Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

The Resilient Infrastructure Initiative

Infrastructure is, by design, largely unnoticed until it breaks down and services fail. This includes water supplies, gas pipelines, bridges and dams, phone lines and cell towers, roads and culverts, railways, and the electric grid—all of the complex systems that keep our societies and economies running. Climate change, population growth, increased urbanization, system aging, and outdated design standards stress existing infrastructure and its ability to satisfy the rapidly changing demands from users. Here, the resilience of both physical and cyber infrastructure systems, however, is critical to a community as it prepares for, responds to, and recovers from a disaster, whether natural or man-made.

97 MATHEMATICS AND COMPUTING↗

Drought Conditions Maximize the Impact of High-Frequency Flow Variations on Thermal Regimes and Biogeochemical Function in the Hyporheic Zone.

Anthropogenic activities, such as dam operations, often induce larger and more frequent stage fluctuations than those occurring in natural rivers. However, the long-term impact of such flow variations on thermal and biogeochemical dynamics of the associated hyporheic zone (HZ) is poorly understood. A heterogeneous, two-dimensional thermo-hydro-biogeochemical model revealed an important interaction between high-frequency flow variations and watershed-scale hydrology. High-frequency stage fluctuations had their strongest thermal and biogeochemical impacts when the mean river stage was low during fall and winter. An abnormally thin snowpack in 2015, however, created a low river stage during summer and early fall, whereby high frequency stage fluctuations caused the HZ to be warmer than usual. This study provided the scientific basis to assess the potential ecological consequences of the high-frequency flow variations in a regulated river, as well as guidance on how to maximize the potential benefits—or minimize the drawbacks—of river regulation to river ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Transforming the U.S. Market with a New Application of Ternary-Type Pumped-Storage Hydropower Technology: Preprint

As the deployment of wind and solar technologies increases at an unprecedented rate across the United States and in many world markets, the variability of power output from these technologies expands the need for increased power system flexibility. Energy storage can play an important role in the transition to a more flexible power system that can accommodate high penetrations of variable renewable technologies. This project focuses on how ternary pumped storage hydropower (T-PSH) coupled with dynamic transmission can help this transition by defining the system-wide benefits of deploying this technology in specific U.S. markets. T-PSH technology is the fastest responding pumped hydro technology equipment available today for grid services. T-PSH efficiencies are competitive with lithium-ion (Li-ion) batteries, and T-PSH can provide increased storage capacity with minimal degradation during a 50-year lifetime. This project evaluates T-PSH for grid services ranging from fast frequency response (FFR) for power system contingency events and enhanced power system stability to longer time periods for power system flexibility to accommodate ramping from wind and solar variability and energy arbitrage. In summary, this project: Compares power grid services and costs, including ancillary services and essential reliability services, for T-PSH and conventional pumped storage hydropower (PSH) - Evaluates the dynamic response of T-PSH and PSH technologies and their contribution to essential reliability services for grid stability by developing new power system model representations for T-PSH and performing simulations in the Western Interconnection - Evaluates production costs, operational impacts, and energy storage revenue streams for future power system scenarios with T-PSH focusing on time frames of 5 minutes and more - Assesses the electricity market-transforming capabilities of T-PSH technology coupled with transmission monitoring and dynamic control. This paper presents an overview of the methodology and initial, first-year preliminary findings of a 2-year in-depth study into how advanced PSH and dynamic transmission contribute to the transformation and modernization of the U.S. electric grid. This project is part of the HydroNEXT Initiative funded by the U.S. Department of Energy (DOE) that is focused on the development of innovative technologies to advance nonpowered dams and PSH. The project team consists of the National Renewable Energy Laboratory (project lead), Absaroka Energy, LLC (Montana-based PSH project developer), GE Renewable Energy (PSH pump/turbine equipment supplier), Grid Dynamics, and Auburn University (lead for NREL/Auburn dynamic modeling team).

13 HYDRO ENERGY↗

Hydropower Development Opportunities for Alaska Native Villages

As a part of the Department of Energy’s (DOE) 2014 study on hydropower new stream-reach development (NSD) opportunities in the U.S., Oak Ridge National Laboratory (ORNL) coordinated with the Alaskan Energy Authority (AEA) and the United States Army Corps of Engineers to assess Alaska’s undeveloped hydropower potential at sites where no dams currently exist. That study identified 437 feasible sites with a combined capacity of 4,723 MW (Kao et al., 2014). In 2016, ORNL met with the U.S. Department of Energy-Alaska Office to discuss hydropower development opportunities to support Alaska Native villages. ORNL, with AEA’ collaboration is evaluating opportunities to increase renewable energy generation for these villages based on the NSD assessment, recent project license applications, and candidate Alaska Renewable Energy Fund projects.Using data for village location, population, diesel consumption, generation and cost, and proximity to existing hydropower and transmission, an initial NSD site feasibility study was performed. To screen out villages and potential hydropower sites that did not meet high-level feasibility criteria, seven filters were used. Based on these filter values, only eleven villages passed all criteria. These eleven hydropower sites have a combined potential capacity of 2.95MW and could supply an estimated 12,934 MWh of renewable hydropower annually. Results indicate that these eleven villages could potentially reduce their total diesel usage by 520,000 gallons per year, which amounts to a present-day value of 50-year diesel savings totaling more than $57 million by tapping into this potential. Follow-up data collection, reconnaissance studies, and pre-feasibility analyses could provide more insight into hydropower development opportunities for Alaska Native villages and focus on the most promising development opportunities identified through this initial study.

Hadjerioua, Boualem↗

Modeling of rock scour using coupled 3-D discrete element and Lattice Boltzmann Methods

Copyright © 2018 ARMA, American Rock Mechanics Association. Scour of rock in unlined rock spillway channels is a critical issue facing many of the world’s dams. From a modeling point of view this poses a challenging and interesting problem that combines rock mechanics and hydraulics of turbulent flow. We analyze this interaction between the blocky rock mass and water by directly modeling the solid and fluid phases—the individual polyhedral blocks are modeled using the Discrete Element Method (DEM) while the water is modeled using the Lattice Boltzmann Method (LBM). The LBM mesh is entirely independent of the DEM discretization, making it possible to refine the LBM mesh such that transient and varied fluid pressures acting of the rock surface are directly modeled. This provides the capability to investigate the effect of water pressure inside the fractured rock mass, along potential sliding planes, and can be extended to rock falls and slides into standing bodies of water such as lakes and reservoirs. Herein we present preliminary results to demonstrate the capabilities of the methodology.

Gardner, MH↗

Monitoring Streambed Scour/Deposition Using Non-Sinusoidal Water Temperature Signals and During Flood Events

Streambed erosion and deposition are inherent to river beds, and monitoring their evolution is important for ecological system management and instream infrastructure stability. The thermal scour-deposition chain (TSDC) is a novel tool capable of simultaneously monitoring scour and deposition, stream sediment thermal regime, and seepage velocity information, but previous research did not address non-sinusoidal temperature variations and natural flooding conditions. Laboratory tests show the TSDC is equally capable of measuring scour-deposition sequences and seepage velocity using sinusoidal and non-sinusoidal temperature signals under a range of seepage velocities. Application in a dam release stream during flood condition shows excellent match between surveyed and TSDC-monitored bed elevation changes and provides useful seepage velocity information even under very low temperature signal amplitudes. Future research should focus on improved techniques for temperature signal phase and amplitude extractions, as well as TSDC application to monitor scour at bridge piers and abutments.

streambed erosion, ecological system management↗

Development and Experimental Hardware Validation of Novel Variable Speed Hydropower Control Schemes for Emerging Applications and Water Resource Paradigms

Recent opportunities for new hydropower generation in the United States have often been in non-powered dams and run-of-river type flows occurring in low-impact natural areas and unregulated conduits. At the same time, a changing water resource paradigm is challenging some existing generation in drought stricken areas where supply reservoirs behind many medium and high head units are at historically low levels. The result is a developing market space which is potentially best captured by machines capable of variable speed operation. Variable speed units have a wider range of operating conditions compared to their synchronous counterparts and have already proven their resilience through a 20+ year history in pumped hydro applications. This work develops a control scheme for variable speed hydropower units operating to deliver a set-point power through flow controlling gates. This control scheme increases both the hydrologic operating range of a unit as well as the speed of response to grid contingencies under droop and automatic generator control. Results from simulation are confirmed on hardware.

Starrett, Mike↗

DETERMINING THE TRIBUTARY SEDIMENT CONTRIBUTION TO EXPERIMENTAL FLOOD DEPOSITS ON THE COLORADO RIVER IN MARBLE CANYON, GRAND CANYON, ARIZONA

A multivariate sediment fingerprint was used in a Bayesian mixing model to determine the source contribution to experimental flood deposits along the Colorado River in the Marble Canyon reach of Grand Canyon, AZ. This study provides an independent evaluation, complementary to previous sediment mass balance and morphological studies, of the degree to which sand from the Paria River, the primary source of sand in Marble Canyon, has supplemented total sand storage since upstream dam closure in 1963. Samples of endmember and downstream mixed populations of sand were analyzed using portable XRF to measure the concentration of eleven major and trace elements, from which 55 elemental ratios were calculated. A principal components analysis consolidated those ratios eligible for use in the fingerprint into a multivariate signature used in the mixing model, MixSIAR. Twenty flood deposits from 14 sites in Marble Canyon from the 2013 and 2014 controlled floods were sampled. Six individual mixing models, using sediment fingerprints unique to each of six half-phi grain size fractions returned the percentage of sand, in each size fraction of each deposit, that was sourced from the Paria River. Paria contribution averaged 33.8 ± 4.1% in deposits from the 2013 flood, and 54.7 ± 4.3% in deposits from the 2014 flood. Individual grain size samples ranged 4.9 – 73.1% in 2013 and 9.1 – 90.2% in 2014. In general, iii the four median grain size fractions (90 – 355 μm) in both years have the highest Paria contribution; low Paria contribution in the finest 63 – 90 μm) fraction suggests significant contribution by an unaccounted-for third endmember, likely minor tributaries. The coarsest fraction, 355 – 500 μm, is the only grain size to show a trend in Paria contribution with distance traveled downstream, suggesting a transport-related fractionation effect. Overall scatter in the results speaks to the spatial heterogeneity of intra-rapid storage pools throughout the reach and their capacity, as well as the effects of local hydraulic variability between eddy deposition zones where sandbars form. Mass balance calculations determine that under conditions of constant or decreasing total storage since 1963, approximately 20-30% of the annual Paria flux would need to be retained within Marble Canyon each year to reach the observed concentration of Paria sand. From these results, we conclude that HFEs are conditionally sustainable given frequent enough occurrence to maintain sandbar deposit storage.

13 HYDRO ENERGY↗

Determination of Optimal Operating Schemes for a Multi-Reservoir System Under Environmental Constraints

In strati ed reservoirs, both dam tailwater discharge and thermal plant intake water quality and temperature can be highly dependent on structure depth. A two- dimensional laterally-averaged model allows for better prediction of water quality over time at specfi c depths. Because high- fidelity models are typically too computationally expensive for direct inclusion within optimization algorithms, water quality is incorporated using one dimensional models are simple flow requirements. Water quality predictions can be incorporated within the optimization process through using surrogate modeling methods, in this application artificial neural network (ANN) models. ANNs are flexible machine learning tools for function approximation composed of a structure of neurons assembled within a multi-layer architecture. They are capable of handling large amounts of training data and modeling nonlinear dynamic systems, making ANNs a well-suited method for this application. This report illustrates the development of ANN models to emulate the hydrodynamic and water quality modeling capabilities of the high- fidelity, two-dimensional CE-QUAL-W2 (W2) model, as well as a linked riverine reservoir system optimization process which accounts for energy generation, water balance and hydraulics, and compliance point water quality. A process for hourly hydropower generation planning is demonstrated on a pair of reservoirs linked in series. The two reservoirs are U.S. Army Corps of Engineers projects with hydropower capabilities on the Cumberland River near Nashville, Tennessee, USA.

13 HYDRO ENERGY↗

Geothermal Exploration of Mount Baker Hot Springs Through Ground-Based Magnetic and Gravity Surveys

The Washington State Division of Geology and Earth Resources (WDGER), together with the USGS, Altarock Energy Inc., Colorado College, Temple University, Innovate Geothermal Ltd., University of British Columbia, and Western Washington University(WWU), conducted phase two of a geothermal play fairway exploration at three plays (Mount Baker, Mount St. Helens seismic zone, and Wind River valley) along the Washington Cascade Range. The Mount Baker (MB) play is an ideal location for further investigation as a potential geothermal resource due to the presence of thermal features, young volcanic centers, existing geothermal leases, accessibility, and its proximity to existing transmission lines at the Baker Lake Dam. The goal of phase II exploration at all three plays is to collect geologic and geophysical data to help constrain spatial changes in subsurface lithology and structures that may be associated with the geothermal systems. Furthermore, this paper discusses the geothermal potential of the southeast flank of Mount Baker, WA by interpreting newly collected ground-based gravity and magnetic data. The Mount Baker play was surveyed from July-September, 2016 by the USGS, WDGER, and WWU. Results of a detailed magnetic and gravity surveys of the region surrounding the Baker hot springs, the primary surface expression of the hydrothermal system, are presented here. Gravity data were collected at 495 stations in the study area amounting to an area of roughly 150 square km. Approximately 93 km of line magnetometer data were collected within the study area, over a dozen magnetic susceptibility measurements were taken at 50 locations and about 50 hand samples were collected for density measurements. Preliminary data and modeling suggest pronounced magnetic anomalies trending NE/SW, generally in line with previously mapped lineaments identified in LiDAR. We present a series of preliminary two-dimensional forward models of the gravity and magnetic data as well as a 3D inversion model of magnetic susceptibility and interpret these models in terms of the structural controls influencing the Baker hot springs and hydrothermal system.

Geophysics↗

1.4.1.401 - Fish Protection Prize

The Fish Protection Prize sought new solutions, designs, and strategies to prevent fish from swimming into water infrastructure, such as water diversions and pipes and intakes at hydropower dams. Participants submitted innovative ideas to advance fish exclusion technology. WPTO collaborated with the U.S. Bureau of Reclamation on the Fish Protection Prize to inspire innovators to compete for $700,000 of combined cash prizes and voucher support to help protect fish from these threats. Five experts in fish passage and protection served as reviewers in the Pitch Contest, and represented a number of Federal and State agencies, including NOAA, USGS, ORNL, Washington Department of Fish and Wildlife, and AFS. Three finalists were selected as Grand Prize winners.

fish passage↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Scaled hydropower

A fish passage system having flexible textile materials forming a conduit to transport fish across river barriers encountered during migration. The system can include modular support structures that can be independently secured to riverbeds to form conduit supports, dams, hydropower structures, and the like.

13 HYDRO ENERGY↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Radio-Ecological Conditions of Groundwater in the Area of Uranium Mining and Milling Facility - 13525

Manmade chemical and radioactive contamination of groundwater is one of damaging effects of the uranium mining and milling facilities. Groundwater contamination is of special importance for the area of Priargun Production Mining and Chemical Association, JSC 'PPMCA', because groundwater is the only source of drinking water. The paper describes natural conditions of the site, provides information on changes of near-surface area since the beginning of the company, illustrates the main trends of contaminators migration and assesses manmade impact on the quality and mode of near-surface and ground waters. The paper also provides the results of chemical and radioactive measurements in groundwater at various distances from the sources of manmade contamination to the drinking water supply areas. We show that development of deposits, mine water discharge, leakages from tailing dams and cinder storage facility changed general hydro-chemical balance of the area, contributed to new (overlaid) aureoles and flows of scattering paragenetic uranium elements, which are much smaller in comparison with natural ones. However, increasing flow of groundwater stream at the mouth of Sukhoi Urulyungui due to technological water infiltration, mixing of natural water with filtration streams from industrial reservoirs and sites, containing elevated (relative to natural background) levels of sulfate-, hydro-carbonate and carbonate- ions, led to the development and moving of the uranium contamination aureole from the undeveloped field 'Polevoye' to the water inlet area. The aureole front crossed the southern border of water inlet of drinking purpose. The qualitative composition of groundwater, especially in the southern part of water inlet, steadily changes for the worse. The current Russian intervention levels of gross alpha activity and of some natural radionuclides including {sup 222}Rn are in excess in drinking water; regulations for fluorine and manganese concentrations are also in excess. Possible ways to improve the situation are considered. (authors)

54 ENVIRONMENTAL SCIENCES↗

Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Challenges at the L-Bar Disposal Site - 19561

The L-Bar, New Mexico, Disposal Site is located in the northeast corner of Cibola County, 10 miles north of Laguna, and was the former site of a uranium mill and underground mine. The mill operated from 1977 to 1981 where a total of 1.9 x 10{sup 6} tonnes (2.1 million tons) of ore was processed. Solid and liquid byproduct, or tailings, from the milling process were impounded behind a dam constructed of native weathered Mancos Shale, which is a predominant geologic formation in the area. The tailings were encapsulated in place, and the resulting 40.5-hectare (100-acre) engineered disposal cell was completed in 2000. The 299-hectare (738-acre) Uranium Mill Tailings Radiation Control Act Title II site was transferred to the US Department of Energy (DOE) Office of Legacy Management under a US Nuclear Regulatory Commission general license in 2004. During reclamation activities, channels were designed and constructed into the surrounding weathered shale to protect the disposal cell from high-precipitation events. Due to the highly erodible soils and anticipated sediment deposition into the diversion channels, a sediment trap was also excavated. By excavating the channels and sediment trap, the local base elevation was altered, which exacerbated erosional forces. Recontouring surrounding drainage basins during the reclamation activities also promoted erosion by reducing natural rock armoring and vegetation that aids in soil stability. To compound the erosion issue, the L-Bar site is susceptible to short-duration, high-intensity, localized convective storms. Because the local geomorphology includes soils consisting of weathered shale, these precipitation events are not conducive to absorption into the soils, but rather to sheet flows that follow topography and concentrate in lower elevation areas where flow volumes and velocities increase. These factors result in the formation of deeply incised gullies and promote soil piping, which is an important geomorphic process in the widening of arroyos and the advancement of head-cutting, evident at the L-Bar site and surrounding areas. At the first annual inspection by DOE in 2005, it was noted that extensive erosion was occurring upgradient of the sediment trap. DOE determined that the design of the site's drainage system was the cause of extensive erosion. It is believed that by lowering the base elevation of the local drainage system through excavation of the sediment trap, the geomorphic response common to fluvial systems in a semiarid environment has increased the incision and remobilization of sediment downstream. Over time, these sediments would be deposited in the channels, which are designed to divert runoff away from the disposal cell, effectively limiting their capacities. The development of alluvial fans on one side of the channel directs flows to the opposite side of the channel, presenting the risk of cutting into the side slopes of the disposal cell. In addition, the upstream migrating gullies could intersect access roads and create hazards for adjacent stakeholders, including their grazing livestock. Current estimates conclude that potential offsite impacts could occur within the next 20 years, with gully migrations of up to 19 meters (63 feet) per year. In 2009, several erosion-control structures were constructed to reduce runoff velocities and ease the elevation differential created by the construction of the sediment trap and diversion channels. The first measurable storm events after construction occurred in August and September 2011, where one structure washed out and another structure was bypassed when runoff breached an earthen berm. DOE has conducted site assessments, continues to monitor erosion, and has applied lessons learned in the process of evaluating options to repair or modify the structures to stabilize the site and prevent potential short-term damage to adjacent properties as well as long-term damage to the disposal cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗