Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Panel Session 110: Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges

This panel session engaged panelists from multiple countries on the issues with the implementation of in situ decommissioning/disposal and how to communicate more effectively with stakeholders. Presentations proposed include: 1 - Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges (Laurie Judd, Longenecker and Associates (USA)); 2 - Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges (Kavita Murthy, Canadian Nuclear Safety Commission (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Maintaining Institutional Controls: Maintenance of an Alternate Water Supply- A Case Study - 19583

The US Department of Energy (DOE) cofunded an alternate water-supply system (AWSS) with the Indian Health Service that was installed in the vicinity of the former uranium mill site near Riverton, Wyoming, as one of the institutional controls (ICs) at the site. The AWSS was constructed in 1998 to supply drinking water to residents within the IC boundary in lieu of drinking untreated groundwater that could potentially be impacted by the contaminated shallow aquifer. The AWSS derives water from three source wells that pump groundwater from the sandstones of the Wind River Formation to a 3.8 x 106 liter (1,000,000 gallon) storage tank. Water from the storage tank is distributed throughout the AWSS service area by approximately 18 kilometers (11 miles) of PVC pipeline. The AWSS currently serves 103 residential customers and 1 commercial customer. DOE and the Northern Arapaho tribe (owner of the AWSS) have partnered over the years to address numerous challenges with the AWSS that included engineering assessments, scientific investigations, sampling support, a hydrant flushing program, and funding. Challenges with the AWSS have included the following: (1) Transmission pipe installed during initial construction did not have a pressure rating high enough to account for system pressure surges. (2) AWSS appurtenances were initially installed without accounting for the effects of corrosive soils on metal components. (3) Natural radium from the Wind River Formation groundwater builds up in the AWSS transmission pipes to levels above the primary drinking water standard because of the lack of a flushing program, dead-end lines, and low system demand. A 2-year study showed that a unidirectional hydrant-flushing program will control the radium buildup. (4) Aging system components including hydrants, valves, and pumps are nearing their effective lifespan and are in need of replacement. (5) With the addition of large commercial customers, demand on the system has increased since the initial installation of the system, and future growth in the area will continue to increase demand. (6) Additional connections and integration of the AWSS with an areawide water system in the near future will require changes to the current flushing plan and add additional complexity regarding areas of responsibility. (7) A well-organized financial and administrative infrastructure is not in place, and additional revenue is needed to operate, maintain, and improve the AWSS. To be a viable IC, the AWSS will require management, maintenance, and upgrades to provide safe drinking water until groundwater meets drinking water standards. Responsibilities and funding for maintaining the AWSS as a viable IC are the focus of current discussions, and decisions regarding responsibilities and funding will be formalized in future cooperative agreements and memoranda of understanding with the owners. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 115: Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges

This panel focused on where multiple countries have collaborated to solve difficult remediation and cleanup challenges through either formal or informal means. The focus was to share real examples of where collaboration has accelerated cleanup saving time and money. This could be through policy or process improvements, technology transfer or sharing R and D, or other means of collaborative efforts. Panelists with presentations: Canada-AECL Collaboration Across Borders (Richard Sexton, Alastair MacDonald); Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges (Anthony Banford); IAEA Perspective on International Collaboration in D and ER (Horst Monken Fernandes); How, Why and Benefits of Collaboration (Kurt Gerdes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Practical Solutions for Conducting Structural MARSSIM Surveys in Elevated Radon Environments - 20413

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) [1] provides comprehensive guidance for the development and implementation of radiological surveys conducted to demonstrate compliance with a dose- or risk-based cleanup goal during final status survey. The MARSSIM methodology follows an integrated strategy combining direct measurements and sampling to assess uniform residual contamination, and scanning surveys to identify localized areas of elevated activity. Building surveys assessing residual surface contamination present unique challenges from reliance on field measurements that may be subject to less than ideal environmental conditions. Additionally, limited characterization and excessive conservatism incorporated into the conceptual site model may result in derived concentration guideline levels (DCGL) and, as a consequence of relatively inefficient field instrumentation, corresponding attributable count rates generally comparable to background. The presence of elevated ambient radon concentrations and associated progeny deposition both exacerbate these intrinsic survey challenges and introduce a series of technical, logistic, and administrative obstacles that can wreak havoc on the statistical legitimacy of each component of the MARSSIM process. Short-lived radon progeny including polonium-218, lead-214, bismuth-214, and polonium-214 produce excessive alpha and beta radiation that may decrease instrument sensitivity through an increase in background count rates, and, at worst, may result in incorrect survey unit failure through the simulation of residual surface activity. Aside from the obvious solution of exhaustive radon mitigation, the primary objectives are to distinguish between radon progeny deposition and actual surface activity, and collect sufficient defensible data. The following is a technical discussion of the consequences of performing building MARSSIM surveys in the presence of elevated ambient radon atmospheres, conceptual examples, and an overview of practical strategies to minimize the effects of radon interference while collecting sufficient defensible data to complete the survey. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Air Monitoring at a Soil Remediation Project in a Suburban Setting - 20448

Air monitoring during soil excavation at a chemically and radiologically impacted site in a suburban setting presents unique challenges. Site activities were conducted in a manner that minimized the release of airborne particulates of concern, principally radionuclides of concern (ROC). Dust and air monitoring were performed to ensure the public was not being exposed to the soil contaminants. The project team collected representative air and dust data while being mindful to not impose on the lives of residents in the area. Due to the close proximity to the public, there was a high level of oversight from the client and regulatory agencies. The challenges involved with air sampling at this soil remediation site located in a suburban setting included the number of contaminants, the ranges of risks and hazards presented by the contaminants and the method of remediation, the concerns of the regulators and the public, and the perception of risk from the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 145: Challenges and Opportunities in Establishing a System for Transportation of SNF/UNF

Issues associated with establishing a SNF Transportation System in the U.S. are complex. In part, this is because in the US when discussing SNF, there are two distinct categories. The two categories represent significant differences in ownership, transportation-regulator, and even the physical characteristics of the SNF. Specifically, the physical differences in the SNF include size of the rods, associated quantities to be shipped, cladding material, and radionuclide content/enrichment. The first is commercial SNF (i.e., that associated with nuclear power plants), owned by utilities, until a permanent repository is built with DOE obligated by law to then assume the responsibility for shipping and ownership of the SNF. Since no-permanent repository currently exists, most commercial SNF is stored near the reactor in which it was installed, hence requiring no shipments. Although current shipments of commercial SNF are very limited, the few that do occur are generally performed to support a utilities SNF consolidation effort utility and for post irradiation examination/testing. However, with approximately 83,000 metric tons currently being stored at more than 70 sites around the U.S., when a permanent repository becomes available, the required number of shipments will be extensive. The second category is DOE and research reactor fuel. These fuel rods are generally much smaller in length than commercial fuel rods, with the quantity of rods transported in a shipment significantly less than the number of rods in a typical commercial fuel assembly. Currently, most of the SNF shipments within the U.S come from this category. DOE is currently managing about 2500 metric tons of heavy metal of SNF. This panel focused on updates and status of transportation of SNF/UNF. Panelists provided updates and information on continuing impacts, risk assessment, equipment (rail cars, handling, securement), possible rail routing, and proposed inspection equipment/routing prior to shipments. Panelists with presentations: Preparing for Nuclear Waste Transportation (Daniel Ogg); Challenges and Opportunities in Establishing a System for Transportation of SNF/UNF (Kathy Langan); UNF Transportation: Challenges and Opportunities (Michael Valenzano)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Getting to 100%: Six Strategies for the Challenging Last 10%

This presentation summarizes the challenge of decarbonizing the last 10%" of the power system and discusses six strategies for addressing that challenge. This presentation was given at the IRA, BIL, and the Future of Energy: A Summit to Support State Implementation" workshop in Washington, D.C., in April 2024.

carbon capture↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗

Practical challenges of model predictive control (MPC) for grid interactive small and medium commercial buildings

To the urgent call for mitigating climate change, substantial initiatives have been undertaken to deploy grid-interactive heating, ventilation, and air-conditioning (HVAC) controls, such as model predictive control (MPC) for buildings. These efforts typically aim to curtail peak energy demand, shift load and enhance overall energy efficiency. With the recent development of low-cost MPC technologies that don’t require extensive instrumentation or manual modeling, small and medium commercial buildings (SMCBs), which rarely utilize advanced HVAC control systems, have become candidates for grid-interactive efficient buildings (GEBs). However, despite the potential benefits and maturity of the technology itself, several practical challenges remain in real-world implementation. In this paper, we share the practical challenges that we have encountered in implementing and testing three types of MPC solutions (ON/OFF unit, dualfuel, and VRF systems) on multiple SMCB sites. We describe the MPC deployment process and discuss the lessons learned. The site selection, eligibility, and retrofit availability (e.g., utility price structure, thermostat communications, etc.) are the main discussion points at the beginning of the project. Also, the modeling automation and the best practices for interacting with endusers and handling erroneous situations are presented for successful operations.

woo Ham, Sang↗

Uncertainty Visualization Challenges in Decision Systems with Ensemble Data & Surrogate Models: Preprint

Uncertainty visualization is a key component in translating important insights from ensemble data into actionable decision-making by visually conveying various aspects of uncertainty within a system. With the recent advent of fast surrogate models for computationally expensive simulations, users can interact with more aspects of data spaces than ever before. However, the integration of ensemble data with surrogate models in a decision-making tool brings up new challenges for uncertainty visualization, namely how to reconcile and communicate the new and different types of uncertainties brought in by surrogates and how to utilize these new data estimates in actionable ways. In this work, we examine these issues as they relate to high-dimensional data visualization, the integration of discrete datasets and the continuous representations of those datasets, and the unique difficulties associated with systems that allow users to iterate between input and output spaces. We assess the role of uncertainty visualization in facilitating intuitive and actionable interaction with ensemble data and surrogate models, and highlight key challenges in this new frontier of computational simulation.

ensemble visualization↗

Human Factors Challenges in Modernizing Nuclear Power Plant Control Rooms

Jeffrey Joe has been invited to give a presentation entitled, “Human Factors Challenges in Modernizing Nuclear Power Plant Control Rooms,” at the 2024 Human Systems Symposium. Experts conducting human factors and human systems research will gather and share research at this conference. This conference is a good opportunity to develop new business for INL via research collaborations, as attendees exchange knowledge and explore the latest trends, advancements, and challenges in the field of human systems research across the DOE national laboratories.

99 GENERAL AND MISCELLANEOUS↗

Few measurement shots challenge generalization in learning to classify entanglement

The ability to extract general laws from a few known examples depends on the complexity of the problem and on the amount of training data. In the quantum setting, the learner's generalization performance is further challenged by the destructive nature of quantum measurements that, together with the no-cloning theorem, limits the amount of information that can be extracted from each training sample. In this paper we focus on hybrid quantum learning techniques where classical machine-learning methods are paired with quantum algorithms and show that, in some settings, the uncertainty coming from a few measurement shots can be the dominant source of errors. We identify an instance of this possibly general issue by focusing on the classification of maximally entangled vs. separable states, showing that this toy problem becomes challenging for learners unaware of entanglement theory. Finally, we introduce an estimator based on classical shadows that performs better in the big data, few copy regime. Our results show that the naive application of classical machine-learning methods to the quantum setting is problematic, and that a better theoretical foundation of quantum learning is required.

97 MATHEMATICS AND COMPUTING↗

SAF Grand Challenge: October 2021 – September 2024 Progress Report Fact Sheet

An interagency team led by the U.S. Department of Energy (DOE), U.S. Department of Agriculture (USDA), U.S. Department of Transportation (DOT), and other federal agencies including the U.S. Department of Defense, U.S. Environmental Protection Agency, National Aeronautics and Space Administration, and Commercial Aviation Alternative Fuels Initiative have made important progress on accelerating acceptance and growth of sustainable aviation fuel (SAF) as a primary strategy in aviation decarbonization. The progress made by these federal agencies supports the interagency SAF Grand Challenge, including new funding opportunities and initiatives aligned with the SAF Grand Challenge Roadmap; providing expertise and technical assistance to industry; increasing interagency collaboration; and providing data, modeling, and analysis to decision makers.

Sustainable Aviation Fuel Aviation SAF↗

Challenges and Strategies for Testing Automation Practices at Sandia National Laboratories

Sandia National Laboratories is a premier United States national security laboratory which develops science-based technologies in areas such as nuclear deterrence, energy production, and climate change. Computing plays a key role in its diverse missions, and within that environment, Research Software Engineers (RSEs) and other scientific software developers utilize testing automation to ensure quality and maintainability of their work. We conducted a Participatory Action Research study to explore the challenges and strategies for testing automation through the lens of academic literature. Through the experiences collected and comparison with open literature, we identify these challenges in testing automation and then present strategies for mitigation grounded in evidence-based practice and experience reports that other, similar institutions can assess for their automation needs.

97 MATHEMATICS AND COMPUTING↗

Challenges and Opportunities for HVAC + Phase Change Material Thermal Energy Storage in Buildings

Phase-change material (PCM) thermal-energy storage (TES) integrated with HVAC and domestic hot water (DHW) can shift a large share of building thermal loads. By flattening and shifting loads, PCM TES reduces peak electricity use, eases stress on local and grid infrastructure, and lowers costs. It can also defer costly upgrades to service panels, distribution, and transmission. Higher energy density relative to chilled or hot water storage makes PCM TES practical for small, space limited, and retrofit projects, while packaged HVAC-integrated systems expand cost-effective load shifting to commercial buildings that previously lacked options. Despite this promise, deployment faces barriers. This paper presents challenges, opportunities, and lessons learned from lab and field integrations of PCM TES with packaged HVAC systems. Key challenges include misalignment between default heat pump controls tuned for direct-to-load operation and TES charge/discharge objectives, PCM properties that diverge from manufacturer claims and evolve with cycling, and high integration and deployment costs with off-the-shelf products. These studies underscore the need for factory built, integrated systems that arrive as prepackaged modules with proven controls, reducing design and installation effort and delivering predictable performance across projects. The paper outlines steps to enable viable and scalable PCM TES HVAC and DHW systems, including 1) validated methods that can be used to characterize PCM properties and TES system performance, 2) supervisory controls that optimize charge/discharge scheduling, and 3) factory integrated packaging that eliminates bespoke field engineering.

Dutton, Spencer↗