Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

The Research of Dr. Joanne Simpson: Fifty Years Investigating Hurricanes, Tropical Clouds and Cloud Systems

This AMS Meteorological Monographs is dedicated to Dr. Joanne Simpson for her many pioneering research efforts in tropical meteorology during her fifty-year career. Dr. Simpson's major areas of scientific research involved the "hot tower" hypothesis and its role in hurricanes, structure and maintenance of trade winds, air-sea interaction, and observations and the mechanism for hurricanes and waterspouts. She was also a pioneer in cloud modeling with the first one-dimensional model and had the first cumulus model on a computer. She also played a major role in planning and leading observational experiments on convective cloud systems. The launch of the Tropical Rainfall Measuring Mission (TRMM) satellite, a joint U.S.-Japan project, in November of 1997 made it possible for quantitative measurements of tropical rainfall to be obtained on a continuous basis over the entire global tropics. Dr. Simpson was the TRAM Project Scientist from 1986 until its launch in 1997. Her efforts during this crucial period ensured that the mission was both well planned scientifically and well engineered as well as within budget. In this paper, Dr. J. Simpson's nine specific accomplishments during her fifty-year career: (1) hot tower hypothesis, (2) hurricanes, (3) airflow and clouds over heated islands, (4) cloud models, (5) trade winds and their role in cumulus development, (6) air-sea interaction, (7) cloud-cloud interactions and mergers, (8) waterspouts, and (9) TRMM science, will be described and discussed.

Tao, W. -K.↗

Can Water-Injected Turbomachines Provide Cost-Effective Emissions and Maintenance Reductions?

An investigation has been performed to evaluate the effect of water injection on the performance of the Air Force Research Laboratory (AFRL, Wright-Patterson Air Force Base (WPAFB)) experimental trapped vortex combustor (TVC) over a range of fuel-to-air and water-to-fuel ratios. Performance is characterized by combustor exit quantities: temperature and emissions measurements using rakes, and overall pressure drop, from upstream plenum to combustor exit. Combustor visualization is performed using gray-scale and color still photographs and high-frame-rate videos. A parallel investigation evaluated the performance of a computational fluid dynamics (CFD) tool for the prediction of the reacting flow in a liquid fueled combustor (e.g., TVC) that uses water injection for control of pollutant emissions and turbine inlet temperature. Generally, reasonable agreement is found between data and NO(x) computations. Based on a study assessing the feasibility and performance impact of using water injection on a Boeing 747-400 aircraft to reduce NO(x) emissions during takeoff, retrofitting does not appear to be cost effective; however, an operator of a newly designed engine and airframe might be able to save up to 1.0 percent in operating costs. Other challenges of water injection will be discussed.

Hendricks, Robert C.↗

Optimizing Facility Operations by Applying Machine Learning to the Army Reserve Enterprise Building Control System (Final Report)

Thousands of U.S. Department of Defense (DoD) buildings have building automation systems (BASs) and/or advanced meters. Although these systems have a wealth of data, performance optimization requires time and expertise to review and act on that information. Machine learning (ML) can provide automated and actionable insights to controls operators. This demonstration implemented proven ML methods on the Army Reserve Enterprise Building Control System. ML refers to algorithms that “learn” from data and improve their performance on a given task over time. In the buildings domain these tasks range from predicting future energy consumption, to identifying operational issues before faults occur, to optimizing control decisions. To learn, ML requires input data, which – for buildings – typically consists of instrument data such as energy consumption data and subsystem controls information such as set-point temperatures, and context data consisting of information such as the physical location of the building, the area of the building, and the weather. ML models use the relationships learned from the input data to make predictions with new, previously unseen, data. The team was able to investigate and successfully implement the following ML use cases: labeling consumption data as anomalous or non-anomalous; baseline whole-building load prediction (unknown fault status); fault detection (validation not possible); and site prioritization for energy-related projects. Due to the constraints of the project, interventions were not able to be implemented during the demonstration; therefore, assessments of operational cost savings and maintenance avoided could not be performed. The project has been presented at two leading national building conferences and two additional publications to peer-reviewed journals are currently in preparation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Machine Tool Data Analytics for Digital Twin and Machine Predictive Maintenance

The primary objective of this project is to improve machining process performance using in-process machining data from the machine tool controller and external sensors. Advances in the Industrial Internet of Things (IIoT) enable monitoring of machines using controller data. Examples of the data provided by a controller include execution status of the controller, part count, block of code being executed, door status, tool position, the spindle and axis load, etc. MTConnect and OPC-UA are the two common protocols for capturing machine information. In this collaboration, methods for retrieving the machine controller data from selected machine tool controls and making these data accessible in different subsystems (such as digital twins and machine maintenance portals, etc.) will be developed and tested. In addition, analytics to improve machining process performance (by increasing productivity and reducing downtime) will be developed.

42 ENGINEERING↗

Effective Materials Property Information Management for the 21st Century

This paper discusses key principles for the development of materials property information management software systems. There are growing needs for automated materials information management in various organizations. In part these are fueled by the demands for higher efficiency in material testing, product design and engineering analysis. But equally important, organizations are being driven by the need for consistency, quality and traceability of data, as well as control of access to sensitive information such as proprietary data. Further, the use of increasingly sophisticated nonlinear, anisotropic and multi-scale engineering analyses requires both processing of large volumes of test data for development of constitutive models and complex materials data input for Computer-Aided Engineering (CAE) software. And finally, the globalization of economy often generates great needs for sharing a single "gold source" of materials information between members of global engineering teams in extended supply chains. Fortunately, material property management systems have kept pace with the growing user demands and evolved to versatile data management systems that can be customized to specific user needs. The more sophisticated of these provide facilities for: (i) data management functions such as access, version, and quality controls; (ii) a wide range of data import, export and analysis capabilities; (iii) data "pedigree" traceability mechanisms; (iv) data searching, reporting and viewing tools; and (v) access to the information via a wide range of interfaces. In this paper the important requirements for advanced material data management systems, future challenges and opportunities such as automated error checking, data quality characterization, identification of gaps in datasets, as well as functionalities and business models to fuel database growth and maintenance are discussed.

Ren, Weiju↗

Failure analysis of a cooling pump using modal and vibration analysis

Four pumps redundantly supply cooling water to a system. All four pumps underwent maintenance during a recently scheduled downtime. During preliminary evaluation following maintenance, one pump, the subject of this document, exhibited higher vibration levels compared to the other three pumps. The pump underwent further performance testing to rule out potential damage resulting from the higher vibration. Vibration analysis and modal analysis including steady state spectrum, operational deflection shape, run up transients, and modal impact have been utilized to identify dynamic characteristics that could contribute to the increased vibration levels. This article will cover the testing setup, methodology, analysis results, and recommendations.

42 ENGINEERING↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar Scout Two spacecraft gravity experiment

Measurement of the gravity field of the Moon has a high science priority because of its implications for the internal structure and thermal history of the Moon, and it has a high priority for future exploration activities because of the influence of lunar gravity on spacecraft navigation and orbit maintenance. The current state of knowledge in the lunar gravity field (and the uncertainty in the knowledge) is based primarily on data accumulated from the Lunar Orbiter and Apollo programs. Data are sparse and emphasize the equatorial band (+/- 30 deg) on the near side of the Moon. There are no tracking data on the far side and only the Lunar Orbiter 5 provides a small amount of high inclination data. A host of gravity models developed from different combinations of tracking data have large discrepancies in their predictions of spacecraft motion and orbit lifetimes. There are also large disagreements in the Mercator projections of the gravity acceleration from each model, especially on the far side, where the contours tend to have no obvious relationship with the local topography. The science and engineering requirements for global gravity field mapping will be satisfied with continuous radio metric tracking of Lunar Scout 1 in a low polar orbit using the Deep Space Network and Lunar Scout 2 in a high elliptical orbit. The gravity field of the Moon will be mapped during the Scout Program using a two spacecraft concept. In the two spacecraft concept, one spacecraft is placed in a high altitude eccentric orbit while the second spacecraft is in a low altitude polar orbit. The gravity experiment requires a radio frequency that will permit two-way Doppler tracking between the spacecraft and the Deep Space Network (DSN). Both spacecraft carry NASA standard transponder systems for data transmission to Earth as well as for tracking and orbit determination. Data sufficient to produce a gravity field map could be acquired within one month with this system.

Cheng, Andrew F.↗

JPL Thermal Design Modeling Philosophy and NASA-STD-7009 Standard for Models and Simulations - A Case Study

The Standard JPL thermal engineering practice prescribes worst-case methodologies for design. In this process, environmental and key uncertain thermal parameters (e.g., thermal blanket performance, interface conductance, optical properties) are stacked in a worst case fashion to yield the most hot- or cold-biased temperature. Thus, these simulations would represent the upper and lower bounds. This, effectively, represents JPL thermal design margin philosophy. Uncertainty in the margins and the absolute temperatures is usually estimated by sensitivity analyses and/or by comparing the worst-case results with "expected" results. Applicability of the analytical model for specific design purposes along with any temperature requirement violations are documented in peer and project design review material. In 2008, NASA released NASA-STD-7009, Standard for Models and Simulations. The scope of this standard covers the development and maintenance of models, the operation of simulations, the analysis of the results, training, recommended practices, the assessment of the Modeling and Simulation (M&S) credibility, and the reporting of the M&S results. The Mars Exploration Rover (MER) project thermal control system M&S activity was chosen as a case study determining whether JPL practice is in line with the standard and to identify areas of non-compliance. This paper summarizes the results and makes recommendations regarding the application of this standard to JPL thermal M&S practices.

thermal blanket performance↗

Target Diagnostic Menu Lawrence Livermore National Laboratory SYSM-5620: Design Thinking and Systems Engineering

Target Diagnostic’s Engineering Science (TDES) currently supports over 80 diagnostic systems, all of which draw from a fixed budget that covers staff time and procurement. As the division continues to add new diagnostics, demand on these limited resources increases, yet the budget remains unchanged. Shot Responsible Individuals (RIs) have unrestricted freedom to select any number or type of diagnostics for each experiment, often by copying previous shot configurations with only minor modifications. This practice makes it easy to generate new shots but does not encourage critical evaluation of diagnostic necessity. As a result, many diagnostics are routinely included in a shot without a clear justification, and in practice, much of the data collected is not analyzed. The ever-growing arsenal of diagnostics also increases the burden on TDES personnel, requiring more staff for support, maintenance, and service. This environment creates challenges in focusing resources on diagnostics that provide the greatest value to the NIF mission and raises concerns about the continued justification for maintaining all existing systems. The static TDES budget cannot sustain the ongoing growth in demand for new diagnostic systems. Shot RIs currently face no constraints on the number or type of diagnostics they assign to each experiment, often defaulting to previous configurations without critically assessing the necessity of each diagnostic. This results in the routine inclusion of diagnostics whose data may not be analyzed or may no longer directly support the NIF mission. Consequently, TDES is required to maintain and support an expanding set of diagnostics, straining limited resources and risking inefficient use of staff and funding. There is a need for TDES to efficiently allocate limited resources by establishing a process that requires shot RIs to critically evaluate and justify the inclusion of each diagnostic in their experiments. This process should discourage the routine, unexamined inclusion of diagnostics, support the identification of underutilized or obsolete systems, and ensure that only those diagnostics providing the greatest value to the NIF mission are maintained and supported. Ultimately, this approach must enable TDES to operate within budget constraints while maximizing scientific impact and operational efficiency.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Automated Performance Characterization of DSN System Frequency Stability Using Spacecraft Tracking Data

This software provides an automated capability to measure and qualify the frequency stability performance of the Deep Space Network (DSN) ground system, using daily spacecraft tracking data. The results help to verify if the DSN performance is meeting its specification, therefore ensuring commitments to flight missions; in particular, the radio science investigations. The rich set of data also helps the DSN Operations and Maintenance team to identify the trends and patterns, allowing them to identify the antennas of lower performance and implement corrective action in a timely manner. Unlike the traditional approach where the performance can only be obtained from special calibration sessions that are both time-consuming and require manual setup, the new method taps into the daily spacecraft tracking data. This new approach significantly increases the amount of data available for analysis, roughly by two orders of magnitude, making it possible to conduct trend analysis with good confidence. The software is built with automation in mind for end-to-end processing. From the inputs gathering to computation analysis and later data visualization of the results, all steps are done automatically, making the data production at near zero cost. This allows the limited engineering resource to focus on high-level assessment and to follow up with the exceptions/deviations. To make it possible to process the continual stream of daily incoming data without much effort, and to understand the results quickly, the processing needs to be automated and the data summarized at a high level. Special attention needs to be given to data gathering, input validation, handling anomalous conditions, computation, and presenting the results in a visual form that makes it easy to spot items of exception/ deviation so that further analysis can be directed and corrective actions followed.

Pham, Timothy T.↗

Automated Performance Characterization of DSN System Frequency Stability Using Spacecraft Tracking Data

This software provides an automated capability to measure and qualify the frequency stability performance of the Deep Space Network (DSN) ground system, using daily spacecraft tracking data. The results help to verify if the DSN performance is meeting its specification, therefore ensuring commitments to flight missions; in particular, the radio science investigations. The rich set of data also helps the DSN Operations and Maintenance team to identify the trends and patterns, allowing them to identify the antennas of lower performance and implement corrective action in a timely manner. Unlike the traditional approach where the performance can only be obtained from special calibration sessions that are both time-consuming and require manual setup, the new method taps into the daily spacecraft tracking data. This new approach significantly increases the amount of data available for analysis, roughly by two orders of magnitude, making it possible to conduct trend analysis with good confidence. The software is built with automation in mind for end-to-end processing. From the inputs gathering to computation analysis and later data visualization of the results, all steps are done automatically, making the data production at near zero cost. This allows the limited engineering resource to focus on high-level assessment and to follow up with the exceptions/deviations. To make it possible to process the continual stream of daily incoming data without much effort, and to understand the results quickly, the processing needs to be automated and the data summarized at a high level. Special attention needs to be given to data gathering, input validation, handling anomalous conditions, computation, and presenting the results in a visual form that makes it easy to spot items of exception/deviation so that further analysis can be directed and corrective actions followed.

Pham, Timothy T.↗

Specification of EBR-II Laser Profilometry Data

All laser profilometry data stored in FIPD were originally measured using the element laser profilometer system in HFEF/N. The irradiated fuel elements or pins were scanned by a laser beam to measure the outer diameter with position mapping of the spacer wire. The normal operation and data collection were performed automatically with HFEF/N Data Acquisition and Process Control System (DAPCS). With the digital control system, measured laser profilometry data were recorded in digital form on magnetic tapes, different from the analog contact profilometry data recorded by strip-chart record sheets. Two documents contained most of the important details about laser profilometry measurements. The first one is the operational manual of the laser profilometer (title: Element laser profilometer (ELP) operation and maintenance manual, HFEF/N OMM 4329, DOC. NO. W0171-0149-ES-01). This manual provides: (1) description of laser profilometer including the functions of each component (transceiver, retroreflector, clamping guide, shielding enclosure, electronic controller, etc.); (2) step-by-step guidance for calibrations, operations and measurements; and (3) maintenance procedures and other details of the element laser profilometer. Since first issued on 12/1/1986, several revisions/changes of the manual were developed to update the measurement accuracies and other factors for the laser profilometer system. The second document is a publicly accessible conference article titled “the element laser profilometer system in HFEF/N.” This article summarizes important functions and parameters of the laser profilometer. The range of measurements and the uncertainties reported in the article were consistent with the values reported in the operational manual.

42 ENGINEERING↗

Emergency Flight Control of a Twin-Jet Commercial Aircraft using Manual Throttle Manipulation

The Department of Homeland Security (DHS) created the PCAR (Propulsion-Controlled Aircraft Recovery) project in 2005 to mitigate the ManPADS (man-portable air defense systems) threat to the commercial aircraft fleet with near-term, low-cost proven technology. Such an attack could potentially cause a major FCS (flight control system) malfunction or other critical system failure onboard the aircraft, despite the extreme reliability of current systems. For the situations in which nominal flight controls are lost or degraded, engine thrust may be the only remaining means for emergency flight control [ref 1]. A computer-controlled thrust system, known as propulsion-controlled aircraft (PCA), was developed in the mid 1990s with NASA, McDonnell Douglas and Honeywell. PCA's major accomplishment was a demonstration of an automatic landing capability using only engine thrust [ref 11. Despite these promising results, no production aircraft have been equipped with a PCA system, due primarily to the modifications required for implementation. A minimally invasive option is TOC (throttles-only control), which uses the same control principles as PCA, but requires absolutely no hardware, software or other aircraft modifications. TOC is pure piloting technique, and has historically been utilized several times by flight crews, both military and civilian, in emergency situations stemming from a loss of conventional control. Since the 1990s, engineers at NASA Dryden Flight Research Center (DFRC) have studied TOC, in both simulation and flight, for emergency flight control with test pilots in numerous configurations. In general, it was shown that TOC was effective on certain aircraft for making a survivable landing. DHS sponsored both NASA Dryden Flight Research Center (Edwards, CA) and United Airlines (Denver, Colorado) to conduct a flight and simulation study of the TOC characteristics of a twin-jet commercial transport, and assess the ability of a crew to control an aircraft down to a survivable runway landing using TOC. The PCAR project objective was a set of pilot procedures for operation of a specific aircraft without hydraulics that (a) have been validated in both simulation and flight by relevant personnel, and (b) mesh well with existing commercial operations, maintenance, and training at a minimum cost. As a result of this study, a procedure has been developed to assist a crew in making a survivable landing using TOC. In a simulation environment, line pilots with little or no previous TOC experience performed survivable runway landings after a few practice TOC approaches. In-flight evaluations put line pilots in a simulated emergency situation where TOC was used to recover the aircraft, maneuver to a landing site, and perform an approach down to 200 feet AGL. The results of this research, including pilot observations, procedure comments, recommendations, future work and lessons learned, will he discussed. Flight data and video footage of TOC approaches may also be shown.

Cole, Jennifer H.↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Healable Coatings as a Mechanism to Repair Leading Edge Erosion in Wind Energy

Wind turbine blades are highly engineered structures designed to face temperature extremes and high winds. However, erosion of the blade's leading edge and subsequent repair remains a significant and costly challenge for the wind energy industry. Repair of these leading edges can lead to large amounts of downtime for the turbine and significant operational inefficiencies. In this work, the strength of adhesion and healing ability of a commercially available vitrimer (Mallinda's VITRIMAX) was compared to that of a thermoplastic resin, which has previously been demonstrated in wind energy applications (Arkema's Elium) to evaluate their efficacy as surface coatings for wind turbine blades, particularly their leading edges. Vitrimers are a class of inherently reprocessable thermosets, and it was theorized that vitrimer-based leading edge coatings could enable more robust and efficient wind turbine blades with decreased operational downtime and safer maintenance practices. It was found that the VITRIMAX adhered better to the wind blades' surfaces than both the manufacturer's paint and Elium, with increases in pull-off strength of adhesion ranging from 24% to 83% above that of the original paint. Furthermore, the VITRIMAX adhered strongly to the underlying composite of each blade with strength of adhesion values increasing in ranges from 42% to 97% above that of the original paint. Finally, the vitrimer coating showed an 88% decrease in surface roughness compared to end-of-life blade materials, and initial healing demonstrations in which coatings were manually scratched and subsequently healed exhibited an ~84.5% decrease in scratch depths.

Hubbard, Amber [ORNL]↗

Space Propulsion Research Facility (B-2): An Innovative, Multi-Purpose Test Facility

The Space Propulsion Research Facility, commonly referred to as B-2, is designed to hot fire rocket engines or upper stage launch vehicles with up to 890,000 N force (200,000 lb force), after environmental conditioning of the test article in simulated thermal vacuum space environment. As NASA s third largest thermal vacuum facility, and the largest designed to store and transfer large quantities of propellant, it is uniquely suited to support developmental testing associated with large lightweight structures and Cryogenic Fluid Management (CFM) systems, as well as non-traditional propulsion test programs such as Electric and In-Space propulsion. B-2 has undergone refurbishment of key subsystems to support the NASA s future test needs, including data acquisition and controls, vacuum, and propellant systems. This paper details the modernization efforts at B-2 to support the Nation s thermal vacuum/propellant test capabilities, the unique design considerations implemented for efficient operations and maintenance, and ultimately to reduce test costs.

Hill, Gerald M.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗