Technology Development: From Idea to Implementation - 12131

There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be integrated into complicated flow sheets. Then fully informed decisions can be made to usher technology development ideas through project implementation. Examples from active technology development projects, Tank 48 Treatment and Enhanced Chemical Cleaning, are presented. This model for technology development integrates several tools and activities to provide a logical method for maturing new ideas and technologies. It provides a framework to develop a good idea into a full up design/build project. This model defines a set of integrated tasks to mature the technology and define scope, cost and schedule necessary to make business decisions for implementing technology development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing and improving regulatory communication processes: the case of the WIPP CRA - 15151

This paper will focus on how and why effective communication is useful and meaningful for a multi-organizational project team and the concrete practices through which this team assessed and intervened in its communication. First, the effort generated five recommendations that may be useful in other similar projects. The five primary areas of improvement include the use of an electronic platform for collaboration and document sharing, the continued use of an in-house technical editor, improved direction for authors and technical editors, improved comment resolution process (development of Communication Guidelines) and improved management of the project schedule. These areas for improvement were translated into process changes that were identified and agreed upon by the team. Specific actions were assigned to members of the team with the intent to streamline the complex regulatory process. Second, and more importantly, we demonstrate how the assessment of communication, thinking about our communication practices together (reflexive engagement), and the implementation of insights about communication fit into a larger continuous improvement framework. Third, the experience of the interdisciplinary team provided preliminary evidence about the efficacy of the approach and the need for continuous engagement with communication. The intensified participation in the second assessment encouraged greater ownership and satisfaction with corrective actions. The substance of the recommendations was made more robust as well, focusing on improving communication within the project team. Early anecdotal evidence suggests that improvements in communications continue to enhance the project team's efficiency and efficacy of the planning phase through submittal of the Compliance Re-certification Application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative Study of the Standards and Guides of a Management System Applicable to Radioactive Waste - Paper 18292

A Management System may be defined as a set of standardized and interrelated practices that aim to improve effectiveness and produce better results. This system should be structured in such a way as to allow essential information to flow properly within the organization, including technical, administrative, production and human resources information, among others, within an adopted compliance model. There are, currently, several standards and guidelines for structuring a compliance model related to a management system. A system that covers various aspects of management in a single system is usually called integrated. Only the International Atomic Energy Agency - IAEA has a guide with this approach for radioactive waste: GS-G-3.3, 'The Management System for the Processing, Handling and Storage of Radioactive Waste' and GS-G-3.4, 'The Management System for the Disposal of Radioactive Waste'. The objective of this work is to present a comparison between existing standards, even if not specific for the management of radioactive waste, but which are widely used by companies. In due course, the result of this work will be object of proposal for specific standard to be presented to regulatory agency for this type of activity. This study should be useful for countries where there are no specific guidelines by the regulatory agency, adopting the best standard or guide as a conformity standards, creating and establishing a hybrid structure best suited to the safety and security aspects of the local culture. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for an Integrated Web-Based Workbench for Data Access and Analysis - 20244

Management of environmental issues can require integration of multiple types of data and information, conducting data analysis and interpretation, and providing data visualization for effective communications. These data elements are important for site management to support regulator interactions and provide defensibility for remedial decisions. Databases and information repositories are core elements of managing data; however, efficient data access and analysis also enable effective site management. The U.S. Department of Energy (DOE) Hanford Site is an example of a complex site with a voluminous quantity of environmental data and a need for efficient site management. Different tiers of data and information tools have been developed and deployed to address site needs. These tools are configured for ready access via the web site interfaces and meet the rigorous quality requirements for environmental site management. Evolving efforts are focused on an integrated platform to meet site environmental management needs. In this platform, users can access site information at multiple levels of detail based on their need and permissions, so that data and associated analyses are presented within the context of the site mission and the user's management or technical needs. This concept is not only applicable at individual sites like Hanford but also applicable at other sites within the DOE complex. An integrated web-based architecture that links data visualization, data analytics, and management tools can provide holistic access to large data sets, minimize complexity, and maximize interactivity and technical communication. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Business Models for Scaling Demand Flexibility Volume III – Stakeholder ecosystem management challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility program stakeholder ecosystem management strategies, which provide information on value delivery and describe how program implementers leverage partner capabilities and collaborate to deliver customer and grid benefits. This report discusses the role of stakeholder ecosystem management in demand flexibility programs, identifies existing challenges to effective stakeholder management, and describes lessons learned. This report is part of a series that includes reports on value propositions, customer relationship management strategies, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2018 LDRD Annual Report (Argonne National Laboratory)

Argonne National Laboratory’s Laboratory Directed Research and Development (LDRD) program encourages the development of novel technical concepts, enhances the Laboratory’s research and development (R&D) capabilities, and enables pursuit of strategic laboratory goals. Argonne’s LDRD projects are proposal based and peer reviewed, supporting ideas that require advanced exploration so they can be sufficiently developed to pursue support through normal programmatic channels. Among the aims of the projects supported by the LDRD program are the establishment of engineering proofs of principle, assessment of design feasibility for prospective facilities, development of instrumentation or computational methods or systems, and discoveries in fundamental science and exploratory development. All LDRD projects have demonstrable ties to one or more of the science, energy, environment, and national security missions of the U.S. Department of Energy (DOE) and its National Nuclear Security Administration (NNSA), and many are also relevant to the missions of other federal agencies that sponsor work at Argonne. A natural consequence of the more “applied” type projects is their concurrent relevance to industry. The LDRD program is managed in overarching portfolios, each containing multiple projects each fiscal year. The LDRD Prime portfolio is further divided into strategic focus areas aligned with Argonne’s strategic plan. The largest component of Argonne’s program is LDRD Prime, which emphasizes R&D explicitly aligned with Laboratory major initiatives in support of Argonne’s strategic plan. The choice of Focus Areas under the LDRD Prime component reflects the major initiatives; the state of development of relevant technical fields; the potential value of advancing those fields to DOE/NNSA and the nation; and the compatibility of the fields with existing facilities, capabilities, and staff expertise at Argonne. Focus Areas with projects that ended in FY18 are: Advanced Computing, Biological and Environmental Science Capability Development, Energy Manufacturing Science and Engineering, Hard X-ray Sciences, Materials and Chemistry, Securing Energy and Critical Resources, and The Universe as Our Laboratory (ULab).

99 GENERAL AND MISCELLANEOUS↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Management Plan/Progress Report: UT/GTKS Training Program Development for Commercial Building Operators (Final Report)

Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Technology Performance Exchange [Fact Sheet]

This fact sheet, 'The Technology Performance Exchange' will be presented at the ET Summit, held at the Pasadena Convention Center on October 15-17, 2012. The Technology Performance Exchange will be a centralized, Web-based portal for finding and sharing energy performance data for commercial building technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smart Labs Accelerator: I2SL China

Presentation offers an overview of energy-efficient Smart Labs, including the benefits, the program, and what it takes to develop one.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Study on Shielding Requirements for Radioactive Waste Transportation in a Mo-99 Production Plant - 13382

Brazil is currently planning to produce {sup 99}Mo from fission of low enriched uranium (LEU) targets. The planned end of irradiation activity of {sup 99}Mo is about 185 TBq (5 kCi) per week to meet the present domestic demand of {sup 99m}Tc generators. The radioactive wastes from the production plant will be transferred to a waste treatment facility at the same site. The total activity of the actinides, fission and activation products present in the wastes can be predicted based on the yields of fission and activation data for the irradiation conditions, such as composition and mass of uranium targets, irradiation time, neutron flux, production schedule, etc., which were in principle already established by the project management. The transportation of the wastes from the production plant to the treatment facility will be done by means of special shielded packages. An assessment of the shielding required for the packages has been done and the results are presented here, aiming at contributing to the design of the waste management facility for the {sup 99}Mo production plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗