Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “subsystem design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Oversimplification of Systems Engineering Goals, Processes, and Criteria in NASA Space Life Support

This paper investigates the oversimplification of the inherently complex systems engineering process in space life support. The standard systems engineering process steps are described. The International Space Station (ISS) life support system is explained with its goals and performance criteria. Although it is not usually emphasized, the essential function of developing a hierarchy of systems and subsystems is to simplify the design process. The System Complexity Metric (SCM) shows how this di-vide-and-conquer approach also reduces the system complexity. The complete systems engineering process has many detailed steps. It is often simplified because of the effort required and the human limitations on working memory and decision span. Systems analysis demands slow, logical, and fo-cused thinking but is often bypassed in favor of quick, intuitive, subconscious “gut feel.” A study of 100 system designs found examples of 12 specific mental mistakes, such as ignoring stakeholder needs, and these mistakes are essentially oversimplifications of the systems engineering process. An analysis of space life support goals, options, criteria, and processes found 11 examples of oversimplifications in systems engineering, such as neglecting safety and cost. All these 11 oversimplifications could be traced to one or more of the 12 previously identified mental mistakes or other well-known ones, such as ig-noring sunk costs. Oversimplification of the systems engineering process is rarely noticed but is a common and harmful problem. A study of failures in 50 different space systems found that problems in systems engineering caused failures and often led to errors in design, development, and test that further contributed to failure. It seems that more diligent systems engineering could prevent many project problems and failures, but projects seem to be more guided by “gut feel” based on tradition, authority, and consensus than on the logical, rational systems engineering approach.

Simplified systems engineering↗

Rapid Cycle Amine 4.0 System Development

Carbon dioxide (CO2) and humidity control is a key function of the spacesuit Portable Life Support Subsystem (PLSS). The latest spacesuit design utilizes a pressure swing bed containing a solid amine sorbent to scrub CO2 and humidity produced by the crewmember from the ventilation loop. The solid amine sorbent removes CO2 and humidity from the ventilation loop through a chemisorption mechanism. Simultaneously, CO2 and humidity are desorbed to vacuum via the two-bed pressure swing system during operation. This continuous regeneration allows for longer Extravehicular Activity (EVA) times while minimizing maintenance, consumables, and power usage. This concept has been in development for over 20 years, during which many prototypes and design iterations have been fabricated and evaluated. This paper discusses the recent Rapid Cycle Amine (RCA) design, development, and testing that has been done to advance the technology. The most recent fabrication is the RCA 3.0. It was delivered to NASA Johnson Space Center in 2015 and has since been tested at the component level and at the integrated PLSS level. The purpose of the component level testing was to understand CO2 removal capacity, end-of-life performance, and establish a baseline performance prior to integrated testing. The RCA 3.0 was integrated into the Exploration Extravehicular Mobility Unit (xEMU) PLSS for a comprehensive Design Verification Test (DVT) series. The integrated testing provided the benefit of characterizing the impact performance degradation has on the system. Many of the RCA requirements were developed through analysis, based on the limitations of the PLSS and, in some cases, assumptions about the system and flow behavior. Integrated testing was an opportunity to validate those requirements and assumptions. While the RCA 3.0 was being tested, the next design iteration, RCA 4.0, was under development. The RCA 4.0 preliminary design phase began in late-2019 and shortly after the Preliminary Design Review, the critical design phase began in 2021. The design work has concluded with the completion of a Pre-Manufacturing Review in 2022. This paper provides an overview of the RCA 4.0 system design, summarizes the results of integrated RCA 3.0 testing, and discusses the pertinence of driving requirements such as mass, volume, and power consumption.

Kelsey Bloom↗

Improving Large-scale Storage System Performance via Topology-aware and Balanced Data Placement

With the advent of big data, the I/O subsystems of large-scale compute clusters are becoming a center of focus, with more applications putting greater demands on end-to-end I/O performance. These subsystems are often complex in design. They comprise of multiple hardware and software layers to cope with the increasing capacity, capability and scalability requirements of data intensive applications. The sharing nature of storage resources and the intrinsic interactions across these layers make it to realize user-level, end-to-end performance gains a great challenge. We propose a topology-aware resource load balancing strategy to improve per-application I/O performance. We demonstrate the effectiveness of our algorithm on an extreme-scale compute cluster, Titan, at the Oak Ridge Leadership Computing Facility (OLCF). Our experiments with both synthetic benchmarks and a real-world application show that, even under congestion, our proposed algorithm can improve large-scale application I/O performance significantly, resulting in both the reduction of application run times and higher resolution simulation runs.

Wang, Feiyi↗

RAMPING UP THE SNS BEAM CURRENT WITH THE LBNL BASELINE H- SOURCE

Over the last two years the Spallation Neutron Source (SNS) has ramped up the repetition rate, pulse length, and the beam current to reach 540 kW, which has challenged many subsystems including the H- source designed and built by Lawrence Berkeley National Laboratory (LBNL). This paper discusses the major modifications of the H- source implemented to consistently and routinely output the beam current required by the SNS beam power ramp up plan. At this time, 32 mA LINAC beam current are routinely produced, which meets the requirement for 690 kW planned for end of 2008. In June 2008, a 14-day production run used 37 mA, which is close to the 38 mA required for 1.44 MW. A medium energy beam transport (MEBT) beam current of 46 mA was demonstrated on September 2, 2008.

43 PARTICLE ACCELERATORS↗

Relevant Parameter Evolution in Team X Mission Concept Designs

The Advanced Projects Design Team, also known as Team X, is a concurrent engineering team that quickly and cheaply designs space mission architectures including the flight system and subsystems, the trajectory, and ground system. Through the use of ICEMaker, an Excel spreadsheet database, the parameters from each subsystem can be shared and used among the other subsystems. This allows for entire missions to be planned with only a few short design team sessions. Based on the results, the feasibility of the mission concept can be determined. Over the Years since the team was created, the amount of information being shared among subsystems on the database has increased, however many of the parameters are now obsolete. Removal of these unused parameters Will clean UP the database and help to streamline the mission design process. By comparing parameter files from previous Team X mission studies, the parameter usage can be determined. As was initially suspected there are more unused parameters on the database than parameters that are actually used.

Huelman, Brandon N.↗

A prototype for simulation of the space-to-ground assembly/contingency system of Space Station Freedom

This project was a continuation of work started during the Summer of 1991 when techniques and methods were investigated for simulating equipment components of the Communications and Tracking System on Space Station Freedom (SSF). The current work involved developing a design for simulation of the entire Assembly/Contingency Subsystem (ACS), which includes the Baseband Signal Processor, standard TDRSS Transponder and the RF Group antenna assembly. A design prototype of the ACS was developed. Methods to achieving 'high fidelity' real-time simulations of the ACS components on IBM-PC compatible computers were considered. The intention is to have separate component simulations running on separate personal computers (PC's), with the capability of substituting actual equipment units for those being simulated when such equipment becomes available for testing. To this end, a scheme for communication between the various simulated ACS components was developed using the serial ports of the PC's hosting the simulations. In addition, control and monitoring of ACS equipment on SSF will be via a MIL-STD 1553B bus. The proposed simulation includes actual 1553B hardware as part of the test bed.

Deacetis, Louis A.↗

Turbofan Engine Core Compartment Vent Aerodynamic Configuration Development Methodology

This paper presents an overview of the design methodology used in the development of the aerodynamic configuration of the nacelle core compartment vent for a typical Boeing commercial airplane together with design challenges for future design efforts. Core compartment vents exhaust engine subsystem flows from the space contained between the engine case and the nacelle of an airplane propulsion system. These subsystem flows typically consist of precooler, oil cooler, turbine case cooling, compartment cooling and nacelle leakage air. The design of core compartment vents is challenging due to stringent design requirements, mass flow sensitivity of the system to small changes in vent exit pressure ratio, and the need to maximize overall exhaust system performance at cruise conditions.

Hebert, Leonard J.↗

Magnetically suspended flywheel system study

A program to study the application of a graphite/epoxy, magnetically suspended, pierced disk flywheel for the combined function of spacecraft attitude control and energy storage (ACES) is described. Past achievements of the program include design and analysis computer codes for the flywheel rotor, a magnetically suspended flywheel model, and graphite/epoxy rotor rings that were successfully prestressed via interference assembly. All hardware successfully demonstrated operation of the necessary subsystems which form a complete ACES design. Areas of future work include additional rotor design research, system definition and control strategies, prototype development, and design/construction of a UM/GSFC spin test facility. The results of applying design and analysis computer codes to a magnetically suspended interference assembled rotor show specific energy densities of 42 Wh/lb (92.4 Wh/kg) are obtained for a 1.6 kWh system.

Kirk, J. A.↗

Evolution of MPCV Service Module Propulsion and GNC Interface Requirements

The Orion Multi-Purpose Crew Vehicle Service Module Propulsion Subsystem provides propulsion for the integrated Crew and Service Module. Updates in the exploration architecture between Constellation and MPCV as well as NASA's partnership with the European Space Agency have resulted in design changes to the SM Propulsion Subsystem and updates to the Propulsion interface requirements with Guidance Navigation and Control. This paper focuses on the Propulsion and GNC interface requirement updates between the Constellation Service Module and the European Service Module and how the requirement updates were driven or supported by architecture updates and the desired use of hardware with heritage to United States and European spacecraft for the Exploration Missions, EM-1 and EM-2.

spacecraft propulsion↗

Gaps in Thermal Design Guidelines in the Goddard Space Flight Center GOLD Rules

The GSFC (Goddard Space Flight Center) GOLD Rules (Goddard Open Learning Design; GSFC-STD-1000) provide a reasonably comprehensive list of guidelines for the design and testing of spacecraft and instruments based on the long heritage of successful GSFC missions. In general, all GSFC missions are required to comply with the GOLD Rules across a number of subsystems or to seek waivers to particular GOLD rules where compliance is not practical, either due to the risk posture of a mission or the cost and/or schedule associated with compliance. In thermal subsystems, GOLD Rules are applied to design margins throughout the project life cycle and include temperature margins, heater power margins, and two-phase transport margins. However, no explicit guidance is provided for two thermal design aspects: heater control authority (for stability requirements) and cryogenic design margins (which are often not reasonable to express in terms of temperatures). This can lead to ambiguity and inconsistency among projects when demonstrating GOLD Rules compliance. Two current GSFC projects, TIRS-2 (Thermal InfraRed Sensor 2) and WFIRST (Wide Field InfraRed Survey Telescope), are both missions with cryogenic aspects and active thermal control for stability. This paper seeks to outline the characterization of cryogenic margins during the design process for TIRS-2 and WFIRST as well as the project derived guidelines for heater control authority margin. This effort serves as potential first steps for updating the GOLD Rules to address these two areas in guiding thermal designs at GSFC.

Modeling↗

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.

distributed propulsion↗

Photovoltaic central-station power conditioner subsystems

The potential of applying new advanced circuit topologies and semiconductors with improved switching characteristics to the design and development of central-station power conditioning subsystems is assessed. State-of-the-art large power conditioners suitable for photovoltaic central-station application are reviewed. Advanced topology power conditioning subsystems, when compared to available production hardware, promise improved performance, significant cost reduction, and lower cost-to-efficiency ratios.

Krauthamer, S.↗

Multidisciplinary Design Optimization Techniques: Implications and Opportunities for Fluid Dynamics Research

A challenge for the fluid dynamics community is to adapt to and exploit the trend towards greater multidisciplinary focus in research and technology. The past decade has witnessed substantial growth in the research field of Multidisciplinary Design Optimization (MDO). MDO is a methodology for the design of complex engineering systems and subsystems that coherently exploits the synergism of mutually interacting phenomena. As evidenced by the papers, which appear in the biannual AIAA/USAF/NASA/ISSMO Symposia on Multidisciplinary Analysis and Optimization, the MDO technical community focuses on vehicle and system design issues. This paper provides an overview of the MDO technology field from a fluid dynamics perspective, giving emphasis to suggestions of specific applications of recent MDO technologies that can enhance fluid dynamics research itself across the spectrum, from basic flow physics to full configuration aerodynamics.

Zang, Thomas A.↗

ISRU Technology Development for Extraction of Water from the Mars Surface

Goals: Develop technologies to extract water from planetary regolith considering production rate vs: energy/power consumption (efficiency, yield, heat recuperation options); Mass and sizing: modularity, batch sizes, soil feed options, etc.; Ruggedness in terms of soil, environmental, and operational parameters; seals and component wear, etc.; Removal of product and disposal of spent material. Summary: Technology development is underway for several ISRU water extraction hardware concepts for Mars application - Hydrated minerals (Auger dryer, Microwave, Open Air), Subsurface Ice (Rodwell); Models are developed with experimental and breadboard efforts for use in larger ISRU system models; Each effort consists of a 3 year development plan, with the goal of integrating into a larger subsystem test in 2020 - Concurrent technology advance allows for flexibility in system design; depending on architecture decisions and progress of associated subsystems.

In-Situ Resource Utilization↗

Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 2: Final report

Lockheed personnel, along with team member subcontractors and consultants, have performed a preliminary design for the LAWS Instrument. Breadboarding and testing of a LAWS class laser have also been performed. These efforts have demonstrated that LAWS is a feasible Instrument and can be developed with existing state-of-the-art technology. Only a commitment to fund the instrument development and deployment is required to place LAWS in orbit and obtain the anticipated science and operational forecasting benefits. The LAWS Science Team was selected in 1988-89 as were the competing LAWS phase 1/2 contractor teams. The LAWS Science Team developed requirements for the LAWS Instrument, and the NASA/LAWS project office defined launch vehicle and platform design constraints. From these requirements and constraints, the lockheed team developed LAWS Instrument concepts and configurations. A system designed to meet these requirements and constraints is outlined. The LAWS primary subsystem and interfaces - laser, optical, and receiver/processor - required to assemble a lidar are identified. Also identified are the support subsystems required for the lidar to function from space: structures and mechanical, thermal, electrical, and command and data management. The Lockheed team has developed a preliminary design of a LAWS Instrument System consisting of these subsystems and interfaces which will meet the requirements and objectives of the Science Team. This final report provides a summary of the systems engineering analyses and trades of the LAWS. Summaries of the configuration, preliminary designs of the subsystems, testing recommendations, and performance analysis are presented. Environmental considerations associated with deployment of LAWS are discussed. Finally, the successful LAWS laser breadboard effort is discussed along with the requirements and test results.

Wilson, D. J.↗

An advanced technology space station for the year 2025, study and concepts

A survey was made of potential space station missions that might exist in the 2020 to 2030 time period. Also, a brief study of the current state-of-the-art of the major subsystems was undertaken, and trends in technologies that could impact the subsystems were reviewed. The results of the survey and study were then used to arrive at a conceptual design of a space station for the year 2025. Factors addressed in the conceptual design included requirements for artificial gravity, synergies between subsystems, and the use of robotics. Suggestions are made relative to more in-depth studies concerning the conceptual design and alternative configurations.

Queijo, M. J.↗

Sequential design of a linear quadratic controller for the Deep Space Network antennas

A new linear quadratic controller design procedure is proposed for the NASA/JPL Deep Space Network antennas. The antenna model is divided into a tracking subsystem and a flexible subsystem. Controllers for the flexible and tracking parts are designed separately by adjusting the performance index weights. Ad hoc weights are chosen for the tracking part of the controller and the weights of the flexible part are adjusted. Next, the gains of the tracking part are determined, followed by the flexible controller final tune-up. In addition, the controller for the flexible part is designed separately for each mode; thus the design procedure consists of weight adjustment for small-size subsystems. Since the controller gains are obtained by adjusting the performance index weights, determination of the weight effect on system performance is a crucial task. A method of determining this effect that allows an on-line improvement of the tracking performance is presented in this article. The procedure is illustrated with the control system design for the Deep Space Station (DSS)-13 antenna.

Gawronski, W.↗

A study of spacecraft technology and design concepts. Volume 2: Appendices

Electrical, mechanical, and software subsystem needs in the Post 1990 space operations environment are considered as well as the effect of radiation environment on spacecraft configuration. Criteria are given for selecting a specific design or technology concept from among the alternatives available.

Zylius, F. A.↗