Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Mars Observer mission design

The spacecraft for the Mars Observer mission is described, and an interplanetary trajectory design maximizing the spacecraft dry mass delivered into its mapping orbit is presented, along with an orbit insertion strategy minimizing spacecraft propulsive requirements. Emphasis is placed on the mapping orbit designed to meet the science requirements for a low-altitude near-circular near-polar orbit which is sun-synchronous with the dayside equatorial crossing at 2 PM local mean solar time. Additional requirements on the design are that the mapping orbit have a repeating groundtrack of no more than 7 sols and comply with the NASA Planetary Protection requirements. It is planned to operate the spacecraft and instruments in a repetitive fashion to minimize mission operation complexity and cost.

Beerer, Joseph G.↗

Gravitational radiation observations on the moon

The paper discusses the features of a laser-interferometer gravitational-wave observatory (LIGO) which is planned for operation in the Unitied States, with special attention given to the benefits gained from an addition of a low-mass laser gravitational wave antenna on the moon to the earth-based antennas. It is pointed out that the addition of a moon-based antenna would improve the angular resolution for burst signals by a factor of about 50 (in the plane containing the source, the moon, and the earth), which would be of major importance in studies of gravitational wave sources.

Stebbins, R. T.↗

Space Station Freedom status

Several graphs are presented which illustrate the restructuring activities of the Space Station Freedom. The restructed SSF program meets the objectives including cost guidelines. The solution adopted best features from alternative concepts. The SSF program allows significantly greater utilization opportunities than other programs. It was decided that pre-integration simplifies on-orbit assembly planning and operations. The SSF permanently manned configuration is shown.

Cox, John↗

Requirements analysis notebook for the flight data systems definition in the Real-Time Systems Engineering Laboratory (RSEL)

A hybrid requirements analysis methodology was developed, based on the practices actually used in developing a Space Generic Open Avionics Architecture. During the development of this avionics architecture, a method of analysis able to effectively define the requirements for this space avionics architecture was developed. In this methodology, external interfaces and relationships are defined, a static analysis resulting in a static avionics model was developed, operating concepts for simulating the requirements were put together, and a dynamic analysis of the execution needs for the dynamic model operation was planned. The systems engineering approach was used to perform a top down modified structured analysis of a generic space avionics system and to convert actual program results into generic requirements. CASE tools were used to model the analyzed system and automatically generate specifications describing the model's requirements. Lessons learned in the use of CASE tools, the architecture, and the design of the Space Generic Avionics model were established, and a methodology notebook was prepared for NASA. The weaknesses of standard real-time methodologies for practicing systems engineering, such as Structured Analysis and Object Oriented Analysis, were identified.

Wray, Richard B.↗

TQM in a test environment

In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.

Chambers, Gary D.↗

Integrated flexible manufacturing program for manufacturing automation and rapid prototyping

The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.

Brooks, S. L.↗

Automation and robotics human performance

The scope of this report is limited to the following: (1) assessing the feasibility of the assumptions for crew productivity during the intra-vehicular activities and extra-vehicular activities; (2) estimating the appropriate level of automation and robotics to accomplish balanced man-machine, cost-effective operations in space; (3) identifying areas where conceptually different approaches to the use of people and machines can leverage the benefits of the scenarios; and (4) recommending modifications to scenarios or developing new scenarios that will improve the expected benefits. The FY89 special assessments are grouped into the five categories shown in the report. The high level system analyses for Automation & Robotics (A&R) and Human Performance (HP) were performed under the Case Studies Technology Assessment category, whereas the detailed analyses for the critical systems and high leverage development areas were performed under the appropriate operations categories (In-Space Vehicle Operations or Planetary Surface Operations). The analysis activities planned for the Science Operations technology areas were deferred to FY90 studies. The remaining activities such as analytic tool development, graphics/video demonstrations and intelligent communicating systems software architecture were performed under the Simulation & Validations category.

Mah, Robert W.↗

HYDROSAT - An instrument platform for hydrology

This paper discusses a multisensor satellite approach for the study of hydrological applications. Spectral as well as spatial and temporal characteristics of specific operational and planned instruments applicable to hydrology are presented. A hydrology specific series of sensors are proposed to fill the gaps not covered by the current and planned systems. We have called this hypothetical platform HYDROSAT. In addition, the trade-offs between a geostationary satellite and a polar orbiter are explored.

Ormsby, J. P.↗

Performance of the Cryogenic Heat Pipe Experiment

The Cryogenic Heat Pipe (CRYOHP) Experiment has been designed to test two cryogenic heat pipes independently in a micro-gravity environment. The CRYOHP experiment is manifested for flight aboard the shuttle (STS-53) which is scheduled for launch in November, 1992. This paper presents the design of this experiment and the thermal vacuum verification test results. A correlation of the test data and the planned mission operations are also provided.

Brennan, Patrick J.↗

Path planning algorithms for assembly sequence planning

Planning for manipulation in complex environments often requires reasoning about the geometric and mechanical constraints which are posed by the task. In planning assembly operations, the automatic generation of operations sequences depends on the geometric feasibility of paths which permit parts to be joined into subassemblies. Feasible locations and collision-free paths must be present for part motions, robot and grasping motions, and fixtures. This paper describes an approach to reasoning about the feasibility of straight-line paths among three-dimensional polyhedral parts using an algebra of polyhedral cones. A second method recasts the feasibility conditions as constraints in a nonlinear optimization framework. Both algorithms have been implemented and results are presented.

Krishnan, S. S.↗

Pax: A permanent base for human habitation of Mars

The Advanced Design Program in Space Architecture at the University of Wisconsin-Milwaukee supported the synthesis report and two of its scenarios - 'Architecture 1' and 'Architecture 4' - and the Weaver ExPO report on near-term extraterrestrial explorations during the spring of 1992. The project investigated the implications of different mission scenarios, the Martian environment, supporting technologies, and especially human factors and environment-behavior considerations for the design of the first permanent Martian base. This paper presents the results of that investigation. The paper summarizes site selection, development of habitability design requirements based on environment-behavior research, construction sequencing, and a full concept design and design development for a first permanent Martian base and habitat. The proposed design is presented in terms of an integrative mission scenario and master plan phased through initial operational configuration, base site plan, and design development details of a complete Martian habitat for 18 crew members including all laboratory, mission control, and crew support spaces.

Moore, Gary T.↗

Channel characterisation for future Ka-band Mobile Satellite Systems and preliminary results

Mobile satellite systems (MSS) are presently designed or planned to operate, with the exception of OMNITRACKS, in the lower part of the frequency spectrum (UHF to S-bands). The decisions taken at the last World Administrative Radio Conference in 1992 to increase the allocated L- and S-bands for MSS services will only partly alleviate the problem of system capacity. In addition the use of L-and S-band frequencies generally requires large antenna apertures on board the satellite terminal side. The idea of exploiting the large spectrum resources available at higher frequencies (20-30 GHz) and the perspective of reducing user terminal size (and possibly price too) have spurred the interest of systems designers and planners. On the other hand, Ka-band frequencies suffer from increased slant path losses due to atmospheric attenuation phenomena. The European Space Agency (ESA) has recently embarked on a number of activities aimed at studying the effect of the typical mobile propagation impairments at Ka-band. This paper briefly summarizes ESA efforts in this field of research and presents preliminary experimental results.

Sforza, Mario↗

Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

Hammond, Wesley↗

The Edison infrared space observatory and the study of extra-solar planetary material

Edison is a proposed large-aperture, radiatively-cooled space observatory planned to operate at wavelengths between 2 and 130 micrometers or longer. Current estimates for the telescope allow an aperture of 1.7 m which will achieve a final equilibrium temperature of about 30 K, although use of cryocoolers may permit temperatures below 20 K. Edison will be a powerful tool to investigate our Solar System, as well as planetary material around distant stars. At near- and mid-infrared wavelengths, where planetary material emits most of its radiation, Edison will be the most sensitive photometric and spectroscopic observatory under current consideration by the space agencies. With its large aperture, Edison will be able both to resolve the structure in nearby circumstellar 'Vega disks' and to discriminate faint IR emission in the crowded environment of the galactic plane. With its long lifetime, Edison will allow extensive follow-up observations and increase the likelihood of catching transient events. We propose Edison as a precursor to elements of a future space-based IR interferometer.

Thronson, H. A., Jr.↗

Mission 59 to survey earth with multiband radar

The preparations for Space Shuttle Mission 59 are described, as are the planned mapping operations of the Space Imaging Radar C (SIR-C). Crew tasks and shuttle maneuvers during the 18 million square mile Earth mapping mission are also outlined.

Mckenna, James T.↗

Improvements In Ball-Screw Linear Actuators

Report describes modifications of design of type of ball-screw linear actuator driven by dc motor, with linear-displacement feedback via linear variable-differential transformer (LVDT). Actuators used to position spacecraft engines to direct thrust. Modifications directed toward ensuring reliable and predictable operation during planned 12-year cruise and interval of hard use at end of cruise.

Iskenderian, Theodore↗

Catalog of solar wind events identified from observations by ISTP spacecraft

The ISTP Science Planning and Operations Facility (SPOF), in collaboration with ISTP investigators, is developing a catalog of solar wind events and features. The catalog is primarily based on plasma and magnetic field observations from the WIND and IMP-8 spacecraft. Interplanetary events that may trigger magnetospheric activity are included as well as features of interest for using the solar wind as a plasma laboratory. Catalog coverage begins on September 8, 1992, the start of ISTP science data collection. The catalog is based on Key Parameter data sets (preliminary summary data at approximately 1 min time resolution produced quickly for survey purposes) and as such has limited citability in formal scientific work. Its primary intent is to serve as a reference for identifying candidate periods for further study, such as may be the focus of coordinated data analysis efforts during ISTP and/or IACG Science Campaigns. To facilitate access by members of the ISTP and wider space physics communities, the catalog will be available on the World Wide Web. The contents of the catalog will be described, and samples of catalog information will be presented.

Peredo, M.↗

Scientific visualization tools for the ISTP project: Mission planning, data analysis and model interpretation

Visualization tools are being developed to meet the challenges of mission planning and data analysis presented by the International Solar-Terrestrial Physics (ISTP) program. ISTP encompasses a large number of spacecraft, multiple ground-based observatories, and several theoretical investigations, with the goal of understanding the global behavior of the solar wind/magnetosphere/ionosphere system. The tools include three-dimensional displays of key boundaries in geospace along with spacecraft trajectories, which can be animated and synchronized to universal time. Magnetic field models and MHD simulation results can be invoked to reveal the magnetic topology or to identify magnetic conjunctions between spacecraft and/or ground-based facilities. Simultaneous displays of satellite trajectories, spacecraft-borne observations, and model predictions are available to facilitate data processing and interpretation efforts. The current status of these tools is described, and their implementation at the ISTP Science Planning and Operations Facility and distribution to the entire ISTP community are discussed.

Peredo, M.↗