Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Measurement of Beam Energy in the Fermilab's Linac taken at the transfer Line

Linac is the first machine in the Accelerator chain at Fermilab where 𝐻− particles are accelerated from 35 keV to 400 MeV and travel to the Booster where they are stripped. of the extra electrons to become protons. The Booster requires stable beam energy at injection. The Linac extraction energy tuning has been performed using two Beam Velocity Monitors (a.k.a Griffin detectors) to maintain stable relative energy between the Booster and the Linac. Our goal is to control the Linac energy parameters using Machine Learning techniques to increase reliability and quality of beam delivered from Linac. The first step is to understand the data from the Linac extraction diagnostics; and develop reliable, accurate methods for energy measurement and control before implementing machine learning. There were two methods of energy measurement implemented, and the results of these are compared. The first method was time of flight measurements using the Phase probes inside B eam Position Monitors (BPM) that provide the beam’s phase of arrival data. The second method used the relation between beam position data from the BPMs and dispersion values from the 400MeV MAD-X model to calculate momentum variation. The results of these two energy measurement methods compare well as the Linac energy is varied.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Scoping Study for Fast Flux Testing in the Advanced Test Reactor

The value of fast spectrum reactors remains prominent in the nuclear technology portfolio. The performance of these reactors can be maximized with advancements in nuclear fuel technologies, but development of these technologies is currently held back by lack of fast spectrum test reactors available to the United States. Spectral modification of experiment positions in the thermal spectrum Advanced Test Reactor (ATR) has long been used to support fast reactor fuel development, but these methods have not been progressed to their full potential. This study investigated the use of concentric rings of aluminum-clad fuel plates in ATR flux traps and thermal neutron absorbing filters to increase fast neutron flux on test specimens. This concept was termed the Boosted Energy Advanced Spectrum Test (BEAST). This approach will enable irradiation of advanced fuel designs in prototypic-length fuel pins and representative flux environment to support post irradiation exams, enable transient testing, and produce the type of data that will permit lead test assembly irradiations in true Sodium Fast Reactors (SFRs) when they become available. Neutronic predictions were performed to investigate BEAST design options and thermal hydraulic models were produced to ensure feasibility of BEAST. Two versions were considered based on the geometric limitations of ATR’s small and large flux traps. The small version was found to be preferable due to slightly higher fast flux and fast-to-thermal neutron ratio. Perhaps more influentially, the small flux trap option was also preferred to avoid conflict with ongoing very high temperature reactor fuel irradiation programs in ATR’s large northeast flux trap. The small flux trap option provided less than half the test volume of the large version, but still had adequate volume for seven SFR pins in cross section which could be stacked two-high in ATR’s 1.2m long core to accommodate up to 14 EBR-II size pins. The preference for the small flux trap configuration should be revisited if additional collaborative test programs emerge with the need to irradiate a significant volume of additional specimens. Calculations were performed regarding a lithium deuteride ring to convert thermal neutrons into 14 MeV fusion neutrons. At the time this report was written these calculations were partially complete and it remains to be seen whether the concept would be worth including in BEAST. Given the preference for the small flux trap option, which does not afford enough room for the 14 MeV ring, it was concluded to defer future work on the lithium deuteride ring. This decision could be revisited if fusion material research programs emerge for collaborative testing in BEAST. A cadmium-lined specimen holder design was found to be adequate in filtering thermal neutrons and preferred over other neutron absorbers based on past experience with cadmium baskets. It was acknowledged that cadmium-bearing hardware would become depleted and need to be replaced occasionally, which appeared feasible from a mechanical design perspective. Neutronic studies investigated different enrichment levels in the booster fuel using uranium-molybdenum alloy dispersion fuel which has performed well in past ATR irradiations. Both options were able to drive fuel pins to SFR-like fission heating rates. The high enriched booster fuel option outperformed the low enriched option by ~20% on key metrics including fast flux and fast-to-thermal ratio, but the low enriched option was favored in order to broaden options for potential fuel suppliers. The preferred BEAST design options including cadmium filter with low enriched booster fuel in the small flux trap configuration was predicted to achieve 6.2E14 n/cm2sec fast flux (>0.1 MeV) with a fast-to-thermal ratio of 44.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improvements to Stripping Foils in BTA

To achieve the desired charge state in the Alternating Gradient Synchrotron (AGS), there is a stripping foil in the Booster to AGS (BtA) transfer line. For light ions, such as p, d, and h, they are already fully stripped in the Booster, or ions such as O have few electrons to be stripped off, and a thin foil of aluminum is used. For medium weight ions, such as Zr and Ru, they use what foils are available which have been optimized for heavy and light ions at 100 MeV/u. This worked well in the Zr case which achieved a measured stripping efficiency of 87%, contrary to the Ru case which achieved a measured stripping efficiency of 63%. For the EIC early science, Ag is currently intended to be the first ion. Using our existing foils, this would, at best, yield a helium-like charge state with a theoretical stripping efficiency of 50%. To improve on this, two foils of Ti or Nb have been selected to provide optimal stripping efficiency of Ag, and other energetic medium ions, which can reach 90% efficiency to fully strip the Ag ions. For heavy ions, the Al+C or Al+Ni stripping foils (sandwich foils) are used to produce helium-like charge states. For high intensity operation of Au, the Al foil nears its melting point and, in some cases, has been severely damaged. To maximize foil lifetime, there is a maximum intensity per unit time in BTA dependent on the Booster and AGS timing configurations. To mitigate the risk of melting the Al, replacement foils that use Ti, Nb, or anodized Al have been evaluated for their improved thermal qualities. At the selected thicknesses, each foil has equivalent charge distributions before entering the C foil, and should provide the same stripping efficiency through the entire sandwich.

43 PARTICLE ACCELERATORS↗

MI Gap Clearing Kicker Magnet Design Review

The kicker system requirements were originally conceived for the NOvA project. NOvA is a neutrino experiment located in Minnesota. To achieve the desired neutrino flux several upgrades are required to the accelerator complex. The Recycler will be used as a proton pre-injector for the Main Injector (MI). As the Recycler is the same size as the MI, it is possible to do a single turn fill ({approx}11 {micro}sec), minimizing the proton injection time in the MI cycle and maximizing the protons on target. The Recycler can then be filled with beam while the MI is ramping to extract beam to the target. To do this requires two new transfer lines. The existing Recycler injection line was designed for 10{pi} pbar beams, not the 20{pi} proton beams we anticipate from the Booster. The existing Recycler extraction line allows for proton injection through the MI, while we want direct injection from the Booster. These two lines will be decommissioned. The new injection line from the MI8 line into the Recycler will start at 848 and end with injection kickers at RR104. The new extraction line in the RR30 straight section will start with a new extraction kicker at RR232 and end with new MI injection kickers at MI308. Finally, to reduce beam loss activation in the enclosure, a new gap clearing kicker will be used to extract uncaptured beam created during the slip stack injection process down the existing dump line. It was suggested that the MI could benefit from this type of system immediately. This led to the early installation of the gap clearing system in the MI, followed by moving the system to Recycler during NOvA. The specifications also changed during this process. Initially the rise and fall time requirements were 38 ns and the field stability was {+-}1%. The 38 ns is based on having a gap of 2 RF buckets between injections. (There are 84 RF buckets that can be filled from the Booster for each injection, but 82 would be filled with beam. MI and Recycler contain 588 RF buckets.) A rough cost/benefit analysis showed that increasing the number of empty buckets to 3 decreased the kicker system cost by {approx}30%. This could be done while not extending the running time since this is only a 1% reduction in protons per pulse, hence the rise and fall time are now 57 ns. Additionally, the {+-}1% tolerance would have required a fast correction kicker while {+-}3% could be achieved without this kicker. The loosened tolerance was based on experience on wide band damping systems in the MI. A higher power wideband damping system is a better use of the resources as it can be used to correct for multiple sources of emittance growth. Finally, with the use of this system for MI instead of Recycler, the required strength grew from 1.2 mrad to 1.7 mrad. The final requirements for this kicker are listed.

43 PARTICLE ACCELERATORS↗

BOOSTR: A Dataset for Accelerator Control Systems

The Booster Operation Optimization Sequential Time-series for Regression (BOOSTR) dataset was created to provide a cycle-by-cycle time series of readings and settings from instruments and controllable devices of the Booster, Fermilab’s Rapid-Cycling Synchrotron (RCS) operating at 15 Hz. BOOSTR provides a time series from 55 device readings and settings that pertain most directly to the high-precision regulation of the Booster’s gradient magnet power supply (GMPS). To our knowledge, this is one of the first well-documented datasets of accelerator device parameters made publicly available. We are releasing it in the hopes that it can be used to demonstrate aspects of artificial intelligence for advanced control systems, such as reinforcement learning and autonomous anomaly detection.

Kafkes, Diana (ORCID:000000021716463X)↗

Sculpturing, forming, and spinning of large components for launch vehicles

At .the beginning of the S-IC booster contract, it was evident that certain manufacturing techniques would have to be developed before the proposed design could be put into full production. Much of the development activity that has been accomplished was initiated because the size of booster components was greater than the capacities of available equipment. This paper describes some of the more significant methods that have evolved from this development activity, and which demonstrate how the capability to manufacture S-IC components such as bulkhead gore segments, tank skins, Y-rings, and lox tunnels, has been acquired. The fabrication methods used to transform 2219 aluminum alloy plate into the large, sculptured, and contoured parts that make up the structural surfaces of the booster include hydraulic bulge forming, age forming, and adaptations of conventional skin milling and chemical milling processes. The importance of fixturing and the machining sequence related to fabrication of the Y-ring are pointed out. The shear-spinning process that is used to produce a seamless, one-piece lox tunnel 40 feet long from a cylindrical blank only 62 inches long is described. The presentation is concluded with a synopsis of the current design changes that are being implemented to improve strength-to-weight ratios. A brief statement of possible future activity is included.

Milling↗

Space shuttle phase B extension, volume 1

In order to define a system which would significantly reduce payload delivery costs, activities were extended to modifications of the reusable space shuttle design concept. Considered were systems using orbiters with external propellant tanks and an interim expendable booster which allowed phased development of the usable orbiter and booster. Analyzed were: Merits of internal and external propellant tanks and the impact of external LH2 compared to L02 and LH2; impact of cargo bay size; impact abort; merit of expendable booster options; and merit of a phased development program. Studies showed that external L02/LH2 and the continued use of the J-2S engine on the orbiter reduced program cost and risk.

Source record↗

Space shuttle: Aerodynamic characteristics of the Titan T 3 (1207-4)/GAC H-33 launch configuration

Aerodynamic data obtained in a 14-inch trisonic wind tunnel test on static stability and drag of 0.003366-scale models of the Grumman H-33 drop tank orbiter and the Titan T 3 (1207-4) expendable booster are presented. The orbiter was mounted to the booster both piggyback and tandem. Data were obtained over a Mach number range of 0.6 to 5.0. Angle of attack data were obtained from -16 deg to +4 deg at both 0 deg and -6 deg sideslip for the piggyback configuration, but were limited to -10 deg to +10 deg at 0 deg sideslip for the tandem configuration. Primary configuration variations, other than piggyback and tandem mount, were the number and location of solid propellant strap-on boosters.

Sims, J. F.↗

Mass properties report on 156-inch diameter SRM

Mass properties data for 156-in.-dia SRM booster with two segments are presented. The SRM baseline booster has a fixed 15 degrees canted nozzle and no thrust neutralization system. Summary mass properties data for alternative booster configurations are included.

Source record↗

A 156-in.-dia SRM mass properties report

Mass property data for the 156-in.-dia SRM booster with two segments are presented. The SRM baseline booster has a fixed 15 deg canted nozzle and no thrust neutralization system. Summary mass property data for alternative booster configurations are included.

Source record↗

Investigation of safe-life fail-safe criteria for the space shuttle

An investigation was made to determine the effects of a safe-life design approach and a fail-safe design approach on the space shuttle booster vehicle structure, and to recommend any changes to the structural design criteria. Two configurations of the booster vehicle were considered, one incorporating a delta wing (B-9U configuration) and the other a swept wing (B-16B configuration). Several major structural components of the booster were studied to determine the fatigue life, safe-life, and fail-safe capabilities of the baseline design. Each component was investigated to determine the practicability of applying a safe-life or fail-safe design philosophy, the changes such design approaches might require, and the impact of these changes on weight, cost, development plans, and performance.

Source record↗

Atmospheric rendezvous feasibility study

A study was carried out to determine the feasibility of using atmospheric rendezvous to increase the efficiency of space transportation and to determine the most effective implementation. It is concluded that atmospheric rendezvous is feasible and can be utilized in a space transportation system to reduce size of the orbiter vehicle, provide a powered landing with go-around capability for every mission, and achieve lateral range performance that exceeds requirements. A significantly lighter booster and reduced launch fuel requirements are additional benefits that can be realized with a system that includes a large subsonic airplane for recovery of the orbiter. Additional reduction in booster size is possible if the airplane is designed for recovery of the booster by towing. An airplane about the size of the C-5A is required.

Schaezler, A. D.↗

Static aerodynamic characteristics of the S-IC booster/GAC H-33 orbiter launch vehicle configuration

This test at the trisonic tunnel was divided into two parts. The first part utilized the H-33 orbiter with drop tanks and cradle mounted on an S-IC booster with 75 square-foot fins oriented 45 deg off the horizontal and vertical reference planes. Runs were initially made to determine the optimum incidence angle to be used for the remainder of the tests. The angle so determined was 0 degrees. Additional testing was performed with drop tanks removed, orbiter vertical tail removed, drop tanks and orbiter wing removed, booster fins removed and booster fins located in the horizontal and vertical reference planes. The second part utilized the H-33 orbiter and cradle only, sting mounted on a strain gage balance. These data were used in conjunction with test number 504 (orbiter alone on balance) to determine cradle effects.

Sims, J. F.↗

Investigation of Structural Factors of Safety for the Space Shuttle

A study was made of the factors governing the structural design of the fully reusable space shuttle booster to establish a rational approach to select optimum structural factors of safety. The study included trade studies of structural factors of safety versus booster service life, weight, cost, and reliability. Similar trade studies can be made on other vehicles using the procedures developed. The major structural components of a selected baseline booster were studied in depth, each being examined to determine the fatigue life, safe-life, and fail-safe capabilities of the baseline design. Each component was further examined to determine its reliability and safety requirements, and the change of structural weight with factors of safety. The apparent factors of safety resulting from fatigue, safe-life, proof test, and fail-safe requirements were identified. The feasibility of reduced factors of safety for design loads such as engine thrust, which are well defined, was examined.

Source record↗

Space shuttle system program definition. Volume 2: Technical report

The Phase B Extension of the Space Shuttle System Program Definition study was redirected to apply primary effort to consideration of space shuttle systems utilizing either recoverable pressure fed liquids or expendable solid rocket motor boosters. Two orbiter configurations were to be considered, one with a 15x60 foot payload bay with a 65,000 lb, due East, up-payload capability and the other with a 14x45 payload bay with 45,000 lb, of due East, up-payload. Both were to use three SSME engines with 472,000 lb of vacuum thrust each. Parallel and series burn ascent modes were to be considered for the launch configurations of primary interest. A recoverable pump-fed booster is included in the study in a series burn configuration with the 15x60 orbiter. To explore the potential of the swing engine orbiter configuration in the pad abort case, it is included in the study matrix in two launch configurations, a series burn pressure fed BRB and a parallel burn SRM. The resulting matrix of configuration options is shown. The principle objectives of this study are to evaluate the cost and technical differences between the liquid and solid propellant booster systems and to assess the development and operational cost savings available with a smaller orbiter.

Source record↗

Aerodynamic results of a separation effects test conducted in the AEDC 40 by 40 inch tunnel A facility on the Rockwell International launch configuration 3 (model-OTS) integrated vehicle (IA13), volume 1

Experimental aerodynamic investigations were conducted from July 5 through July 17, 1973, on a 0.01 scale model. The AEDC captive trajectory system was utilized in conjunction with the tunnel primary sector to obtain grid-type data for external tank abort from the orbiter, and for nominal separation of one solid rocket booster from the orbiter-tank combination. Booster separation was investigated with and without separation motors plume simulation. The plumes were generated by eight M sub j = 2.15 nozzles using a 1500 psia cold air supply. Free stream data were obtained for all models (orbiter, tank, orbiter-tank, and right-hand booster) to provide baselines for evaluation of proximity effects.

Campbell, J. H., II↗

Postflight Evaluation of Atlas-Centaur AC-5 (Launched 2 March 1965)

The Atlas-Centaur AC-5 vehicle was launched from ETR Complex 36A on March 2., 1965 at 8:25.04 a.m. EST. Within about 1 second after launch the thrust of the Atlas booster engine decayed rapidly; the vehicle settled back on the launch pad and was quickly destroyed by fire and explosion. Considerable damage was sustained by the launch complex and its associated equipment. Loss of booster engine thrust was due to fuel depletion at the turbopump inlets, which is attributed to closure of the fuel prevalve or the staging valve. To preclude the recurrence of either of these fuel valving malfunctions, the following corrective action has been taken: The remote control actuator has been replaced by manual operation of the Atlas fuel prevalve; the internal passage dimensions in the staging valve have been increased to lessen the hydraulic load on the valve poppet. In addition to the Atlas fuel system malfunction, a failure in the power control circuitry of the Centaur guidance computer resulted in partial removal of power at umbilical ejection. To prevent such a guidance system failure on future flights some redundant circuitry has been eliminated and more rigorous checkout procedures have been adopted. No further anomalies were discovered in the telemetered data prior to the Atlas booster thrust decay. A prime objective of the AC-5 flight was to place a dynamic model of the Surveyor spacecraft in a simulated lunar transfer trajectory. An important facet of this problem is the demonstration of a launch-on-time capability in accordance with the proper Earth-moon relation. The window opening time was established at 8:25 a.m. EST; thus the actual launch occurred within 4 seconds of the planned time.

Source record↗

Technical challenges of integrating the Space Shuttle

A review is presented of the technology involved in integrating the Space Shuttle system. A powered flight analysis of the Shuttle is presented, touching upon the following areas: ascent profile and abort mode integration, sizing and design, control of load factor by a stage thrust shaping, structural load constraints, flight performance reserve and trajectory design for the orbital flight test. A discussion is presented of aerothermodynamics including aerodynamic and plume heating. Flight control and separation is considered with attention paid to liftoff, ascent to booster staging, elevon load relief, booster tailoff thrust mismatch and gimbal limitations and booster separation. Structural analysis and dynamics is examined, considering: vehicle loads and modes and the pogo effect. Propulsion aspects (hydraulics, the LH2 recirculation system, the antigeyser system, the pressurization system, etc.), ground vibration tests, separation system verification and flight readiness firing are all described.

Martin, A. C.↗