Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Decision support tools”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Extreme Environment Mission Operations (NEEMO)

Introduction: NASA is preparing to land the first woman and first person of color on the Moon within the next decade, and ensuring the success of these missions will depend on our preparation on the ground in multiple ground-based lunar environment analogs. To achieve this, NASA has used full mission class analogs, of which NASA Extreme Environment Mission Operations (NEEMO) is the longest continuously running example. Discussion: NEEMO is NASA’s long-standing undersea high-fidelity spaceflight mission analog. It focuses on exploration science, EVA techniques and tools, and maturing ISS IVA flight hardware and operations concepts. NEEMO crews are composed of groups of US and International Partner (IP) astronauts, engineers and scientists who live, work and explore in a challenging environment analogous to the environment experienced currently on ISS and what is expected for future deep space exploration destinations. NEEMO missions are conducted at Aquarius Reef Base (ARB), which includes a shore base in Tavernier, FL, and the world's only undersea research station, the Aquarius habitat, which is located 5.4 miles (9 kilometers) off Key Largo in the Florida Keys National Marine Sanctuary. ARB is owned and operated by Florida International University (FIU). Aquarius was selected due to its remote and extreme location and its ability to provide the unique isolation and risk factors that spaceflight presents. NEEMO missions allow for evaluations of end-to-end EVA and Science exploration concepts of operations with a crew that is in situ in a true extreme environment. They also allow for evaluations of flight hardware and ops tools that are either pondered or destined for ISS or Gateway in the near future. NEEMO missions feature flight-like interactions between the crew and a Mission Control Center (MCC )and Science Team, which in turn allows evaluation of mission and science operations decision making and communications techniques. One reason NEEMO missions are of such high fidelity is that so many of the participants are experienced human space flight end operators. The majority of crewmembers are trained astronauts, and many of the MCC operators have credentials as current or former certified ISS MCC operators (e.g., CapCom, EVA Officer, etc.). Mission products are generated daily by the ground team and are modeled on ISS products (but modified as needed). A planning team manages the constantly evolving mission timelines in response to the ever-changing constraints and opportunities. During NEEMO missions, suited EVA crewmembers (using diving helmets) have clear voice communications with each other, the habitat, and the MCC and Science Team back on shore. Each EVA crewmember also sends helmet cam video to the habitat and MCC and Science Teams. Appropriate communications latencies are inserted for the destination being simulated as well. NEEMO missions are made possible by a broad collaboration of participants. Astronauts from all of the ISS partner agencies are eligible for crew assignment. Often the crew includes a NASA scientist, doctor or engineer with a particular skill to contribute. Sometimes crewmembers come from external entities–generally institutes or universities. Objectives come from a wide variety of sources as well, from within NASA, IPs, government agencies, academia, commercial companies and research institutes. A typical NEEMO mission is a collaboration between at least 5 NASA centers. To date, 23 NEEMO missions have been conducted since 2001, and NEEMO 24 is planned for 2022. Conclusion: NEEMO is a high-fidelity mission analog conducted in an extreme subsea environment. It features experienced end-operators in human spaceflight, from the astronaut crewmembers to key personnel staffing Mission Control. Acknowledgments: The authors wish to thank FIU and NASA’s HEO SEI/Strategic Analysis and Exploration Integration and Science Directorate organizations for the continued support that makes the NEEMO Project possible.

M L Reagan↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty

The Athena project (www.athena-mobility.org) has worked to investigate the relationship between the Dallas-Fort Worth Airport (DFW) and the greater Dallas area in order to better understand and therefore better inform future decision-making regarding the critical infrastructure that influence mobility between the airport and the city. Through this work, infrastructure related to curbside pickup and drop-off, parking, public transit, and the road network congestion were identified as critical to the operation of the DFW transportation hub. The infrastructure analysis and expansion aspect of the Athena project is focused on the restructuring of the CTA curb as a hierarchical curb and the building or repurposing of parking infrastructure as the interplay between these two areas. Many sources of uncertainty exist that may impact future airport and transportation hub operations, such as passenger volume growth, population demographic changes over time, electric vehicle (EV) adoption rates, and autonomous vehicle (AV) adoption rates. Due to these sources of uncertainty, we have selected for our research a modeling framework that can capture various types of uncertainty and hedge against those uncertainties in the optimization process. We analyze road network and curb congestion, the rise of transportation networking companies, trends in parking usage, existing policies around this infrastructure, airport revenue streams, and other contributing factors to enable infrastructure decision making with less uncertainty. To accomplish this wholistic analysis, we have developed a novel multi-stage, multi-period stochastic optimization model which considers the airport's decisions from 2025-2045 under different possible future macro trajectories and day-to-day variations in operational conditions captured as "annual representation of operations" scenarios with respective probabilities. This model has also been designed to leverage the outputs of various efforts under the Athena project to create a combined decision framework for infrastructure decisions. These various efforts include the route optimization model, the ASPIRES simulation, the mode choice model, and the SUMO traffic simulation. Our computational experiments of this system at scale have resulted in a working version of our infrastructure model which enables the explicit representation and consideration of various sources of uncertainty in the decision process to enable robust, flexible decision-making. This model has been effectively run on NREL's HPC system, Eagle, with large numbers of stochastic scenarios and shows promise as a scalable tool for robust consideration of uncertainties in airport planning. We have tested our model using 30,240 operational circumstances in total, resulting in a problem with more 200 million variables. This model was solved in several different configurations, and a workflow to simulate the performance of the infrastructure model results was developed and deployed. In general, our results indicate that a combination of remote parking, remote curb infrastructure, and dynamic pricing can generate revenue, reduce emissions, accommodate emerging technologies such as AVs and EVs, and manage airport passenger growth over time. We note the success of the proposed strategy depends on the data collection and forecasting abilities of DFW. We have also seen that the AV adoption by TNCs might necessitate larger amounts of remote curb. The results of this work inform strategies for airport infrastructure decision making, as well as demonstrate the value of an adaptable model, but also indicate that there are avenues remaining where further research would be of value.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

HEASARC Software Archive

(1) Chandra Archive: SAO has maintained the interfaces through which HEASARC gains access to the Chandra Data Archive. At HEASARC's request, we have implemented an anonymous ftp copy of a major part of the public archive and we keep that archive up-to- date. SAO has participated in the ADEC interoperability working group, establishing guidelines or interoperability standards and prototyping such interfaces. We have provided an NVO-based prototype interface, intending to serve the HEASARC-led NVO demo project. HEASARC's Astrobrowse interface was maintained and updated. In addition, we have participated in design discussions surrounding HEASARC's Caldb project. We have attended the HEASARC Users Group meeting and presented CDA status and developments. (2) Chandra CALDB: SA0 has maintained and expanded the Chandra CALDB by including four new data file types, defining the corresponding CALDB keyword/identification structures. We have provided CALDB upgrades for the public (CIAO) and for Standard Data Processing. Approximately 40 new files have been added to the CALDB in these version releases. There have been in the past year ten of these CALDB upgrades, each with unique index configurations. In addition, with the inputs from software, archive, and calibration scientists, as well as CIAO/SDP software developers, we have defined a generalized expansion of the existing CALDB interface and indexing structure. The purpose of this is to make the CALDB more generally applicable and useful in new and future missions that will be supported archivally by HEASARC. The generalized interface will identify additional configurational keywords and permit more extensive calibration parameter and boundary condition specifications for unique file selection. HEASARC scientists and developers from SAO and GSFC have become involved in this work, which is expected to produce a new interface for general use within the current year. (3) DS9: One of the decisions that came from last year's HEADCC meeting was to make the ds9 image display program the primary vehicle for displaying line graphics (as well as images). The first step required to make this possible was to enhance the line graphics capabilities of ds9. SAO therefore spent considerable effort upgrading ds9 to use Tcl 8.4 so that the BLT line graphics package could be built and imported into ds9 from source code, rather than from a pre-built (and generally outdated) shared library. This task, which is nearly complete, allows us to extend BLT as needed for the HEAD community. Following HEADCC discussion concerning archiving and the display of archived data, we extended ds9 to support full access to many astronomical Web-based archives sites, including HEASARC, MAST, CHANDRA, SKYVIEW, ADS, NED, SIMBAD, IRAS, NVRO, SAO TDC, and FIRST. Using ds9's new internal Web access capabilities, these archives can be accessed via their Web page. FITS images, plots, spectra, and journal abstracts can be referenced, down-loaded, and displayed directly and easily in ds9. For more information, see: http://hea-www.harvard.edu/saord/ds9. Also after the HEADCC discussion concerning region filtering, we extended the Funtools sample implementation of region filtering as described in: http://hea-www.harvard.edu/saord/funtools/regions.html. In particular, we added several new composite regions for event and image filtering, including elliptical and box annuli. We also extended the panda (Pie AND Annulus) region support to include box pandas and elliptical pandas. These new composite regions are especially useful in programs that need to count photons in each separate region using only a single pass through the data. Support for these new regions was added to ds9. In the same vein, we developed new region support for filtering images using simple FITS image masks, i.e. 8-bit or 16-bit FITS images where the value of a pixel is the region id number for that pixel. Other important enhancements to DS9 this year, include supporor multiple world coordinate systems, three dimensional event file binning, image smoothing, region groups and tags, the ability to save images in a number of image formats (such as JPEG, TIFF, PNG, FITS), improvements in support for integrating external analysis tools, and support for the virtual observatory. In particular, a full-featured web browser has been implemented within D S 9 . This provides support for full access to HEASARC archive sites such as SKYVIEW and W3BROWSE, in addition to other astronomical archives sites such as MAST, CHANDRA, ADS, NED, SIMBAD, IRAS, NVRO, SA0 TDC, and FIRST. From within DS9, the archives can be searched, and FITS images, plots, spectra, and journal abstracts can be referenced, downloaded and displayed The web browser provides the basis for the built-in help facility. All DS9 documentation, including the reference manual, FAQ, Know Features, and contact information is now available to the user without the need for external display applications. New versions of DS9 maybe downloaded and installed using this facility. Two important features used in the analysis of high energy astronomical data have been implemented in the past year. The first is support for binning photon event data in three dimensions. By binning the third dimension in time or energy, users are easily able to detect variable x-ray sources and identify other physical properties of their data. Second, a number of fast smoothing algorithms have been implemented in DS9, which allow users to smooth their data in real time. Algorithms for boxcar, tophat, and gaussian smoothing are supported.

White, Nicholas↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

Interplay of changing irrigation technologies and water reuse: example from the upper Snake River basin, Idaho, USA

Abstract. Careful allotment of water resources for irrigation is critical for ensuring the resiliency of agriculture in semiarid regions, and modernizing irrigation technology to minimize inefficient water losses is an important tool for farmers and agricultural economies. While modernizing irrigation technology can achieve reductions in the nonbeneficial use of water, such as bare soil evaporation and nonconsumptive losses, water returned to the landscape is also reduced, often eliminating flow paths that other users rely on. In basins using a combination of surface and groundwater, replenishing aquifer storage by the managed aquifer recharge (MAR) of seasonally available water can mitigate the aquifer drawdown that results from reduced recharge when irrigation efficiency is improved. We examine the effects of MAR on the system-scale efficiency of modernizing irrigation technology and the resulting changes in the reuse of nonconsumptive losses, using a macroscale hydrologic model applied to the semiarid upper Snake River basin (USRB) of western Wyoming and southern Idaho, USA. Irrigation technologies were represented explicitly in the model, and available data informed baseline parameterizations of the irrigation technology. A suite of parameterizations were simulated that updated the existing technologies to be more efficient, both with and without sufficient MAR to cause a stabilization of the aquifer at the present-day head. As expected, simulated changes in irrigation technology resulted in greater downstream export of pristine water and a higher rate of aquifer drawdown when MAR was not simulated. Under current water use and cropping patterns, we were not able to simulate aquifer stabilization and maintain discharge downstream at any level of irrigation efficiency. We found support for the hypothesis that, as efficiency improves, less MAR is required to maintain a stable aquifer than when return flows are reduced due to increased efficiency. To evaluate the hypothesis, we defined the management benefit as a metric that compared the difference between the change in irrigation's net recharge and the change in MAR required as irrigation technology became more efficient. The metric generally indicated that less MAR was needed than net recharge was lost, but only for the most efficient case did the management benefit exceed the MAR needed at the baseline to stabilize the aquifer. Increasing efficiency of irrigation technology reduced the reuse of the gross irrigation derived from prior nonconsumptive losses, but simulating MAR increased reuse for a given parameterization, leading to higher effective irrigation efficiency. We find that local groundwater storage that users depend on is generally more sensitive to management decisions than downstream flows, and the drawdown of the aquifer without MAR always exceeded any decrease in discharge induced by MAR. Improving resource sufficiency in semiarid systems like the USRB will require an array of solutions that will need to balance benefits to local and downstream users.

54 ENVIRONMENTAL SCIENCES↗

Spaceflight Medical Evacuation Risk Assessment Principles - A Qualitative Investigation

BACKGROUND Future human space exploration beyond Low Earth Orbit (LEO) will require innovative solutions in many areas, primarily those that provide direct medical support to crew on long-duration missions and optimize their health and performance. The associated challenges therein will be numerous, including but not necessarily limited to extended one-way or "asynchronous" communication delays, minimal to non-existent resupply, and a prolonged transit time to "definitive care" ranging from 3-days to 9-months. At the same time, long-duration exploration spacecraft and crew will face restrictions on mass, power, volume, and data far more significant than that seen in current LEO settings. Given these limitations, medical risk assessment is of primary importance, especially evaluating the implications of a medical evacuation of an ill or injured crewmember. Such evacuations are complicated, potentially dangerous, and well may be impossible in certain phases of the mission. Regardless, such issues must be weighed against the risks of the injured crew remaining aboard a spacecraft with limited medical resources. OBJECTIVE This qualitative study drew from the experiences of subject matter experts (SMEs) in spaceflight and appropriate analog environments (i.e., military, disaster, and extreme environment fields) to identify unique principles common amongst medical evacuation considerations helpful in informing future risk assessment tools. Appropriate analog environments included austere operational settings where multiple factors (weather, logistics/limited resupply, denied/extreme environments, and patient condition) resulted in a limited ability to provide definitive local medical care. The fundamental principles in question revolved around scenarios where evacuation became a complicating yet necessary consideration and where life-threatening medical concerns had to be weighed against critical mission objective(s). The primary authors collected semi-structured data gathered through in-depth interviews with 16 subject matter experts (SMEs). Interview questions investigated how these SMEs consider and weigh the attendant risks present in medical evacuation scenarios. Among the critical questions posed were those that sought to understand how the SME balanced the challenges and requirements of medical evacuation (or keeping an injured patient "on-site" aka: "prolonged field care") against the evacuation operation's risks on impacting overarching mission success. The team analyzed interview transcripts for common themes and principles using the qualitative methods of thematic analysis based on consensus, co-occurrence, and comparison. As a result, nine primary risk consideration themes and nine contributing factor themes emerged, all of which will ideally inform future medical evacuation decision-making tools and operational decision-making for exploration class missions. Specific aims for this study included: 1. Identification of common principles used to assess risks and benefits of medical evacuations in extreme environments 2. Identification of common points of friction or complication and challenges in extreme environment evacuations

A T Almand↗

Assessing the Needs of NASA's Near Real-Time Earth Observation Products

"The 2017-2027 Decadal Survey for Earth Science and Applications from Space stated that NASA's Earth Science with planned implementation of applications provides sustained earth observations for societal benefits [1]. The Decadal Survey indicated that data latency is invaluable for time-sensitive applications including disaster risk reduction, wildland fire carbon emissions quantification, real-time measurements of the state of the hydrologic systems and many more. Data latency refers to the time between earth observation and data products available to users. During the past 13 years, NASA's Land, Atmosphere Near Real-Time Capability for Earth Observing Systems (LANCE) continues to provide free access to earth observation products that are made available much quicker than routine processing allows. The latency of most LANCE data products is Near Real-time (NRT) which is defined as less than three hours from satellite observations [2]. LANCE is managed by the Earth Science Data and Information System (ESDIS) Project at NASA Goddard Space Flight Center [3], and a User Working Group (UWG) is responsible for providing guidance to LANCE. LANCE data are used by direct users and brokers who add value to the data [4]. NASA Earth Applied Sciences Program (ASP) is one of the primary users of LANCE, which collaborates with partner organizations and provides support to scientists to solve problems in applications of earth observations. ASP promotes the use of LANCE NRT data products to demonstrate applications in decision making, facilitates end-user feedback to the science team to improve data products, and provides information on future demands for research. LANCE supports applications that need a rapid response including detecting wildland fires and volcanic eruptions, tracking smoke, ash and dust plumes, monitoring air quality and tracking extreme weather events such as hurricanes, landslides, and floods. To gather feedback regarding the availability, accessibility and actionability of NASA's NRT data products for societal benefit, three surveys and a few discussions with experts involved in the topic within ASP were conducted from the perspective of users. Feedback has been collected from users who are interested in using low latency NASA data within application communities of agriculture, disasters, water resources, health and air quality, ecological conservation, wildland fires and capacity building. Analysis-ready NRT data products in a variety of formats have been mentioned many times in the collected feedback, especially for applied users with little to no experience using research-grade earth observation products. Users prefer to have products that can be easily integrated into their existing workflows and take their analysis to the data. HDF5 is a commonly used data format for research, but typically requires some conversion to a more friendly format for applications and regular use in decision-making. Users prefer the GeoTIFF data format that can be directly ingested into a GIS mapping software and platform for data analysis and visualization. For example, LANCE’s fire, flood, SO2 and Black Marble Nighttime Blue/Yellow Composite data products have been integrated into NASA Disasters Mapping Portal, which is an GIS-based open data portal, for users in the disaster management community. There are 291 LANCE NRT layers available through GIBS and Worldview, where users can download a snapshot in GeoTIFF format. Operational users expect data to be processed as close to the user as possible. The collected feedback indicates that LANCE fire products within 3 hours latency would meet the needs of the wildland fire community. The ideal latency for volcanic application is 10-15 minutes. Users in Volcanic Ash Advisory Centers (VAAC) reported that the first forecast volcanic product should be issued within 75 minutes from the volcano eruption [5]. Overall, for disaster applications, data latency within 3 hours is useful while latency greater than 12 hours is not timely enough for operational use. Capacity building and training are critical for users to be able to access, interpret and use data products and tools for their decision making, especially for applied users with limited experience using earth observation products. LANCE data products have been used in a number of capacity building projects domestically and internationally [6]. As LANCE continues to bring new products into the system, users request training to utilize LANCE new and upcoming data products and capabilities in their applications. Due to the limitation of bandwidth and downstream flow paths, users in some developing countries need tools to select and download data for a specific area of interest instead of bulk downloads. The collected feedback also shows the lack of available SAR satellite low latency data products. The advantages of SAR to monitor conditions and changes on the ground through darkness, clouds, volcanic ash, and other atmospheric conditions, are appealing to low latency users. For example, terabytes of low latency but cloudy optical images are not helpful in rapidly identifying the extent of flood or fire impacts. LANCE could be complemented with low latency measurements via the upcoming NASA-ISRO Synthetic Aperture Radar (NISAR) mission [7]. Requests for higher spatial resolution products are expressed. A user from the wildland fire management community reported that products with 30-m spatial resolution could be used to detect small fires. The 30-m Landsat OLI fire data is now part of NASA’s Fire Information for Resource Management System (FIRMS) US/Canada [8]. Within the open and free NASA resources, LANCE disseminates NRT data products in a manner that allows them to be accessible and understandable to both scientific and applied users. In many application areas, latency plays an important or even decisive role where low latency earth observations help people to observe areas of interest, detect and track changes in the environment and make timely decisions. NASA’s Earth Applied Sciences Program promotes the use of LANCE NRT products and builds a bridge between application users and research teams. The collected feedback indicates data latency within 3 hours is useful for most of the applications, and shows the needs of user-friendly, analysis-ready products, and requests training on LANCE’s new and upcoming data products. User feedback has been provided to LANCE UWG for guidance and recommendations, and for translating findings into something actionable.

Tian Yao↗

Earth Science Technology Office (ESTO) New Observing Strategies (NOS) and NOS-Testbed (NOS-T)

With the advancement of space hardware technologies such as smaller spacecraft, component and instrument miniaturization and high performance space processors, and with the advancement of software technologies in artificial intelligence, big data analysis and autonomous decision making, Earth Science is looking at novel ways to observe phenomena that previously could not have been studied or would have been too expensive to study with traditional missions. In particular, the New Observing Strategies (NOS) component of the NASA Earth Science Technology Office (ESTO) Advanced Information Systems Technology (AIST) Program aims at leveraging these novel technologies as well as low cost and easy access to space to acquire multi-temporal or simultaneous multi-angular, multi-locations, multi-resolution and multi-spectral observations that will provide better multi-source measurements and will build a more dynamic and comprehensive picture of Earth Science phenomena that need to be studied and analyzed. For applications such as water resources management, air quality monitoring, biodiversity studies or disaster management, NOS will integrate the use of small instruments, small spacecraft, constellations of spacecraft and networks of sensors to design new missions that will provide the necessary measurements to improve future forecast and science modeling systems.Measurement acquisition will therefore be approached as a system of systems rather than on a mission basis, and a system of this complexity should not be expected to work without full integration and experimental characterization. Although most of the individual technologies enabling to link and coordinate multi-source observations are more or less mature, a few technologies need to be developed and all of them need to be integrated and tested as a system. In order for this validation to occur, the AIST Program is developing the NOS Testbed that includes 3 main goals:1.Validate novel NOS technologies, independently and as a system2.Demonstrate novel distributed operations concepts3.Socialize new Distributed Spacecraft Mission (DSM) and SensorWeb (SW) technologies and concepts to the science community by significantly retiring the risk of integrating these new technologies.The NOS Testbed will consist of multiple sensing nodes, simulated or actual, representing space, air and/or ground measurements, that are interconnected by a communications fabric (infrastructure that permits nodes to transmit and receive data between one another and interact with each other). Each node will be supported by hardware capabilities required to perform nodes monitoring and command & control, as well as intelligent "onboard" computing. The nodes will work together in a collaborative manner to demonstrate optimal science capabilities. The testbed will enable to validate technologies such as inter-node communication models, techniques and protocols; inter-node coordination; real-time data fusion and understanding; planning; sensor re-targeting; etc. Additionally, the testbed will have the capability to interact with various mission design tools, OSSEs and one or several forecast models. More details about the NOS Testbed will be presented at the confererence.

Earth Science missions; Advanced information Syste↗

Risk of Performance Decrements and Adverse Health Outcomes Resulting from Sleep Loss, Circadian Desynchronization, and Work Overload

Sleep loss, circadian desynchronization, and work overload occur to some extent for ground and flight crews, prior to and during spaceflight missions. Ground evidence indicates that such risk factors may lead to performance decrements and adverse health outcomes, which could potentially compromise mission objectives. Efforts are needed to identify the environmental and mission conditions that interfere with sleep and circadian alignment, as well as individual differences in vulnerability and resiliency to sleep loss and circadian desynchronization. Specifically, this report highlights a collection of new evidence to better characterize the risk and reveals new gaps in this risk as follows: Sleep loss is apparent during spaceflight. Astronauts consistently average less sleep during spaceflight relative to on the ground. The causes of this sleep loss remain unknown, however ground-based evidence suggests that the sleep duration of astronauts is likely to lead to performance impairment and short and long-term health consequences. Further research is needed in this area in order to develop screening tools to assess individual astronaut sleep need in order to quantify the magnitude of sleep loss during spaceflight; current and planned efforts in BHP's research portfolio address this need. In addition, it is still unclear whether the conditions of spaceflight environment lead to sleep loss or whether other factors, such as work overload lead to the reduced sleep duration. Future data mining efforts and continued data collection on the ISS will help to further characterize factors contributing to sleep loss. Sleep inertia has not been evaluated during spaceflight. Ground-based studies confirm that it takes two to four hours to achieve optimal performance after waking from a sleep episode. Sleep inertia has been associated with increased accidents and reduced performance in operational environments. Sleep inertia poses considerable risk during spaceflight when emergency situations necessitate that crewmembers wake from sleep and make quick decisions. A recently completed BHP investigation assesses the effects of sleep inertia upon abrupt awakening, with and without hypnotics currently used in spaceflight; results from this investigation will help to inform strategies relative to sleep inertia effects on performance. Circadian desynchrony has been observed during spaceflight. Circadian desynchrony during spaceflight develops due to schedule constraints requiring non-24 operations or 'slam-shifts' and due to insufficient or mis-timed light exposure. In addition, circadian misalignment has been associated with reduced sleep duration and increased medication use. In ground-based studies, circadian desynchrony has been associated with significant performance impairment and increased risk of accidents when operations coincide with the circadian nadir. There is a great deal of information available on how to manage circadian misalignment, however, there are currently no easily collected biomarkers that can be used during spaceflight to determine circadian phase. Current research efforts are addressing this gap. Work overload has been documented during current spaceflight operations. NASA has established work hour guidelines that limit shift duration, however, schedule creep, where duty requirements necessitate working beyond scheduled work hours, has been reported. This observation warrants the documentation of actual work hours in order to improve planning and in order to ensure that astronauts receive adequate down time. In addition to concerns about work overload, ground based evidence suggests that work underload may be a concern during deep space missions, where torpor may develop and physically demanding workload will be exchanged for monitoring of autonomous systems. Given that increased automation is anticipated for exploration vehicles, fatigue effects in the context of such systems needs to be further understood. Performance metrics are needed to evaluate fitness-for-duty during spaceflight. Although ground-based evidence supports the notion that sleep loss, circadian desynchronization and work overload lead to performance impairment, inconsistency in the measures used to evaluate performance during spaceflight make it difficult to evaluate the magnitude of performance impairment during spaceflight. Work is underway to standardize measures of performance evaluation during spaceflight. Once established, such performance indicators need to be correlated with operational performance. Individual differences in sleep need and circadian preference, phase shifting ability and period have been documented in ground-based studies. Individual differences in response to sleep loss and circadian misalignment have also been documented and are presumed to be associated with genetic polymorphisms. No studies have systematically reported individual differences in sleep or circadian-related outcomes during spaceflight. More work is needed in this area in order to identify genetic or phenotypic biomarkers that predict resilience or vulnerability to sleep loss in order to personalize countermeasure strategies and mitigate performance impairment during spaceflight. Two laboratory and field investigations specific to this topic are currently ongoing; additional efforts, including an effort to mine existing biological data from spaceflight relative to sleep and circadian outcomes, are planned. Sex differences in sleep need and circadian period and phase have been reported in ground-based studies. The impact of these sex differences on performance is unclear. Sex differences in sleep need and circadian rhythms have not been systematically studied during spaceflight, presumably due to the small number of women that have flown in space. More research is needed in this area to evaluate whether any of the observed sex differences in physiology lead to altered performance in spaceflight and on the ground.

Flynn-Evans, Erin↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Evaluating Lunar Water Processing System Model Configurations for Small Scale Oxygen and Hydrogen Production Within JAXA'S ISRU Technology

Introduction: In-Situ Resource Utilization (ISRU) refers to novel methods of extracting and processing local resources for use in life support and propulsion systems, reducing or eliminating the required consumables to be transferred from Earth. Current estimates of water-ice availability embedded in regolith within the Moon’s permanently shadowed regions (PSR’s) range between 1-5% by weight. However, the composition and characteristics of the “wet” regolith is unknown. Alternate ISRU excavation techniques and Concept of Operations (ConOps) must be explored to optimize surface system operations based on these factors. To assess the feasibility of different ISRU subsystem technologies and compare system architecture configurations, an interchangeable system model was generated to incorporate technologies spanning excavation of raw materials to storage of products and determine optimal arrangement of total system processing needs. Total Mass, Volume, and Power (M/V/P) requirements were computed for 168 design iterations of this water processing plant. System Model: In FY24, the System Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) team developed a lunar water processing system model using the Mission Analysis and Integration Tool (MAIT) to estimate the M/V/P for ISRU subsystems operating under a wide range of Hydrogen (H2) and Oxygen (O2) production targets for the Space Technology Mission Directorate (STMD) [1]. Based on Japan Aerospace Exploration Agency’s (JAXA) surface operational requirements, this system architecture was modified to include the ability to excavate consolidated icy regolith (versus granular ice excavation using Kennedy Space Center’s (KSC) ISRU Pilot Excavator, IPEx) and explore the feasibility of processing the lunar water both inside and outside of the PSR. For the consolidated icy regolith case study, excavation was performed via a mobility transport chassis outfitted with The Regolith Ice Drill for Exploring New Terrain (TRIDENT) for drilling [2] and the Cold Operable Lunar Deployable Arm (COLDArm) [3] for regolith transfer. The system model determines the required rover and payload. M/V/P to handle the required regolith processing rates. The regolith is then sorted and heated to sublimate the ice (via an auger dryer). The exiting high temperature, low pressure vapor is cleaned of volatiles (via cold trap) and electrolyzed to produce H2 and O2. These products are then dried, liquified with 20 K and 90 K cryocoolers (for H2 and O2, respectively), and stored in cylindrical tanks. Study Goals: Due to the different ConOps options of regolith transport to the ridge for processing versus processing it directly inside the PSR, as well as the unknown regolith/water-ice composition, new excavation techniques and their power configurations are being evaluated within a ISRU system architecture for production targets less than NASA’s pilot plant (1 mT). This analysis investigates the feasibility of numerous excavation techniques, power architectures, and logistical operations and determines an optimal system configuration with regards to M/V/P. It aims to investigate which parameters, both locally and globally, have the greatest effect on each subsystem within the plant. This can be used to identify the most critical components of the plant, and guide future decisions on allocating funding for research and development. The results from this study may provide subsystem developers with appropriate interfaces with excavation subsystems and downstream processes, and assessing the overall feasibility of each excavation technique, power architecture, and logistical timeframe. References: [1] Carlson, A. et. al. (2024) ICES. [2] Zacny, K., et. al. (2024) “ASCE Earth and Space”. [3] McCormick, R., et. Al. (2024) IEEE Xplore.

ISRU↗

Simulation and Analysis of Technology and Operational Procedures to Reduce the Combined Effects of Emissions and Contrails

The development and evaluation of concepts and technology to support future air traffic management systems require a hierarchy of models ranging from real-time simulations to extensive field evaluations. Air traffic simulation models such as Airspace Concept Evaluation System, Center Tracon Automation System, Future Air traffic management Concept Evaluation Tool and others are used to design air traffic systems balancing the conflicting objectives of maximizing safety, meeting future demands for airports and airspace and increase efficiency of traffic flows in the presence of uncertain weather. The impact of aviation emissions and contrails on climate imposes another constraint on the design of aircraft and aviation operations. The understanding of the complex interaction between physical climate system, the carbon and other greenhouse gas emissions and aviation activity can be improved by the development of integrated assessment models that include emission and climate models together with air traffic simulations. The modeling of aircraft emissions and their interaction with each other to change the concentration levels of different gasses in the atmosphere and the resulting impact of the radiative forcing on the equilibrium of the Earth's atmosphere is complex and requires the use of coupled atmosphere-ocean general circulation models together with three-dimensional models of carbon cycle and chemistry of other non-CO2 greenhouse gases. These models are computationally intensive and unsuitable for studies involving the generation of multiple scenarios. Simple emission and climate models, based on the input-output relations of linear systems, capture the fundamental emission to climate impact behavior by careful selection of key variables and their dynamics. The impact of various greenhouse gases depends on the total concentration, effect per unit change in atmospheric concentration and the spatial distribution of the gas. All these quantities are influenced by the lifetime of the gas. The impact of a greenhouse gas depends on the interval of assessment, which may vary from a few decades to a few centuries. Climate metrics are aimed at providing a common scale to compare different greenhouse gases. If the metrics are to be used as a tool in developing and evaluating aviation operations, they should be transparent and easy to apply. Global Warming Potential and Aggregate Global Temperature Potential are some of the commonly used metrics. This paper integrates a national-level air traffic simulation and optimization capability with simple climate models and carbon cycle models, and climate metrics to assess the impact of aviation on climate. The capability brings together metrics, which are useful in aviation operations together with metrics used in climate studies. The capability can be used to make trade-offs between extra fuel cost and reduction in climate impact. There is considerable uncertainty in our understanding of the radiative forcing associated with emissions and contrails. The parameters in the simulation can be used to evaluate the effect of various uncertainties in emission models and contrails. It can also be used to evaluate the impact of different decision horizons. Alternatively, the optimization results from the simulation can be used as inputs to other tools that monetize global climate impacts like the FAA's Aviation Environmental Portfolio Management Tool for Impacts.

impact of aviation on the environment↗

Analysis of Launch Vehicle Liftoff Debris: Historical Perspective from Space Shuttle and Application to Artemis I

Human exploration-class launch vehicles are inherently prone to debris due to the extreme environments generated during pre-launch operations, liftoff, and flight. The use of cryogenic propellants often requires thermal protection system (TPS) coatings, typically foam, to maintain the propellant conditions in the tank and prevent an accumulation ice on the external surface of the vehicle. Some ice growth is to be expected at umbilical interfaces, vents, flanges, or brackets where it is difficult to apply TPS. This ice may come loose at any time due to wind on the launch pad, structural vibration and acoustics after rocket ignition, or aerodynamic forces during flight. This phenomena is especially apparent on vehicles with no TPS, such as the Saturn V rockets used in the Apollo Program, see Figure 1. During propellant tanking, the thermal contraction of the underlying substrate may generate cracks in the TPS (Figure 1). Chunks of TPS can release due to the expansion of ingested gas from cryopumping or from aerodynamic forces if the crack creates an offset surface. Most foams will also have a certain amount of “popcorning” where small pieces of foam will pop off during flight because of the differential between the static surface pressure and the pressure of the gas trapped in the foam cell structure. There are a number of other coating or closeout materials that may be shed from the vehicle and become debris. During pre-launch operations and liftoff, the vehicle may also be exposed to debris originating from the launch pad or ground support equipment. This debris is separate from foreign object debris, or FOD, which is not intended to be present and is strictly controlled through operations and maintenance procedures. In this case, debris is generated from hardware and materials that are necessary for launch and are subject to the intense vibration, acoustics, and direct plume impingement of the launch environment. Examples include ice from umbilicals, tape and tie wraps that protect cables, and rust or corrosion from the launch platform. While NASA has historically been aware of debris as a potential issue that could cause a failure resulting in loss of mission, loss of vehicle, or loss of crew, the likelihood and severity of that risk was not always well understood or given sufficient weight in program and flight decisions. After the Space Shuttle Columbia accident (STS-107), the investigation found that foam TPS debris shed from the external tank was the proximate cause of the damage to the orbiter wing. Six previous observations of debris released from the foam ramp that covered the bipod connecting the forward end of the orbiter to the external tank resulted in minor changes or were determined to be accepted flight risks. Two occurrences of bipod ramp foam loss were not identified until the STS-107 investigation. Despite the damage inflicted by these debris strikes, the Shuttle Program Requirements Control Board deemed the vehicle safe to fly. During the Return to Flight effort following the Columbia disaster, NASA Engineering developed a process for the assessment of debris transport, impact, and damage tolerance to support independent assessments of risk by NASA Safety and Mission Assurance (S&MA). Under this system, each element (vehicle or ground system) defines a catalog of all expected debris based on launch history, component testing, or analysis. Debris transport analysis (DTA) is conducted using the debris catalog characteristics and potential flow transport mechanisms (e.g., vehicle aerodynamics, gravity, wind, plume-driven). The predicted debris impact locations and velocities are provided to the hardware owners, who use available test data and analysis to determine whether each component can withstand the impacts. In cases where the element hardware may be severely damaged or fail, the options are to mitigate the debris source through some change in design or operation, or to work with S&MA to try to characterize the probability of the impact and damage for program risk acceptance. Because of the differences in debris characteristics and transport, the DTA has been divided between the Liftoff and Ascent regimes. The development and application of Liftoff DTA methodology from the Shuttle Program to the current Artemis Program is the subject of this paper. Liftoff DTA covers the time from the start of pre-launch operations at the launch pad, up until the vehicle clears the launch tower and there is no longer any interaction with ground systems. Debris transport during this period is broadly classified as either gravity, wind, and plume-entrained (GWPE) or plume driven (PD). GWPE debris is generally lower speed, travelling in a forward-to-aft direction. PD transport includes flow features from the rocket ignition transient, as well as plume impingement and recirculation that occur as the vehicle lifts off the launch platform. In these cases, the debris typically moves in an aft-to-forward direction at higher speeds. The applicable transport mechanisms must be considered for each piece of debris depending on the material, and release location and time. For example, rust or metallic debris from the tower could fall (GWPE) and impact the vehicle before landing on the launch platform deck where it could be also be transported by plume impingement (PD). However, falling ice (GWPE) from an umbilical is unlikely to survive impact with the vehicle or launch platform and be available for PD transport. Modeling of debris transport is accomplished using a set of DTA tools which simulate debris trajectories subject to a reference frame acceleration (i.e., gravity) and aerodynamic drag. Where the trajectory encounters a solid surface, the debris is allowed to rebound with a specified coefficient of restitution. The drag is calculated by interpolating the fluid state at each point in the debris trajectory from high-fidelity computational fluid dynamics (CFD) simulations of the launch vehicle and pad. The CFD data may either be static (steady state or time averaged), typically for GWPE transport, or dynamic (time-accurate) for PD flow features like the ignition transient. Examples of the CFD flow field solutions for the Space Launch System (SLS) rocket and launch pad are shown in Figure 2. Typical SLS debris trajectory predictions from DTA are illustrated in Figure 3. The final version of this paper will include a more detailed examination of the Liftoff DTA process developed during the Shuttle Program, and how it has been augmented and applied to the SLS rocket under the Artemis Program. Comparisons with debris observations from the Artemis I launch will demonstrate validation of the tools and methodology.

Debris↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗