In more recent years, with the emergence of the European Space Agency (ESA) member countries and Asian countries joining the family of space-faring nations, it is truer now more than ever that space access and utilization has become a truly global enterprise. In fact, according to the Space Report 2007, this enterprise is a $251-billion economy. It is possible to gauge the vitality of worldwide efforts from open sources in today's transparent, media-based society. In particular, print and web broadcasters regularly report and catalog global space activities for defense and civil purposes. For the purposes of this paper, a representative catalog of missions is used to illustrate the nature of the emerging "globalization." This paper highlights global trends in terms of not only the providers of space access, but also the end-users for the various recently accomplished missions. With well over 50 launches per year, in recent years, the launch-log reveals a surprising percentage of "cooperative or co-dependent missions" where different agencies, countries, and/or commercial entities are so engaged presumably to the benefit of all who participate. Statistics are cited and used to show that recently over d0% of the 50-plus missions involved multiple nations working collectively to deliver payloads to orbit. Observers, space policy professionals, and space agency leaders have eloquently proposed that it might require the combined resources and talents of multiple nations to advance human exploration goals beyond low earth orbit. This paper does not intend to offer new information with respect to whether international collaboration is necessary but to observe that, in continuing to monitor global trends, the results seem to support the thesis that a global interdependent effort with all its likely complexities is an increasingly viable and pragmatic option. The discussion includes a breakdown of space missions into those of civil (scientific), military, and strictly commercial nature. It concludes that all three are robust components of a globally diversified portfolio of activities relying, essentially, on a common space industrial base and space infrastructure. As in other industries, the distribution of space industry assets and knowledge across countries and continents enables a diverse suite of options and arrangements, particularly in the areas of civil and commercial space utilization. A survey of several ongoing bilateral and multilateral space collaboration examples are provided to augment the observations regarding multinational work in space.

Rahman, Shamim A.↗

Design and Manufacture of a Highly Reliable, Miniaturized and Low Mass Shutter Mechanism

This paper describes the development, manufacturing and testing of a lightweight shutter mechanism made of titanium for the MERTIS Instrument. MERTIS is a thermal infrared imaging spectrometer onboard ESA's future BepiColombo mission to Mercury. The mechanism is built as a parallelogram arrangement of flexible hinges, actuated by a voice coil. In a first test run, it was shown that the selected EDM processing led to the generation of titanium oxides and an oxygen-enriched surface layer on the substrate (so called alpha-case layer). In the revised version of the shutter, it was possible to manufacture the complex geometry by micro-milling and an adjacent pickling procedure. The adequacy of this approach was verified by lifetime and vibration testing.

Manhart, M.↗

An Evaluation of Liquid, Solid, and Grease Lubricants for Space Mechanisms Using a Spiral Orbit Tribometer

We present the findings of the test program performed by The European Space Tribology Laboratory (ESTL) to evaluate the performance (friction and lifetime) of a number of space lubricants under vacuum using a Spiral Orbit Tribometer (SOT). Focus was given to a comparison of various popular space oils, a comparison study between the old and new MAPLUB grease formulations, and the performance of commonly used solid lubricants under various conditions. Tests demonstrated that the lifetimes of hydrocarbon NYE oils 2001 & 2001A outperformed those of the perfluroropolyalkylether (PFPE) oils Fomblin Z25 & Z60, though these pairs displayed similar behavior. This relationship was also generally seen for greases; with the lifetimes of the multiple alkylated cyclopentane (MAC)-based greases being extended in comparison to the PFPE-based greases. Testing on greases also demonstrated similar performance between the old (-a) and new (-b) formulations when considering PFPE-based MAPLUB greases, and indeed for all tested PFPE-based non-MAPLUB greases, but significantly shorter lifetimes for the new formulations when considering MAC-based MAPLUB greases. MAPLUB MAC greases containing molybdenum disulphide (MoS2) thickener were also found to display reduced lifetimes. For solid lubricants, lead displayed significantly extended lifetimes over MoS2, speculated to be caused by redistribution of lead from the ball onto all contact surfaces during the test. Friction coefficients were seen to be some 2.5x higher for lead than for MoS2 under similar conditions, a result that corresponds well with conventional bearing tests. The work described was performed under contract for the European Space Agency as part of the Tribology Applications Program, with all funding for testing and apparatus provided by European Space Agency (ESA).

Buttery, Michael↗

Enhancements to the NASA/Goddard Space Flight Center (GSFC) Space Environment Simulator (SES) Facility to Support Cryogenic Testing of the James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2014. It is directly responsible for the integration and test of the Integrated Science Instrument Module (ISIM), which includes a composite truss structure provided by NASA, and four science instruments sponsored and provided by NASA, the European Space Agency (ESA), the Canadian Space Agency (CSA), and the European Consortium (EC). Three of the four instruments are passively cooled and designed to operate at temperatures in the 36K to 40K range, and the fourth instrument is actively cooled to approximately 6K. The ISIM will undergo several performance tests at various levels of integration in the NASA Goddard Space Flight Center's (GSFC) Space Environment Simulator (SES), GSFC's largest thermal vacuum chamber. These activities range from Cryo-cycling the bare flight composite structure to thermal balance and performance testing of the full ISIM module. This paper describes the enhancements made to the SES chamber in order to support all cryogenic thermal vacuum testing of the ISIM. Upgrades discussed include: design and fabrication of a very large, removable and reconfigurable helium shroud; a new valve box permitting independent flow control of gaseous helium (GHe) to up to ten zones; and development of in-situ 3-dimensional photogrammetry capability in a cryogenic environment. Also presented will be select results from several facility tests already conducted to verify the chamber capabilities and optimize operational procedures, including the Helium Shroud -03 Configuration Acceptance Test, and the Helium Shroud -01 Configuration Chamber Certification Test.

Cleveland, Paul↗

Porting Gravitational Wave Signal Extraction to Parallel Virtual Machine (PVM)

Laser Interferometer Space Antenna (LISA) is a planned NASA-ESA mission to be launched around 2012. The Gravitational Wave detection is fundamentally the determination of frequency, source parameters, and waveform amplitude derived in a specific order from the interferometric time-series of the rotating LISA spacecrafts. The LISA Science Team has developed a Mock LISA Data Challenge intended to promote the testing of complicated nested search algorithms to detect the 100-1 millihertz frequency signals at amplitudes of 10E-21. However, it has become clear that, sequential search of the parameters is very time consuming and ultra-sensitive; hence, a new strategy has been developed. Parallelization of existing sequential search algorithms of Gravitational Wave signal identification consists of decomposing sequential search loops, beginning with outermost loops and working inward. In this process, the main challenge is to detect interdependencies among loops and partitioning the loops so as to preserve concurrency. Existing parallel programs are based upon either shared memory or distributed memory paradigms. In PVM, master and node programs are used to execute parallelization and process spawning. The PVM can handle process management and process addressing schemes using a virtual machine configuration. The task scheduling and the messaging and signaling can be implemented efficiently for the LISA Gravitational Wave search process using a master and 6 nodes. This approach is accomplished using a server that is available at NASA Ames Research Center, and has been dedicated to the LISA Data Challenge Competition. Historically, gravitational wave and source identification parameters have taken around 7 days in this dedicated single thread Linux based server. Using PVM approach, the parameter extraction problem can be reduced to within a day. The low frequency computation and a proxy signal-to-noise ratio are calculated in separate nodes that are controlled by the master using message and vector of data passing. The message passing among nodes follows a pattern of synchronous and asynchronous send-and-receive protocols. The communication model and the message buffers are allocated dynamically to address rapid search of gravitational wave source information in the Mock LISA data sets.

Thirumalainambi, Rajkumar↗

Component-Oriented Behavior Extraction for Autonomic System Design

Rich and multifaceted domain specific specification languages like the Autonomic System Specification Language (ASSL) help to design reliable systems with self-healing capabilities. The GEAR game-based Model Checker has been used successfully to investigate properties of the ESA Exo- Mars Rover in depth. We show here how to enable GEAR s game-based verification techniques for ASSL via systematic model extraction from a behavioral subset of the language, and illustrate it on a description of the Voyager II space mission.

Bakera, Marco↗

Fabrication of Glass Mirror Segments for the International X-Ray Observatory

As the next major X-ray astronomical mission of NASA, ESA, and JAXA, the International X-ray Observatory (IXO) requires a mirror assembly that has an unprecedented effective area and an angular resolution better than all past missions except Chandra. This mirror assembly consists of approximately 15,000 mirror segments, which need to be fabricated, measured, aligned and integrated. In this talk we will present the latest results from our effort of developing an efficient and fast process of making these mirror segments by slumping commercially available glass sheets. We will report on our progress both in terms of perfecting the slumping process as well as the metrology process. In particular, we will discuss what additional work needs to be done to fully facilitate the manufacture of these mirror segments, meeting both budgetary and schedule requirements.

Zhang, William W.↗

Roles of Thin Film Stress in Making Extremely Lightweight X-Ray Optics

X-ray optics typically must be coated with one of the noble metals, gold, platinum, or iridium, to enhance their photon collection area. In general, iridium is preferred to the other two because it generates the highest X-ray reflectivity in the I to 10 keV band. Unfortunately, iridium films typically have also the highest stress that can severely degrade the optical figure of the mirror substrate, resulting in a poorer image quality. In this paper we will report our work in understanding this stress and our method to counterbalance it. In particular we will also report on potential ways of using this stress to improve the substrate's optical figure, turning a bug into a desirable feature. This work is done in the context of developing an enabling technology for the International X-ray Observatory which is a collaborative mission of NASA, ESA, and JAXA, and expected to be launched into an L2 orbit in 2021.

Zhang, William W.↗

Assessing Space Exploration Technology Requirements as a First Step Towards Ensuring Technology Readiness for International Cooperation in Space Exploration

Advancing critical and enhancing technologies is considered essential to enabling sustainable and affordable human space exploration. Critical technologies are those that enable a certain class of mission, such as technologies necessary for safe landing on the Martian surface, advanced propulsion, and closed loop life support. Others enhance the mission by leading to a greater satisfaction of mission objectives or increased probability of mission success. Advanced technologies are needed to reduce mass and cost. Many space agencies have studied exploration mission architectures and scenarios with the resulting lists of critical and enhancing technologies being very similar. With this in mind, and with the recognition that human space exploration will only be enabled by agencies working together to address these challenges, interested agencies participating in the International Space Exploration Coordination Group (ISECG) have agreed to perform a technology assessment as an important step in exploring cooperation opportunities for future exploration mission scenarios. "The Global Exploration Strategy: The Framework for Coordination" was developed by fourteen space agencies and released in May 2007. Since the fall of 2008, several International Space Exploration Coordination Group (ISECG) participating space agencies have been studying concepts for human exploration of the moon. They have identified technologies considered critical and enhancing of sustainable space exploration. Technologies such as in-situ resource utilization, advanced power generation/energy storage systems, reliable dust resistant mobility systems, and closed loop life support systems are important examples. Similarly, agencies such as NASA, ESA, and Russia have studied Mars exploration missions and identified critical technologies. They recognize that human and robotic precursor missions to destinations such as LEO, moon, and near earth objects provide opportunities to demonstrate the technologies needed for Mars mission. Agencies see the importance of assessing gaps and overlaps in their plans to advance technologies in order to leverage their investments and enable exciting missions as soon as practical. They see the importance of respecting the ability of any agency to invest in any technologies considered interesting or strategic. This paper will describe the importance of developing an appropriate international strategy for technology development and ideas for effective mechanisms for advancing an international strategy. This work will both inform and be informed by the development of an ISECG Global Exploration Roadmap and serve as a concrete step forward in advancing the Global Exploration Strategy.

Laurini, Kathleen C.↗

Highlights from 10 Years of NASA/KNMI/FMI Collaboration on UV Remote Sensing from Space

The first joint meeting between NASA, KNMI and FMI scientists was held on 13 & 14 June, 2000, almost exactly 10 years ago. NASA had recently selected 14 US scientists to work on instrument calibration, science algorithms, and validation activities related to the Ozone Monitoring Instrument (OMI) that we being built by collaboration between the Netherlands and Finland for flight on NASA's EOS Aura satellite. The progress on this project had been remarkable for a space based instrument. Only two years before this meeting my colleague Ernest Hilsenrath and I had visited Netherlands at the invitation of Fokker Space to persuade KNMI management to collaborate with NASA on this mission. And only 4 years after the first science meeting was held OMI was lunched on the Aura spacecraft. Next month will be the 6 th anniversary of this launch and very successful operation of OMI. All this was possible because of the leadership from Dr. Hennie Kelder and KNMI management who in 1998 saw the opportunity for Netherlands in the mission and stepped up to the challenge by creating a young and talented team of scientists at KNMI under the leadership of Dr. Pieterenel Levelt. This vision has now put Netherlands as the leading country in the world in monitoring air quality from space. Recent selection of TROPOMI by ESA attests to the success of this vision. I will present some selected highlights of our very successful collaboration on this project over the past 10 years.

Bhartia, Pawan K.↗

IXO/XMS Detector Trade-Off Study

This document presents the outcome of the detector trade-off for the XMS instrument on IXO. This trade-off is part of the Cryogenic instrument Phase-A study as proposed to ESA in the Declaration of Interest SRONXMS-PL-2009-003 dated June 6, 2009. The detector consists of two components: a core array for the highest spectral resolution and an outer array to increase the field of view substantially with modest increase in the number of read-out channels. Degraded resolution of the outer array in comparison with the core array is accepted in order to make this scheme possible. The two detector components may be a single unit or separate units. These arrays comprise pixels and the components that allow them to be arrayed. Each pixel comprises a thermometer, an absorber, and the thermal links between them and to the rest of the array. These links may be interfaces or distinct components. The array infrastructure comprises the mechanical structure of the array, the arrangement of the leads, and features added to improve the integrated thermal properties of the array in the focal-plane assembly.

Kilbourne, Caroline Anne↗

Noise Budget for the X-Ray Microcalorimeter Spectrometer (XMS) Core Array

The purpose of this document is to present and archive the noise budget for the XMS detector, in order, at this stage in mission planning, to learn the scale of the requirements placed on the other instrument subsystems. This document mainly concerns the core array, specifically the baseline version that emerged from the trade studies associated with the ESA Phase A study report. Qualitative extension to the Hydra approach to the outer array is included at the end.

Kilbourne, Caroline Anne↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗