Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Securing Environmental IoT Data Using Masked Authentication Messaging Protocol in a DAG-Based Blockchain: IOTA Tangle

The demand for the digital monitoring of environmental ecosystems is high and growing rapidly as a means of protecting the public and managing the environment. However, before data, algorithms, and models can be mobilized at scale, there are considerable concerns associated with privacy and security that can negatively affect the adoption of technology within this domain. In this paper, we propose the advancement of electronic environmental monitoring through the capability provided by the blockchain. The blockchain’s use of a distributed ledger as its underlying infrastructure is an attractive approach to counter these privacy and security issues, although its performance and ability to manage sensor data must be assessed. We focus on a new distributed ledger technology for the IoT, called IOTA, that is based on a directed acyclic graph. IOTA overcomes the current limitations of the blockchain and offers a data communication protocol called masked authenticated messaging for secure data sharing among Internet of Things (IoT) devices. We show how the application layer employing the data communication protocol, MAM, can support the secure transmission, storage, and retrieval of encrypted environmental sensor data by using an immutable distributed ledger such as that shown in IOTA. Finally, we evaluate, compare, and analyze the performance of the MAM protocol against a non-protocol approach.

Gangwani, Pranav (ORCID:0000000159226002)↗

Advances in solid polymer electrolyte fuel cell technology with low-platinum-loading electrodes

The Gemini Space program demonstrated the first major application of fuel cell systems. Solid polymer electrolyte fuel cells were used as auxiliary power sources in the spacecraft. There has been considerable progress in this technology since then, particularly with the substitution of Nafion for the polystyrene sulfonate membrane as the electrolyte. Until recently the performance was good only with high platinum loading (4 mg/sq cm) electrodes. Methods are presented to advance the technology by (1) use of low platinum loading (0.35 mg/sq cm) electrodes; (2) optimization of anode/membrane/cathode interfaces by hot pressing; (3) pressurization of reactant gases, which is most important when air is used as cathodic reactant; and (4) adequate humidification of reactant gases to overcome the water management problem. The high performance of the fuel cell with the low loading of platinum appears to be due to the extension of the three dimensional reaction zone by introduction of a proton conductor, Nafion. This was confirmed by cyclic voltammetry.

Srinivasan, Supramaniam↗

Utilization of Hydrologic Remote Sensing Data in Land Surface Modeling and Data Assimilation: Current Status and Challenges

Recent advances in remote sensing technologies have enabled the monitoring and measurement of the Earth's land surface at an unprecedented scale and frequency. The myriad of these land surface observations must be integrated with the state-of-the-art land surface model forecasts using data assimilation to generate spatially and temporally coherent estimates of environmental conditions. These analyses are of critical importance to real-world applications such as agricultural production, water resources management and flood, drought, weather and climate prediction. This need motivated the development of NASA Land Information System (LIS), which is an expert system encapsulating a suite of modeling, computational and data assimilation tools required to address challenging hydrological problems. LIS integrates the use of several community land surface models, use of ground and satellite based observations, data assimilation and uncertainty estimation techniques and high performance computing and data management tools to enable the assessment and prediction of hydrologic conditions at various spatial and temporal scales of interest. This presentation will focus on describing the results, challenges and lessons learned from the use of remote sensing data for improving land surface modeling, within LIS. More specifically, studies related to the improved estimation of soil moisture, snow and land surface temperature conditions through data assimilation will be discussed. The presentation will also address the characterization of uncertainty in the modeling process through Bayesian remote sensing and computational methods.

Kumar, Sujay V.↗

Real-time forecasting of electricity demand in a streams-based architecture with applications

A streams platform is used. Multiple streams of electricity usage data are received, each from an electrical meter providing periodic updates to electrical usage for devices connected to the electrical meter. Weather information is received corresponding to locations where the electrical meters are. Real-time predictive modeling of electricity demand is performed based on the received multiple streams of electricity usage data and the received weather information, at least by performing: updating a state space model for electrical load curves using the usage data from the streams and the weather, wherein the updating uses current load observations for the multiple streams for a current time period; and creating forecast(s) for the electricity demand. The forecast(s) of the electricity demand are output. Appliance-level predictions may be made and used, and substitution effects and load management functions may be performed.

Ghosh, Soumyadip↗

An extended conventional fuel cycle for the B and W mPower{sup TM} small modular nuclear reactor

The B and W mPower{sup TM} reactor is a small pressurized water reactor (PWR) with an integral once-through steam generator and a thermal output of about 500 MW; it is intended to replace aging fossil power plants of similar output. The core is composed of 69 reduced-height PWR assemblies with the familiar 17 x 17 fuel rod array. The Babcock and Wilcox Company (B and W) is offering a core loading and cycle management plan for a four-year cycle based on its presumed attractiveness to potential customers. This option is a once-through fuel cycle in which the entire core is discharged and replaced after four years. In addition, a conventional fuel utilization strategy, employing a periodic partial reload and shuffle, was developed as an alternative to the four-year once-through fuel cycle. This study, which was performed using the Studsvik core design code suite, is a typical multi-cycle projection analysis of the type performed by most fuel management organizations such as fuel vendors and utilities. In the industry, the results of such projections are used by the financial arms of these organizations to assist in making long-term decisions. In the case of the B and W mPower reactor, this analysis demonstrates flexibility for customers who consider the once-through fuel cycle unacceptable from a fuel utilization standpoint. As expected, when compared to the once-through concept, reloads of the B and W mPower reactor will achieve higher batch average discharge exposure, will have adequate shut-down margin, and will have a relatively flat hot excess reactivity trend at the expense of slightly increased peaking. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scalable Memory Registration for High-Performance Networks Using Helper Threads

Remote DMA (RDMA) enables high performance networks to reduce data copying between an application and the operating system (OS). However RDMA operations in some high performance networks require communication memory explicitly registered with the network adapter and pinned by the OS. Memory registration and pinning limits the flexibility of the memory system and reduces the amount of memory that user processes can allocate. These issues become more significant on multicore platforms, since registered memory demand grows linearly with the number of processor cores. In this paper we propose a new memory registration/deregistration strategy to reduce registered memory on multicore architectures for HPC applications. We hide the cost of dynamic memory management by offloading all dynamic memory registration and deregistration requests to a dedicated memory management helper thread. We investigate design policies and performance implications of the helper thread approach. We evaluate our framework with the NAS parallel benchmarks, for which our registration scheme significantly reduces the registered memory (23.62% on average and up to 49.39%) and avoids memory registration/deregistration costs for reused communication memory. We show that our system enables the execution of problem sizes that could not complete under existing memory registration strategies.

99 GENERAL AND MISCELLANEOUS↗

Superstructure-based optimal synthesis of pressure swing adsorption cycles for precombustion CO2 capture

The grand challenge facing the power and energy industries is the development of efficient, environmentally friendly, and affordable technologies for next-generation energy systems. To provide solutions for energy and the environment, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) and its research partners in industry and academia are relying increasingly on the use of sophisticated computer-aided process design and optimization tools. In this paper, we describe recent progress toward developing an Advanced Process Engineering Co-Simulator (APECS) for the high-fidelity design, analysis, and optimization of energy plants. The APECS software system combines steady-state process simulation with multiphysics-based equipment simulations, such as those based on computational fluid dynamics (CFD). These co-simulation capabilities enable design engineers to optimize overall process performance with respect to complex thermal and fluid flow phenomena arising in key plant equipment items, such as combustors, gasifiers, turbines, and carbon capture devices. In this paper we review several applications of the APECS co-simulation technology to advanced energy systems, including coal-fired energy plants with carbon capture. This paper also discusses ongoing co-simulation R&D activities and challenges in areas such as CFD-based reduced-order modeling, knowledge management, advanced analysis and optimization, and virtual plant co-simulation. Continued progress in co-simulation technology – through improved integration, solution, and deployment – will have profound positive impacts on the design and optimization of high-efficiency, near-zero emission fossil energy systems. Published by Elsevier Ltd.

97 MATHEMATICS AND COMPUTING↗

IRAS cryogenic system flight performance report

It is pointed out that the Infrared Astronomical Satellite (IRAS) is the first telescope to perform observations in the far infrared from orbit. IRAS was launched on January 25, 1983 into a 900 km orbit. The use of the first large superfluid helium dewar in space makes it possible to provide a 2 K telescope environment for an anticipated period of one year. A description of the cryogenic system of IRAS is presented, taking into account the superfluid helium tank, the insulation system, the vacuum shell, the aperture cover, and the fluid management system. The dynamic performance of the cryogenic system is considered along with aspects of prelaunch preparations. Details of flight performance are also discussed, giving attention to transient performance, and steady state performance.

Urbach, A. R.↗

Exploring Infiniband Hardware Virtualization in OpenNebula towards Efficient High-Performance Computing

has been widely accepted that software virtualization has a big negative impact on high-performance computing (HPC) application performance. This work explores the potential use of Infiniband hardware virtualization in an OpenNebula cloud towards the efficient support of MPI-based workloads. We have implemented, deployed, and tested an Infiniband network on the FermiCloud private Infrastructure-as-a-Service (IaaS) cloud. To avoid software virtualization towards minimizing the virtualization overhead, we employed a technique called Single Root Input/Output Virtualization (SRIOV). Our solution spanned modifications to the Linux’s Hypervisor as well as the OpenNebula manager. We evaluated the performance of the hardware virtualization on up to 56 virtual machines connected by up to 8 DDR Infiniband network links, with micro-benchmarks (latency and bandwidth) as well as w a MPI-intensive application (the HPL Linpack benchmark).

Pais Pitta de Lacerda Ruivo, Tiago↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

Koenig, John C.↗

Freescale Semiconductor Successfully Implements an Energy Management System

Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

Case Study↗

Two-phase behavior and compression effects in the PEFC gas diffusion medium

A key performance limitation in the polymer electrolyte fuel cell (PEFC), manifested in terms of mass transport loss, originates from liquid water transport and resulting flooding phenomena in the constituent components. A key contributor to the mass transport loss is the cathode gas diffusion layer (GDL) due to the blockage of available pore space by liquid water thus rendering hindered oxygen transport to the active reaction sites in the electrode. The GDL, therefore, plays an important role in the overall water management in the PEFC. The underlying pore-morphology and the wetting characteristics have significant influence on the flooding dynamics in the GDL. Another important factor is the role of cell compression on the GDL microstructural change and hence the underlying two-phase behavior. In this article, we present the development of a pore-scale modeling formalism coupled With realistic microstructural delineation and reduced order compression model to study the structure-wettability influence and the effect of compression on two-phase behavior in the PEFC GDL.

Effects of adaptive task allocation on monitoring of automated systems

The effects of adaptive task allocation on monitoring for automation failure during multitask flight simulation were examined. Participants monitored an automated engine status task while simultaneously performing tracking and fuel management tasks over three 30-min sessions. Two methods of adaptive task allocation, both involving temporary return of the automated engine status task to the human operator ("human control"), were examined as a possible countermeasure to monitoring inefficiency. For the model-based adaptive group, the engine status task was allocated to all participants in the middle of the second session for 10 min, following which it was again returned to automation control. The same occurred for the performance-based adaptive group, but only if an individual participant's monitoring performance up to that point did not meet a specified criterion. For the nonadaptive control groups, the engine status task remained automated throughout the experiment. All groups had low probabilities of detection of automation failures for the first 40 min spent with automation. However, following the 10-min intervening period of human control, both adaptive groups detected significantly more automation failures during the subsequent blocks under automation control. The results show that adaptive task allocation can enhance monitoring of automated systems. Both model-based and performance-based allocation improved monitoring of automation. Implications for the design of automated systems are discussed.

Task Performance and Analysis↗

SAPHIRE 8 Quality Assurance Software Metrics Report

The purpose of this review of software metrics is to examine the quality of the metrics gathered in the 2010 IV&V and to set an outline for results of updated metrics runs to be performed. We find from the review that the maintenance of accepted quality standards presented in the SAPHIRE 8 initial Independent Verification and Validation (IV&V) of April, 2010 is most easily achieved by continuing to utilize the tools used in that effort while adding a metric of bug tracking and resolution. Recommendations from the final IV&V were to continue periodic measurable metrics such as McCabe's complexity measure to ensure quality is maintained. The four software tools used to measure quality in the IV&V were CodeHealer, Coverage Validator, Memory Validator, Performance Validator, and Thread Validator. These are evaluated based on their capabilities. We attempted to run their latest revisions with the newer Delphi 2010 based SAPHIRE 8 code that has been developed and was successful with all of the Validator series of tools on small tests. Another recommendation from the IV&V was to incorporate a bug tracking and resolution metric. To improve our capability of producing this metric, we integrated our current web reporting system with the SpiraTest test management software purchased earlier this year to track requirements traceability.

97 MATHEMATICS AND COMPUTING↗

Integrating the autonomous subsystems management process

Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

Ashworth, Barry R.↗