LEAKAGE CHARACTERISTICS OF A STEPPED BALANCE PISTON LABYRINTH SEAL IN SUPERCRITICAL CO2

In an integrally geared compressor, there is a net thrust load on the pinion shaft from gear loads and aerodynamic forces. The net thrust on the pinion is resolved with either a thrust bearing or a thrust collar (rider ring). As the pressure increases, this increases the aerodynamic force proportionally. In highpressure systems this can overwhelm the thrust bearing or thrust collar if thrust is mismanaged. In a recent test program for an sCO2 integrally geared compander (compressor/turbine), a balance piston was created on the opposite end of the turbine to provide an equalizing thrust; while this is not novel, the balance piston provided a test apparatus for measuring the leakage on a 20 tooth stepped labyrinth seal operating at pressures in excess of 250 bar (3600 psi). The stepped balance piston seal is a 20 tooth tooth-onrotor balance piston seal. This type of seal was selected since it was predicted to have substantially less leakage than a comparably sized straight through labyrinth seal. Comparisons between the two designs will be made, showing that the leakage of the stepped balance piston seal is considerably lower. The tooth clearance on the seal was selected to be 30 mils radial. While this seems large, a stack-up tolerance assessment showed that this magnitude of clearance was appropriate to prevent rotor stator contact. During the testing campaign, data was recorded showing the leakage across this stepped balance piston seal at pressures in excess of 250 bar (3600 psi) with a pressure ratio of 2. This leakage data was measured, and will be compared to leakage data predicted with CFD. Two measurement methods are presented for the stepped balance piston seal: an orifice plate and valve. The predicted seal leakage from a straight through seal was four times that of the predicted stepped labyrinth seal. The measured flow from the stepped seal was on the same order as the CFD prediction and offered adequate rotordynamic performance

wilkes, jason↗

DESIGN AND TESTING OF A 275 BAR 700 DEGREE CELSIUS EXPANDER FOR AN INTEGRALLY GEARED SUPERCRITICAL CO2 COMPANDER

An integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale concentrated solar power (CSP) supercritical carbon dioxide (sCO2) plant application was designed, manufactured, and tested. The integrally-geared compander (IGC) developed for this application comprises multiple pinion shafts interacting through a single bull gear to create a compact package and utilize a lowcost, low-speed driver. The present work will detail the design of the high-pressure high-temperature expander casing on an integrally geared frame, and illustrate how the project successfully mitigated the risk of fatigue and creep while allowing for rapid thermal transients in the design. Furthermore, test data from the test campaign will be presented supporting the analysis. Test results also show temperature profiles during operation exceeding 720° Celsius.

wilkes, jason↗

Multistage CSR Microbunching Gain Development in Transport or Recirculation Arcs

Coherent synchrotron radiation (CSR) induced microbunching instability has been one of the most challenging issues in the design of modern accelerators. A linear Vlasov solver has been developed [1] and applied to investigate the physical processes of microbunching gain amplification for several example lattices [2]. In this paper, by further extending the concept of stage gain as proposed by Huang and Kim [3], we develop a method to characterize the microbunching development in terms of stage orders that allow the quantitative comparison of optics impacts on microbunching gain for different lattices. We find that the microbunching instability in our demonstrated arcs has a distinguishing feature of multistage amplification (e.g, up to 6th stage amplification for our example transport arcs, in contrast to two-stage amplification for a typical 4-dipole bunch compressor chicane). We also try to connect lattice optics pattern with the obtained stage gain functions by a physical interpretation. This Vlasov analysis is validated by ELEGANT [4] tracking results with excellent agreement.

Tsai, C. -Y.↗

Cold Climate Integrated Heat Pump with Energy Storage for Grid-Responsive Control

An air-source integrated heat pump (ASIHP) is a multifunctional unit, capable of space cooling, space heating, and water heating. We developed a packaged cold climate ASIHP, using a multi-stage compressor, capable of working down to -25°C, and providing 100% rated capacity down to -15°C with a heating COP > 2.2. An innovative system configuration and related controls were developed to solve charge balance in the integrated heat pump, smooth charge migration, and mode transition among multiple working modes. Extensive laboratory investigations for individual modes were performed to verify the performance. Its integrated heating capability provides speedy water heating to meet domestic hot water use and store heating energy in a phase change material ceiling/panel. The heating energy storage can be used to shift the load when the electricity price is high. Based on the performance data and a calibrated model from the laboratory testing, we conducted building energy simulations driven by a model predictive control, using EnergyPlus in one U.S. cold climate zone to investigate the grid-responsive control strategy and estimate the utility cost reduction potential.

Shen, Bo↗

Modeling Assessment of Residential Air-to-Water Heat Pumps Coupled with Cooling Thermal Storage

This study explored the performance and operating cost viability of air-to-water heat pumps (AWHPs) coupled with thermal energy storage (TES) in efficient new residential construction. AWHPs are an emerging technology in this country, but offer promise in terms of high efficiency, fully contained and factory charged outdoor refrigeration system, and hydronic delivery capabilities, which facilitates zoning, ducts in conditioned space, and TES integration for summer load-shifting. Although this AWHP+TES strategy is not yet mainstream, the authors feel that in ten years as decarbonization efforts proceed and TOU rates become more common, strategies such as this will be more accessible. Validated EnergyPlus simulation models were developed based on detailed monitoring data collected over several years at Pacific Gas and Electric's CVRH laboratory test homes located in Stockton, California. One of the CVRH test homes (1,962 ft 2 two-story) had been testing various AWHP systems and configurations over the past six years. The validated model was then updated with high efficiency IECC ZERH envelope and component requirements for climate zones 1-5, including ducts in conditioned space thermal distribution. Simulations were completed for the 1,962 ft 2 home in each climate zone for a minimum efficiency ASHP, an AWHP coupled with a fan coil, and an AWHP coupled with TES sized to eliminate summer on-peak compressor operation. To maintain consistency in reporting energy use estimates, all cases were run with a similar indoor thermostat control strategy to pre-cool the house below the nominal 76 degrees Fahrenheit set point prior to the on-peak period and float slightly above the set point during the peak period. The AWHP+TES configuration was controlled to alternately condition the indoor space or to charge the TES tanks prior to the beginning of the on-peak. Three composite TOU rates were developed based on existing TOU rates across the U.S. to provide differing economic scenarios to evaluate customer bill impacts throughout the summer. Two of the TOU rates had short three-hour peak periods, while the third rate had a longer seven-hour duration peak period. AWHP modeling projections were based on the observed field performance of the Chiltrix CX34 variable speed unit. Other products on the market or entering the market in the near term would likely perform differently.

25 ENERGY STORAGE↗

Optimization of a Residential Air Source Heat Pump using Refrigerants with GWP <150 for Improved Performance and Reduced Emission

Using low-GWP refrigerants can reduce the Green House Gas (GHG) emission of heat pump systems. Heat exchangers and compressors are the key components and have a prominent impact on system performance, significant research is devoted to reducing the cost of the heat exchangers while achieving the same or better system performance with refrigerant charge reduction.To better understand the environmental impacts of optimized systems with low-GWP refrigerants, Life Cycle Climate Performance (LCCP) evaluation method was used to evaluate the direct and indirect emissions of the system over the course of its lifetime from manufacturing to disposal. The DOE/ORNL Heat Pump Design Model (HPDM) is used to evaluate the performance of heat pumps. Multi-objective optimizations using Particle Swarm Optimization (PSO) algorithm are performed on a 3-ton R410A residential air source heat pump on market. Seven R410A alternatives, i.e., R32, R454B, R454C, R455A, R457A, R1234yf and R1234ze(E) are investigated. The last five fluids have GWP lower than 150.As a result, 5.5%-12.8% seasonal energy efficiency ratio 2 (SEER2) improvement is achieved, and the optimized systems reduce life cycle CO2 emission by 8.5%-28.6% with GWP lower than 150 refrigerants. The optimal heat exchangers can fit into the original R410A fan-coil units; therefore, the proposed design method establishes a production and installation path to produce cost-effective low-GWP heat pumps easily accepted by end users.

Li, Zhenning↗

Gaseous hydrogen storage system with cryogenic supply

A gaseous hydrogen storage and distribution system with a cryogenic supply and a method for the cryogenic conversion of liquid hydrogen into high-pressure gaseous hydrogen are provided. The gaseous hydrogen storage and distribution system includes pressuring liquid hydrogen from a cryogenic tank using a low pressure liquid pump before vaporization within a relatively small vaporizer. The resulting high pressure gaseous hydrogen is transferred to a plurality of storage tanks at ambient temperature according to a desired fill sequence. The high pressure hydrogen gas is subsequently distributed from the storage tanks through a hydrogen fueling dispenser according to a desired dispensing sequence. The present system and method provide improvements in operational safety, eliminates the use of high pressure gas compressor, and minimizes boiling off and ventilation losses at a reduced cost when compared to existing thermal compression storage systems.

Feng, Zhili↗

Modeling a Water-Cooled Printed Circuit Heat Exchanger Condensing CO2 for use in SCO2 Cycle System Optimization Studies

This work describes a one-dimensional model of a water-cooled printed circuit heat exchanger (PCHE) condensing supercritical CO2. The model is developed for use in cycle optimization studies (e.g., minimizing levelized cost of electricity) as either the main heat rejection cooler and/or a compressor intercooler for recompression closed Brayton supercritical CO2 power cycles. Sensitivity and case studies are used to illustrate the impact of important model parameters, and this includes allowing for independent variation of zig-zag channel wave angles on the CO2 and water side. Results show that for a given CO2 design pressure (and thus saturation temperature), the PCHE design inlet water temperature has a significant impact on the PCHE size. Results also demonstrate that if wave angles are the same on the CO2 and water side, the water side pressure drop will have more influence on determining the optimum PCHE mass than the CO2 side pressure drop. Reducing the water side wave angle to near straight channel flow offers a more compact design for a similar water side pressure drop (and pump power requirement). Cases are also shown for further increasing the compactness and how the PCHE mass is affected along with water pump power.

Liese, Eric↗

Compact Accelerator Design for a Compton Light Source

A compact electron accelerator suitable for Compton source applications is in design at the Center for Accelerator Science at Old Dominion University and Jefferson Lab. The design includes a KE=1.24 MeV low-emittance, optimized superconducting electron gun; a 25 MeV linac with multi-spoke 4.2 K superconducting cavities; and transport that combinesmagnetic longitudinal bunch compressor and transvese final focus. We report on the initial designs of each element, including end to end simulations with ASTRA and elegant, and expected beam parameters.

Satogata, T.↗

Direct Expansion Heat Pump Using High Glide Low GWP Refrigerant

Next generation of refrigerants require drastically lower global warming potential (GWP). The refrigerant mixtures, with a GWP < 150, e.g., R-457A, etc., tend to have significant temperature glide, which prefer multi-row, cross counter flow configuration. Typical heat pump operation reverses the refrigerant flow direction, compared to the air flow, from cooling mode to heating mode. It is difficult to configurate cross counter-flow heat exchangers in heat pumps. We invented an innovative configuration, having check valve assembly to maintain uniform cross counter flow configuration in both cooling and heat modes, which optimizes the performance of a high temperature slide refrigerant mixture, i.e. R-457A. Based on it, we developed a laboratory prototype, using a 2-stage compressor, achieved a cooling SEER (cooling seasonal energy efficiency rating) of 16.0 (cooling seasonal COP of 4.69) and a heating HSPF (heating seasonal performance factor) > 9.5 (heating seasonal COP of 2.78). The unit was tested in an extensive ambient condition, heating operation from 5˚F to 62˚F (-15˚C to 16.7˚C); cooling operation from 82˚F to 95˚F (27.8˚C to 35˚C). The paper will introduce the system configuration, heat exchanger dimensions and laboratory investigations.

Shen, Bo↗

Proton exchange membrane material and methods of making the same

Hydrocarbon proton exchange membranes are disclosed that are composed of a material including a hydrophobic main chain, and acidic side chains. The main chain includes a polyaryl structure that is substantially free of ether linkages and also includes a fluoromethyl substituted carbon. The acidic side chains include a hydrocarbon tether terminated by a strongly acidic group, such as a fluoroalkyl sulfonate group. Chemical stability of the material is increased by removing the ether linkages from the main chain. The hydrophobic main chain and substantially hydrophilic side chains create a phase-separated morphology that affords enhanced transport of protons and water across the membrane even at low relative humidity levels. These materials are advantageous as membranes for use in fuel cells, redox flow batteries, water hydrolysis systems, sensors, electrochemical hydrogen compressors, actuators, water purifiers, gas separators, etc.

Bae, Chulsung↗

Workshop on a future muon program at FNAL

The Snowmass report on rare processes and precision measurements recommended Mu2e-II and a next generation muon facility at Fermilab (Advanced Muon Facility) as priorities for the frontier. The Workshop on a future muon program at FNAL was held in March 2023 to discuss design studies for Mu2e-II, organizing efforts for the next generation muon facility, and identify synergies with other efforts (e.g., muon collider). Topics included high-power targetry, status of R&D for Mu2e-II, development of compressor rings, FFA and concepts for muon experiments (conversion, decays, muonium and other opportunities) at AMF. This document summarizes the workshop discussions with a focus on future R&D tasks needed to realize these concepts.

43 PARTICLE ACCELERATORS↗

Modification of the Decontamination Facility at the Kruemmel NPP - 13451

In February 2009, Siempelkamp Nukleartechnik GmbH was awarded the contract for the design, manufacture, delivery and construction of a new Decontamination Facility in the controlled area for Kruemmel NPP. The new decontamination equipment has been installed according to the state of art of Kruemmel NPP. The existing space required the following modification, retrofitting and reconstruction works: - Demounting of the existing installation: to create space for the new facility it was necessary to dismantle the old facility. The concrete walls and ceilings were cut into sizes of no more than 400 kg for ease of handling. This enabled decontamination so largest possible amount could be released for recycling. All steel parts were cut into sizes fitting for iron-barred boxes, respecting the requirement to render the parts decontaminable and releasable. - Reconstructing a decontamination facility: Reconstruction of a decontamination box with separate air lock as access area for the decontamination of components and assemblies was conducted using pressurized air with abrasives (glass beads or steel shots). The walls were equipped with sound protection, the inner walls were welded gap-free to prevent the emergence of interstices and were equipped with changeable wear and tear curtains. Abrasive processing unit positioned underneath the dry blasting box adjacent to the two discharge hoppers. A switch has been installed for the separation of the glass beads and the steel shot. The glass beads are directed into a 200 l drum for the disposal. The steel shot was cleaned using a separator. The cleaned steel shot was routed via transportation devices to the storage container, making it available for further blasting operations. A decontamination box with separate air lock as access area for the decontamination of components and assemblies using high pressure water technology was provided by new construction. Water pressures between 160 bar and 800 bar can be selected. The inner walls are welded gap-free and all rough edges are rounded off. All wetted parts are steel grade 1.4301 or higher. In an extension to the high pressure water decontamination box, 2 ultrasonic ponds and one washing station for small components as provide by new construction. A long pond with 3.25 m length for the decontamination of large components (e.g. turbine blades, pump rotors, driving rods) was installed. For the handling heavy components, a 2 t crane was installed. New construction of a mechanical effluent treatment facility including oil separator was connected to the existing effluent storage tank provided by the customer. One exhaust air filtration system is provided for each decontamination box, with the following requirements. The exhaust air is sent back to the room (recirculated air system). Dry blasting box including raw separator with dust collection in 200 l drum, filter for suspended particles; High pressure water decontamination box and wet area with water separator, pre-separator, filter for suspended particles. Installation of a steel platform at building height +12.85 above the decontamination boxes + 8.50 m for the erection of the high pressure water facilities, the recirculating air filter system, the air compressor and the respiratory air supply unit. The aforementioned components are placed on the steel platform and have been encased in a sound-lowering and accessible manner. New construction of the entire E and C technology for the TU system including modification of the supply lines from the switch gear. All devices are to be operated automatically. Dry blasting box, high pressure water decontamination box and wet area are designed to guarantee a unitary 'exterior view' of the decontamination facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

K-25 D and D Challenges - 12170

Decontamination and decommissioning (D and D) of the K-25 former gaseous diffusion plant provides lessons learned applicable to other D and D projects in the DOE Complex. The 175,000- square-meter, 1.6-kilometer-long building is contaminated with highly enriched uranium (HEU), Tc-99, trace quantities of other fission products, asbestos, PCBs, and other hazardous wastes. Safety challenges include deteriorated electrical systems, significant structural degradation, and criticality and exposure risks. The project completely revised the D and D approach after a worker fell through an operating floor and was seriously injured. For protection from deteriorated building conditions, the project reduced the number of workers in the facility, limited their hours in the building, and installed nets and barriers to protect them from falls through weakened floors and from falling material. The new plan involved removing high-risk components, removing motors and compressors, and demolishing the building from the outside with heavy equipment with most of the piping and components inside the building during demolition. The team provided temporary electrical power; reconfigured the criticality alarm system; upgraded security; performed sampling and analysis to locate and characterize HEU deposits and Tc-99; and, to establish 'criticality incredible' conditions, conducted a nondestructive assay program and injected foam into equipment and piping as a contamination fixative. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges and Recent Developments of Neutron Non-Destructive Assay with UO{sub 2}F{sub 2}-Bearing Materials - 17336

In the enrichment process of an operating Gaseous Diffusion Plant (GDP), such as the Portsmouth and Paducah facilities, UF6 gas will immediately hydrolyze forming the chemical compound UO{sub 2}F{sub 2} (Uranyl Fluoride). This mostly happens in Alumina (Al{sub 2}O{sub 3}) traps where the UF6 adsorbs to moistened Alumina pellets forming a UO{sub 2}F{sub 2} layer around the pellet. Similarly, NaF.UF{sub 6} absorption traps produce the complex Na{sub 2}UF{sub 8} which also hydrolyzes when exposed to moist air. UO{sub 2}F{sub 2} can also be formed in many other processes where UF6 gas comes into contact with moisture within structures and objects such as pipes, converters compressors and coolers. When the structures are refurbished, or designated for D and D, UO{sub 2}F{sub 2}-bearing objects are generated both in situ and ex situ requiring fissile (U-235) characterization. In addition, ex situ waste streams are generated when UO{sub 2}F{sub 2}-bearing materials are placed in drummed or boxed waste containers. Gamma spectroscopy Non-Destructive Assay (NDA) is commonly utilized to characterize UO{sub 2}F{sub 2}-bearing waste but generally has high associated Total Measurement Uncertainties (TMU's) and, in some cases, Data Quality Objectives (DQO's) cannot be met. In addition, high UO{sub 2}F{sub 2} mass loadings, such as hold-up materials, require gamma modeling when infinitely thick to the Uranium energy lines. A common neutron NDA technique, or method, is to exploit the neutrons generated from the F-19(a, n)Na-22 reaction which has an appreciable reaction cross-section. The isotopes of Uranium are a-emitters, and, in particular, U-234 has a significantly higher a-decay reaction cross-section leading to a significant relative neutron Specific Activity (nSA). Neutron NDA is appealing since, in some cases, it has potentially lower TMU's than gamma NDA and neutron detector slabs facilitate surrounding large, complex-shaped, objects. Characterizing UO{sub 2}F{sub 2}-bearing waste for fissile content using neutrons generated from U-234, requires the U-235/U-234 ratio as well as the enrichment as well as the corresponding nSA's. It is also noted that U-238 has a considerable, relative, spontaneous fission nSA and this is a higher concern for low-enrichments where the mass of U-238 dominates. Additional neutron interfering elements include cosmic-ray induced spallation within the objects and background from other, in situ, UO{sub 2}F{sub 2}-bearing objects. In this paper we present the challenges and recently developed hardware and algorithmic strategies for quantifying fissile mass both in situ and ex situ using neutron NDA that works in conjunction to gamma spectroscopy NDA, or process knowledge, for objects and drummed/boxed waste containing UO{sub 2}F{sub 2}-bearing materials leading to minimal TMU's and achievable DQO's. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Large-Scale Implementation of Recirculation Systems for In-Situ Treatment of Hexavalent Chromium in Groundwater in Hinkley CA - 17338

In-situ remediation using recirculation systems is being used to treat hexavalent chromium (Cr[VI]) in groundwater within the plume core at the Pacific Gas and Electric Company Hinkley Compressor Station in Hinkley, California (the Site). In-situ Reactive Zones (IRZs) are currently treating an area of 0.8 kilometers (km, one-half of a mile) by 1.6 km (a mile) to target treatment of the core of the Cr(VI) plume, where concentrations of Cr(VI) range from 10 s of micrograms per liter (μg/L) to several milligrams per liter (mg/L). Following pilot testing from 2004-2006, large scale implementation of in-situ remediation began in late 2007 and has been on-going. Implementation of the recirculation systems has been successful in remediating Cr(VI) in groundwater at a large scale. Through Third Quarter 2015, in-situ remediation had removed over 44 percent of the mass in the target treatment area. Within the IRZs, concentrations are rapidly reduced within the timeframe of weeks to a few months. Down-gradient of the IRZs, treatment has been observed at distances over 915 meters (3,000 feet). This presentation will focus on the design, operation, adaptive management and results of this effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demolition of the K-27 Building at the East Tennessee Technology Park (ETTP) - 17423

On February 8, 2016, URS - CH2M Oak Ridge LLC (UCOR) initiated the demolition of the East Tennessee Technology Park's (ETTP's) final gaseous diffusion building in DOE's Oak Ridge Environmental Management program. Building K-27 was a 35,582 m{sup 2} (383,000 ft{sup 2}) gaseous diffusion building that contained approximately 92,903 m{sup 2} (1 million ft{sup 2}) of floor space. It was one of five gaseous diffusion buildings at the site, formerly known as the Oak Ridge Gaseous Diffusion Plant. The actual demolition of this facility took approximately seven months to complete; however, planning and preparation took more than three years. The deactivation process was a critical element in preparing the building for demolition. UCOR's K-27 deactivation activities began in April 2012 with the installation of safe walking paths and fall protection systems to allow safe work access. Next, all mechanical and electrical systems associated with the facility were shut down and isolated, a process known as 'cold and dark.' More than 19.3 km (12 mi) of process piping and components were marked and measured. Additionally, workers performed nondestructive assay (NDA) and vent-purge-and-drain activities and applied foam to piping and components as needed [1]. Based on characterization results, approximately 4.8 km (3 mi) of process piping, and 372 converters and compressors were removed and shipped offsite prior to demolition. Lower-hazard materials and equipment were demolished with the building structure and transported to onsite disposal facilities. Upfront waste characterization and ongoing monitoring were key to the successful disposal of demolition debris at onsite facilities. Due to process improvements in waste loading recommended by work crews, the project achieved a 50 percent improvement in the daily hauling rate during the 9,000-truckload shipping campaign. Crews worked in high-risk, high-hazard conditions and were exposed to radiological and chemical contaminants, extreme temperatures, and deteriorating infrastructure. However, the hazard controls that were put in place, based on the Integrated Safety Management System (ISMS) walk-downs and hazard determination, made the effort manageable. The overall safety performance during demolition of the facility was excellent, with no significant injuries, and exceeded industry standards and DOE target levels. Outstanding safety performance was a testament to the dedication of the workforce, given the significant hazards presented by the demolition of the Hazard Category 2 nuclear facility. Another key element to the success of the K-27 demolition was the support and approval of all stakeholders involved in this effort, including DOE, the surrounding communities, the State of Tennessee, the UCOR management team, and, most importantly, the workforce that performed this highly hazardous work. This $52 million demolition project was completed ahead of schedule with no significant injuries and in compliance with all DOE orders, site procedures, and environmental controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Switchable system for high-salinity brine desalination and fractional precipitation

A saline feed stream flows into a liquid-liquid extraction system; and a volatile organic solvent flows through a main compressor. The compressed volatile organic solvent then flows through a solvent regenerator, which can be a heat exchanger or a combination of a vaporization device and a condenser, to cool the volatile organic solvent. The cooled volatile organic solvent in liquid phase then flows into the liquid-liquid extraction system, where the saline feed stream contacts the volatile organic solvent to selectively extract water from the saline feed stream into the volatile organic solvent, producing a concentrated brine and an organic-rich mixture of water and the volatile organic solvent. The organic-rich mixture flows from the liquid-liquid extraction system into the solvent regenerator, where the organic-rich mixture is heated to produce an organic-rich vapor and desalinated water; and the organic-rich vapor is recycled as volatile organic solvent back into the liquid-liquid extraction system.